my architecture portfolio

41
I /CONTENT APPRENTICESHIP ARCHITECTURE HOUSE BORBEI HOUSE BOTAREL RECONVERSION OF INDUSTRIAL SITE MINE BAIA SPRIE /WORKSHOP BAIA SPRIE CONTESTS & WORKSHOPS page 01 CV II 05 13 16 18 20 drawings on request GERIATRIC RESIDENCE OFFICE BUILDING TECHNOLOGY SEMINAR 2013 2012 2011 2009 2005 2010 2014 after graduation graduate project student ARCHITECTURE PORTOFOLIO arh.Ruxandra Elena Moldovan

Upload: rux-ruxrux

Post on 07-Apr-2016

218 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

  • I/CONTENT

    I

    APPRENTICESHIP ARCHITECTURE

    HOUSE BORBEI

    HOUSE BOTAREL

    RECONVERSION OF INDUSTRIAL SITEMINE BAIA SPRIE /WORKSHOP BAIA SPRIE

    CONTESTS & WORKSHOPS

    page01

    CV

    II 05 13 16 18 20drawings on request

    GERIATRIC RESIDENCE

    OFFICE BUILDING TECHNOLOGY SEMINAR

    2013 2012 2011 2009 200520102014

    after graduation graduate project student

    ARCHITECTURE PORTOFOLIO arh.Ruxandra Elena Moldovan

  • I have spent the last few years studying the arts and I am in a continuous learning process. I am passionate about information theory and everything related to explain the universe in which we live.I am a poetic and shy person , even though I do not always like that about me , I 'm easily impressed by the perfection of ephemeral things .

  • II

    CV/

    /EDUCATION 2005-2012Polytechnic University of Timisoara Timisoara, RomaniaFaculty of Architecture

    2001-2005High School of Music and Art Baia Mare, Romania Specialisation: Architecture

    1997-2001 School of Music and Plastic artsSpecialisation: Plastic artsReghin, Romania

    /EXPERIENCEnov.2013-july 2014

    Architecture Studio Razvan Oprita

    1.Reconversion of an old mill2.Industrial Parc Gabud

    /freelanceian.2012-oct.2013

    House Botarel Reghin, RomaniaCollaborators: arh.Klaus Birthlering.Cornel Farcas

    House Borbei Mosnita Veche, RomaniaCollaborators:arh.Doina Tudoring.Cornel Farcas

    2008-2010 Student employment-interior design for a housing complex-supervision the construction site

    /PERSONAL PROJECTS

    Organizer and participantWorkshop Baia Sprie

    2011 The objective was to provide to the administration advice on the planning of public spaces and the industrial ruins in the area. The workshop ended with concrete proposals for dierent points of the city and mountain Dealul Minei.

    2012This year, the workshop had a practical aspect, participants had the opportunity to implement their projects and work directly with local craftsmen and materials.

    2013Administration of the city was our main contributor, the teams have studied the term of 'urban regenera-tion' in the context of the post-industrial city and completed two projects:

    /PUBLICATIONSArticle 'Urban regeneration in Baia Sprie' 'Arhitectura 09/2013

    /SOFTWAREArchicad / AutoCad/ ArtlantisAdobe Photoshop / Adobe Illustrator /Adobe InDesign

  • /single family residenceH BOTAREL Reghin, Romania

    /city atmosphere

    Reghin is the city where I spent part of my childhood and I was very happy to know that my family wants to build a house in the historic area of it.Located in the middle of Transylvania, Reghin is an ancient city called Regen Saxon Schsische in the thirteenth century. Located on the Mures River the city was developed through the timber trade.

    The site is located on a sloping street in the historical center of the city, in the vicinity of old saxon houses.

    -the main objective of the project was to integrate into the existing urban context and adapt to the slope of the land.

    ?

  • 01

    volumes on site /proposal

  • axonometric architectural drawings

    first floor +3.00

    ground floor +0.00

    semi-basement-2.10

    /proposal

    11

    22

    33

  • 02

    section 11 section 22 section 22

  • facades/proposal

    +4,90

    -0,00

    +8,25

    +4,90

    +2,85

    -0,00

    +8,25

    +4,90

    +2,85

    +8,25

    +4,90

    -0,00

    +1,20

    +2,90

    +8,25

    3,85

    +6,55

    +7,30

    +0,75

    +4,90

    -6,00

    +1,20

    +2,90

    +8,25

    3,85

    +6,55

    +7,30

    +0,75

    40

    ,00

    -0,00

    +0,90

    +2,

    +4,90

    +3

    +4,50

    +8,25

    40

    -0,00

    -2,15

    +0,90

    +2,

    +3,85

    +7,30

    +6,55

    +0,20

    +4,90

    +8,25

    +6,55

    3,85

    -0,00

    -2,15

    +6,55

    -0,00

    -2,15

    +0,90

    40+2,

    +4,90

    +3,85

    +8,25

  • 03

    technical drawings/execution

    2,10

    5,00

    1,00

    2,03

    89

    2,80

    222,

    89

    2,10

    80

    1,60

    6034

    1,40

    2,09

    7122

    2,05

    2,92

    4,97

    2,51

    3,00

    18

    +0,75

    -2,10

    -0,00

    +3,03

    -0,00

    +3,033,20

    +6,20+6,20

    +3,03

    -6,00 -0,00

    +0,75

    +3,03

    -2,15

    5,50

    4,10

    -1,00-1,00

    +0,30

    -Parchet dublu stratificat 2cm-Folie polietilena-Sapa beton slab armat 3cm-Termoizolatie polistiren expandat 10 cm-Hidroizolatie-Placa B.A. 10cm-Folie separare-Umplutura

    -Parchet dublu stratificat 2cm-Folie polietilena-Sapa beton slab armat 3-5cm-Placa B.A. 12,5 cm-Finisaj tavan

    -Parchet dublu stratificat 2cm-Folie polietilena-Sapa beton slab armat 5cm-Termoizolatie polistiren expandat 10 cm-Hidroizolatie-Placa B.A. 10cm

    -Podea lemn-Folie polietilena-Sapa beton slab armat 3-5cm-Placa B.A. 12,5 cm-Finisaj tavan

