multidisciplinary system training centre - indian...

29
Multidisciplinary System Training Centre NORTH EASTERN RAILWAY, GORAKHPUR Established in February 1947

Upload: others

Post on 21-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Multidisciplinary System Training Centre

NORTH EASTERN RAILWAY, GORAKHPUR

Established in February 1947

Page 2: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

BRIEF HISTORY

Training Centre was established in February 1947.

After bifurcation of N.F. Railway from N.E. Railway, it was named as System

Technical School in August 1958.

It was again renamed as Supervisors’ Training centre in July, 1995 and after merger of all training center as MSTC in April 2018.

To imparts training to supervisory /

Artisan staff of mechanical, engineering, Signal, Electrical and other departments as well as to the running staff.

It also runs few other inter-disciplinary courses such as

Computer, Disaster Management and Advance work-study.

Page 3: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

GOALS

Initially appointed staff and

supervisors do not have any idea of

railway working. For this propose

this training centre imparts

knowledge about system of Railway

working and at the same time the

training centre motivate the

trainees for safety, security and

punctuality which is the main

objective of Railways.

Faculty Member of MSTC SL

No NAME Designation Mob. No Email ID Pic

1 Ashwani Kumar

Dikshit Director 9794840405 [email protected]

2 Mohd. Javed Dy. Director 9794844450 [email protected]

3 P.K. Dubey Lecturer

(C&W) 9794844434

[email protected]

4 Ram Sajivan Instructor

Dsl.Elect 9794844433 [email protected]

5 R.K. Mishra Sr. Instructor

(P.way) 9794844406

[email protected]

6

Rajendra INSTRUCTO

R (C&W) 9794844407

[email protected]

Page 4: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

7 R. P. SINGH INSTRUCTO

R (C&W) 7800114460

[email protected]

8 Amarjeet INSTRUCTO

R

(Mechanical)

9494831518 [email protected]

9 Santosh Kumar INSTRUCTO

R

(Mechanical)

7380450540 [email protected]

10 Dr. Mahesh Kumar Instructor/Mec

hanical 9771443367

[email protected]

11 Indrabhan

Chaudhari

INSTRUCTO

R

(Mechanical)

9838113568 [email protected]

12 Anand Kumar

Gupta Instructor

Audio-Visual 8545994505

[email protected]

13 Deepak Kumar

Rawat

INSTRUCTO

R (Civil-

Defence)

9511159514 [email protected]

14 Ehtesham Khan Sports &

recreation

Supervisor

9794865180 [email protected]

15 Shivanand

Srivastava Store

Supervisor 9452442235

[email protected]

16 Janeswar Shahi Janitor 9532909480 [email protected]

17 Anuj Kumar

Srivastava Mess

Supervisor 9794831940

[email protected]

18 Vivek Singh Hostel

Supervisor 9794832140

[email protected]

19 Vijay Kumar Varma

Chief Loco

Inspector

7905325247 [email protected]

20 H.P. Pandey 9794844404 [email protected]

21 Abhay Kumar

Srivastava 9794842437

Page 5: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Training Infrastructure

S.N. Description Mech. Engg. S&T Electrical Total 1. No. of class

room

11 01 06 02 20

2. Conference hall 01 - - - 01

3. E-Learning - - 01 01

4. LCD Projector 19 - 08 06 11

5. Model room 01 01 - 02 04

6. Assembly Hall 01 - - - 01

7. Library 01 - 01 - 02

Hostel Infrastructure

S.N. Description Mechanical Engg. S&T Electrical Total

1. No. of Hostel 04 01 02 01 08

2. No. of rooms 102 08 36 10 156

3. Capacity 261 32 76 24 393

4. Hall 01 - 01 - 02

Type of Training Courses 1. Initial Courses

2. Promotional Course

3. Refresher Courses

4. Special Need Base Courses

5. Other Courses

Course Calendar 2018-2019 Courses Total Courses Total

Loco Pilot Passenger Promotion

05 C&W Supervisor Refresher

06

Page 6: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Loco Pilot Goods Promotion

03 Workshop Supervisor Refresher

06

Loco Pilot Refresher 12 Diesel Supervisor refresher

06

Asstt. Loco Pilot Refresher

12

Total no of courses 32 18

Grand Total = 50 Courses

Initial Training 2018-2019 SSE & JE through RRB of all stream 03

Intermediate/LDCE JE of all stream 03

Promotion through seniority JE 03

Total 09

Training Course

Department Trade Courses Duration Approved

By

Mechanical

SSE/JE C&W, workshop,

Diesel , drawing Induction 52 week Rly. Board

Inter App JE work shop ,C&W ,

Diesel Promotional 52 week Rly. Board

Trainee JE work shop ,C&W ,

Diesel Promotional 26 week Rly. Board

SSE/JE workshop, C&W, Diesel Refresher 18 days Rly. Board Ministerial Staff (Mech.

