multistage biological wastewater treatment … · trickling filter 2 tf each 4.900 m ... multistage...

18
1 Page 1 Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011 - Introduction: P- and N-Removal in Multistage Processes - WWTP Ratzeburg: Step-feed Denitrification - WWTP Lübeck: Combined Treatment with Biofiltration All Topics: Description of Process Features, Remarks on Loads and Effluent Values - WWTP Flensburg: Trickling Filter and Upflow Sludge Bed Reactor Multistage Biological Wastewater Treatment in Northern Germany Dr.-Ing. Jörn Einfeldt Dr.-Ing. H.-O. Günter / Dr.-Ing. A. Silem (Privatinstitut für Klärtechnik GmbH, 23611 Bad Schwartau, Germany) Page 2 Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011 German Experts on Water Management Biotests and chemical investigations Consulting Field investigations and data collection Process design and development Facilities start up Expert‘s report Optimization Support Introduction Page 3 Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011 German Experts on Water Management Introduction Tallinn Schleswig- Holstein Page 4 Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011 German Experts on Water Management Flensburg Lübeck Ratzeburg Introduction

Upload: truongdung

Post on 31-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

1

Page 1Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

- Introduction: P- and N-Removal in Multistage Processes

- WWTP Ratzeburg: Step-feed Denitrification

- WWTP Lübeck: Combined Treatment with Biofiltration

All Topics: Description of Process Features,

Remarks on Loads and Effluent Values

- WWTP Flensburg:

Trickling Filter and Upflow Sludge Bed Reactor

Multistage Biological Wastewater Treatmentin Northern Germany

Dr.-Ing. Jörn Einfeldt

Dr.-Ing. H.-O. Günter / Dr.-Ing. A. Silem(Privatinstitut für Klärtechnik GmbH, 23611 Bad Schwartau, Germany)

Page 2Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Biotests and chemicalinvestigations

• Consulting

• Field investigationsand data collection

• Process design anddevelopment

• Facilities start up

• Expert‘s report

• Optimization

• Support

Introduction

Page 3Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementIntroduction

Tallinn

Schleswig-Holstein

Page 4Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Flensburg

Lübeck

Ratzeburg

Introduction

2

Page 5Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

WWTP Flensburg, 224.000 PE

WWTP Lübeck, 640.000 PE

WWTP Ratzeburg, 25.000 PE

Introduction

Page 6Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Biological Treatment:

Carbon Removal (Activated Sludge)

InletEffluent

Return sludge Excesssludge

Primary settlement tank Aeration tank Clarifier

Introduction

+ further stages for advanced treatment

Page 7Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Removal of Phosphorus

Introduction

biological

*

*

/ chemical

Page 8Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Removal of Phosphorus

Introduction

Why combining different precipitation stages ?

- Early relief of the following process stages

- Economical use of chemicals

- Reducing flushing frequency of the filtration unit

3

Page 9Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Return sludge

Aeration tank Clarifier

Excesssludge

NH4

NO3

NH4

NC

Introduction

Biological Nitrogen Removal

Page 10Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Biological Nitrogen Removal

Return sludge

Aeration tank Clarifier

Excesssludge

Recirculation

NH4

NO3

NH4NO3

N2

NDN

Recirculation = 3 to 4 times inlet quantity

Introduction

Page 11Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementIntroduction

Page 12Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementIntroduction

4

Page 13Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementIntroduction

1. Stage of Treatment

? ?

2. Stage3. Stage

Page 14Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Examples:

Different Processes for N-Removal / Integration of P-Removal

- WWTP Ratzeburg: Step-feed Denitrification

- WWTP Lübeck: Combined Treatment with Biofiltration

- WWTP Flensburg: Post-Denitrification with an

Upflow Sludge Bed Reactor

Introduction

Page 15Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

WWTP Ratzeburg (2005): 25.000 PE

WWTP Ratzeburg

Page 16Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Design CapacityPopulation Equivalents 25.000 PEB60

(34.000 PEB60)

Hydraulic Load 4.700 m³/d

470 m³/h

(500 m³/h, 275 m³/h equalized)

COD 3.240 kg/d

Nges 350 kg/d

WWTP Ratzeburg

5

Page 17Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Equalization Tank

Inlet Effluent Fill Level

WWTP Ratzeburg

Page 18Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

(Bio)-Filtration

Equalization tankSubstrate feeding

Mechanicalpretreatment

(Screen, grit chamber, primary settlement tank)

Biological treatment

DigesterBiogastank

Combinedheat and power unit

Sludgedewatering

1. Flow line

2. Flow line

Effluent

WWTP Ratzeburg

Dosing of precipitant

Page 19Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementWWTP Ratzeburg

Page 20Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Activated Sludge Stage