    1,80

    7330

    +6,30

    +8,00

    +6,55

    +8,00

    +8,25

    +7,30 +7,30

    +6,55

    2,75

    +2,15

    +6,30

    +8,25 +8,25

    Profilstrada

    -Invelitoare, tigle solzi, ceramice-Sipci de lemn, transversale, pentru prinderea tiglelor-Spatiu ventilare, sipci longitudinale-Folie hidroizolanta, pentru protectia termoizolatiei-Astereala, scanduri de lemn ignifugate

    -Termoizolatie vata minerala intre capriori 10 cm-Termoizolatie vata minerala intre capriori 5 cm-Termoizolatie vata minerala la fata clestilor 5 cm-Folie contra vaporilor-Placi gipscarton finisate

    +0,75

    +6,30+6,55

    +7,30

    2,05

    1,83

    2,54

    -0,00

    +0,75

    -2,10

    +2,80

    +0,03

    +0,75

    +1,20

    +2,20

    -0,00

    +4,90

    -Pardoseala- lemn exterior 3cm-Strat drenaj- pietris-Geotextil-Membrana hidroizolanta-Strat egalizare beton usor-Beton de panta 1,5 %

    3,85

    -2,10

    +6,55+6,30

    +8,25

    -2,10

    Zid de sprijin Gabione

    50x100x200

    +8,25

    +6,30

    +3,85

    +0,75

  • technical drawings/execution

    F

    3,51

    0,6 0,6 0,9

    0,05

    0,9

    2,73

    1,29 0,92,1

    0,892,94 0,16

    3,21

    2,44

    3,06

    0,29

    2,33 2,4 0,560,5

    60,

    32,

    2

    1,41

    0,8

    2,1

    0,23

    0,92,1

    0,6

    1,5

    2,010,82,1

    3,83

    2,2

    0,05 0,8 1,13 2,7 0,29 0,81 0,57 2,96 1,2

    6,36

    3,54

    1,24

    0,29 0,84 0,26

    0,96

    0,7

    2,1

    0,7116

    0 ,8

    0,29

    1,21

    0,62 2,1

    0,6

    2,63

    2,63

    1,83

    1,00

    1,13

    3,16

    1,58

    1,2

    2,42,720,2902112,41,2

    2,73 1,020,3

    1,45

    0,56

    0,79

    0,98

    2,01

    0,8

    0,430,82,1

    1,30

    0,44

    0,83

    10,

    31,

    22,

    45

    2,61

    0,3

    3,75

    4,37

    2,02

    4

    88,061,1

    92,0

    3,79

    3,4

    10,3

    5

    0,6 60

    1,1

    0,29

    0,3

    0,47

    0,60,880,60,90,60,580,161,23

    2,04

    1,3

    2,2

    0,4

    3,35

    0,29

    0,5

    5,15 1,9 2,29 2,68 1,39

    19,18

    1 0,61,5

    0,9 0,61,5 2,75 0,6

    0,60,67

    0,295,15

    2,4 0,61,5

    0,9 0,61,5

    0,88 0,61,5

    0,3 4,96

    11,74

    1,30

    20,22

    +1,20

    0,00

    +0,75

    5,71

    2 3 4 51

    F1 F1F2 F1 F1 F1

    hp=90 hp=90hp=1,50 hp=90 hp=90 hp=90

    hp=1,20

    hp=0,90 hp=0,90

    C

    54 4'32

    1,201,202,10

    04

    B'

    B

    D

    F

    D'

    2,40

    1

    U2

    U1

    U3

    A'

    1,02 U3

    U4

    U4

    hp=1,80

    06

    5'

    F4

    F4

    F5

    F5

    U4

    U5

    BucatarieA 15,00 m2Wood floor

    HolA 13,25 m2

    Dressing 1A 3,75 m2Wood floor

    Dep.A 1,50 m2

    TerasaA 25,50 m2

    BaieA 2,00 m2

    SufragerieA 14,75 m2Wood floor

    Dormitor 2A 11,25 m2Wood floor

    Dressing 2A 4,75 m2

    Hol 2A 1,25 m2

    Dormitor 1A 17,00 m2Wood floor

    Baie 2A 7,75 m2Wood floor

    1,00

    0,16

    1,55

    0,60,92,1

    4,1

    0,16

    2,44

    0,29

    1,61

    2,38

    708

    0,44

    0,580,30,35

    0,29 4,67 0,29 2,32

    0,29

    1,01

    0,44 4,67 0,16

    +0,75

    P3 P2

    P1

    P3

  • 04

    /execution

    Camera de ziA 28,00 m2Wood floor

    2,41

    2,71

    1,57

    1,22

    1,11

    0,86

    1,97

    2,71

    1,13

    3,86

    3,28

    2,03 1,20 0,25

    1,1

    3,12

    1,5

    0,3

    1,5

    1,95

    4,15

    0,3

    8,19

    1,12 0,25

    5,55

    5,32

    1,08

    1,5

    1,23 3,57 0,29

    5,76

    6,19 0,3

    3,3

    +0,75

    +0,05

    +0,75

    -1,02

    Semineu

    6

    A

    C

    C'

    E

    F3

    2,10

    6

    2,10

    5'

    F4

    5''

    0,440,29

    Rigola

    Zid de sprijin Gabione

    50x100x200

    TerasaA 15,25 m2

  • /Mine Baia Sprie /local analysis

    te

    x

    1

    CENTRE MULTIFONCTIONNEL RECONVERSION OF INDUSTRIAL SITE

    Ruines de l'quipementtechnologique XVIII

    La colline Dealul Minei

    Historically attested since 1329 Baia Sprie has its historical roots in the rich mineral of volcanic mountains -gold, silver, copper. With a population of 16,500 inhabitants Baia Sprie area remained an underdeveloped region due the stop of mining began in 1997. The new context has led, to the administrative level, the adoption of strategies of economic rehabilitation.

    -in the thirteenth and fourteenth centuries miners descended in galleries, using a leather apron, place of work is lit with a lamp burning canola oil.

    -in 1575, there is a regulation on Baia Sprie, the work of the day was set at 10 hours for workers at galleries and 11 hours for the pestle stamps workers.

