Multi-vendor Experiences with
IEC 61850 Installation, Testing,
Configuration, Diagnostics, and
Upgrades
David Dolezilek
Schweitzer Engineering Laboratories, Inc.
![Page 2: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/2.jpg)
Practical Uses of IEC 61850 Protocols
and Synchrophasors
GOOSE in a Centralized Remedial Action
Scheme (CRAS)
GOOSE versus hard-wire protective trip
RTU I/O collection via GOOSE
Diagnostics tools for GOOSE “virtual wiring”
Recent Global IEC 61850 installations
Improving RAS with synchrophasors
![Page 3: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/3.jpg)
Remedial Action Schemes
![Page 4: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/4.jpg)
Southern California Edison (SCE)
Tested Digital Communications Speed
Strive to mitigate thermal overload and
instability throughout
transmission territory
13.313
3 4
26.7
8.4
Peer-to-Peer Control
Tim
e (
ms)
RAS Round-Trip
SEL Mirrored Bits® Communications
SEL IEC 61850 GOOSE
Non-SEL IEC 61850 GOOSE
Detect Decide Trip
![Page 5: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/5.jpg)
![Page 6: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/6.jpg)
![Page 7: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/7.jpg)
![Page 8: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/8.jpg)
Performance Criteria: Detect, Calculate,
React 50 ms To / From any Location
Test starts when Monitor
detects Contact Input 1
Monitor chooses action to take
Monitor sends monitor alarm
Central Processor receives
monitor alarm
RAS enabled in Central Processor?
Central Processor chooses
action to take
Central Processor sends
decision alarm
Mitigator receives decision alarm
Mitigator chooses action to take
Mitigator closes trip output contact
Monitor detects mitigation trip output
as Monitor Contact Input 2
Scope measures difference
between Contact Input 1 and 2Yes
![Page 9: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/9.jpg)
Initial Testing Verified Time Budget
Using Three IEDs 740 Km Apart
![Page 10: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/10.jpg)
Next: Arming via SEL an Dell Computers
![Page 11: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/11.jpg)
Multiple Devices Demonstrated for
WECC RAS Committee
![Page 12: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/12.jpg)
Within One
Hour, Five
New
Devices
Were
“Digitally”
Wired
![Page 13: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/13.jpg)
Typical: GOOSE Trip Tansit 1.50 msec
Central Processing Time 2.083 msec
Monitor is 60 miles distant. Mitigators are local to CP.
Mitigation GOOSE transit, subscription, output - 3 msec or 11 msec
![Page 14: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/14.jpg)
Jim Bridger Power Plant
![Page 15: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/15.jpg)
Simultaneous, Independent Operation
DNP Gateway
IEC Logic
Controller
I/O
Modules
IEC Logic
Controller
IEC Logic
Controller
I/O
Modules
I/O
Modules
DNP Gateway
IEC Logic
Controller
I/O
Modules
IEC Logic
Controller
IEC Logic
Controller
I/O
Modules
I/O
Modules
RAS DRAS C
![Page 16: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/16.jpg)
Three Levels
of Voting
Crosspoints Voting
InputInput Input
Input Voting
Output Voting
Output
![Page 17: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/17.jpg)
Jim Bridger Substation
![Page 18: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/18.jpg)
RAS Uses Crosspoint Switch
Crosspoint Switch
f
tCB
Opens
Tripping
Outputs
Trigger
Inputs
X
Trip G2
N5
N4
XN3
XN2
N1
Trip G1
Output RemediationContingency
Trip G3
X
Trip G4
X
Bypass
C1
X
Bypass
C2
X
X
X XX
X
Preloaded and Ready to Go
![Page 19: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/19.jpg)
Designed to Handle Multiple, Closely
Timed Events
N-EventsIN1
N=1
S1
IN6
N=20
S1
IN6
N=6
S2
First Event
Example 1 Example 2
Time (s)
System State
t=5st=0s
![Page 20: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/20.jpg)
PacifiCorp / Idaho Power Remedial Action
Scheme Eliminates Congestion
Stability improvements increase capacity 50%, avoid blackouts
