municipal complex feasibility study report
TRANSCRIPT
Municipal Complex Feasibility Study Report
City of New Castle | Municipal Services Commission | New Castle, Delaware
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 1
Project Background
Purpose:
The City of New Castle and Municipal Services Commission contracted with George, Miles, & Buhr, LLC to conduct a feasibility study to determine the viability of a combined City/MSC Administration building and other necessary facilities near the existing Police Department, City Maintenance facility, and Utility building.
Study findings were developed into Two (2) feasible concepts.
Presentation Outline:
• Review Targeted Administration Building Program Requirements.
• Review Two (2) Concepts and Estimated Costs.
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 2
Trolley Barn Public Works
New Castle City Police Department
Site Context
New Castle City Police Department
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 3
Trolley Barn Public WorksGarage / Storage Building
Utility Building
MSC Pole Building
Further Project Context
New Castle City Police Department
New Castle City Police Department
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 4
Project BackgroundMunicipal Complex Entrance
Municipal Boulevard – Singular Entrance to Existing Complex
Recommend that Boulevard be Upgraded and Revitalized as Part of Municipal Complex Improvements
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 5
Functional Building Area Comparison
Preliminary Tool to Define Floor Areas and Number of Rooms for All City and MSC Administrative Functions. Also identifies additional space parameters required for circulation, construction, facilities and utilities.
Rooms and Floor Areas established in coordination with MSC/City Staff. More in-depth interviews shall take place in the future for defining adjacencies and shared functional space, etc.
Current City/MSC Space Deficits Affecting Administrative Efficiencies:
MSC Office:• No Conference Room• No Lunch Area• Lack of Storage• Currently Accommodated Off-Site
City Hall:• Lack of storage space – file
storage currently in combined conference/lunchroom
Design DevelopmentEstablishing the Proposed Administration Building Footprint
Design DevelopmentEstablishing the Proposed Administration Building Footprint
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 6
•Involvement of interested parties in the definition of the scope of work prior to the design effort
•Emphasis on gathering and analyzing data early in the process so that the design is based upon sound decisions
•Efficiencies gained by avoiding redesign and more redesign as requirements emerge during architectural design.
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 7
Design DevelopmentEstablishing the Proposed Administration Building Footprint
COUNCIL CHAMBER OPTION 1
120 ATTENDANT SEATS
9 COUNCIL SEATS
129 TOTAL SEATS
1,711 SQUARE FEET
COUNCIL CHAMBER OPTION 2
128 ATTENDANT SEATS
7 COUNCIL SEATS
135 TOTAL SEATS
1,860 SQUARE FEET
Concept APlaza Concept
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 8
Concept ABird’s Eye View
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 9
N
Concept APlaza Concept
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 10
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 11
Concept APlaza Concept
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 12
Concept BPolice Department Extension Concept
Concept BPolice Department Extension Concept
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 13
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 14
Concept BPolice Department Extension Concept
Concept BBird’s Eye View
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 15
N
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 16
Summary Next Steps + Other Possibilities
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 17
SummaryPros & Cons
CONCEPT A CONCEPT B
NEW BUILDING LOCATION
2 1
SITE ACCESS / CIRCULATION
2 1
SECURITY 2 1
CONVENIENCE 2 1
PARKING ACCOMODATED
2 2
MEETS CITY PROGRAM NEEDS
2 2
MEETS MSC PROGRAM NEEDS
1 1
TOTAL 13 9
OVERALL COST $ 10,268,494 $10,638,599
Pu
blic v
s.
Pri
vate
Concept A
Concept B
** Scores range from 1-2. 2 being the highest
• Based on Concept selection
• Revise and refine site requirements and layout.
• Provide 30% concept building & site design:
• Additional programming on Administration Building determining key City/MSC Departments space needs, interior and exterior configuration, and adjacency
• Preliminary code evaluations for the building and site
• Develop floor plans and exterior building elevations with building cross-section views
Municipal Complex Feasibility Study Report GMB – Architects & Engineers, LLC 18
SummaryNext Steps