Department) Refresher 06 Days Rly.Board

Running ALP Induction 103 Days Rly.Board ALP to LPG Promotional 78 Days Rly.Board

Page 7: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

LPG to LPP Promotional 48 Days Rly.Board ALP and Loco Pilot (Diesel) Refresher 18 days Rly. Board Loco Inspector, Power

Controller & Crew Controller Refresher 18 days Rly. Board

ALP and Loco Pilot (Electric) Refresher 12 days Rly. Board

Electric Loco

conversion

Courses

ALP (Diesel to Electrical) conversion 48 Days Rly. Board

Loco Pilot, PNL, CPNL, CCC &

CLI (Diesel to Electrical conversion 36 Days Head Qtr

LPG to LPP conversion 48 Days Rly. Board

ALP and LPG conversion 78 Days Rly. Board

Electrical

SSE/JE, Induction 52 Week Rly.Board

Technician (ITI) Induction 6 months Rly.Board

Technician ( non ITI) Induction 03years Rly.Board

Technician Prom. 21 days Rly.Board

SSE/JE Prom. 21 days Rly.Board

Group D to Technician Prom. 21 days Rly.Board

Unskilled to Skilled

Artisan Prom. 18 days Rly.Board

Technician to JE Prom. 36 days Rly.Board

SSE/JE Refresher 12 days Rly.Board

Technician R

fresher 12 days Rly.Board

Engineering

SSE/JE, P-Way/Works Induction 52 Week Rly.Board

JE, P-Way Promotional 52 Week Rly.Board

SSE/JE (P.Way) Refresher 12 days Rly. Board

Page 8: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

SSE/JE, P-Way Special courses 03days Head Qtr

Signal

Khalasi Sig/Tele Induction 24days Rly. Board

Signal/Tele Maintainer Gr.III Induction 102 days Rly.Board

Signal Maintainer Gr.II Induction 150 days Rly. Board

JE Sig/Tele Prom. 102 days Rly. Board

Signal/Tele Maintainer Refresher 18 days Rly.Board

Khalasi to Sig./Tele Maintainer Gr III Foundation 72 days Rly. Board

Signal/Tele Maintainer Equipment 6/12 days Rly. Board

Special Courses

All Deptt.

Disaster Management

( All Departments) Special 06 Days Head.Qtr

Fire Fighting & First

Aid (Front line staff) Special 02 Days Head.Qtr

Computer Special 06 Days Head.Qtr

Coaching( SC/ST

candidate) Group B

Promotion Special 21 Days Head Qtr

Technition Power tp

TRD Conv.

12 Days Head Qtr

Investigation of

Derailment Special 06 Days Head.Qtr

Running GDR (Guard Driver

Report ) Special

03 Days Head.Qtr

Page 9: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

ADEQUACY OF QUALIFICATION

AND EXPERIENCE OF FACULTY

MEMBERS

Eligible qualification of STC GKP:-

a. Tech. Qualification : Minimum degree / Diploma in Engineering

b. Field experience : Minimum five years in supervisory category .

c. Age Limit : Below 52 years

d. Selection criteria : Three members

SAG committee

e. Selection pattern : Two stages.

a. Written examination

b. Viva-Voce

Courses Conducted & Capacity utilization

Page 10: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Description Year Mech. Elec. S&T Engg. Total

No of

Courses

2016-17 80 62 71 15 228

No of

Trainees

2301 361 402 127 3191

Capacity

utilization %

162.0 118.35 66.61 28.7 -----

No of

Courses

2017-18 127 51 74 19 271

No of

Trainees

2526 367 533 110 3536

Capacity

utilization %

148.6 127.33 68.96 133.8

____

No of

Courses

2018-19

up to

sept.18

64 28 44 13 149

No of

Trainees

1235 249 149 46 1679

Capacity

utilization %

131.8 122.86 72.78 52.2

------

Page 11: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Staff Trained under Project Saksham:

(upto Sept. 2018)

Courses for Number of Training Courses Conducted Year Total

Trainee

Technical 01

2017-18

14

Non-Technical 05 69

LP, ALP & CLI 04 49

Total 10 121

Technical 04

2018-19

51

Non-Technical 04 18

Group D 04 46

Total 16 115

Page 12: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Mobile Training Car For on spot training of Depot/

Diesel lobby of Division in 2004 a

Mobile training car no.87922/ NE is

handed over to Multidisciplinary

system training centre Gorakhpur.