Fastest control
system in the
world
![Page 21: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/21.jpg)
Training / Testing / Playback Simulator
![Page 22: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/22.jpg)
Test Simulator Plugged Into RAS C
![Page 23: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/23.jpg)
Protection-Class Features
Deterministic, high-speed, peer-to-peer
protocol used between RAS controllers
No backplanes to fail
No auxiliary power supplies
MS Windows® NOT used in RAS controller
All controllers embedded
Identical logic in all six controllers
![Page 24: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/24.jpg)
Florida’s International
Drive 1999 Project: Distribution Automation
at Transmission Speeds
![Page 25: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/25.jpg)
Switching With a Recloser…
Manual Switching = 1 hour
Switching w/Recloser = 10 seconds
Recloser + Control Without Communications
![Page 26: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/26.jpg)
…vs. Distribution at Transmission SpeedSEL & S&C for International Drive
SEL-351S + Communications
Smart Switching = 0.1 second
![Page 27: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/27.jpg)
Multivendor IEC 61850
CFE Parque Eolico La Venta
![Page 28: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/28.jpg)
Existing Generators at Wind Farm
![Page 29: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/29.jpg)
Biggest Wind Farm Project in Mexico
CFE expects to generate close to 3 GW
by 2014 in “La Ventosa”
![Page 30: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/30.jpg)
Substation Expansion - New Generators
![Page 31: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/31.jpg)
SEL - MX060018 Project Satisfies
Newest SICLE Design With IEC-61850
SICLE is Spanish Acronym for
“Integrated System For Substation Local
Control”
CFE Specifies SICLE for integration of high
voltage substations, SISCOPROMM for low
voltage
![Page 32: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/32.jpg)
CFE Decided to Build Small but
Meaningful Substation
CFE wanted to prove 61850 was real
Include as many vendors as possible
Add other redundant IEDs in parallel
Demonstrate true functionality on the
network
Prove multi-vendor interoperability
![Page 33: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/33.jpg)
“This is, without any doubt, a great
advancement for the integration of control
and protection systems, and for integration
of the IEC 61850 International standard.”
David Lancha, Project Manager, IBERINCO
Proven. Reliable.
Complete.
World’s First Multisupplier
IEC 61850 System in Service
Since 2006
![Page 34: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/34.jpg)
Wind Farm Under Construction
![Page 35: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/35.jpg)
50BF
50BF
51PHS
87T
51PHS
51NHS
51NLS
87B
RD
50BF
79
21PP
87L
La Venta II Substation
Protection Requirements
![Page 36: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/36.jpg)
Design #1 Used IEC 61850 Part 5, SEL Methods
in IEDs, IEC 61850 in SCADA Gateway
SEL-451-4
SEL-451
SEL-451-4
SEL-451
SEL-387E
SEL-451-4
SEL-451
SEL-311L
SEL-421
SEL-487B
SEL-3351
SEL-3351
SEL-3332
SEL-3332
230KV Line
LVD93100
230KV
Autotransformer
LVD92010
230KV Tie
LVD97010
230KV Bus
Diff
LVDDB9
Redundant
HMI
Redundant
SCADA
Gateway
Information Processor Serves DNP/Conitel as
SCADA Gateway and OPC to HMIs
![Page 37: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/37.jpg)
CFE Requested IEC 61850 in all IEDs
SEL-421 – Distance
SEL-311L – Current Differential
SEL-451 – Distribution
SEL-387E – Transformers
SEL-487B – Buses
SEL-451-4 – Bay Control
SEL-3351 Rugged Computer
SEL ACSELERATOR Architect –
Substation Configuration Language
(SCL) Engineering SoftwareSEL-710 – Motors
SEL-2411 – Automation
Controller SEL-751A – Feeders
![Page 38: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/38.jpg)
Meet CFE Substation Protection
Requirements Using IEC 61850
Conventional wiring and IEC 61850 GOOSE
Test performance of conventional wiring vs.
