n giungas presentation p

73

Upload: gustavo-fuentes

Post on 26-Dec-2015

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: N Giungas Presentation p
Page 2: N Giungas Presentation p

§ huge SAVINGS of capitals: § MAINTENANCE FREE § LOW energetic costs § LIFETIME DURATION § less electric power needed § ELECTRIC current flow INTERRUPT § WITHOUT technical CHARACTERISTICS ALTERATION

Page 3: N Giungas Presentation p

§ O-RINGS SEALING SYSTEM

§ RECTANGULAR SHAPED SEALING

SYSTEM

§ U – SHAPE SEALING SYSTEM

Page 4: N Giungas Presentation p

Mechanical assembly needed to induce the right deformation

2 or 4 O-Rings between metal and insulating

Page 5: N Giungas Presentation p

Deformation/compression required is reached while compressing O-Rings against the rigid INSULATING spacer

a surface load higher than internal pressure

RESULT

TIGHT SEAL

Page 6: N Giungas Presentation p

ONE OF THE POSSIBLE SIDE EFFECTS IN THE LONG TERM COULD BE

FLUID LEAKAGE

Page 7: N Giungas Presentation p

O-Ring-walls rubbing rubber overheating O-Rings wearing and tearing

Surface load decreases - due to O-Rings shape deformation- up to becoming less than the internal pressure LEAKAGE

ABRASION

Page 8: N Giungas Presentation p

• Shaping

• Dimensioning

• Finishing operating pressures

• Temperatures

cause

O-Rings tear off

The structure deforms material looses flexibility

Surface load “P1” becomes less than pressure “P”,

FLUID LEAKAGE

EXTRUSION

Page 9: N Giungas Presentation p

Gas saturates the O-Ring at a certain pressure. If pressure suddenly decreases, gas gets rapidly expelled. That previously trapped in nano cavities expands violently O-Rings causing swell-up and bubbles

Explosive decompression could generate blisters, or tears O-Ring shape is deformed

Surface load becomes less than pressure, causing FLUIDS LEAKAGE.

EXPLOSIVE DECOMPRESSION

Page 10: N Giungas Presentation p
Page 11: N Giungas Presentation p

STRONG HOLDS

MICROSCOPIC PRECISION

STRICT TOLERANCES.

STRUCTURAL DEFORMATIONS

NOT WATERPROOFED

EXTRUSION

SHORTENING

WEAK POINTS:

LACERATIONS

CHEAP

NO PARTICULAR EQUIPMENTS

OF EASY PROVISION

SYMMETRIC SYSTEM

NO FAST PRESSURE CHANGES

Page 12: N Giungas Presentation p
Page 13: N Giungas Presentation p

One rectangular shaped gasket hardly compressed among the metallic surfaces, the metal and the insulating spacer

Page 14: N Giungas Presentation p

CHEAP EASY TO ASSEMBLY.

NO SURFACE FINISHING

WATER PROOFED

NO EXPLOSIVE DECOMPRESSION

NO EXTRUSION

SHORTENING

PRESSURE APPLICATION CIRCLE IS VERY HIGH

SPECIFIC EQUIPMENTS AND MOULDS

NON-SYMMETRIC SEALING SYSTEM

STRONG HOLDS WEAK POINTS:

Page 15: N Giungas Presentation p

Even widely used they experienced some inconveniences

NOT RECOMMEND for very

HIGH PRESSURES.

Page 16: N Giungas Presentation p

NUOVA GIUNGAS In the 70s, started to invest in R&D

to design new more efficient solutions. Time is ripe for the

U-shape sealing system

Page 17: N Giungas Presentation p

RGD Rapid gas decompression (Explosive Decompression)

17

Page 18: N Giungas Presentation p

Increasing the level of groove fill (≥ 90%)is one way to improve the resistance of a sealing elastomer

compound to RGD effects

Page 19: N Giungas Presentation p

In classical O-RING system, higher levels of fill may not be appropriate

for service ! O-ring must be fill max ≈2/3 of groove.