Facilities available in Mobile car

One Kitchen room. One bed room and one cabin. One washroom & one toilet One class room with one projector, one computer

and PA System. Technical Course Flexi boards are displayed in

Mobile Training car class room for Knowledge. Class room has Capacity

Page 13: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

of 30 trainees at a time.

Last movement of mobile

training car was on

02.07.2019 at Manduadih

for training of C&W Depot Staff.

Page 14: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Bed Room,Cabin & Kitchen

Page 15: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Technical Flexi boards

Page 16: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

C&W Lab

Page 17: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

CONFERENCE HALL

Mechatronics Lab

Page 18: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Diesel Loco Electrical Lab

Page 19: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Diesel Loco Mechanical Lab

Model Room

Crew Manage ment System Distributor Valve Assembly

Page 20: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

ICF Trolley with Twine Pipe Air Brake System H Type CBC

ASSESSMENT /ANALYSIS OF TRAINING NEEDS

NEW TOPICS ADDED IN C&W MODULE

1. H-Type coupler

2. Design features of LHB & FIAT Bogie

3. Bio-toilets

4. Disc brake system

5. MCC,OBHS,CTS

6. EIMWB

7. MBS, LSD & APM EL 60 in freight stock

8. Twin pipe brake system in wagons.

9. BCNHL ,BOXNHL & BOBRN wagons.

Page 21: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

NEW TOPICS ADDED IN DIESEL MODULE

1. Fuel oil, lube oil, water cooling & air intake systems of

HHP

2. Components, functions , overhauling & trouble shooting

of HHP Loco

3. Working, maintenance & Trouble shooting of C.C.B

system

4. Constructional and working principle of dual CAB Loco

5. MCBG, VCD,

6. MBCS of conventional & HHP locos.

7. Various components, working principle & maintenance

of HHP

8. Circuit analysis of WDG4/P4 Locos

9. DEMU

NEW TOPICS ADDED IN WORKSHOP MODULE

1. POH procedure of LHB coaches

2. POH procedure of FIAT bogie

3. PU Painting

4. POH of BCNHL&BOXNHL Wagons.

5. Attention to BIO- TOILETS in POH.

Page 22: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

NEW TOPICS ADDED IN ELECTRIC LOCO

MODULE

1. Conventional Electrical Loco

2. 3-Phase Electrical Loco

LIBRARY FACILITIES- STOCKING OF COURSE

RELEVANT BOOKS, E-LEARNING ETC. (contd.)

STC library extends facilities to faculty members,

trainees, officers of headquarters and divisions.

FACILITIES AVAILABLE AT HOSTEL

1R.O. with water cooler

Geyser facility.

Cooler.

LED TV

Paper and Magazine

Page 23: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

UPKEEP OF PREMISES (SURROUNDINGS, CLASS

ROOMS, WASH ROOMS)

1. Swachh Bharat Abhiyan

Page 24: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

UPKEEP OFPREMISES (SURROUNDINGS,

CLASS ROOMS, WASH ROOMS) (Contd..) Environment Day Celebration:

ADEQUACY OF HOSTEL ROOM SHARING,

TOILETS AND BATH ROOMS

Page 25: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

MESS FACILITIES

FACILITIES FOR TRAINEES IN HOSTEL:

Page 26: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

GAMES, YOGA AND MEDITATION

FACILITIES

Page 27: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Indoor Games

Page 28: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Yoga Kaksh in Hostel

Meditation

Page 29: Multidisciplinary System Training Centre - Indian Railwayner.indianrailways.gov.in/uploads/files/1592376486234-mstc web pa… · N.E. Railway, it was named as System Technical School

Achievement of MSTC/GKP

1.H Type CBC Working Model

2.Bio Toilet Cut Model

3.Electrical Locomotive Models

4.CMS for Running Staff

5.Provision of CC TV Camera

6.Latest Modular Furniture in Class Room

and Conference Room

7.Two newly built Fully Furnished hostel for

Boys and Girls.

END