WWTP Ratzeburg

6

Page 21Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

DN

DN

N

NDN

N

N

Step-feed Denitrification

DN

DN

N

N

DN

DN/N

N

- No recirculation

- Higher MLSSin the upper tanks

WWTP Ratzeburg

Page 22Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Technical Specifications:

Sludge Age tSS,Dim T = 8°C 11 d

Activated Sludge Volume 3.360 m³

Biofiltration:

1st Stage, Nitrification 4 FBR each A = 5 m²

2nd Stage, Denitrification 6 Grit Filter each A = 5 m²

Digester 1.200 m³

WWTP Ratzeburg

Page 23Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Effluent Demands:

COD ≤ 60 mg/l

BOD5 ≤ 15 mg/l

NH4-N ≤ 3 mg/l

Nges ≤ 10 mg/l

Pges* ≤ 0,3 mg/l

Susp. Sol. ≤ 5,0 mg/l

GK 4

90 mg/l

20 mg/l

10 mg/l

18 mg/l

2,0 mg/l

--

WWTP Ratzeburg

* T > 15°C

Page 24Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results: COD

WWTP Ratzeburg

7

Page 25Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results: Phosphorus

WWTP Ratzeburg

Page 26Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results: Nitrogen

WWTP Ratzeburg

Page 27Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Summary: Special Features WWTP Ratzeburg

- Step-feed Denitrification(no mixed liquor recirculation)

- Upgradable by diverse extra modules,according to future requirements

- Very strict effluent demands

WWTP Ratzeburg

Page 28Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

WWTP Flensburg (1997 - 2005): 224.000 PE

WWTP Flensburg

8

Page 29Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Design CapacityPopulation Equivalents 224.000 PEB60

Hydraulic Load 55.000 m³/d

3.190 m³/h

COD 28.300 kg/d

Nges 2.125 kg/d

WWTP Flensburg

WWTP Flensburg

Page 30Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Inlet (frommechanical

treatment)

1st Lane

2nd Lane

3 Clarifiers

Effluent

Situation in 1985

WWTP Flensburg

Page 31Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Flow Scheme, Concept 1997

High loaded biology

Low loaded biology

Clarifier

Clarifier

?

Effluent

TF 2 USBR 2

USBR 1TF 1

TF 3 ?

Inlet (frommechanical

treatment)

SS as Substrate

WWTP Flensburg

Page 32Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

since Large-scale pilot operation and optimisation1999 (by PIK together with TU Hamburg-Harburg)

1997 Start of construction for nutrient removal:Existing studies by the TU Hamburg-Harburg, butlack of large-scale experience� Process survey and adjustment in parallel with

stepwise upgrading the plant

2001 Verification of the dimensioning of TF 1 and USBR 1prior to start of construction of TF 2 and USBR 2

2004 Start of operation TF 2

2005 Start of operation USBR 2 and filtration unit

1988-95 Extension of carbon-removal facilities,simultaneous phosphorus-precipitation

WWTP Flensburg

9

Page 33Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementWWTP Flensburg

Page 34Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Details high loaded lane

TF USBR FBR FF

Effluent

3rd biological stage(2-stage-filtration)

2nd biological stage

Act. sludge(HL)PT Clar.

1st biological stage

Me

SS

WWTP Flensburg

Dosing of precipitant

Page 35Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Upflow Sludge Bed Reactor (Moving Bed Reactor)

WWTP Flensburg

Page 36Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementWWTP Flensburg

Upflow Sludge Bed Reactor (Moving Bed Reactor)

Bubbling of N2

10

Page 37Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

• Inlet cylinder, diverting theflow

• Submerged outlet pipe

• Floating sludge removal

WWTP Flensburg

Page 38Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

• Two of a total of fourpaddle agitators per USBR

• Scraper for settled sludge

WWTP Flensburg

Page 39Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Kläranlage Flensburg

Hydraulikversuch 14 vom 14.09.05: Erhöhung Beschickung SBtR 2 von

900 m³/h auf 1.400 m³/h, RW=20 Hz

0

1

2

3

4

5

6

7

8

5:00 7:00 9:00 11:00 13:00 15:00 17:00 19:00 21:00

Tie

fe in

m

0

400

800

1.200

1.600

2.000

2.400

2.800

3.200

Schlammspiegel innen Schlammspiegel aussen Beschickung

Be

sch

icku

ng

in

m³/

h

Anhebung 1,02 m

Operating behaviour USBR:Inlet increase from 900 m³/h to 1.400 m³/h

Sludge rising 1 m, stable sludge bed

WWTP Flensburg

Page 40Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Technical Specifications:

