EUROPEAN NETWORK OPERATION SAFETY –TOP 5 RISKS. HOW TO IDENTIFY, ANALYZE AND RESPOND? RUNWAY SAFETY ACTION PLANS. Joe Sultana EUROCONTROL Network Manager Director October 2014

Upload: others

Post on 29-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

EUROPEAN NETWORK OPERATION SAFETY – TOP 5 RISKS. HOW TO IDENTIFY, ANALYZE AND RESPOND? RUNWAY SAFETY ACTION PLANS.

Joe SultanaEUROCONTROL

Network Manager DirectorOctober 2014

Page 2: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

NM Top 5 Operational Safety Issues 2

In this presentation:

What is our operational NM safety task?

How do we decide our network operational safety

priorities?

What are the Top 5 for this year?

What next?

Runway Safety Action Plans

Page 3: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

3

We studied the same two risk areas:(1) Runway Incursion (2) Loss of separation en-route

Workshops with 10 major ANSPS during 2013 and 2014

Reviewing severity A and B incidents for 2012, 2013

Mapping the incidents on SAFMAPs (Safety Functions Maps –several hierarchical levels were developed)

2014 - the new cycle of prioritisation

NM Top 5 Operational Safety Issues

Page 4: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

4

The efficiency of the barriers - MIDAIRWhat proportion of the incidents that “tested” a barrier were prevented by it?

PROVIDENCE

ACAS COLLISION AVOIDANCE

COLLISION AVOIDANCE BY ATCSEPARATION MINIMA PREVENTION

CONFLICT PREVENTION

WORKED FAILED

SEE AND AVOID

92

92

6329

60 3

21

2

NM Top 5 Operational Safety Issues

Page 5: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

5

15

PROVIDENCE

COLLISION ACOIDANCE BY PILOT OR VEHICLE DRIVER

COLLISION AVOIDANCE BY ATC

CONFLICT PREVENTION

42RWY INCURSION PREVENTION

WORKED FAILED

411

22

The efficiency of the barriers - RWYC

2

37 5

4100%

73%

59%

12%

?%

What proportion of the incidents that “tested” a barrier were prevented by it?

NM Top 5 Operational Safety Issues

Page 6: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

6

Top 5 (2013-2014)

NM Top 5 Operational Safety Issues

Page 7: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

7

Top5: (1) Risk of operations without transponder or with dysfunctional one

A single threat often removing all the barriers up to ‘see and avoid’;

No ATC awareness;

No STCA;

No TCAS/ACAS.

NM Top 5 Operational Safety Issues

Page 8: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

8

Top5: (2) Landing without clearance

For numerous reasons, aircraft sometimes land without ATC clearance;

This is resulting in Runway Incursions that are often only resolved through ‘providence’.

NM Top 5 Operational Safety Issues

Page 9: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

9

Top5: (3) Detection of Occupied Runway

Good share of the severe Runway Incursion incidents could have been prevented;

Need for the controllers to detect that the runway was occupied at the time of giving a clearance for the next aircraft to use it.

NM Top 5 Operational Safety Issues

Page 10: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

10

Top5: (4) “Blind Spot”

Conflict was not detected with the closest aircraft;

After descending clearance;

Rapidly developing situation –often 1000ft and 15 Nm between the conflicting a/c.

NM Top 5 Operational Safety Issues

Page 11: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

11

Top5: (5) Conflict detection with adjacent sectors

Involve “inadequate coordination” of clearance with an adjacent sector;

These typically involve either an early (premature) transfer of control to or from the neighbouring sector.

NM Top 5 Operational Safety Issues

Page 12: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

12

What will the Network Manager do and deliver?

For each ‘Top 5’ - a dedicated Operational Safety Study

To provide additional insight on causal/contributory factors:

Suggest actions to reduce or eliminate risk factors;

Identify industry ‘best’ practice and lessons learned for sharing amongst affected stakeholder groups;

Inform development of SKYbrary materials (to further all of the above).

NM Top 5 Operational Safety Issues

Page 13: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

13

Runway Safety Action Plans

NM Top 5 Operational Safety Issues

Top 5 Risks – “Tactical” management of operational safety Addressing in short term the current safety issues

Runway Safety Action Plans - “Strategic” safety improvementsAddressing in long term the major safety concerns

Two Action Plans released in partnership with many actors:

European Action Plan for the Prevention of Runway Incursions

European Action Plan for the Prevention of Runway Excursions

Page 14: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

Use ground navigation ICAO compliant signs, markings and lighting

Page 15: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

24H use of Stop Bars

The key messages for the Stop Bars are:

Pilots – NEVER cross a lit red Stop Bar

ATCOs – NEVER issue a clearance to cross a lit Stop Bar (except in contingency)

Page 16: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

A SMGCS

06/11/2014 16

Page 17: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

A-SMGCS: Advanced-Surface Movement Guidance and Control System

Page 18: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

18

Runway Incursion Action Plan - EAPPRI

NM Top 5 Operational Safety Issues

Page 19: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

19

Runway Incursion Action Plan - EAPPRE

NM Top 5 Operational Safety Issues

Page 20: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

20

The Network Manager

NM Top 5 Operational Safety Issues

Ready to support the stakeholders for Top 5 Risks

Supports the implementation of Runway Safety Action Plans

Building and maintaining a recognised knowledge base

Measuring and improving safety culture in operational stakeholder organisations i.e. ANSPs

Page 21: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

SYSTEM

What do we SAY?

What do we (really) DO?

How do we THINK

about safety?

Image: Deutsche Flugsicherung GmbH © All rights reserved

SYSTEM[Demand, Pressure, Resources, Constraints, Flow of work, etc…]

21

Page 22: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

safety management

system

safety culture

safety regulation

commitment

control & competence

compliance

Image: Steven Shorrock CC BY-NC-SA 2.0 http://flic.kr/p/hWySYn22

Page 23: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

organisational culture

national culture

professional culture

safetyculture

Image: Steven Shorrock CC BY-NC-SA 2.0 http://flic.kr/p/hWySYn23

Page 24: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

SKYbrary (www.skybrary.aero) - The Global Aviation Safety Encyclopedia

24

Page 25: N O S – T 5 R European... · EUROCONTROL. Network Manager Director. October 2014. NM Top 5 Operational Safety Issues 2 In this presentation: What is our operational NM safety task?

Top 5 Safety Priorities 25