IntroductionElectrical Engineering – JuniorTwin Lakes, WIOlivet Nazarene University (Bourbonnais, IL)SWEVarsity Tennis
![Page 3: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/3.jpg)
Initial ThoughtsFriendly atmosphere - CommunityFoster learning environmentHard workersCollaboration
![Page 4: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/4.jpg)
Photo Control Test FixturePurpose: Test competitors’ photo-control
unitsFirst “hands-on” experience Planning – wire diagrams/ schematicsSoldering (fuses)
![Page 5: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/5.jpg)
Multiwave Test BedPurpose: Test and trouble
shoot software for Multiwave Pool & Spa Controller
Programs: Altium, Solidworks, Microcap, Excel
Design: Schematics, PCB layout, soldering, assembly, part selection/ordering (BOM)
Parts: LED indicators, switches, PCB & temp. controls
![Page 6: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/6.jpg)
Multiwave Test Bed Schematic
![Page 7: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/7.jpg)
Multiwave Test Bed PCB Layout
![Page 8: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/8.jpg)
Multiwave Test Bed PCB Layout
![Page 9: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/9.jpg)
Multiwave Test Bed
![Page 10: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/10.jpg)
Multiwave Test Bed cont.Goal: 5 MW Test Beds for software/electrical
eng.Status: 1 Complete, 4 other boards
installation readyImprovements:
Change potentiometer (lower value/multi-turn)Adjust PCB layout for motor speedsSpread LEDs out Use various colored LEDs
![Page 11: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/11.jpg)
Future EmploymentGrowth opportunities
within company
Further education
401k Benefits
Flexible hours
![Page 12: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/12.jpg)
Final Thoughts/SuggestionsEnjoyed Intermatic family
Great learning experience:Planning is KEY.
Favorite thing: Exposure to multiple areas
Idea: Internships – collaboration of interns
![Page 13: Multiwave Test Bed](https://reader036.vdocuments.us/reader036/viewer/2022062503/587e051d1a28abe11a8b5953/html5/thumbnails/13.jpg)
Thank You Intermatic!!!!!!!!!!!!!Special thanks to:
Jeff Schroeder & Don Gallagher: Electrical
Barry Gates & Rob Lofgren: PCB/assembly
Mark Miller & Gary Kinsch: Test Box
Teresa Pilcher: Support