Sludge Age tSS,Dim T = 12°C 9,5 d (LL)T = 12°C 1,5 - 2,0 d (HL)

Activated Sludge Volume 4.670 m³ (LL)2.700 m³ (HL)

Trickling Filter 2 TF each 4.900 m³

Upflow Sludge Bed Reactor 2 USBR each 3.350 m³

hm = 7,40 m

Biofiltration:

1st Stage, Nitrification 8 FBR each A = 40 m²

(therefrom 2 for nitrification of sludge liquor)

2nd Stage, Denitrification 8 FBR each A = 40 m²

WWTP Flensburg

11

Page 41Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Effluent Demands:

COD ≤ 60 mg/l

BOD5 ≤ 15 mg/l

NH4-N ≤ 10 mg/l

Nges ≤ 10 mg/l

Pges ≤ 0,5 mg/l

Susp. Sol. ≤ 5,0 mg/l

GK 5

75 mg/l

15 mg/l

10 mg/l

13 mg/l

1,0 mg/l

--

WWTP Flensburg

Page 42Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results: Phosphorus(German limit values are based on grab samples!)

WWTP Flensburg

Page 43Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results and simulation study USBR:

WWTP Flensburg

Page 44Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results:

High loaded biology

Low loaded biology

Clarifier

Clarifier TF 2 USBR 2

USBR 1TF 1

Inlet (frommechanical

treatment)

99 % N

50–80 % DN

0 % N

< 1 mgNH4-N/l

< 10 mgNO3-N/l

Ca. 5-6 mgNO3-N/l

< 1 mgNH4-N/l

< 8 mgNO3-N/l

2-s

tag

e-b

iofi

ltra

tio

n w

ith

nit

rifi

cati

on

an

d -

den

itri

ficati

on

WWTP Flensburg

12

Page 45Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Summary: Special Features WWTP Flensburg

- Biological process, 3 stages(no MLSS recirculation for denitrification):

- Strict effluent demands

1) Carbon removal: Activated Sludge System2a) Nitrification: Trickling Filter2b) Post-Denitrification: Upflow Sludge Bed3) Biofiltration: 1st stage subsidiary nitrification

2nd stage denitrification

WWTP Flensburg

Page 46Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

WWTP Lübeck (2009): 640.000 PE

WWTP Lübeck

Page 47Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Design CapacityPopulation Equivalents 640.000 PEB40

(Outlet primary treatment)

Hydraulic Load 90.000 m³/d

15.100 m³/h

Inlet biological treatment: 5.500 m³/h

BOD < 25.650 kg/d

BOD / Nges < 4,0

WWTP Lübeck

Page 48Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

WWTP Lübeck:1967-2007

- 1990 / 1991 Pilot Plant

- 1967 Mechanical-biological Treatment1982 Aeration with refined oxygen

1990 New mechanical treatment

- 1992 Approval Planning (641.000 PE)

- 1996 Official Approval

WWTP Lübeck

13

Page 49Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Filtration: a) Higher MLSS in aeration tank: then NH4-N < 8 mgN/l

FBR used for denitrification

1. Stage: 2-stage step-feed denitrification,

SVI 150 ml/g, actual suspended solids (2007) too low

b) Alternative, needs a longer period for putting into

operation: FBR for Nitrification, FF for Denitrification

Concept

WWTP Lübeck

Page 50Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

RecintRecint

Recext

Inlet from mechanical pretreatment

2-s

tag

e-b

iofi

ltra

tio

n

Effluent

5

Clar.

RS

VKB

K MWB 2

MWB1

C C

C

ANDN

50% QZu

50% QZu DN DNN N

MWB: Combined Wastewater Equalisation Tank

WWTP Lübeck

Dosing of precipitant

Page 51Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

RecintRecint

Recext

Inlet from mechanical pretreatment

2-s

tag

e-b

iofi

ltra

tio

n

Effluent

5

Clar.

RS

VKB

K MWB 2

MWB1

C C

C

ANDN

50% QZu

50% QZu DN N N

MWB: Combined Wastewater Equalisation Tank

WWTP Lübeck

Dosing of precipitant

DN

Page 52Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

- 1997 Start of overall completion

- 1996 / 1997 Verification of inlet data

- 2000 Start of operation 5 new clarifiers

- 2001 Verification of inlet data

- 2003 Start of operation of new activated sludge stage, design biofiltration

WWTP Lübeck:1967-2007

- 2008 Start of operation biofiltration (in progress)

- 2006 Verification of inlet data: declining biological load 370.000 PE,but disadvantageous CSB/BSB ratio 3,0 at weekends

WWTP Lübeck

14

Page 53Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Inlet Filtration (Effluent Secondary Clarifier)

