![Page 1: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/1.jpg)
M&V Commissioning Sub Committee ReportDoug Dahle - NRELSteve Dunnivant - EMP2FEMP M&V Summit - Kansas CityNovember 6, 2002
![Page 2: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/2.jpg)
Cx Committee ActivitiesCommissioning (Cx) & ESPCsDefinitionsESPC Report ClarificationPost Installation Verification ReportM&V PlanAnnual M&V Reconciliation Report
1
![Page 3: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/3.jpg)
Commissioning & ESPCs Value Added for Customer and
ESCO Verifies that the
installation/operation meets customer Need (Design Intent)
Improves customer confidence & term commitment
Reduces the 1st year jitters 2
![Page 4: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/4.jpg)
Definitions Commissioning Performance Testing Functional Performance Tests Acceptance Tests
3
![Page 5: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/5.jpg)
Commissioning Commissioning is defined as the
process of ensuring that the systems are designed, installed, functionally tested and capable of being operated and maintained to perform in conformity with the design intent.
ECM Operational Performance to Design Intent 4
![Page 6: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/6.jpg)
Performance Testing Tests that are performed in-situ
or at the manufacturer’s to ensure that a specific piece of equipment operates to manufactures specifications - installation design intent requirements.
5
![Page 7: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/7.jpg)
Functional Performance Tests Item has been installed and
function according to design + MUCH MORE!
Usually includes pre functional testing point to point checkout
(wiring/piping) Calibration and Installation 6
![Page 8: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/8.jpg)
Acceptance Tests Acceptance tests are tests that
are performed on specific equipment that does not necessarily require a commissioning plan. (Wide Variation) Does the light switch operate
the lights? 7
![Page 9: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/9.jpg)
ESPC Report Clarification M&V Plan - Included with final
proposal - ECM Savings Verification Methodology
Post Installation Verification Report - Completed as part of the project acceptance after Cx
Annual M&V Reconciliation Report - Performed annual as required by contract (Show the Customer)
![Page 10: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/10.jpg)
Cx Team Activities - For review by M&V Team
Update of ESPC Project Management Plan - Cx additions
Add Cx/Design Intent Focus IP Kickoff Meeting DES Kickoff Meeting Project Acceptance Checklist
(with Input from ESCOs) Complete Definition Development
![Page 11: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/11.jpg)
Cx Support Cx Consultants
SOW Being developed Contracts in Progress
Activities Cx Plan Reviews & Consults PF Training
![Page 12: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/12.jpg)
Team Members - Labs & Subs
NREL: Doug Dahle, Phil Voss, LBNL: Dale Sartor, Satish
Kumar ORNL: Terry Sharp Subcontractors: Steve
Dunnivant, Mark Stetz, Lia Webster, Wilson Reynolds
![Page 13: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/13.jpg)
Team Members - ESCO’s: Honeywell - Sylvia Berry-
Lewis Energy Masters - Dan Flaig Noresco - Scott Judson Select Energy - Ayokunle
Kafi
![Page 14: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f335503460f94c50628/html5/thumbnails/14.jpg)
Thanks For Your Attention! Open Discussion