GOOSE for protection functions
Determine if all relays will interoperate and
perform as desired
IEDs approved by CFE
![Page 39: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/39.jpg)
Design #2 Used IEC 61850 Part 8,9 in the IEDs IEC 61850 From SEL for Every Application in Bays
SEL-451-4
SEL-451
SEL-451-4
SEL-451
SEL-387E
SEL-451-4
SEL-451
SEL-311L
SEL-421
SEL-487B
SEL-3351
SEL-3351
SEL-3332
SEL-3332
230KV Line
LVD93100
230KV
Autotransformer
LVD92010
230KV Tie
LVD97010
230KV Bus
Diff
LVDDB9
Redundant
HMI
Redundant
SCADA
Gateway
![Page 40: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/40.jpg)
Next CFE Chose to Demonstrate Multi-
vendor Interoperability
System integrates devices from multiple
vendors
SEL Siemens
GE ZIV
RuggedCom Team ARTECHE
Other vendors invited but did not have
IEC 61850 available or not approved by CFE
![Page 41: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/41.jpg)
Two Different Engineering Groups
Working in Parallel to Integrate IEDs
HMI LN reporting and bay level
GOOSE IEC 61850 integration
being done by Iberdrola
SCADA Gateway LN reporting and
station level GOOSE IEC 61850
integration being done by SEL
![Page 42: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/42.jpg)
New Products for CFE : Bay Control, SCADA
Gateway, and IEC 61850
![Page 43: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/43.jpg)
SEL Scope: Panel Design for Parque Eolico
“Wind Farm” and Intertie Substation
![Page 44: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/44.jpg)
Design #3 Used IEC 61850 Part 8,9 in the IEDs Added IEC 61850 Devices From Other Vendors
SEL-451-4
SEL-451 SEL-451
SEL-387E
SEL-451
SEL-311L
SEL-421
SEL-487B
SEL-3332
230KV Line
LVD93100
230KV
Autotransformer
LVD92010
230KV Tie
LVD97010
230KV Bus
Diff
LVDDB9
Redundant
HMI
Redundant
SCADA
Gateway
GE F650 BC
Siemens 7SJ62
GE F60
Siemens 7SJ61
ZIV BC
GE T60
GE F35 GE L90
ZIV HMI
ZIV HMI
ZIV CPT
![Page 45: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/45.jpg)
Panels Ready for Installation
![Page 46: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/46.jpg)
System Architecture
Router
+ Firewall
Remote HMI
RuggedCom
Fiber-Optic
Ring
DNP
Conitel
SW-4
SW-5
SW-3
SW-1
SW-2
GE F650 BC
SEL-451 50BF, 25, 27
SEL-387E
GE T60 87T
GE F60 50, 51HS
GE F35 50, 51TZ
Siemens 7SJ62 50, 51LS
Siemens 7SJ61 50, 51N
SEL-451-4 BC
SEL-451 50BF, 25, 27
ZIV 6MCV BC
SEL-421 21, 67
SEL-279H 79
SEL-451 50BF, 25, 27
GE L90 87L
SEL-311L
SEL-487B 87BGPS
ZIV CPT ZIV HMI ZIV HMI
SEL-3332
SCADA Gateway
![Page 47: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/47.jpg)
SEL Construction, Factory Acceptance
Test (FAT), Training, Commissioning
![Page 48: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/48.jpg)
IEC 61850 SCL Replaces Wired
Connections With Logical Connections
![Page 49: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/49.jpg)
GOOSE Messages for Protection
CFE wanted to see performance comparison between wired and GOOSE
CFE chose to test breaker failure protection scheme using GOOSE
Primary protection trip
Breaker failure relay retrip
Breaker failure relay trip
Breaker failure trip reception by bus differential relay
Trip to all breakers in bus
![Page 50: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/50.jpg)
Customer Factory Acceptance Test
![Page 51: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/51.jpg)
GOOSE Retrip Operation 12.5ms Faster
Than Parallel Hardwire at La Venta
GOOSE Breaker 21 TRIP A
Wired Contact Breaker 21 TRIP A
12.5 ms Difference
Between Inputs
![Page 52: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/52.jpg)
86FI Operation: GOOSE 8 ms Faster
![Page 53: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/53.jpg)
CFE Project Results
Retrip test; GOOSE three-fourths cycle faster
Breaker failure scheme; GOOSE half-cycle
faster – wiring scheme still has to go through
physical lockout (86) relay, which adds 6 to 8 ms
Configuration and troubleshooting made simpler
with sequential events recorder (SER) and
event reports
Traffic did not affect performance of SEL
devices
![Page 54: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/54.jpg)
Project Engineering Revealed
Necessary Communication Parameters
Time synch method - chose SNTP
Sacraficed accuracy to use Ethernet
Changed back to IRIG later
Number of client associations – chose 6