    -in the eighteenth appear the first forms of capitalist production, while the first changes occurring in mining technology.

    -the nationalization in 1948 also affected the mining sector. Baia Sprie Mine became the property of the State. During the communist period the mines were used as places of detention for those who resisted the regime.

    -The mountain 'Dealul Minei' ', full of wealth, at the base of which developed Baia Sprie, is crossed by numerous galleries and shafts.

    Chapelle Calvaria XVII lieu de repos pour les mineurs avant d'entrer dans la mine

    Lake Lacul Albastru natural monument IUCN

    Ruine flux technologique XX

    Pit -surface mining

    Flotation plant

    The north side of themountainDealul Minei

    Nature reserve fossiles-

    GHIUZBAIA

    Crevasse Crapatura Zorilor the oldest traces of mining

    exploitation in the area

    Quartier historiqueincludes homes of mine officials and workers.

  • 05

    +455

    LM-10

    LM-11LM

    -12

    2

    20

    +451

    +462

    +469

    +469

    +469

    +472

    +470

    +475

    +480

    +487+497

    +500

    +5 13

    +504+498

    + 482

    + 466

    +481

    +466

    +469

    +460+435

    +460

    + 462

    +488

    +592

    +523

    +510

    +500

    +511

    Chapelle Calvaria XVII lieu de repos pour les mineurs avant d'entrer dans la mine

    MINE BAIA SPRIE COMPLEX

    Ruine flux technologique XX

    Flotation plant

    The north side of themountainDealul Minei Mine Suior

    Ski piste MogosaNature reserve-Creasta Cocosului

  • /proposalsolution arguments volumetric concept

    1.in the citys strategic plan are scheduled leisure activities on the former mine site.

    2.the associations in the region are proposing the establishment of a geopark witch includes all mines in the county, with the center in Baia Sprie.

    3.in 2009 a group of students began to study the area and organize creative workshops during the holidays, now the group is organized in a association.

    4.the orientation to the development of tourism in the region.

    5.the community must have a cultural identity

    -guidelines of volumetric developmentsuggested by the existing buildingsat different levels

  • 07

    -new paths -new volumes

    -Once the infrastructure is established the complex can be extended according to needs.

  • site plan functions/proposal

    0.00

    +12.00

    +15. 00

    + 7.45

    +9.4+4.80

    +15.00

    +13. 75

    +13.75

    -0.10

    -0.10

    + 15.00

    +7.45

    +7.45

    +7.60

    +13 .45

    +1 4.00+ 14.5

    +15.0 0

    +15.00

    +1 4.00

    +16. 70

    +9.00+5.90

    + 10.30+15. 00

    -1.2

    -2.2

    -1.2

    +1 6.70

    S-142

    + 15.0 0

    +5.25

    + 12.00

    -5.00

    +12.00

    new interventions

    existing buildingsexisting buildings

  • 08

    museum

    parking

    sport/ recuperation/ SPAhotel / restaurant / cafe

    sesonieres studios / artists / students

    conference room

  • section 11

    plan AA

    /proposal

    0.00

    + 11.50

    +15.00

    +9.4

    +7 .45

    +4.6

    +8.45

    +15.00

    +15.0 0

    +13.7 5

    +13.7 5

    -0.10

    -0.10

    +15.00

    +7.45

    +5.25+7.45

    +7.60

    +13 .45

    +14.0 0+14.5

    +15.00

    +15.00

    +1 4.00

    S-144

    +16. 70

    +5.40+10.30

    +14.40+11.40

    -5.00

    -1.2

    -2.2

    -1.2

    +16.70

    +11.40

    1 1

  • section 22

    plan BB09

    +11.5 0

    +9.4

    + 7.45

    +4.6

    +8.45

    -0 .10

    -0 .1 0

    +7.45

    +10.65

    +5 .40+10. 30

    +1 4. 40+11.40

    -5. 00

    -1.20.00

    +5.25+7 .45

    + 7.60

    -2.2

    -1.2

    +11.4 0

    S-147

    2

    2

    ABC

    D

    de nouvelles interventions

    btiments existants

  • section 33

    plan CC

    /proposal

    90.990

    +9.00

    +7.45

    +7.45

    +5.00

    +5.25

    +5.90

    -5. 00

    0.00

    +7.45

    +4.8

    -2.2

    -1.2

    -0.10

    -1.2

    -0.10

    4

    4

    66

  • section 44

    10plan DD

    -5.00

    -1.20.00

    -0. 10

    -0. 10

    -2.2

    -1.2

    55

    A

    CB

    D

    new interventions

    existing buildings

  • facade 66/proposal

  • facade 55

    11

    A

    CB

    D

  • WORKSHOP BAIA SPRIE

    /2013

    //urban furniturearh. Raul Timi, Teodora Ungurean, Bianca Fanta

    //coconiiAndrei Temian, Mihai Tman, Larisa Prelucan, Valentin Mete

    //pavilion Ruine 2012Adrian Leioiu, Alexandru Mociran, Hanna Bianca Nistor, Simona Mesaro, Hanna Bianca Nistor, Hitter Timea, Ruxandra Moldovan, Ion Avram, Ignuta Amaliaing. Cornel Farca

    Building the team Workshop Baia Sprie is a process that took place over several years, starting in 2009, when the citys architect Edmund Futo with a group of students organized the rst edition of the workshop to study the tehnlogical paths and the ruins left by the mining facilities. All the coordinators, participants, sponsors, community volunteers contributed to the development of the annual summer school in Baia Sprie.

    The administration of the city was our main contributor, the teams have studied the term 'urban regeneration' in the context of the post-industrial city

    projects: Central Park development and conversion of the old cinema in the center of the community.

    /2012This year, the workshop had a practical aspect, participants had the opportunity to implement their projects and work directly with materials and local craftsmen.

