Oscar Moreno Asenjo, CEng. MICEPMP®

Page 2: My projects CEng MICE

Chief Resident Engineer (Highway). November 2011 – June 2012 Control and monitoring:

4.3 km motorway. 8 viaducts. Partial cloverleaf interchange.

Page 3: My projects CEng MICE

Viaduct construction

Page 4: My projects CEng MICE

Cranes lifting concrete beams

Page 5: My projects CEng MICE

Asphalt mixtures spread, Viaduct pillars

Page 6: My projects CEng MICE

Load test

Page 7: My projects CEng MICE

Project Manager (Perm-way works). July 2007 – November 2009 Implementation of the following activities:

Earth Movement: 550.000 m3. Double track using Iberian gauge with a total length of 27.500m. Track ballast spread (167.000 m3), placement of sleepers “MR” and

“PR”, placement of track, securing, heavy tamper, welding and rail de-stress.

Installing a total of 28 crossovers and railroad switches.

Page 8: My projects CEng MICE

Ballast spread, final link

Page 9: My projects CEng MICE

Final link, unloading tracks

Page 10: My projects CEng MICE

Levelling, switch detail

Page 11: My projects CEng MICE

Rail yard

Page 12: My projects CEng MICE

Crossover detail, work train

Page 13: My projects CEng MICE

Station rail yard

Page 14: My projects CEng MICE

Construction Manager. December 2005 – June 2007 Typology of the tunnels (Cut & Cover, total length of 3.600 m):

Concrete pile walls (diameters from 800 to 1500, depth up to 22m). In total 120.000 ml were performed.

Upper slab on supporting heads and lower reinforced slab. Shotcreting of pile walls.

Typology of the bridges: Pk 0+500, Single steel box girder bridge of 96m length, central span

48m. Pergola pk 6+100, two openings of 14 and 12 beams of 21m length

each beam. 4 curved post-tensioned slabs of 1,20m at the edge y 27 m of length. Footbridge between Pozuelo and the University of Somosaguas.

Page 15: My projects CEng MICE

Bored piles

Page 16: My projects CEng MICE

Pile walls

Page 17: My projects CEng MICE

Steel box girder bridge

Page 18: My projects CEng MICE

Pergola over motorway

Page 19: My projects CEng MICE

Curved post-tensioned slabs

Page 20: My projects CEng MICE

Finished project

Page 21: My projects CEng MICE

Site Manager. June 2004 – November 2005 Work’s description:

Drainage system of 370 m length with a stretch of 135 m jackable and diameter of 2500mm.

Three connecting chambers. Roundabout renovation. Overflow and sand trap chambers

Page 22: My projects CEng MICE

Launch shaft

Page 23: My projects CEng MICE

Pipe jacking in progress

Page 24: My projects CEng MICE

Pipe jacking in progress

Page 25: My projects CEng MICE

Pipe jacking in progress

Page 26: My projects CEng MICE

Pipe trench and roundabout

Page 27: My projects CEng MICE

Roundabout renovation

Page 28: My projects CEng MICE

Construction Manager. May 2002 – May 2004 Typology of the bridges:

Foundations: footings over drive piles or on land. Circular pillars of 1,5m diameter with height up to 15 m. Superstructure formed by pre-fabricated beams and solid slab Two of the bridges are extensions of the existing ones at the San Pedro

Sula highway – Puerto Cortés

Page 29: My projects CEng MICE

Driven Piles for Gabriela Bridge

Page 30: My projects CEng MICE

Channel flowing

Page 31: My projects CEng MICE

Channel flowing