Two redundant HMIs
Remote and local engineering workstations
Two redundant SCADA gateways
![Page 55: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/55.jpg)
Interlock and Automation Projects
Dictated GOOSE Requirements
Number of outgoing GOOSE messages -
eight
Number of incoming GOOSE messages - 16
Number of incoming GOOSE bits
Bay control – 128
Relay –16, 128 depending on application
![Page 56: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/56.jpg)
Parque Eolico La Venta II
![Page 57: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/57.jpg)
PP&L Modernized
From PLCs to IEDs
Eliminate programmable devices
Digital transducers
PLCs
Eliminate other components
24 Vdc supplies
Interface relays
External fault detectors
![Page 58: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/58.jpg)
Streamline, Reduce
Complexity With
IEC 61850 Design
![Page 59: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/59.jpg)
Reduce Hardware Components With
IEC 61850 Design
Design Computers
Substation
PLCs & Comm.
Processor
Bay
PLCsRelays
Metering
IEDs
Ethernet
SwitchesSER Total
PLC 3 5 22 24 16 4 1 75
NGS 3 1 0 24 0 2 0 30
![Page 60: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/60.jpg)
Display Redundant Data Sources via HMI
L2 P disagrees with other IEDs Faulty L2 P manually removed
![Page 61: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/61.jpg)
Using IEC 61850 Methods for RTU
Replacement and Distributed Automation
![Page 62: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/62.jpg)
RTU Vendor Went AWOL
No New Units, No Product Support
Over 400 pad-mounted switchgear in service
50 to 100 new each year
Three switch configurations controlling
one to six circuit taps or “ways”
Desire to simplify configuration, add
engineering access, and improve logic
![Page 63: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/63.jpg)
Numerous I/O Configurations Must Fit
in Fixed Small Space
DNP3 serial over radio to SCADA Master
changing to DNP3 / TCP in future
![Page 64: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/64.jpg)
RTU Real-Time Values via Internal and
External Communications Connections
![Page 65: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/65.jpg)
RTU Replacement Network Could Also
Connect I/O of Relays and Meters
Example system database
32 AC analog inputs
2 DC analog inputs
24 digital inputs
16 digital outputs
192.168.0.15 192.168.0.25 192.168.0.30
192.168.0.20
SCADA
Master
DNP3 Serial
Ethernet
SwitchGOOSE Messages
PAC_MASTER
PAC_Slave_A PAC_Slave_B PAC_Slave_C
![Page 66: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/66.jpg)
Data Flow Acts the Same as Distributed
RTU I/O Panels But Performs Better
SCADA Master
Field Inputs
GOOSE Inputs
DNP3 Response
DNP3 Command
Contact Output
GOOSE Outputs
![Page 67: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/67.jpg)
Multi-vendor Configuration Requires
Stand-Alone Tool Specifically for 61850
Alternate traditional UCA2 method of
proprietary settings makes multi-
vendor systems difficult
![Page 68: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/68.jpg)
Configure IED via International Standard
Substation Configuration Language, SCL
Start with IED capability
description, ICD file
Create configured IED
description, CID file
Edit only what you
choose
No accidental changes
Minimize verification
testing
![Page 69: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/69.jpg)
Load File in IED, or Send to Colleague Via
email to Add Future IED Subscriptions
![Page 70: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/70.jpg)
“Best Practice” Provides Contextual
Names – Generic Names Less Useful
Best practice provides specific names whenever possible
Exceptions include generic logic points, unnamed contact I/O
Generic Specific
![Page 71: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/71.jpg)
Use Unique Name and Revision ControlAsk IED Directly to Verify Present Configuration
Solicit identification report from IED
IED name reveals file name and revision
ConfigVersion reveals default SCL file that
configuration was developed with
![Page 72: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/72.jpg)
IED GOOSE Reports Are Essential
Review receive and
transmit configuration
Quickly review network
settings
Analyze GOOSE statistics
and diagnostics
Immediately pinpoint