    /team: Alexandru Mociran, Edmund Futo, Hanna Nistor, Ruxandra Moldovan, Valentin Metes

    see more : http://tabaradecreatie.blogspot.fr/

  • 19

    //bridge rehabilitation, Sasar Riverarh.Flaminiu Talos, arh. Edmund Futo, ing.Cornel FarcasRuxandra Moldovan, Simona Mesaro, Raul Timi, Andrada Sindretean, Marta Cosma, Oana Burla

    //Crevasse Crapatura ZorilorHanna Bianca Nistor, Valentin Mete, Florentina Cran, Alexandra SuciuIonu Radu Filip

    //urban furnitureArh. Anca Filipan, Stud.Mihai Tamasan,Stud.Andrei Temian, Stud.Simona Zinca, Stud.Mirona Faloba

    //pavilion Ruine 2012Adrian Leioiu, Alexandru Mociran, Hanna Bianca Nistor, Simona Mesaro, Hanna Bianca Nistor, Hitter Timea, Ruxandra Moldovan, Ion Avram, Ignuta Amaliaing. Cornel Farca

    This year, the workshop had a practical aspect, participants had the opportunity to implement their projects and work directly with materials and local craftsmen.

    /2011

    The objective was to provide to the administration advice on the planning of public spaces and the industrial ruins in the area. The workshop ended with concrete proposals for dierent points of the city and mountain Dealul Minei.

  • /concept /proposal

    /Villa Giulia, Roma

    EXTERIOR SPACE -public - intermediate - private

    living

    SPA

    community services

    chapel

    GERIATRIC RESIDENCE

  • 13

  • ground floor/proposal

    +0.35

    +7.20

    +6.20

    +4.00

    +3.20

    +0.00

    dtail

    F

    1.15

    2.61

    2.61

    1.00

    4.91

    1.47802.10 92

    802.10 1.41

    1.051.002.10 40 2

    .74

    2.87

    2.35

    2.64

    1.371.002.10 40

    8.00

    3.00

    2.60

    1.20

    2.70

    2.60

    7.00

    4.40

    4.20

    4.00

    4.20

    801.401.50 1.20

    1.002.10 17

    1.002.10 1.191.002.10 1.22

    1.002.10 1.38802.10

    4.42

    7.20

    1.802.40

    2.45

    12.00

    96

    3.00

    3.50

    2.00

    2.30

    3.50

    95

    2.00

    1.802.40

    6.87

    9.17

    3.60

    3.50

    2.00

    2.00

    3.50

    80

    8.50

    8.488.50

    9.269.25

    11.42

    10.80

    10.63

    3.60

    3.50

    60

    4.20

    5.06

    1.802.10

    2.91

    3.83

    9292

    9292

    1.10

    3.60

    1.502.102.22

    4.92

    2.95

    2.07

    902.10 1.17

    3.00

    902.10

    3.18

    90 2.76

    1.39

    1.00

    1.58

    94

    2.00

    3.50

    1.12

    1.73

    2.00

    3.50

    21

    23

    3.60

    3.50

    20

    3.98

    1.00

    1.42

    2.74

    902.10

    351.571.002.10

    4.13

    1.84

    1.65

    1.21

    3.95

    1.002.10

    1.41

    6.86

    2.68

    902.10

    2.02

    2.508.20

    173 .00

    3 .50

    1 .2 3

    1.4 9

    2.1 1

    1.1 3

    2 .40

    3 .50

    6 71 .31

    2 .43

    3 .50

    1 21 .36

    1.8 0

    3 .50

    1 .08

    3.03

    3.83

    3.15

    90 2.10

    1.90

    431.502.40

    42

    1.90

    90 2.101.

