Disposable formworks for
the simultaneous casting of
foundation beams and the slab
www.daliform.com
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
2/10
Water, collection tanks
Foundations
KEY:
SWITCHBOARD
Telephone Fax
+39 0422 2083 +39 0422 800234
FOREIGN COMMERCIAL SECRETARY OFFICE
Telephone Fax e-mail+39 0422 208311 +39 0422 800234 [email protected]
TECHNICAL SECRETARY OFFICE
Telephone Fax e-mail
+39 0422 208350 +39 0422 800234 [email protected]
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
3/101
Cassaforma Muro (Wall formwork) was designed as an
alternative to traditional wood shuttering, which permits
casting walls at a height, reversed beams and foundation
bases, drastically reducing the time for creating the
foundation.
This disposable formwork consists of a combination of pipes,
panels, collars and stirrups all made of polypropylene.
In combination with the Atlantis system, the Wall
formwork makes it possible to create foundation beams
and a slab, which optimises and speeds up the work in the
building site, with considerable economic implications.
For this reason this system is greatly appreciated for the
creation of water collection and/or dispersion tanks, which
are always needed in various construction contexts.
Due to its easy, quick positioning, it is also perfectly suited for
creating ribbed rafts, where the empty spaces between the
beams are filled by Atlantis System formworks.
variable height from 56 cm to 150 cm
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
4/10
For the creation, in a single solution, of an upper slab (cavities) and internal and
perimetric foundation beams for a structure.
For the creation of ribbed rafts (structures not used often normally due to the
excessive work of shuttering and deshuttering).
For the creation of water dispersion and/or collection tanks.
For any project that requires, for a variety of reasons, elaborate and geometrically
complex shuttering.
Advantages
Applications
Muro formwork in coherence with its purpose,which is quick and easy work in the construction site, is characterised by simple, lightweight
parts that permit intuitive and quick assembly with multiple advantages:
Less time used for shuttering and deshuttering.
Saving time in cleaning the planking, which will be smooth and clean.
Saving time and expenses related to storing, depositing and transporting formworks; the material is not bulky and is not affected by bad weather.
A specialised workforce is not required.
Simultaneous casting of the foundation beams and slab if combined with the Atlantis system.
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
5/10
Technical data
Atlantis heightStirrups
Pcs/lm*
Collars
Pcs/lm*
Inner Stirrups
Pcs/lm*
Panel
lm/lm*
60 2 2 2 1,0
70 2 2 2 1,3
80 4 4 2 1,5
90 4 4 2 1,7
100 4 4 2 2,0
110 4 4 2 2,0
120 4 4 2 2,3
130 6 6 2 2,5
140 6 6 2 2,7
150 6 6 2 3,0
Panel
* Linear metres in reference to the length of each formwork wall.
Component quantity table based on the height of the Atlantis unit
Supply and installation cost grid
2 Collar supply no/lm 2
1 Supply of the Wall panel for Atlantis h=76cm m2/lm 0.700
3 Supply of the lower stirrup no./lm 2
4 Supply of the intermediate stirrup no./lm 2
5 Supply and positioning of the connection forks Kg/lm
6 Dry positioning of the Wall formwork and accessories hours 0.010
Total cost d/m2
No. Item U.M. Quantity/m2 Unit price Total
Wall panel
Stirrups bracket Collar
50 cm
50 cm
Intermediate Stirrups
The Wall panel can be easily adopted inheight and width to project needs with asimple yard tool, guarateeing maximumassembly speed and flexibility.
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
6/106
Application examples
Daliform Group technical office
The technical consultancy is only valid for the Daliform Group construction systems.
To contact the technical office: Tel. +39 0422 208350 - [email protected]
To obtain updated technical cards, support material, new photos and case studies, go to www.daliform.com
FEASIBILITY STUDY
Predimensioning and optimisation of the structures, comparative and/or revised
proposals, material and manpower estimates, cost analysis.
Evaluation of forced ventilation in the case of cold rooms.
SUPPORT FOR THE EXECUTIVE DESIGN
Support by design professionals. Upon request, the formwork positioning plan
can be supplied with a list of the products required to carry out the work and the
relative accessories.
CALCULATION REPORT
Reports certifying the execution of Daliform Group constructive systems.
ON-SITE SUPPORT
If necessary, our technical staff can be present on-site to help the construction
company during the operational phase.
Perimeter section of the cavity with Atlantis and Muro.
Intermediate foundation section with cut formworks.
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
7/10
Construction details showing the various solutions targeted towards compensating structures if the inner dimensions of
the under-fl oor cavity are not exact multiples of the Atlantis formwork.
Creating a foundation and under-floor cavity with Muro and Atlantis Formworks
Placing the foundation reinforcements on the
prepared light concrete base.
After assembling the first Atlantis formworks,
position the intermediate stirrups on the panel
and then connect the stirrups and collars of
the opposing pillars with the steel forks (to be
prepared in the construction site).
Nailing along the inner and perimetric foundation
beams of the lower stirrups and pipe base at an
equal distance, approx. every 50 cm.
Position other panels on top, always fastening
them with stirrups and collars, based on the
necessary height to be reached. Complete
assembling the Atlantis modules and plugging
up the side that remained open in the formwork
along the perimeter with polystyrene panels.
Place the initial panel by inserting it in the guide
of the lower stirrups and fasten it on the top with
the collars inserted on the pillars.
Start casting the concrete starting from the
pillars, continuing with the curbs and the slab.
1
4
2
5
3
6
Loading and breaking test certifi ed by the Univeristy of Padua.
Environmental Compatibility Certifi cation (CCA).
Member of the Italian Green Building Council. System certifi cation pursuant to SA Standard 8000.