source of problem
![Page 73: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/73.jpg)
Identification (ID) Reports Provide
Source / Destination of “Virtual Wiring”Mismatched Configuration Explains Failure
ID shows incorrect revision of PAC configuration
Once corrected, GOOSE report shows correct
revision as part of GOOSE reference name
![Page 74: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/74.jpg)
Analyze Contents With Knowledge
of Configuration File
![Page 75: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/75.jpg)
Failed GOOSE, Other Alarms Displayed
and Sent via Email, Voice, Text Message
![Page 76: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/76.jpg)
Cigre
Multi-
vendor
System
of 12
Vendor
IEDs
![Page 77: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/77.jpg)
Support 8 Unique GOOSE Publications,
16 Subscriptions, 24 for Complex
Interlocking
SEL-451-4
Sisco software
IED on PC
GE D60Siemens
6MD669
Areva
P444
Siemens
7SA525
Siemens
BC1703
GE
F650
Toshiba
GRZ100
ZIV
IRV-ATeam
Arteche
SEL-421
![Page 78: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/78.jpg)
![Page 79: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/79.jpg)
Second Generation Modernization
Began in 2006
Complete modernization
of 30 substations ranging
in voltage level from
13.8 kV to 138 kV
![Page 80: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/80.jpg)
Elektro Network
Includes IEC 61850,
Telnet, FTP, and
SEL Protocols
Substations:
Guarujá 2 – first modernized substation energized June 12
2007 – seven complete
2008 – eight complete Sao Paulo State,
Brazil
Guarujá 2
Guarujá 3
![Page 81: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/81.jpg)
Fiber Optics Replace Copper
![Page 82: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/82.jpg)
![Page 83: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/83.jpg)
KONYA Industrial Park
Chooses SEL and IEC 61850
500 large to mid-size electricity-dependent
tenants: plastics, machinery, pharmaceuticals
Park management responsible for infrastructure:
electricity, gas, water, traffic, security
One 100 MW transformer and three 33 kV
tie lines from National Grid
65 MW maximum demand increasing by 15%
every year
![Page 84: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/84.jpg)
SEL-2407
GPS-Receiver
Clock
Front-End 1
Substation
Computing
Station 1
Front-End 2
Substation
Computing
Station 2 Station 3 Station 4 Station 5 Station 6 Station 7 Station 8
3 Tie Lines (6 Future)
6 x SEL-311L
Server 1 Operator
Station 1
42-Inch LCD
Monitors
SEL-3401
GPS-Clock
54 SEL-751A Relays and 38 SEL-311L Relays
Server 2Operator
Station 2
Switch
8 Switching Stations, 99 Feeders
Switch
Printers
![Page 85: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/85.jpg)
Control Center
Manages 165
Distribution
Substations
24 km redundant fiber-optic ring
Future distribution automation additions
![Page 86: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/86.jpg)
Use Modern Communications for
Diagnostics – FTP, Telnet, email
![Page 87: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/87.jpg)
GEESE Migrate to Africa
Stations Include IEC 61850 MMS and GOOSE
City Power Pennyville – 19 bays , 2 bus
sections, 3 transformers
City Power Khanyisa – similar to above with
36 bays
City of Cape Town – 2 complete substations
Nelson Mandela Bay Municipality
Three new substations in 2008
Each based on IEC 61850
![Page 88: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/88.jpg)
City Power Johannesburg
Harley Street Substation
Control Center
IEC 60870-5-101
Fdr 29Fdr 1
SEL
SEL-1102
SEL-2410SEL-2410
Switch Switch
SEL-1102 Gateway, 2 SEL-2410s, 36 Bays With SEL-451 Relays
![Page 89: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/89.jpg)
Electricity of Vietnam (EVN)
State-owned utility established 1995
Generation, transmission, and distribution
for whole country
4 transmission
companies
79,800 km of
distribution lines
![Page 90: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/90.jpg)
Growing Electricity Demand
Forecasted growth 17% per annum until 2025
0
100
200
300
400
500
600
1995 2000 2005 2010 2015 2020 2025
Production
Sales
Tera
watt-H
ours
![Page 91: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/91.jpg)
First Phase – Substation Modernization
Began in 1999
First computerized 220 kV substation