    70 2.00

    5.40 1.55

    6.00

    2.16 1.53 1.53 2.22

    99

    7.40

    7.40

    90 2.10

    1.95

    7.15

    3.00

    7.12

    2.86

    90 2.10

    10

    6.80

    6.80

    4.851.67

    901.67

    12.20

    1.502.10

    6.79

    5.79

    153.60

    3.50

    2.04

    2.40

    3.50

    543.60

    3.50

    1012.40

    5.00711.0034

    1.65 2.40

    10.79

    5.74

    5.06

    1.00 2.10

    70

    2.40

    3.50

    4.40

    5.52

    4.80

    4.00

    6.12902.10

    24

    3.90

    6.80

    90 2.10

    2.87

    2.99

    90 2.10

    12

    1.92 2.02

    4.30

    1.92

    2.00

    2.00

    401.40

    3.50

    1.40

    3.50

    40

    3.83

    2.30

    1.43

    1.50 2.40

    5.10

    2.371.1060

    35 902.40 2.701.50 12

    3.75

    4.07

    2.30

    1.50 80 1.53

    2.30

    60 1.10 2.37

    122.701.50

    902.40

    35 3.75

    2.30

    801.50

    2.30

    601.102.37

    1.12

    902.40

    2.701.50

    13

    902.40 2.79

    902.40

    2.701.50

    601.601.65

    1.30

    70 1.50

    1.48

    56 1.50

    1.60 2.23

    902.45

    2.17

    2.33

    9890 2.10

    64 3.15

    1.10 13.37

    1.502.40

    70

    34.75

    19.50

    15.5760 90

    2.10 5.15902.10

    1.45 902.10 5.27

    902.10

    1.33 902.10 5.27

    902.10 1.33 90

    2.10 5.15902.10 2.00 3.10

    1.48902.10

    5.85902.10

    4.12902.10 5.85

    902.10

    8.35

    2.4 0

    90 2 .10

    5.2 4

    2.12 1.001.50

    1.53

    5.1 2

    981.03

    1.50

    1.52

    78 1.50

    81

    2.70 90 1.20

    90 2.1 0

    1.24

    1.61902.10

    3.47

    2.3 0

    2.51

    1.09

    90 2.10

    71

    2.1171

    8690 2.10

    632.32

    5.64

    902.40

    1.782.68

    20

    3.60

    2.20

    57

    1.40 90 1.32 7290 2.10

    2.33

    2.20

    1.70

    1.77 1.201.20 2.45

    21 2.701.50 1.35 90

    2.40 2.69 13

    3.85

    2.60

    95

    3.87

    2.33

    2.20

    7290 2.10

    1.32 90 1.41 1.83

    3.85

    2.45 1.321.29 1.962.56

    95

    122.701.50

    1.35902.40

    2.701.50

    11

    12 2.701.50 1.35 90

    2.40 2.701.50 1212 2.701.50 902.40

    1.352.701.50 1211 1.80

    1.50 902.40

    3.85

    1.951.293

    .85

    1.96 1.291.32

    2.442.56

    9572

    90 2.10

    1.32871.41

    1.842.20

    3.94

    3.94

    2.32

    2.20

    2.20

    2.33

    90 2.10

    72

    2.45 1.32

    2.20

    4.00

    9.72

    1.502.40

    36902.10

    3.33902.10

    4.179064902.10

    2.41

    47801.50

    1.611.031.50

    50122.641.031.50302.361.651.50

    56121.80122.71

    1.80

    4.58 3.84 4.416.58

    3.8 5

    9.48

    4.1212

    4.57121.80

    123.12

    3.11

    2.4446

    3.97

    1.8 0

    2.4 0

    22

    5.96

    4.07

    4.084.08

    124.08

    124.08

    124.08

    124.08

    125.05

    1.76

    8.01

    7.8812

    7.88

    7.8812

    3.37

    3.22

    6.83

    6.83

    59 1.802.40 56

    3.96

    1.70

    2.03

    1.39 1.33

    1.80 1.98

    1.33

    1.60

    1.61

    1.59

    1.53

    2.00

    2.00

    12.13

    27.35

    4.931.802.40

    1.12902.10

    51

    25.69

    29.19

    51 1.802.40

    59

    29 1.502.40

    911.802.40 91

    81 2.701.50 1.78 90

    2.4047 90

    2.40 2.701.50 36 2.701.50 902.40

    86 902.40 2.701.50 34 2.70

    1.50 902.4083 90

    2.40 2.701.50 37 2.701.50 902.40

    83 902.40 2.701.50 35 2.70

    1.50 902.4090

    3.4148 2.70

    1.50 1.35 902.40 2.701.50 35 2.70

    1.50 902.401.35

    2.701.50 35 2.70

    1.50 1.35 902.40 2.701.50 35 2.70

    1.50 902.401.35

    2.701.50 35 1.80

    1.50 902.401.06

    5.771.0236

    2.801.40 1.77 1.02 94 47 2.80

    1.40 1.77 1.02 94 44 2.821.40 1.71 1.08 88

    2.8844

    1.40 2.40 1.29

    1.28 1.27 1.52 2.16 96 1.07 1.02 1.77 1.52 1.67 961.79

    1.06 1.03 1.79 1.52 1.71 96 1.00 1.10 1.73 1.52 1.77 96 93 1.172.79

    4.14

    5.0 3

    8.42

    4.00

    4.00

    4.00

    4.00

    4.00

    4.00

    4.55

    3.01

    4.84

    4.20

    4.20

    4.20

    4.20

    4.20

    4.20

    4.072.68

    3.2536

    36

    80.74

    4.67

    3.97

    8.83

    3.00

    2.60

    1.20

    2.70

    2.60

    1.28

    3.00

    3.50

    2.00

    2.30

    3.50

    1.33

    3.60

    3.50

    2.00

    2.00

    3.50

    81

    3.60

    3.50

    68

    3.17

    1.72

    2.37

    1.89

    2.43

    1.72

    1.99

    2.26

    3.07

    9.56

    2.00

    3.50

    1.57

    3.60

    3.50

    2.21

    2.00

    3.50

    47

    28

    4.18

    4.12

    4.20

    3.05

    5.38

    4.17

    4.20

    4.20

    4.20

    4.21

    4.20

    4.20

    4.20

    4.24

    4.17

    4.19

    4.19

    4.19

    4.33

    12

    80.24

    42.15

    31.47

    4.20

    4.91

    4.21

    3.06

    5.39

    4.18

    4.21

    4.21

    4.21

    4.21

    4.21

    4.21

    4.21

    4.25

    4.17

    4.20

    4.20

    5.50

    4.33

    4.03

    7.71

    2.52

    651.002.10

    5.58

    1.002.10

    3.32

    1.42

    9.96

    1.981.502.40

    29

    3.466.29

    6.75

    25

    11.55

    17.22

    1.32 831.50 7.31 1.65

    1.503.51 1.65

    1.501.38

    4.89 1.65 2.66 1.03 3.26 1.031.50

    1.61 801.50

    2.13 1.651.50

    76 1.031.50

    1.68 2.04 1.031.50

    2.04

    974.022.836.73

    2.494.024.024.02

    3.193.875.40

    4.224.224.224.22

    4.224.224.09

    3.36 2.692617.22

    17.65

    24.17

    5.10

    4.14

    1 .00

    1.5 0

    2 .91

    7 8 1 .50

    2.9 3

    78 1 .50

    1 .52

    1 .03

    1.5 0

    1 .49

    6 .39

    9 .68

    37

    1 6.59

    70 1.50

    1.48