PO4-P ≤ 1,5 mg/l

Ntot ≤ 20 mg/l

Suspended Solids ≤ 75 mg/l

Construction:

1.Stage: Upflow granular fixed bed reactor (FBR)

Fill: expanded clay

2.Stage: Sandfilter (FF)

Fill: anthracite / siliceous sand

WWTP Lübeck

Page 54Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Dosing Point Substrate, Precipitant

C

12 x FBR 12 x FF

Fe

3 x 2 RF

vom Pumpwerk

Filtration

zur Trave from pump station

Outletchannel

WWTP Lübeck

Page 55Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Prinzipskizze der 2-Stufen-Filtration

FF =

FBR = Festbettreaktor ( gefüllt mit Blähbeton )

= Verlauf des Wasserweges vom Quellschacht

Feinfilter ( gefüllt mit Sand )

FRB FF Ablauf zur Reinwasserkammer

Quellschacht

Quellschacht = Wasserverteilung

Prozeßluftgebläse

Schlammwasserkanal

RK1 RK2 RK3

RK = Rohrkanal 1, 2, 3

Schlammwasserkanal

vorh. Rohrkanal

Ablaufkanal zur Trave

FBR FF FBR FF

Flow path filtration

Inlet chamber: water distribution

FBR: upflow granular fixed bed reactor

FF: sandfilter

RK: pipe channel 1, 2, 3

Inlet chamber

WWTP Lübeck

Page 56Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

15

Page 57Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Page 58Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

„Pipe channel“

Page 59Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Upflow granular fixed bed reactor,filled with Liaperl Ø 4-8 mm (expanded clay)

height 5,00m

Page 60Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Fine filter, filled with anthracite (1,4-2,5 mm, height 1,5 m) and siliceous sand (0,7 - 1,2 mm, height 0,5 m)

16

Page 61Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Page 62Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Technical Specifications:

Sludge Age tSS,Dim T = 12°C 12 - 16 d

Activated Sludge Volume 22.400 m³ + 17.340 m³

Biofiltration (main function: removal of suspended solids):

1st Stage 12 FBR each A = 36 m²

(Denitrification, optional nitrification)

2nd Stage 12 FBR each A = 36 m²

(P-removal, optional denitrification)

WWTP Lübeck

Page 63Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Effluent Demands:

COD ≤ 60 mg/l

BOD5 ≤ 15 mg/l

NH4-N ≤ 8 mg/l

Nges ≤ 10 mg/l

Pges ≤ 0,5 mg/l

Susp. Sol. ≤ 5,0 mg/l

GK 5

75 mg/l

15 mg/l

10 mg/l

13 mg/l

1,0 mg/l

--

WWTP Lübeck

Page 64Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

KLint.KLint.

KLext.

Inlet from primary treatment

2-s

tag

e-b

iofi

ltra

tio

n

Effluent

5

Clar.

RS

VKB

K MWB 2

MWB1

ANDN

50% QZu

50% QZu DN DNN N

C C

C

99 % N

50–80 % DN< 20 mgNO3-N/l

WWTP Lübeck

< 5 mgNO3-N/l

17

Page 65Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results, 2-stage-biofiltration: Phosphorus

WWTP Lübeck

Page 66Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results, 2-stage-biofiltration: Phosphorus

WWTP Lübeck

?

Page 67Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results, 2-stage-biofiltration: Phosphorus

WWTP Lübeck2-s

tag

e-b

iofi

ltra

tio

n

Effluent

50% QZu

50% QZu DN DNN N5

Clar.

RS

from PT

FeSO4

FeCl32) Stormwater flow: values up to 0,3 mgP/l

3) Dosing into activated sludge tank improves SVI

4) … reduces H2S-formation in digester

5) … reduces flushing frequency (energy, hydraulic backcharge)

1) FeSO4 cheaper than FeCl3

Page 68Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results, 2-stage-biofiltration: Nitrogen

WWTP Lübeck

18

Page 69Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Operational results, 2-stage-biofiltration: Nitrogen

WWTP Lübeck

Page 70Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Summary: Special Features WWTP Lübeck

- Biological process, 2 stagesCombined treatment

- Strict effluent demands

1) Carbon removal, nitrification,partial denitrification:Activated Sludge System

2) Biofiltration: 1st stage denitrification2nd stage fine filter (SS)

WWTP Lübeck

Page 71Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water ManagementSummary

- Strict effluent demands,based on grab samples

- Different process designs proved to be applicable

- Different framework conditionsrequire matched process designs

- New technologies may produce newoperating challenges

- Take advantage from other operatorsexperiences

Page 72Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management

Thank you foryour attention !

Page 72Multistage Biological Wastewater Treatment in Northern Germany / Tallinn 16.03.2011

German Experts on Water Management