commissioned in Ho Chi Minh City
This success resulted in digitizing more
substations through 2003
![Page 92: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/92.jpg)
Early Substation Modernization
Conventional protection and control using
DNP3 serial and hardwired connections
Problems with incompatibilities between
multiple manufacturers’ IEDs
![Page 93: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/93.jpg)
Second Phase – Standardization
To improve IED compatibility, EVN issued
specification for substation automation based
on UCA2
Based on this, first large-scale substation
automation system (SAS) was implemented
![Page 94: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/94.jpg)
220 kV Thu Duc Substation
![Page 95: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/95.jpg)
Upgraded
Protection
System
Architecture
220 kV
66 kV Busbar
Phase 1 Phase 3
Phase 2
220 kV
110 kV
Phase 1 Phase 3 Phase 2
![Page 96: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/96.jpg)
Third Phase – IEC 61850
IEC 61850 Part 10 approved Oct. 2005
EVN standardized for future projects –
new and retrofit
All 500 kV
backbone
substations
upgraded by
2010
![Page 97: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/97.jpg)
New System Requirements
Dual redundant fiber-optic LAN with no
single point of failure
IEC 61850 for all substation communication
IEC 60870-5-101 for SCADA
![Page 98: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/98.jpg)
Host 1 Host 2Engineering
(Bridge to SCADA)HIS Server Router to WAN
Backup
IED
Backup
IED
Main
IED
Main
IED
Bay
Devices
Bay
Devices
Main
NIM
Backup
NIM
Bay CubicleBay Cubicle
Bay Cubicle
Option 2
Option 1
LAN 1
LAN 2
GPS Clock
Backup
IED
Main
IED
Bay
Devices
Fiber-Optic
Ethernet
100 Mbps
Standard System Hardware Architecture
![Page 99: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/99.jpg)
Computerized Control and Monitoring
Local HMI,
engineering console,
and historian
Redundant system
servers running on
Windows® 2000 or Linux®
![Page 100: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/100.jpg)
Old Protection Panels Replaced
Microprocessor-based relays perform
protection, control, and monitoring
![Page 101: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/101.jpg)
Outdoor Cubicles Reduce Cabling
![Page 102: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/102.jpg)
Existing Copper Cabling Binh Long Substation
![Page 103: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/103.jpg)
Copper
Cabling
Reduced
![Page 104: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/104.jpg)
@STATION System Overview
HMI1 HMI2ENG
HISGW
LAN / WAN
Primary Equipment
Meter
Hardware
Connections
Relays / BCUs
IEC 61850
![Page 105: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/105.jpg)
Legacy Device GatewayRugged Computing Platform
![Page 106: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/106.jpg)
SCADA Gateway
![Page 107: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/107.jpg)
![Page 108: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/108.jpg)
Test Results
User Interface FeatureRequired by
EVNTested
Display Response Time < 1 s < 1 s
Data Entry Response Time < 1 s < 1 s
Display Update Rate < 2 s < 2 s
Update Completion Rate < 1 s < 1 s
![Page 109: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/109.jpg)
Test Results
User Interface FeatureRequired by
EVNTested
Alarm/Event
Response Time< 1 s < 1 s
Alarm Acknowledge/
Delete Time< 2 s < 2 s
Report and Logbook
Response Time< 0.5 min < 0.5 min
Display Color Printout
Response Time< 0.5 min < 0.5 min
![Page 110: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/110.jpg)
User Interface FeatureRequired by
EVNTested
Console Inhibit Time for
Display Hardcopy< 2 s < 1 s
Analog Data
Collection Rate– < 2 s
Status Indication
Collection Rate– < 1 s
Failover Time Between
Main 1 and Main 2– 0 s
GOOSE Exchange Time < 10 ms < 8 ms
Test Results
![Page 111: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/111.jpg)
Benefits of IEC 61850 SAS
Faster system integration with IED
interoperability
Reduction of copper cabling and
hardwiring GOOSE for peer-to-peer data exchange
Outdoor cubicles adjacent to feeder or bay
System malfunctions reduced by nearly
50%
![Page 112: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/112.jpg)
What is a Synchrophasor?