    56 1.50

    4.37

    3.92

    6.36

    1.99

    32

    28

    11.02

    2.05

    1.48

    2.911.802.10 3.39

    4.15

    8.007.16

    53

    32

    15.24

    10.32

    423 .60

    3 .50

    2.0 4

    2 .40

    3 .50

    5 43 .60

    3 .50

    1 .81

    2 .40

    3.5 0

    8 .85

    1.4 0

    3 .50

    5 .17

    1 .40

    3 .50

    4.591.502.40

    26

    12.70

    6.35

    51

    4 .32

    4 .22

    4 .21

    4.2 1

    4 .21

    1 2.62

    4.2 1

    4 .21

    4 .21

    4 .21

    4 .21

    4.2 1

    4 .25

    4 .16

    33

    6 7.50

    1 7. 62

    4 .71

    4.24

    4 .25

    4 .10

    3 21 .13

    1 .78

    1 .50

    3 .43

    5 3 1 .50

    4 .1 8

    4 7 1 .50

    2 .83

    1 .31

    1 .50

    1.43

    1.77

    1.071.501.27

    1.071.501.94

    1.911.50

    2.12

    1.041.50

    3.21

    14.8315.40

    1.19

    1.80 2.10

    5.17

    2.53

    1.80

    44.64

    1.65

    6.77

    1.00

    68

    29.21

    38.85

    10.61

    1.78

    8.12

    4.20

    4.20

    4.20

    4.20

    4.20

    4.20

    4.20

    4.20

    12.61

    4.20

    4.20

    4.23

    4.21

    4.31

    68.05

    73.62

    14.24

    8.31

    3.76 12.11

    16.09

    5.0 24.71

    38.61

    15.16

    1.76

    4.25 2.33

    2.47

    1.5 0

    2.4 0

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.35

    0.35

    0.00

    hp=0.90

    hp=0.90

    hp=0.90

    hp=0.15

    hp=0.15

    hp=0.15

    hp=0.15

    hp=0.15

    hp=0.15

    hp=0.15

    hp=0.15

    hp= 0

    .00

    h p= 0

    .00

    hp=0

    .00

    h p= 0. 00

    8.20

    4.40

    35 1.002.10

    25

    2 03 .00

    3 .50

    6.38

    2 .40

    3.5 0

    2 .10

    2 .43

    3.50

    1.6 0

    1 .8 0

    3 .50

    1 .34

    1 2.13

    Hol39.7 m2

    Cam.frig

    6.4m2

    Dep.

    7.9m2

    Vestiar F

    5.2m2

    Gr.sanitar

    4.6m2

    Gr.sanitar

    4.6m2

    Vestiar B

    5.2m2

    Hol-serviciu

    15.8m2

    Dep.spalatorie

    18.8m2

    Spalatorie

    19.4m2

    Hol gunoi

    8.3m2

    Bucatarie

    82.2m2

    Salamese

    102.0m2

    Salapolivalenta

    87.2m2

    Club

    40.6m2

    Ingrijire medicala47.2 m2

    S.asteptare14.5 m2

    Grsanitar F7.8 m2

    Gr.sanitar B7.9 m2

    Hol8.0 m2

    Ergoterapie21.9 m2

    Fizioterapie26.8 m2

    Hidroterapie27.3 m2

    Terasa SPA76.9 m2

    Spa-piscina87.2 m2

    C.T.34.8 m2

    Depozitare27.5 m2

    Hol16.4 m2

    Vestiar F16.7 m2

    Vestiar B15.3 m2

    Cam 125.0 m2 Cam 1

    25.0 m2 Cam 125.0 m2 Cam 1

    25.0 m2 Cam 125.0 m2 Cam 1

    25.0 m2 Cam 125.0 m2

    Cam 129.9 m2

    Buc+sp.masa34.2 m2

    Cam 247.7 m2

    Cam.serviciu11.5 m2 Vestiar7.7 m2 Campersonal20.8 m2 Gr.sanitar19.4 m2

    Hol76.7 m2

    Hol100.5 m2

    Vestiar2.5 m2

    Vestiar2.3 m2

    Gr.sanitar2.2 m2

    Vestiar2.5 m2

    Vestiar2.5 m2

    Cam 249.0 m2

    Cam 249.0 m2

    Cam 249.0 m2

    Dormitor25.1 m2

    Garsoniera 260.1 m2

    Hol

    129.8m2

    Curte

    serviciu

    105.5m2

    Curte angajati74.5 m2

    Frize

    r ie33.3m2

    Gr.sanitar F

    6.4m2

    Gr.sanitar B

    6.2m2

    Hol

    4.3m2

    Secretariat

    16.8m2

    Administra

    tie26.4m2

    Consilieregenerala

    35.4m2

    Capela192.2 m2

    Hol acces134.4 m2

    Hol79.1 m2

    Hol88.2 m2

    Hol54.1 m2

    Lenjerie16.6 m2

  • 2.78

    2.78

    2.83

    2.38

    +3.36

    +6.72

    +10.50

    +12.00

    +0.00

    +3.20

    +10.60

    +12.00

    +4.00

    14

  • /proposaldetail

    400

    176

    1423

    412

    378

    163

    90 927

    152

    466

    2,563

    39092

    558

    9233831 11 126 14 217

    44217 14 25 92 9

    1231

    357

    181116 11 90 11 116

    24714

    245116 11 90 11 116

    196

    379

    316

    163

    55

    583

    362

    48 23264

    143 85266

    56264

    85 133264

    56

    428

    400

    400

    400

    256

    256

    14.5110307

    14.4348

    110

    1434 90 53

    14110207

    431

    786

    798

    1

    BucatarieS=7 mpparchet

    BaieS=5 mpplaci ceramice

    CameraS=31.5 mpparchet

    BaieS=5 mpplaci ceramice

    CameraS=31.5 mpparchet

    BucatarieS=6.2 mpparchet

    HolS=3.50 mpparchet

    HolS=3.50 mpparchet

    HolS=73.6 parchet

    Camera personalS=20.8 mpparchet

    Camera serviciuS=12.3 mpparchet

    VestiarS=7.4 mpparchet

    DepozitareS=19.4 mpparchet

    210

    210

    210

    210

    LogieS=11.8 mppodele lemn

    LogieS=11.5 mppodele lemn

    23

    45

    B

    210210

    210

    210

    120

    120

    120

    120

    210

    210

    F7

    F7

    F7

    F7

    U1

    U1 U2

    U2

    U2

    U2

    U4

    U5

    U5

    HP=90

    HP=90

    HP=90

    HP=90

    273125

    85270

    171417

    26985

    135272

    18

    P2

    P2

    P2

    P3

    P3

    P2

    P2 P5

    P5

    P4

    P3

    P3

    P3

    P3

    P5

    P5

    P5

    P5

    C

    P1

    P1

    section 11

  • 15

    +10.30

    +12.40

    +10.80+10.80

    +7.35+7.35+7.35

    +4.00+4.00+4.00

    +66.00+66.00+66.00

    0.00

    Strat protectie, sortGeotextilMembrana HIZ 2 straturiTermoizolatie AUSTROTHERM EPS A30, 12 cmBariera contra vaporilor, folie polietilenaSapa egalizare cu panta 1.5%Planseu B.A. 10 cmStructura tavan fals Ul 14/41- 3600Tavan fals -AMF WOOD SYMETRA 03, cant tip VT -S15

    Folie polietilena

    Folie de separatieAUSTROTHERM AT (pentru zgomot de impact)-3cmAUSTROTHERM EPS A20 (strat de egalizare si termoizolatie)-3cmPlanseu B.A. 10 cmStructura tavan fals Ul 14/41- 3600Tavan fals -AMF WOOD SYMETRA 03, cant tip VT -S15