O-ring fill ≈2/3 of groove

Page 20: N Giungas Presentation p

DNV rules say …

20

Page 21: N Giungas Presentation p

O-RING SEALING SYSTEM PRIOR AND AFTER ASSEMBLY

DNV RULES REQUIRE AED/RGD CERTIFICATION FOR O-RINGS BECAUSE THE SYSTEM ARE SUBJECT TO RGD/ED EFFECT

Page 22: N Giungas Presentation p

SYSTEM ARE ENCLOSED IN A COMPLETELY CONFINED SPACE!

DNV RULES DO NOT REQUIRE AED/RGD CERTIFICATION BECAUSE THE SYSTEM ARE

NOT SUBJECTED TO RGD/ED EFFECT.

NUOVA GIUNGAS SEALING SYSTEM PRIOR AND AFTER ASSEMBLY

Page 23: N Giungas Presentation p

We have check i f i s t rue…

With comparative test based on NORSOK M710:2001

The Tests was carried out at the same time and in the

same condition on O-RING sealing system and on

NuovaGiungas U-Shape system manufactured with

standard FKM Compound (NOT AED!)

Page 24: N Giungas Presentation p

Test condition, fluid media, pressure and cycles: § Test Gas Mixture: 10% CO2 in CH4 § Test Temperature: 100°C § Test Pressure: 150 bar § The initial exposure period at 150 Bar: 72 hrs § decompression rate: 20 - 40

Bar/min. § Holding at atmospheric pressure(each cycle): 1 h (approx) § Holding at 150 Bar (each cycle): ≥ 23 hrs (+/-

1hrs) § Decompression cycles: 10

Page 25: N Giungas Presentation p

U-shape sealing system

TEST APPARATUS

25

Page 26: N Giungas Presentation p

GAS

Page 27: N Giungas Presentation p

O-RING samples

Page 28: N Giungas Presentation p

U-SHAPE samples

Page 29: N Giungas Presentation p

O-RING

Equivalent to NORSOK RATING#4

RGD results

Page 30: N Giungas Presentation p

U-SHAPE

Equivalent to

NORSOK RATING #0

RGD results

Page 31: N Giungas Presentation p

Nuova Giungas has developed different rubber compound § SUITABLE FOR: § GAS § OIL § STEAM § LOW TEMPERATURE § HIGH TEMPERATURE § AND OTHERS …

Page 32: N Giungas Presentation p

… and even if the system is not subject to the explosive decompression phenomena, a compound tested to Norsok M-710

Page 33: N Giungas Presentation p

NORSOK RGD

NGPR1201

Page 34: N Giungas Presentation p

NORSOK AGEING TESTS

Page 35: N Giungas Presentation p

Change in properties against time and temperature for Arrhenius model

Page 36: N Giungas Presentation p

Arrhenius model for life prediction

Page 37: N Giungas Presentation p

References

The NORSOK tests was carried out according to NuovaGiungas procedure N° 11522143

Test report N° 11511221

Page 38: N Giungas Presentation p

O-ring low pressures

small diameters

no bending, no tensile, no torsion and no compression

Rectangular

Only medium pressure.

U-SHAPE

NO SERVICE LIMITATIONS

Page 39: N Giungas Presentation p

THE VERY HIGH INVESTMENT IN SEARCH OF MATERIALS, EQUIPMENTS AND MOULDS

HAS BEEN SATISFYINGLY PAID BACK

A LESS EFFICIENT PRODUCT STRONGLY UNDERMINE, ORIGINAL SAVINGS.

Page 40: N Giungas Presentation p

A WIDE RANGE OF PRODUCTS ALWAYS AT STOCK …

BUT THAT'S JUST THE BEGINNING

10 BAR

25 BAR 100 BAR

Page 41: N Giungas Presentation p

ALL YOUR WISHES ARE OUR JOB

WE ARE ABLE TO MANUFACTURE JOINTS SUITABLE FOR ALL YOUR REQUESTS

Page 42: N Giungas Presentation p

WE HAVE ALWAYS SATISFIED OUR CLIENTS …

Page 43: N Giungas Presentation p

And we keep on doing it with our KNOWLEDGE able TO MEET every kind of REQUIREMENTS

NO LIMITS ON :

