Page 1: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

M&V Commissioning Sub Committee ReportDoug Dahle - NRELSteve Dunnivant - EMP2FEMP M&V Summit - Kansas CityNovember 6, 2002

Page 2: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Cx Committee ActivitiesCommissioning (Cx) & ESPCsDefinitionsESPC Report ClarificationPost Installation Verification ReportM&V PlanAnnual M&V Reconciliation Report

1

Page 3: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Commissioning & ESPCs Value Added for Customer and

ESCO Verifies that the

installation/operation meets customer Need (Design Intent)

Improves customer confidence & term commitment

Reduces the 1st year jitters 2

Page 4: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Definitions Commissioning Performance Testing Functional Performance Tests Acceptance Tests

3

Page 5: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Commissioning Commissioning is defined as the

process of ensuring that the systems are designed, installed, functionally tested and capable of being operated and maintained to perform in conformity with the design intent.

ECM Operational Performance to Design Intent 4

Page 6: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Performance Testing Tests that are performed in-situ

or at the manufacturer’s to ensure that a specific piece of equipment operates to manufactures specifications - installation design intent requirements.

5

Page 7: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Functional Performance Tests Item has been installed and

function according to design + MUCH MORE!

Usually includes pre functional testing point to point checkout

(wiring/piping) Calibration and Installation 6

Page 8: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Acceptance Tests Acceptance tests are tests that

are performed on specific equipment that does not necessarily require a commissioning plan. (Wide Variation) Does the light switch operate

the lights? 7

Page 9: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

ESPC Report Clarification M&V Plan - Included with final

proposal - ECM Savings Verification Methodology

Post Installation Verification Report - Completed as part of the project acceptance after Cx

Annual M&V Reconciliation Report - Performed annual as required by contract (Show the Customer)

Page 10: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Cx Team Activities - For review by M&V Team

Update of ESPC Project Management Plan - Cx additions

Add Cx/Design Intent Focus IP Kickoff Meeting DES Kickoff Meeting Project Acceptance Checklist

(with Input from ESCOs) Complete Definition Development

Page 11: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Cx Support Cx Consultants

SOW Being developed Contracts in Progress

Activities Cx Plan Reviews & Consults PF Training

Page 12: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Team Members - Labs & Subs

NREL: Doug Dahle, Phil Voss, LBNL: Dale Sartor, Satish

Kumar ORNL: Terry Sharp Subcontractors: Steve

Dunnivant, Mark Stetz, Lia Webster, Wilson Reynolds

Page 13: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Team Members - ESCO’s: Honeywell - Sylvia Berry-

Lewis Energy Masters - Dan Flaig Noresco - Scott Judson Select Energy - Ayokunle

Kafi

Page 14: M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002

Thanks For Your Attention! Open Discussion