![Page 113: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/113.jpg)
v(t)
0
A
wt2
A
Reference
Time Waveform
and Phasor Representation
![Page 114: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/114.jpg)
Absolute Time Synchronization Has
Fundamentally Changed the World
GPS RCVR
PMU 1
A B
Satellite
GPS RCVR
PMU 2
IRIG-B IRIG-B
Mag/Ang Mag/Ang
![Page 115: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/115.jpg)
Direct State Measurement
SYNCHROPHASORS
GPS provides common time reference
Measure state vector
Measure currents, too
Synchronously!
Every second
Every cycle
![Page 116: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/116.jpg)
Synchrophasors Provide a “Snapshot”
of the Power System
P= |V1| |V2|sinФ / X Ф= sin-1(PX / |V1| |V2|)
V1∠0 V2 ∠ФP→
Increase Stable
Power Transfer
![Page 117: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/117.jpg)
Relays Are Right for Synchrophasors
Phasor measurement and control unit
(PMCU) ≥ PMU
Minimal incremental cost
Reduced current and voltage connections
High-accuracy measurements
High reliability and availability
Future control applications
Relays are everywhere
![Page 118: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/118.jpg)
What Operators Did Not See Aug. 14th
64 Minutes
![Page 119: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/119.jpg)
Utilities Are Operating Closer to the Edge
MarginMargin
1.0 1.3 1.5 1.7PU Nominal Load
1.0
0.5
0.0
Operating
Point
Bifurcation
Point
![Page 120: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/120.jpg)
Long Island: Monitor Angles Between
Transmission Distribution Buses to
Detect & Prevent Voltage Collapse
X)θcos(2
V)θsin(1S
2
2
smax
ZL = R + jXVS 0
Vr
S = P + jQ
![Page 121: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/121.jpg)
Apply Remote Synchronizing
115 kV
Bus
230 kV
Bus
13.8 kV
Bus
SEL-421
SEL-421
![Page 122: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/122.jpg)
Improved View:
Synchroscope
and Freq Plot
make it easier
for operators
![Page 123: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/123.jpg)
“The MRI of Power Systems”
NERC press release on Florida outage Feb. 26,
2008:
Synchrophasors are “Like the MRI of bulk power
systems”
![Page 124: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/124.jpg)
SCE Uses C37.118 From
Relays and PMU
SCADA
Master
DNP3
IEEE C37.118
Information
Processor
Harris 5000/6000,
IEC 60870-103,
Modbus, SEL Fast
Message, Telegyr
8979, Conitel 2020,
CoDeSys, OPC, …
![Page 125: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/125.jpg)
Distributed Generation Creates
Islanding Problems
Transmission
Network
DG
SEL-3378
Synchrophasors Detect and Correct
Islanding Problems
![Page 126: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/126.jpg)
Defensive Strategies Working Group
New York State Reliability Council
NYSRC asked SEL to propose solutions
Mitigate impact of major disturbances on the
New York electric system
Blackout mitigation and prevention
Separate into “islands” using transmission
system fault protection relays
![Page 127: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/127.jpg)
Canada
SEL Synchrophasor Total
Potential Worldwide!