•Pressures

•Sizes

•Fluids

Page 44: N Giungas Presentation p

128” – WATER SERVICE

Relatore
Note di presentazione
128” Project: Opere di adduzione primaria dal serbatoio sul fiume Chiascio Ente: Ente Irriguo Umbro-toscano Cliente: SEAS Anno: 2004 1 pezzo Il giunto con diametro più grande mai realizzato
Page 45: N Giungas Presentation p

88” PN 100 BENI HAROUN PROJECT (ALGERIA)

Relatore
Note di presentazione
1x88” PN100 Con la sua grande stazione di pompaggio acqua grezza, la cui potenza è di 180 MW, la diga fornisce acqua potabile a più regioni limitrofe e acqua per l'irrigazione Anno: 2005 Il giunto più grande con maggior pressione mai realizzato
Page 46: N Giungas Presentation p

48” API 5L X100 SAIPEM – TAP PROJECT

Relatore
Note di presentazione
siamo unici ad aver fatto un giunto con tubo in API 5L X100 nel 2003 I 2 pipe sono stati fatti da 2 tubifici diversi ( Nippon steel e Mannesmann) The aim of the project is to develop Long Distance, High Capacity, High Pressure, High Grade technology solutions to achieve the following targets: distances of more than 3,000 km; gas transport volumes around 20-30 billion m3/year; pressures equal to or greater than 15 MPa � Launched in 2003 in cooperation with Snamprogetti/Saipem, Snam Rete Gas and Enitecnologie and finished at the end of 2007,  The other pilot line has been realised at the Military Area of Perdasdefogu in Sardinia and comprises two tracts, with a diameter of 48 inches in high-resistance API 5L X100 steel. The test, which started in September 2005, involved the use of pressure levels floating between 140 and 150 bar which made it possible, over a testing period of 17 months, to simulate the behavior of an effective industrial infrastructure over an equivalent period of twenty years. � At the end of the testing program full scale detonation tests started. In June 2007 a test for the propagation of ductile fracture was performed in order to verify both the toughness properties of API 5L X100 steel and the ability of crack arrestors (specially designed) to stop the fracture. Also hydraulic tests were performed to assess the ability of pipes with defects to resist the internal pressure. The project was completed at the end of 2007.
Page 47: N Giungas Presentation p

GORGON UPSTREAM PROJECT - AUSTRALIA

Relatore
Note di presentazione
The Gorgon gas project is a natural gas project in Western Australia, involving the development of the Greater Gorgon gas fields, subsea gas-gathering infrastructure, liquefied natural gas plant and also includes a domestic gas component. Dal 6” al 34” da 260 a 360.5 Barg Anno: 2011 Posizionato a 200 fino a 1,300 metri di profondità in acqua The proposed project has attracted criticism from conservation groups in relation to the potential impact upon Barrow Island's ecology. The island is a Class A nature reserve, and home numerous other animals not found on the Australian mainland. Other concerns are related to the adequacy of quarantine procedures on Barrow Island to protect against the introduction of non-endemic species,[ and risks associated with geological sequestration of CO2.It was reported in November 2011 that native animals on Barrow Island had been accidentally killed daily with a known total of 1550 since construction began
Page 48: N Giungas Presentation p

DUPLEX CARBON STEEL

Page 49: N Giungas Presentation p
Relatore
Note di presentazione
Giunti con spool lunghi rivestiti internamente per fluidi molto conduttivi
Page 50: N Giungas Presentation p

WEST SACRAMENTO FORCE MAIN, PROJECT NEW NATOMAS & SOUTH RIVER PUMPING STATION

Relatore
Note di presentazione
WEST SACRAMENTO FORCE MAIN, PROJECT NEW NATOMAS & SOUTH RIVER PUMPING STATION: 2pezzi PN25 62” Anno: 2004
Page 51: N Giungas Presentation p

W A F A - M E L L I T A H

Relatore
Note di presentazione
Wafa – melita Dalla libia alla sicilia   Primo grande progetto x valorizzare il gas natural della libia attraverso l’esportazione e la commercializzazione in europa Anno: 2003/2004 32” . 516 km
Page 52: N Giungas Presentation p
Relatore
Note di presentazione
Gazprom holds the world’s largest natural gas reserves. Gazprom accounts for 15 and 78 per cent of the global and Russian gas output accordingly. Range di giunti tra -40 e -60 °C
Page 53: N Giungas Presentation p
Page 54: N Giungas Presentation p

