  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    1/10

    Disposable formworks for

    the simultaneous casting of

    foundation beams and the slab

    www.daliform.com

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    2/10

    Water, collection tanks

    Foundations

    KEY:

    SWITCHBOARD

    Telephone Fax

    +39 0422 2083 +39 0422 800234

    FOREIGN COMMERCIAL SECRETARY OFFICE

    Telephone Fax e-mail+39 0422 208311 +39 0422 800234 [email protected]

    TECHNICAL SECRETARY OFFICE

    Telephone Fax e-mail

    +39 0422 208350 +39 0422 800234 [email protected]

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    3/101

    Cassaforma Muro (Wall formwork) was designed as an

    alternative to traditional wood shuttering, which permits

    casting walls at a height, reversed beams and foundation

    bases, drastically reducing the time for creating the

    foundation.

    This disposable formwork consists of a combination of pipes,

    panels, collars and stirrups all made of polypropylene.

    In combination with the Atlantis system, the Wall

    formwork makes it possible to create foundation beams

    and a slab, which optimises and speeds up the work in the

    building site, with considerable economic implications.

    For this reason this system is greatly appreciated for the

    creation of water collection and/or dispersion tanks, which

    are always needed in various construction contexts.

    Due to its easy, quick positioning, it is also perfectly suited for

    creating ribbed rafts, where the empty spaces between the

    beams are filled by Atlantis System formworks.

    variable height from 56 cm to 150 cm

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    4/10

    For the creation, in a single solution, of an upper slab (cavities) and internal and

    perimetric foundation beams for a structure.

    For the creation of ribbed rafts (structures not used often normally due to the

    excessive work of shuttering and deshuttering).

    For the creation of water dispersion and/or collection tanks.

    For any project that requires, for a variety of reasons, elaborate and geometrically

    complex shuttering.

    Advantages

    Applications

    Muro formwork in coherence with its purpose,which is quick and easy work in the construction site, is characterised by simple, lightweight

    parts that permit intuitive and quick assembly with multiple advantages:

    Less time used for shuttering and deshuttering.

    Saving time in cleaning the planking, which will be smooth and clean.

    Saving time and expenses related to storing, depositing and transporting formworks; the material is not bulky and is not affected by bad weather.

    A specialised workforce is not required.

    Simultaneous casting of the foundation beams and slab if combined with the Atlantis system.

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    5/10

    Technical data

    Atlantis heightStirrups

    Pcs/lm*

    Collars

    Pcs/lm*

    Inner Stirrups

    Pcs/lm*

    Panel

    lm/lm*

    60 2 2 2 1,0

    70 2 2 2 1,3

    80 4 4 2 1,5

    90 4 4 2 1,7

    100 4 4 2 2,0

    110 4 4 2 2,0

    120 4 4 2 2,3

    130 6 6 2 2,5

    140 6 6 2 2,7

    150 6 6 2 3,0

    Panel

    * Linear metres in reference to the length of each formwork wall.

    Component quantity table based on the height of the Atlantis unit

    Supply and installation cost grid

    2 Collar supply no/lm 2

    1 Supply of the Wall panel for Atlantis h=76cm m2/lm 0.700

    3 Supply of the lower stirrup no./lm 2

    4 Supply of the intermediate stirrup no./lm 2

    5 Supply and positioning of the connection forks Kg/lm

    6 Dry positioning of the Wall formwork and accessories hours 0.010

    Total cost d/m2

    No. Item U.M. Quantity/m2 Unit price Total

    Wall panel

    Stirrups bracket Collar

    50 cm

    50 cm

    Intermediate Stirrups

    The Wall panel can be easily adopted inheight and width to project needs with asimple yard tool, guarateeing maximumassembly speed and flexibility.

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    6/106

    Application examples

    Daliform Group technical office

    The technical consultancy is only valid for the Daliform Group construction systems.

    To contact the technical office: Tel. +39 0422 208350 - [email protected]

    To obtain updated technical cards, support material, new photos and case studies, go to www.daliform.com

    FEASIBILITY STUDY

    Predimensioning and optimisation of the structures, comparative and/or revised

    proposals, material and manpower estimates, cost analysis.

