municipal planning commission agenda summer …€¦ · the exterior of the developments must be...

18
MUNICIPAL PLANNING COMMISSION AGENDA SUMMER VILLAGE OF NORGLENWOLD SUMMER VILLAGES ADMINISTRATION OFFICE DECEMBER 1, 2017 @ 1:00 P.M. A. CALL TO ORDER B. ADOPTION OF AGENDA C. DEVELOPMENT ITEMS 1. 99 Grand Avenue D. ADJOURNMENT

Upload: others

Post on 14-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

MUNICIPAL PLANNING COMMISSION AGENDA SUMMER VILLAGE OF NORGLENWOLD

SUMMER VILLAGES ADMINISTRATION OFFICE DECEMBER 1, 2017 @ 1:00 P.M.

A. CALL TO ORDER

B. ADOPTION OF AGENDA

C. DEVELOPMENT ITEMS

1. 99 Grand Avenue

D. ADJOURNMENT

Page 2: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

November 2, 2017

Summer Villages of Norglenwold – Municipal Planning Commission

Agenda Item

99 Grand Ave (Lot 10 Block 5 Plan 5116AE)

Development Permit Application

Background:

Chris Aldrich of 99 Grand Ave (Lot 10 Block 5 Plan 5116AE) submitted a complete application on

November 7, 2017 for a detached garage w/ guest house above and a dwelling addition. This property is

located in the R-S District in the Summer Village of Norglenwold.

Owner has existing Encroachment Agreement for all Aspen Lane encroachments shown on June 2002

RPR, and currently parks on the Lane. Approximately 12 trees will be removed from the property, no

trees/shrubs will be replanted.

Discussion:

This application is before MPC for the following reasons:

The total floor area of the garage is 1536 sq. ft. and is listed as a Discretionary Use.

Since the dwelling does not conform to the current front yard setback of 7.5m or side yard

setback of 1.5m:

o The front yard setback to the garage of 4.43m meets the regulation “it is not closer to

the top of the escarpment than the front wall of the main building”, however the main

building does not comply with the 7.5m setback, so a variance may be required.

o The front yard setback to the proposed deck of 0.40m is below the 3.75m minimum and

a variance of 3.35m is required, since the dwellings/garages front yard setback isn’t

7.5m.

o A variance for the addition is required, due to the non-conforming dwelling.

A guest house is listed as a Discretionary Use.

Administration would request that if approved the following conditions be added:

Site survey at footing pour to ensure compliance.

Site survey post landscaping to ensure compliance (50% maximum parcel coverage).

Completions deposit of $2000.00.

Both sheds to be removed from the property.

The eave of the dwelling addition shall not encroach into the Street.

Guest house shall not contain a kitchen or cooking facilities.

The exterior of the developments must be finished to match or compliment the exterior finish of

the main building.

Electrical power from the property line to any building situated on this parcel shall be

constructed underground.

The Summer Village will not be held responsible for any slope instability.

C-1

Page 1 of 17

Page 3: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

November 2, 2017

New deck/stairs shall remain unenclosed.

After discussion the Commission may:

Approve the application, or

Deny the application stating reasons why.

C-1

Page 2 of 17

Page 4: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

-----Original Message-----

From: Chris Aldrich

Sent: November-07-17 3:03 PM

To: Koralyn Lemmon <[email protected]>

Subject: 99 grand ave

Koralyn,

My property at 99 grand ave has been there since the seventies. It is a Panabode style home which to

me is very desireable as a lake cabin. It has only two bedrooms and renovating this home to

accommodate more is a difficult task. Our lot has several challenges but I believe we have come up with

a very modest and well thought out layout to expand not only our living space but also to accommodate

my boats so they can be stored inside at our lake lot as well as eliminating some of our outdoor sheds

and to make this home more asthetically pleasing. I ask that you consider our application for our garage

with suite so we can move forward with enjoying our lake lot and making it more practical for our family

to use. Thanks Chris

Chris Aldrich

C-1

Page 3 of 17

Page 5: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 4 of 17

Page 6: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 5 of 17

Page 7: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 6 of 17

Page 8: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 7 of 17

Page 9: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 8 of 17

Page 10: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 9 of 17

Page 11: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 10 of 17

Page 12: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 11 of 17

Page 13: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 12 of 17

Page 14: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 13 of 17

Page 15: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 14 of 17

Page 16: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 15 of 17

Page 17: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 16 of 17

Page 18: MUNICIPAL PLANNING COMMISSION AGENDA SUMMER …€¦ · The exterior of the developments must be finished to match or compliment the exterior finish of the main building. Electrical

C-1

Page 17 of 17