BLUE STREAM PROJECT

Relatore
Note di presentazione
Blue stream project: Pipe burial depth within maritime part is up to 2150 m Gas pipeline length is 1213 km trans-Black Sea gas pipeline that carries natural gas from Russia into Turkey. The pipeline has been constructed by the Blue Stream Pipeline B.V., the Netherlands based joint venture of Russian Gazprom and Italian Eni. The pipeline uses pipes with different diameters: mainland section 1,400 millimetres (55 in), mountainous section 1,200 millimetres (47 in) and submarine section 610 millimetres (24 in). The gas pressure in submarine section is 25 MPa (250 atm). 15 pezzi del 24” PN300 2 pezzi del 48” PN10
Page 55: N Giungas Presentation p

KPO PROJECT

Relatore
Note di presentazione
KPO project: 17 pezzi da 1” e 8” ANSI 2500 Anno: 2010 Kazakhstan Individuazione giacimento: 1979 Inizio lavori: 1984 Current production of oil 200,000 barrels per day Current production of gas: 650 million cubic feet per day in 1992, AGIP (now Eni) and the then British Gas (now BG Group) were awarded the sole negotiating rights, forming a partnership company. In 1997, Texaco (now Chevron Corporation) and Lukoil signed a production sharing agreement with the original two companies and the Kazakhstan Government. This is a 40-year agreement to develop the field to allow the production to reach world markets. This is done under a partnership company known as Karachaganak Petroleum Operating (KPO) where BG Group and ENI are joint operators with a 29.25% stake each in the company
Page 56: N Giungas Presentation p

TECHINT PERU - CAMISEA PROJECT

Relatore
Note di presentazione
Camisea 2004   The Camisea Gas Project extracts and transports natural gas originating near the Urubamba River in central Peru, the San Martín Reservoir. there are two pipelines carrying natural gas from the Camisea gas fields. The 540-kilometre Camisea pipeline traverses through the steep Andes mountains, and terminates within the Paracas National Reservation at the Pisco terminal. The pipeline has capacity of 450 million cubic feet per day .4] The second 714-kilometre natural gas pipeline runs from Malvinas along the coast to Lima and Callao for distribution to residents and industries in the capital city
Page 57: N Giungas Presentation p

BELAYIM EGYPT

Page 58: N Giungas Presentation p

SAIPEM - MENZEL

Relatore
Note di presentazione
menzel: da Algeria fino in Spagna Dal 4” al 36” PN100 circa 90 pezzi
Page 59: N Giungas Presentation p

SAIPEM - MENZEL

Page 60: N Giungas Presentation p

ALL OUR PROCESSES ARE UNDER STRICHT CONTROLS

Page 61: N Giungas Presentation p

ELECTRICAL TEST

Page 62: N Giungas Presentation p

DIELECTRICAL TEST

Page 63: N Giungas Presentation p

HYDRAULIC TEST

Page 64: N Giungas Presentation p

HYDRAULIC TEST

Page 65: N Giungas Presentation p

TENSILE TEST

Page 66: N Giungas Presentation p

TORSIONAL TEST

Page 67: N Giungas Presentation p

BENDING TEST

Page 68: N Giungas Presentation p

H O L I D AY T E S T

Page 69: N Giungas Presentation p

MAGNETIC TEST

Page 70: N Giungas Presentation p

MAGNETIC TEST

Page 71: N Giungas Presentation p

IMMERSION IN SALINE SOLUTION

Page 72: N Giungas Presentation p

… AND MANY OTHERS ACCORDING TO CLIENT REQUEST

R&D AND TECHNOLOGY AT YOUR SERVICE!

Page 73: N Giungas Presentation p

NUOVA GIUNGAS srl 41043 – Formigine Modena Italy Via A. Moro 26,28 Tel: +39 059 578611 Fax: +39 059 570633 E-mail [email protected] URL : www.nuovagiungas.com