North America
142,085 units
South America
15,903 units
Europe / Asia
4,115 units
Africa / Middle East
5,085 units
Asia
Pacific
45,793 units
![Page 128: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/128.jpg)
Real-World Example – Line Repair
Error Detection
![Page 129: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/129.jpg)
Relay-to-Relay
Synchrophasors for
Generator Shedding
Synchrophasors Make
CFE’s Grid Smarter
![Page 130: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/130.jpg)
115 kV Network
400 kV
900 MW
AngosturaTapachula
City
400 kV
Southern Region Load
SabinoChicoasen
National
System
400 kV
Load Shedding Based on Angle
SynchrophasorsTrip
Generator
![Page 131: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/131.jpg)
Detect and Control Adaptive Islanding
Transmission
Network
SEL-451
Relay / PMU
SEL-3378 SVP
Unintentional
Islanding
Distribution
Network
SEL-451
Relay / PMU
![Page 132: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/132.jpg)
Over Angle Protection Holds System
Together
Area 1
Heavy
Load
Area2
Link 1
Link 2
Area 3
Light
LoadTrip
Generation
SEL-421 SEL-421Synchrophasors
(Chicoasen – Angostura) > 5° Trip Generation
![Page 133: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/133.jpg)
Today: Most Processing Is at the Master
Finds topology
Purges bad data
Estimates stateMaster
RTU RTU
Asynchronous
Scan
~5 seconds per scan
. . . can have partial
information from
two or more
physical systems –
due to faults, switching,
swinging, tap changes.
![Page 134: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/134.jpg)
One Utility’s View of Several Data
Streams
Bus Voltage
Line
MVA
Frequency
Instantaneous
Phase Angles
Trended
Phase Angles
PMU ID
![Page 135: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/135.jpg)
Local Calculation of Line Temperature
Improves Power Transfer Reliability
+ +
Line Temperature = f (Ambient Temp, Current, Line Orientation, Season)
![Page 136: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/136.jpg)
IEEE Synchrophasors Compatible
With IEC 61850 Networks Possible Future GOOSE or 9-2 Extension
IEEE C37.118,
Telnet, tunneled
serial
Verify CT wiring,
phase rotation,
settings
![Page 137: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/137.jpg)
Determining the State of a Power System
4
3
2
1
34
232
231
12
V
V
V
V
I
I
I
I
Y
I12 I34
I231
I232
V1 V4V3V2
State Vector
![Page 138: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/138.jpg)
Traditional RAS Clearing Time Budget
Relay I/O Module Computer I/O Module Relay Breaker
1 Cycle0 Cycle-1 Cycle
Relay
Detects
Fault
Relay Trips/
Asserts Contact
Output
RAS Controller
Issues Gen
Breaker Trip
2 Cycles
Relay Receives
Trip Command
and Trips Gen
Breaker
Breaker Trip
Time
3 Cycles 6 Cycles
Total RAS Clearing Time
![Page 139: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/139.jpg)
SVP RAS Clearing Time ¾ Cycle Faster
![Page 140: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/140.jpg)
Improving RAS with Synchrophasors
Direct state measurement is now practical
because of the widespread availability of
Synchrophasors
The SVP performs local direct state
measurement and control
Wide area RAS schemes are improved
because synchrophasors reduce the amount
of information communicated to the master
station
![Page 141: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/141.jpg)
What Does a Future “Worst-Case
Scenario” Look Like?
Detect potential unstable operating conditions
Control islanding
Detect system oscillation before criticality
Minimize problems automatically
![Page 142: Multi-vendor Experiences with IEC 61850 Installation ...docshare01.docshare.tips/files/25543/255432666.pdf · SEL-421 –Distance ... Breaker failure relay retrip ... GE D60 Siemens](https://reader036.vdocuments.us/reader036/viewer/2022081722/5a7325a37f8b9aa2538e64ae/html5/thumbnails/142.jpg)
Synchrophasors Empower the Future