    Evaluation of forced ventilation in the case of cold rooms.

    SUPPORT FOR THE EXECUTIVE DESIGN

    Support by design professionals. Upon request, the formwork positioning plan

    can be supplied with a list of the products required to carry out the work and the

    relative accessories.

    CALCULATION REPORT

    Reports certifying the execution of Daliform Group constructive systems.

    ON-SITE SUPPORT

    If necessary, our technical staff can be present on-site to help the construction

    company during the operational phase.

    Perimeter section of the cavity with Atlantis and Muro.

    Intermediate foundation section with cut formworks.

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    7/10

    Construction details showing the various solutions targeted towards compensating structures if the inner dimensions of

    the under-fl oor cavity are not exact multiples of the Atlantis formwork.

    Creating a foundation and under-floor cavity with Muro and Atlantis Formworks

    Placing the foundation reinforcements on the

    prepared light concrete base.

    After assembling the first Atlantis formworks,

    position the intermediate stirrups on the panel

    and then connect the stirrups and collars of

    the opposing pillars with the steel forks (to be

    prepared in the construction site).

    Nailing along the inner and perimetric foundation

    beams of the lower stirrups and pipe base at an

    equal distance, approx. every 50 cm.

    Position other panels on top, always fastening

    them with stirrups and collars, based on the

    necessary height to be reached. Complete

    assembling the Atlantis modules and plugging

    up the side that remained open in the formwork

    along the perimeter with polystyrene panels.

    Place the initial panel by inserting it in the guide

    of the lower stirrups and fasten it on the top with

    the collars inserted on the pillars.

    Start casting the concrete starting from the

    pillars, continuing with the curbs and the slab.

    1

    4

    2

    5

    3

    6

    Loading and breaking test certifi ed by the Univeristy of Padua.

    Environmental Compatibility Certifi cation (CCA).

    Member of the Italian Green Building Council. System certifi cation pursuant to SA Standard 8000.

    Certifications

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    8/10

    Specifi cations

    Creat ion of a lightened raf t in reinforced co nc rete wi th a total thickn ess o f ______ cm . The formw ork sp ace s w i ll be created o n si te through

    the combined use o f recyc led p last i c formworks, such as Atlantis and Wall formwork f rom the Dal i form Group. The project wi l l be

    carr ied out as sp ec ified be low:

    a )Sup ply and laying o f steel bars and we lde d m esh to create the first slab o n the g round , and the vert ical st if feners ( internal and perimeter

    plates) for the raft . Price euro/k g ____________

    b) Format ion of the first slab on the ground for the l ightened raf t through the supply and pouring of concrete, resistance class 20/25 to a

    height of cm ______ sui tably vibrated an d finished w i th a st raight ed ge o utside of the vert ical cag es for the inner and p erime tric s ubd ivision

    of the raft, constituting the vert ical st i f feners.

    Price euro/k g ____________

    c)Format ion of the formw ork nec essa ry for creat ing the vert ical st if feners o f the lightened raf t in reinforced co ncrete throug h the sup ply and

    po si toning of vertical dispo sab le formw ork suc h as the Wa ll formw ork f rom the Dalifo rm Group con s is t ing o f c ane honeyc om b p anels

    in polypropylene, 50 x 200 cm thickness 1 cm weight 3kg/Pcs, including intermediate polypropylene st i rrups, col lars for polypropylene

    Atlantis pipes, inner 110mm, lower polypropylene st i rrups for anchoring to the ground, wi th nai ls, of the steel C shaped spacerst i rrups to restrain the pressure of the concrete, nai ls and consumables needed for an ef fecient and quick cast ing phase. Including

    expe nses for aligning w i th the w ork for placing the ho rizontal Atlantis fo rmwo rk.