Certifications
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
8/10
Specifi cations
Creat ion of a lightened raf t in reinforced co nc rete wi th a total thickn ess o f ______ cm . The formw ork sp ace s w i ll be created o n si te through
the combined use o f recyc led p last i c formworks, such as Atlantis and Wall formwork f rom the Dal i form Group. The project wi l l be
carr ied out as sp ec ified be low:
a )Sup ply and laying o f steel bars and we lde d m esh to create the first slab o n the g round , and the vert ical st if feners ( internal and perimeter
plates) for the raft . Price euro/k g ____________
b) Format ion of the first slab on the ground for the l ightened raf t through the supply and pouring of concrete, resistance class 20/25 to a
height of cm ______ sui tably vibrated an d finished w i th a st raight ed ge o utside of the vert ical cag es for the inner and p erime tric s ubd ivision
of the raft, constituting the vert ical st i f feners.
Price euro/k g ____________
c)Format ion of the formw ork nec essa ry for creat ing the vert ical st if feners o f the lightened raf t in reinforced co ncrete throug h the sup ply and
po si toning of vertical dispo sab le formw ork suc h as the Wa ll formw ork f rom the Dalifo rm Group con s is t ing o f c ane honeyc om b p anels
in polypropylene, 50 x 200 cm thickness 1 cm weight 3kg/Pcs, including intermediate polypropylene st i rrups, col lars for polypropylene
Atlantis pipes, inner 110mm, lower polypropylene st i rrups for anchoring to the ground, wi th nai ls, of the steel C shaped spacerst i rrups to restrain the pressure of the concrete, nai ls and consumables needed for an ef fecient and quick cast ing phase. Including
expe nses for aligning w i th the w ork for placing the ho rizontal Atlantis fo rmwo rk.
Per face Price euro/kg ____________
d) Format ion of the formwork necessary to construct the upper port ion of the horizontal closure of the l ightened raf t through the supply
and p osi t ioning of the Atlantis dispo sable formw orks in recycled p lastic f rom the Dal iform G roup. The format ion w il l be carried out at the
sam e t ime as the installat ion of the Wa ll formw ork (vert ic al st i ffeners ) for the external bord ering; the Atlantis fo rmw ork is formed by the
ordered suc ces sion, in a cloc kwise d i rect ion, of the Igl mo dules f rom the Dalifo rm Group, w hose ed ges o ver lap b y a t least 3 c m, w ith
cu rved fork feet and d imensions eq ual to one q uarter of the pipe, for a bayone t conn ec t ion on the e dg e of a supp lied , vertical ly pos it ione d
pipe w ith an externa l of 11 0 mm and th ickness o f 1 .8 m m onto w hich a prev ious ly suppl ied flat c losure foot , w i th s lo ts aga inst the ground
and two opposed vert ical pre-f ractures in the housing guide, wi l l be hooked to the other end. Instal lat ion centre distance between the
vert ical sup po rt pipes to the Igl m odule , 50 cm a long two p erpendicu lar d irec t ions. Tota l max he ight o f the b ase for the formw ork cm
__ __ __ ; th e c o s t fo r t he c re at ion o f h o les w ith th e d im ens ions an d sec tio ns fo re seen b y th e arc h ite c tu ra l d raw ings is inc lud ed . Th e p ric e is
co nsidered as including and c overing al l co sts for providing the finished wo rk in a wo rkmanl ike m anner. It mus t be p oss ible to safely walk
on the ho rizontal Atla ntis mo dules and they m ust be cer t ified to res is ts a load o f 15 0 kg in the weakest po in t w i th tes t pressure on the
square sup port o f 8 x 8 cm ; they must not re lease p o l lu t ing sub stances and have an Environmenta l Comp a tibility C ertific a tion and be
produc ed by a com pany that is equ ipped w ith an In tegrated Managem ent System (ISO 9001, ISO 14001, OHSAS 18001, S A 8000);
the com pany supp ly ing the Atlantis m odules m ust repor t const ruct ive ly to the d es igner and the yard m anager upon supp ly and pr ior to
the creat ion of the slab, adapt ing their product to the execut ive design, integrat ing i t when necessary, the company must also exhibi t the
produc t cer t ificate app roved by an EOTA mem be r a g enc y (European Organisation for Technical Approvals).
Price euro/kg ____________
e)Supply and laying of steel bars and welded mesh to create the upper slab of the l ightened raf t to be placed on the to p o f the horizonta l
fo rmw ork Atlantis w ith the raft 's vert ica l s t i f fners ( in ternal and p erim eter p lates) passing abo ve.
Price euro/kg ____________
f)Supply and pouring of concrete, resistance class C25/30, first for fil l ing the Wall formworks (which form the vert ical st i f fners, that is,
the inner and p erime tric d ivisions of the raf t) and s ubs equ ent co nt inous po uring of the co nc rete on the horizontal plat form o f Atlantis
formw orks, wh ich first saturates the pipes and then creates the up per slab of the raf t unt i l a minimu m thicknes s is obtained f rom the top of
the Atla ntis formworks of cm ______ sui tably vibrated and finished wi th a st raight edge.
Price euro/kg ____________
The information contained in this catalogue cou ld be changed. Before placing an order, request a confirmation or updated information from the DALIFORM
GROUP, which reserves the right to make changes at any moment without notice. In consideration of recycled material, it is specified that there are
tolerance margins caused by environmental factors.
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
9/10
-
8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab
10/10
www.daliform.com
DG_
MU
-Rev.
03_
07-12
Tel. +39 0422 2083 - Fax +39 0422 800234
[email protected] - www.daliform.com
Via Serenissima, 30 - 31040
Gorgo al Monticano (TV) - Italy
Socio del GBC Italia.