    Sapa beton slab armat-3cm

    Parchet dublu stratificat -2cm

    Folie polietilena

    Folie de separatieAUSTROTHERM AT (pentru zgomot de impact)-3cmAUSTROTHERM EPS A20 (strat de egalizare si termoizolatie)-3cmPlanseu B.A. 10 cmStructura tavan fals Ul 14/41- 3600Tavan fals -AMF WOOD SYMETRA 03, cant tip VT -S15

    Sapa beton slab armat-3cm

    Parchet dublu stratificat -2cm

    Folie polietilena

    Folie de separatieTermoizolatie polistiren expandat 10 cm

    Placa B.A. 10 cmFolie separareUmplutura

    Sapa beton slab armat-3cm

    Parchet dublu stratificat -2cm

    Hidroizolatie

    Adeziv placi ceramice 2 cm

    Folie de separatieAUSTROTHERM AT (pentru zgomot de impact)-3cm

    AUSTROTHERM EPS A20 (strat de egalizare si termoizolatie)-3cm

    Sapa beton slab armat-3cm

    Placi ceramice 300x300x5

    Planseu B.A. 10 cm

    Grup sanitarGrup sanitar

    Grup sanitarGrup sanitar

    Grup sanitarGrup sanitar

    Camera

    Camera

    Camera

    Camera

    Camera

    Camera

    Adeziv placi ceramice 2 cm

    Folie de separatieAUSTROTHERM AT (pentru zgomot de impact)-3cm

    AUSTROTHERM EPS A20 (strat de egalizare si termoizolatie)-3cm

    Sapa beton slab armat-3cm

    Placi ceramice 300x300x5

    Planseu B.A. 10 cm

    Adeziv placi ceramice 2 cm

    Folie de separatieAUSTROTHERM AT (pentru zgomot de impact)-3cm

    AUSTROTHERM EPS A20 (strat de egalizare si termoizolatie)-3cm

    Sapa beton slab armat-3cm

    Placi ceramice 300x300x5

    Planseu B.A. 10 cm

    Folie polietilena

    Folie de AUSTROTHERM AUSTROTHERM Planseu Structura Tavan fals

    Sapa beton

    Parchet

    Folie polietilena

    Folie de AUSTROTHERM AUSTROTHERM Planseu Structura Tavan fals

    Sapa beton

    Parchet

    Folie polietilena

    Folie de Termoizolatie

    Placa B.A. Folie separareUmplutura

    Sapa beton

    Parchet

    Hidroizolatie

    Hol

    Hol

    Hol

    Sort tabla zincata

    404

    270

    2240

    1010

    106

    266

    440

    2227

    04

    40

    4027

    022

    4010

    1010

    626

    64

    4022

    270

    440

    4027

    022

    4010

    1010

    626

    64

    4022

    270

    440

    4027

    022

    4010

    1010

    626

    64

    4022

    270

    440

    +9.73 +10.50

    +7.13+7.13

    +3.77 +3.77+3.77

    +7.13

    F

    21 x 16 = 3.360 m

    1234567890111

    385

    385

    241

    46933

    384

    496

    157

    101

    9081

    116

    245

    9050

    8

    857

    92

    559

    92158

    7615

    3

    217

    1290

    127

    14151415357

    3111

    7 92 27 1444

    4019

    2

    11611

    14245

    116 11

    196

    14 196116 11 90 11 116

    247

    488

    231 12 123

    72829

    412

    1235

    29138

    885188

    161417

    273125

    85

    379

    379

    256

    95

    256

    95

    56264

    133 85264

    56264

    85 133264

    55 18085 41 26 25

    400

    400

    400

    400

    33031

    3,635

    25014

    90

    231 90 135

    2429017

    224

    5319

    2

    379

    11

    118

    202

    102

    232

    653

    1808314.5

    31

    332

    786

    786

    P1

    Bucatariemp Bucatarie

    S=5 mpparchet

    CameraS=31.5 mpparchet

    BaieS=5 mpplaci ceramice

    BaieS=5 mpplaci ceramice

    BaieS=5 mpplaci ceramice

    CameraS=31.5 mpparchet

    Camera de ziS=10.3 mpparchet

    BucatarieS=5 mpparchet

    HolS=3.50 mpparchet

    HolS=3.50 mpparchet

    BucatarieS=10 mpparchet

    HolS=6.2 mpparchet

    DormitorS=22 mpparchet

    S=73.6 mpparchet

    Bucatarie+sp.masaS=34.2 mpparchet

    210

    210

    210

    210

    210LogieS=11.5 mppodele lemn

    LogieS=11.5 mppodele lemn

    LogieS=3.4 mppodele lemn

    240

    210

    210

    210

    120

    120

    120

    120120

    210

    210

    210

    F7

    F7

    F7

    F7

    F7

    U1

    U1

    U3

    U5

    U5

    U5

    HP=90

    HP=90

    HP=90

    HP=90

    HP=90

    217 14 25 92 911

    31357

    151415

    27117

    1417269

    85125

    273171417

    P5

    P6

    P6

    P6

    P6

    P6

    P3

    P3

    P4

    P2

    P2

    P5 P5

    P3

    P3

    P2

    P2

    P2 P5

    P5

    P4

    P3

    P3

    P3

    P3

    P2

    P3

    P5

    P5

    P5

    P5

    P5

    P5

    P1

    P1

    P1

    P1

    section11

  • Lamela tabla groasa

    Copertina aluminiu

    Panou din lemn,sistem de fatada ventilatatip Prodex

    Panou sistem tip Prodex

    Montant exterior,profil FW50 Schuco

    Gratar verticalpentru ventilare

    Jaluzele electrice

    Gratar

    Montant

    Piesa

    Montant aluminiu

    Piesa prindere

    Tiz polistiren extrudat

    Tiz

    Piese suport, otel, 15mmBanda cauciuc, EPDM, 6mm

    Balustrada, sticla securizata, 2x10mm

    OFFICE BUILDING TECHNOLOGY SEMINAR

  • +46.20

    Element prefabricat din betonGeotextil

    Membrana cu crampoane cu stocare de apa pentru terase gradinaMembrana hidroizolanta