    Per face Price euro/kg ____________

    d) Format ion of the formwork necessary to construct the upper port ion of the horizontal closure of the l ightened raf t through the supply

    and p osi t ioning of the Atlantis dispo sable formw orks in recycled p lastic f rom the Dal iform G roup. The format ion w il l be carried out at the

    sam e t ime as the installat ion of the Wa ll formw ork (vert ic al st i ffeners ) for the external bord ering; the Atlantis fo rmw ork is formed by the

    ordered suc ces sion, in a cloc kwise d i rect ion, of the Igl mo dules f rom the Dalifo rm Group, w hose ed ges o ver lap b y a t least 3 c m, w ith

    cu rved fork feet and d imensions eq ual to one q uarter of the pipe, for a bayone t conn ec t ion on the e dg e of a supp lied , vertical ly pos it ione d

    pipe w ith an externa l of 11 0 mm and th ickness o f 1 .8 m m onto w hich a prev ious ly suppl ied flat c losure foot , w i th s lo ts aga inst the ground

    and two opposed vert ical pre-f ractures in the housing guide, wi l l be hooked to the other end. Instal lat ion centre distance between the

    vert ical sup po rt pipes to the Igl m odule , 50 cm a long two p erpendicu lar d irec t ions. Tota l max he ight o f the b ase for the formw ork cm

    __ __ __ ; th e c o s t fo r t he c re at ion o f h o les w ith th e d im ens ions an d sec tio ns fo re seen b y th e arc h ite c tu ra l d raw ings is inc lud ed . Th e p ric e is

    co nsidered as including and c overing al l co sts for providing the finished wo rk in a wo rkmanl ike m anner. It mus t be p oss ible to safely walk

    on the ho rizontal Atla ntis mo dules and they m ust be cer t ified to res is ts a load o f 15 0 kg in the weakest po in t w i th tes t pressure on the

    square sup port o f 8 x 8 cm ; they must not re lease p o l lu t ing sub stances and have an Environmenta l Comp a tibility C ertific a tion and be

    produc ed by a com pany that is equ ipped w ith an In tegrated Managem ent System (ISO 9001, ISO 14001, OHSAS 18001, S A 8000);

    the com pany supp ly ing the Atlantis m odules m ust repor t const ruct ive ly to the d es igner and the yard m anager upon supp ly and pr ior to

    the creat ion of the slab, adapt ing their product to the execut ive design, integrat ing i t when necessary, the company must also exhibi t the

    produc t cer t ificate app roved by an EOTA mem be r a g enc y (European Organisation for Technical Approvals).

    Price euro/kg ____________

    e)Supply and laying of steel bars and welded mesh to create the upper slab of the l ightened raf t to be placed on the to p o f the horizonta l

    fo rmw ork Atlantis w ith the raft 's vert ica l s t i f fners ( in ternal and p erim eter p lates) passing abo ve.

    Price euro/kg ____________

    f)Supply and pouring of concrete, resistance class C25/30, first for fil l ing the Wall formworks (which form the vert ical st i f fners, that is,

    the inner and p erime tric d ivisions of the raf t) and s ubs equ ent co nt inous po uring of the co nc rete on the horizontal plat form o f Atlantis

    formw orks, wh ich first saturates the pipes and then creates the up per slab of the raf t unt i l a minimu m thicknes s is obtained f rom the top of

    the Atla ntis formworks of cm ______ sui tably vibrated and finished wi th a st raight edge.

    Price euro/kg ____________

    The information contained in this catalogue cou ld be changed. Before placing an order, request a confirmation or updated information from the DALIFORM

    GROUP, which reserves the right to make changes at any moment without notice. In consideration of recycled material, it is specified that there are

    tolerance margins caused by environmental factors.

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    9/10

  • 8/12/2019 Muro - for the simultaneous casting of foundation beams and the slab

    10/10

    www.daliform.com

    DG_

    MU

    -Rev.

    03_

    07-12

    Tel. +39 0422 2083 - Fax +39 0422 800234

    [email protected] - www.daliform.com

    Via Serenissima, 30 - 31040

    Gorgo al Monticano (TV) - Italy

    Socio del GBC Italia.