Munitions Remediation at RCRA Facilities Kim Meacham Project Engineer
USACE, Huntsville Center Environmental Protection and Utilities Branch
30 May 2013
US Army Corps of Engineers BUILDING STRONG®
![Page 2: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/2.jpg)
BUILDING STRONG®
Agenda
Brief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS
2
![Page 3: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/3.jpg)
RCRA – What is it?
RCRA is the Resource Conservation and Recovery Act [42 USC 6901 et seq.] , which was enacted by Congress in 1976. RCRA is the primary Federal statute regulating the generation, transportation, treatment, storage, and disposal of solid and hazardous waste. RCRA was enacted by Congress to require proper management of waste generated at existing facilities.
- EM1110-35-1 Chapter 9
3 BUILDING STRONG®
![Page 4: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/4.jpg)
RCRA – What is it?
RCRA has kept in stride with current waste management issues and problems by way of Congressional amendments, the most notable being the Hazardous and Solid Waste Amendments (HSWA).
- EM1110-35-1 Chapter 9
4 BUILDING STRONG®
![Page 5: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/5.jpg)
RCRA – What is it?
Under provisions of HSWA, Congress established the authority for corrective action requirements at permitted or interim status hazardous waste management facilities.
Some states are RCRA-authorized states and have the authority to regulate the hazardous and solid waste within their state
- EM1110-35-1 Chapter 9
5 BUILDING STRONG®
![Page 6: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/6.jpg)
RCRA Permits
Authorized RCRA States ►Achieve Primacy by EPA Acceptance of State
Legislation/Codes/Rules • Georgia EPD RCRA Guidance
Selecting Media Remediation Levels at RCRA SWMUs
• Utah Administrative Code Title R315 Environmental Quality, Solid and Hazardous Waste
6 BUILDING STRONG®
![Page 7: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/7.jpg)
RCRA Permits
RCRA Part A ► Consists of EPA Form 8700-23 (includes both
the RCRA Subtitle C Site Identification Form and the Hazardous Waste Permit Information Form), maps, drawings, and photographs, as required by 40 CFR 270.13
► Or, State form that requires information not requested in the EPA form
► May obtain interim status until Part B permit is issued
7 BUILDING STRONG®
![Page 8: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/8.jpg)
BUILDING STRONG®
RCRA Permits
RCRA Part B ► Hazardous waste permit application contains
detailed, site-specific information ► Negotiations maybe required ► Organized in Modules
• Standard Permit Conditions • General Facility Conditions • Corrective Action • Post Closure Conditions • Attachments – Plans, Management requirements…
8
![Page 9: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/9.jpg)
Permit/Management
Other Requirements may include, as applicable ► Air Modeling ► Waste Analysis Plans ► Inspection Plans ► Contingency Plans ► Closure Plans ► Container Management
Notice of Violation can come with Fines and Penalties
9 BUILDING STRONG®
![Page 10: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/10.jpg)
SWMU/HWMU
Solid Waste Management Unit Hazardous Waste Management Unit
►RCRA permitted • Regulator is Lead Agency • Environmental Remediation
Follows RCRA programmatic requirements
Facility specific requirements
SWMU in the past called Operable Units
10 BUILDING STRONG®
![Page 11: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/11.jpg)
BUILDING STRONG®
CERCLA vs RCRA
- EM 1110-1-502
11
![Page 12: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/12.jpg)
BUILDING STRONG®
CERCLA vs RCRA
- EM 1110-1-502
12
![Page 13: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/13.jpg)
Project SWMUs
Site Description ►Multiple burial pits
• Munitions • Drums
►Open burning and/or dumping trenches,
►Open burn/open demolition sites, including ash piles
13 BUILDING STRONG®
![Page 14: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/14.jpg)
Objectives
First SWMU ►Perform surface stabilization
• Surface clearance for Kick-outs from OB/OD • Removal of materials from pits and trenches • Collect surface samples to determine presence/
absence of contamination ►Surface items were removed from burial pits
as long as no digging was required ►Dispose of conventional munitions
14 BUILDING STRONG®
![Page 15: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/15.jpg)
Specifics to the RCRA Permit
Air Modeling required for burning of incendiaries ►Resulted in Modification of the Permit
Unacceptable to move items BIP’d ►Required Emergency Permit
Staging of Hazardous Waste ►No Hazardous Waste left the SMWU until
properly manifested and ready for shippment
15 BUILDING STRONG®
![Page 16: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/16.jpg)
BUILDING STRONG®
Objectives
Second SWMU ►Perform Interim Removal ►Achieve Response Complete
• Sampling to confirm presence/absence • Remove contaminated soil • Resample • Prepare required closure Documents
HWMU ►Achieve Closure
16
![Page 17: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/17.jpg)
Specifics to the RCRA Permit
Air Modeling Unacceptable to move items BIP’d Closure Plan part of RCRA Permit
►Required to use EPA Regional Screening Levels
►RCRA Facility Quality Assurance Project Plan ►RCRA Facility Risk Assumptions Document
17 BUILDING STRONG®
![Page 18: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/18.jpg)
Specifics to the RCRA Permit
Federal government is exempted from the financial requirements of: ► 40 CFR § 270.14(b)(15)
• Closure Cost Estimate • Financial Assurance
Mechanism for Closure
► 40 CFR § 270.14(b)(16) • Post-Closure Cost Estimate • Financial Assurance
Mechanism for Post-Closure Care
► 40 CFR § 270.14(b)(17) • Liability Requirements
► 40 CFR § 270.14(b)(18) • State Financial Mechanism
18 BUILDING STRONG®
![Page 19: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/19.jpg)
MRS
Munitions Response Site ►RCRA or CERCLA ►Regulator may allow CERCLA
• Must still meet the substantive requirements of the RCRA Permit
►RCRA Facility risk assessment may be more streamlined than required in CERCLA
19 BUILDING STRONG®
![Page 20: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/20.jpg)
Project MRS
Site Description ►Potential for multiple munitions burial pits ►Open burning and/or dumping trenches, ►Barracks
20 BUILDING STRONG®
![Page 21: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/21.jpg)
Objectives
Perform RCRA Facility Investigation ►Reacquire/Resolve anomalies ►Collect samples for Risk Assessment ►Prepare RFI Report ►If required, perform Corrective Measures
Study
21 BUILDING STRONG®
![Page 22: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/22.jpg)
BUILDING STRONG®
Specifics to the RCRA Permit
Little difference from CERCLA Disposal of DMM and Unacceptable to
move items ►Required Emergency Permit
Followed RCRA Facility Risk Assessment Protocols
22
![Page 23: Munitions Remediation at RCRA FacilitiesBrief Overview of RCRA RCRA vs CERCLA SWMU/HWMU MRS . 2 . 3 RCRA – What is it? RCRA is the Resource Conservation and Recovery Act [42 USC](https://reader033.vdocuments.us/reader033/viewer/2022051607/603a0edfb4468c201f741778/html5/thumbnails/23.jpg)
BUILDING STRONG®
Questions?