    Termoizolatie AUSTROTHERM EPS A30, grosime 12 cmFolie bariera contra vaporilor

    Strat DDC (difuzie, decompresiune, compensare)Strat egalizare din beton usor

    Beton de panta 1,5%

    Gratar aerisiresi scurgere apa

    Strat protectie,sortGeotextil

    Membrana HIZMembrana hidroizolanta

    Termoizolatie AUSTROTHERM EPS A30, grosime 12 cmBariera contra vaporilor, folie polietilena

    Sapa de egalizare, cu panta 1.5% 30-5cmPlanseu beton-tabla cutata cu supra betonare 15 cm

    Grinda ajurata 60 cmStructura tavan fals

    Tavan fals

    Lamela tabla groasa

    Tamplarie de aluminiu-usa schuco

    Grinda ajurata / instalatii 60 cmStructura inchidere exterior, profile Z 210 mm\termoizolatie vata minerala rigida 14 cm

    Inchidere consola, panouri sandwich tip KINGSPAN

    Structura tavan falsTavan fals

    Rigola pentru drenareasi colectarea apelor

    Sol vegetal

    Panou de tabla ancorat in stratul de nisip

    Pietris 6 cm / dulapi lemn 5X12 cmGeotextil

    Membrana hidroizolantaTermoizolatie AUSTROTHERM 5 cm

    Folie bariera contra vaporilorStrat DDC (difuzie, decompresiune, compensare)

    Strat egalizare din beton usorBeton de panta 1,5%

    Structura tavan falsTavan fals

    Podele lemn circlabil 3cm

    Planseu beton-tabla cutata cu supra betonare 15 cmPlanseu beton-tabla cutata cu supra betonare 15 cm

    Convector incalzire

    Montant exterior,profil FW50 Schuco

    Copertina aluminiu

    Copertina aluminiu

    Panou din lemn,sistem de fatada ventilatatip Prodex

    Gratar metal-structurapt.sustinere dulapi lemn

    Dulap lemn 5X12

    Podele lemn circulabil

    Tamplarie de aluminiu-usa schuco

    Geam termoizolant, securizat, 280mmtransparent, fatada exterioara

    IPE 140

    Gratar pentru aerisire

    Copertina aluminiu

    Montant aluminiu

    Piesa prindere

    Profil pt.ochiuri mobile Schuco

    Profil pt.ochiuri mobile Schuco

    Tiz polistiren extrudat

    15mmEPDM, 6mm

    2x10mm

    Fnisaj inchidere consola-panouri lemn tip Prodex

    Gratar verticalpentru ventilare

    facade detail

    16

  • Montant exterior,profil FW50 Schuco

    Rigla exterioaraprofil FW50, Schuco

    Gratar verticalpentru ventilare

    Jaluzele electrice

    Panou din lemn,sistem de fatada ventilatatip Prodex

    Copertina aluminiu

    Prindere montant exterior

    Gratar circulatie,intretinere

    Gratar circulatie,intretinere

    Montant exterior,profil FW50 Schuco

    Rigla exterioaraprofil FW50, Schuco

    Gratar verticalpentru ventilare

    Jaluzele electrice

    Grinda ajurata / instalatii 60 cmStructura inchidere exterior, profile Z 210 mm\termoizolatie vata minerala rigida 14 cm

    Inchidere consola, panouri sandwich tip KINGSPANFnisaj inchidere consola-panouri lemn tip Prodex

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    Sp.tehniceA: 20.668 m2

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    26

    x 0.

    173

    = 4.

    500

    m

    hp=0.90

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    Sp.tehniceA: 20.668 m2

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    Sp.tehniceA: 20.668 m2

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    25 x 0.180 = 4.500 m

    /plans

  • +41.20

    +37.2

    Convector incalzire

    Convector incalzire

    Prindere montant interior

    Montant exterior,profil FW50 Schuco

    Geam termoizolant, securizat, 280mmtransparent, fatada exterioara

    Montant exterior,profil FW50 Schuco

    Copertina aluminiu

    Profil pt.ochiuri mobile Schuco

    Placi pentru pardoseala lemn-5 cmSuporti reglabili pentru podea suprainaltata

    Gratar verticalpentru ventilare

    facade detail

    17

  • 2.885.00

    0.305.20

    0.305.30

    0.305.40

    3.08

    9.14 14.62

    36.28

    28.03

    4.64

    3.80 9.60

    7.203.30

    8.15

    6.84

    11.40

    3.24

    2.314.11

    9.01

    6.90

    7.40

    17.09

    3.523.35

    7.579.32

    2.5111.03

    6.90

    10.69

    17.49

    7.08

    7.68

    6.58

    6.36

    1.10

    14.24

    2.74

    41.24

    4.58

    10.00

    6.12

    4.355.50

    -1.00

    -1.00-1.00

    -1.00

    -1.00-2.00

    0.00

    -2.00

    -2.00

    -1.00

    -1.00

    -1.00

    accesdeserviciu

    Spatiup olivale nt

    Depozi tare

    Sp .t ehnicArhiva

    Ex poBeg a

    Sp ati uex po zitii tem

    po ra r e

    Dep.bar

    Bar

    Gr.sanitar

    Gr.sanitar

    Bir ou 1

    Bir ou 2

    Gr. sa nita r-H

    In treti ne re

    10.50

    30.18

    9.811.50

    21.1 710.37

    42.85

    4.78

    66

    +2.20

    0 .00

    -2.00

    +2.20

    0.00

    EXPO CENTER Timisoara, Romania

  • 18

  • CONTEST International Holcim Awards 2011/team: Bobarnac Ruxandra, Ciupuliga Simona, Iordan Ioana, Moldovan Ruxandra

  • 19

  • WORKSHOP TENSEGRITY WORKSHOP ZA/3RS20092012

  • 19

    20

    DEALUL CERULUI2008

    01_en02_en03_en04_en05_en06_en07_en09_en10_en11_en12_en13_en14_en15_en16_en17_en18_en19_en20_en21_en22_en