MyOcean2 First Annual Meeting – 17-18 April 2013

WP 09

MONITORING & FORECASTINGCENTRE for IBI

MyOcean2 First Annual Meeting – Cork /16-17 April 2013

Work Package Main Objectives

MyOcean2 First Annual Meeting – 17-18 April 2013

To ensure and improve the reliable and accurate provision of a regional ocean forecast service on the IBI region

To ensure management of service and products, update on new IBI products (i.e. Re-analysis)

To provide a back-up capability: A nominal system IBI-NOM operated by Puertos del Estado A Back-up system IBI-BUP, operated by Mercator.

The system will include modeling improvements and advances derived from R&D when demonstrated.

A robust Tier 1 R&D activity is planned in order to address specific demands of improvement in the operational system

To contribute to enhance IBI users community

1/14

Partnership Interface with Exec, Board, PMO, external representation, Cross-cutting Activ.

Coordination

Daily operations & ServiceInterface with ServiceDesk, CIS, TACs & MFCs, Crosscutting WPs…

Operations & Service

Oriented short-term R&D to improve IBI system & Service

Develop IBI-Vn+1, n+2…Product Quality (WP17)

R&D

MyOcean2 First Annual Meeting – 17-18 April 2013

4 partners: PdE, CLS, CNRS & Mercator

2/14

System & Production Evolution

MyOcean2 First Annual Meeting – 17-18 April 2013

Objectives for V3 were

Make evolve IBI numerical solution

Upgrade IBI operational suites in Production Lines

Enhance Back-Up Services (exchange between PCs)

Improve CAL/VAL capabilities

3/14

System & Production Evolution

MyOcean2 First Annual Meeting – 17-18 April 2013

Main achievements for V3 are

IBI-V3 solution includes improved river discharge data

A more robust & efficient operational suite:

Some sources of IBI incidents minimized with incorporation of some extra QC procedures

Noticeable upgrade of IBI-MFC Validation capabilities:

Launch of NARVAL (north Atlantic Regional VALidation) Tool

4/14

System & Production Evolution

MyOcean2 First Annual Meeting – 17-18 April 2013

Main difficulties encountered

Changes in computational environment in both Production lines:

Significant changes in Production hardware

environments both in NOM (PdE-CESGA for V3) & BUP (MO-MF for V4)

Open issue: Risk for operational V3 & V4 services ?

5/14

System & Production Evolution

MyOcean2 First Annual Meeting – 17-18 April 2013

Main difficulties encountered: Back up issue

CIS

DU (PdE)

PU (PdE)

DU (CLS)

PU (Mercator)

USERS

IBI-NOM IBI-BUP

If IBI-NOM pb

1st senario

6/14

System & Production Evolution

MyOcean2 First Annual Meeting – 17-18 April 2013

Results from Test of internal BUP production services:

Slightly difference in final products format (i.e. netcdf file format) has an unexpected impact on the download of mixed IBI (NOM & BUP production origin) data through subsetter service (PdE MisGW) ...

OK FOR HOURLY PRODUCTS

NOK FOR DAILY PRODUCTS

Main difficulties encountered7/14

Improvements, results, illustrations

MyOcean2 First Annual Meeting – 17-18 April 2013

River runoffs of Adour (on the left) and Garonne (on the right). Red line: monthly climatology runoffs used in IBI-V1, blue line daily runoffs used in IBI-V2 and green line daily runoffs which take into account tributaries and used in IBI-V3.

IBI solution upgrades:

IBI-V3 will have a more realistic inputs for river discharge runoff data used. (More details on QuID)

IBI River inputs locations. In green: daily runoffs hindcasts from E-HYPE model (SMHI)In red: daily runoffs obs data from PREVIMER

(FCs from E-HYPE only )

8/14

IBI CAL/VAL improvements

IBI Improved CalVal capabilities Noticeable upgrade of the IBI-MFC Validation capabilities:

Launch of NARVAL Tool (On-line & Delayed Mode)

MyOcean2 V3 Acceptance & V4 Product Design Workshops – Madrid 28,29th January 2013

Validation of daily IBI FC cycle.Statistics covering longer periods (monthly, seasonal and annual reviews) MyO Quarterly Validation Reports

9/14

Spanish Marine GMES User groupCo

ncep

tual

org

aniz

ation

Kick-off Meeting Spanish Marine GMES UG (Madrid, Oct 18th 2012)Kick-off Meeting Iberian MyO IBI-MFC Users (Madrid, Nov 13th 2012)

To enhance the downstream service10/14

The Spanish IBI User Group: Institutions…

13 Groups articulates (by now) the Spanish Users Network: 11 Intermediate/end user. 2 Institutions related to MyO MCS.

Number of people implicated: 25 technical contacts (already

members of the mailing list) 23 attendees to the Spanish IBI

User Group Kick-off Meeting

11/14

First period summary and next steps

MyOcean2 First Annual Meeting – 17-18 April 2013

Service and user outreach Enhance user feedback (i.e. bug detection in current IBI products,

new taylored user-oriented products)

12/14

Objectives for V3 accomplished Amelioration axis:

Operational aspects: Reduction of execution times associated to model and computer

changes Increase Robustness, preventing new risks identified before V4 Complete the full B.U. solution

R&D aspects Improvement of engineering procedures to validate and include

R&D tier 1 developments Complete IBI R&D plan as established in PMP

First period summary and next steps

MyOcean2 First Annual Meeting – 17-18 April 2013

Evolutions scheduled for V4Model improvement DeliveryImprovement of operational suite: decrease CPU time, increase robustness

V3 and V4

River input improvement V3Solving the BU issue During V3 (RFC when OK)Possible new Heat flux formulation

V4

Nudging for spin-up V4Change of model version from 2.3 to 3.4

V4

Wave forcings (SBC: wave roughness &TKE; Stokes-Coriolis term)

V4

Data assimilation ECOMF…

V4 R&D works mainly focus on improve IBI NEMO solution

New IBI V4 Products: IBI RE-ANALYSIS

PHY BGC

Main DEV: PdE

Main DEV: MO

Main DEV: MO

Main DEV: MO

13/14

First period summary and next steps

MyOcean2 First Annual Meeting – 17-18 April 2013

THANK YOU!