multi-level jobs in vantage. m1 – mto top assembly p1 – purchased comp p2 – purchased comp p3...
TRANSCRIPT
Multi-Level Jobs in Vantage
M1 – MTO Top Assembly
P1 – Purchased Comp P2 – Purchased Comp P3 – Purchased Comp
Buy Direct
M2 – MTO Sub Assy
Pull as Assy
P2 P1
M3 – MTO Sub Assy A1 – MTS Sub Assy
P2 P2 P1 P1
M1 – MTO Top Assembly
P1 – Purchased Comp P2 – Purchased Comp P3 – Purchased Comp
Buy Direct
M2 – MTO Sub Assy
P2 P1
M3 – MTO Sub Assy A1 – MTS Sub Assy
M3 – MTO Sub Assy A1 – MTS Sub Assy
P2 P2 P1 P1
STOCK
Job No. 1 (2 levels)
Job No. 2
Make Direct to Job 1 Job No. 3
Make to stock
ManufacturingPurchasing
Purchase OrdersPurchase
To Stock
Purchase Direct
To Job
WT/200 – Emergency Trolley
6100796 (Base Fabrication)
6100533(Assembly Door)
6100789(Drawer Fab)
2CAT056(Castor)
2PLO29(Tray)
6201301 (Front Panel)
620334(Lock clip)
6201303(Body Panel)
2SHMS002(MS sheet 0.9x3x5)
2SHMS031(MS sheet 2.0x3x1.5)
Level 0
Level 2
Level 1
Sub Assembly Sub AssemblySub Assembly
Manufactured component
Manufactured component
Manufactured component
Purchased Purchased
PurchasedPurchased
Sales Order Demand10 Cabinets
KANBAN
STOCK
Job Number 1
Assembly 0Cabinet
Assembly 1Carcase
Assembly 2Door Assembly
Demand
Multi Level Jobs(Product marked as Make to Order)
TubeCell
SheetCell
RAW
MATERIALS
Purchase components
Cabinet Cell
WT/200Emergency Trolley
6100796(Drawer Fab )
6100533(Assembly Door)
6100789(Base Fabrication)
2CAT056(Castor)
2PLO29(Tray)
6201301 (Front Panel)
620334(Lock clip)
6201303(Body Panel)
2SHMS031(MS sheet 2.0x3x1.5)
Sales Order Qty 10
Job 1
Job 2
Job 3Disadvantages
Not How You OperateJob 2 not linked to Sales order3 Jobs to manage/Schedule ETCDoes not include Kanban
Kanban / Work Orderless Supply From Sheet & Tube Cell
WT/200Emergency Trolley
6100796(Drawer Fab )
6100533(Assembly Door)
6100789(Base Fabrication)
2CAT056(Castor)
2PLO29(Tray)
6201301 (Front Panel)
620334(Lock clip)
6201303(Body Panel)
2SHMS031(MS sheet 2.0x3x1.5)
Sales Order Qty 10
Job 1
Rotor Set Example
Single Level Jobs(All Assemblies marked as Make to Stock)
Sales Order Demand10 Rotor Sets
STOCK
Demand
Job Number 1Rotor Set
Supply
Demand
Job Number 2Male Rotor
Supply
Job Number 3Female Rotor
Supply
Demand
Advantages
Separate Route Cards
Materials Tied to CorrectLevels
Can sell as separate items
• Rotor Sets• Males• Females
Disadvantages
No Sales order – WorkPegging / Links
3 Separate Jobs to manage
3 Separate Jobs to ScheduleMove ETC
Sets are not tied together
Males & Female Rotors haveTo be processed throughStores
Sales Order Demand10 Rotor Sets
STOCK
Demand
Job Number 1Rotor Set
Supply
Job Number 2Male Rotor
Supply
Job Number 3Female Rotor
Supply
Demand
Advantages
Separate Route Cards
Materials Tied to CorrectLevels
Can sell as separate items • Rotor Sets• Males• Females
Sets are tied together
Males & Female Rotors do not go through Stores
Disadvantages
No Sales order – WorkPegging / Links
3 Separate Jobs to manage
3 Separate Jobs to ScheduleMove etc.
Single Level Jobs(All Assemblies marked as Make to Order)
Sales Order Demand10 Rotor Sets
STOCK
Demand
Job Number 1
Assembly 0Rotor Set
Supply
Assembly 1Male Rotor
Assembly 2Female Rotor
Demand
Multi Level Jobs(All Assemblies marked as Pull As Assembly)
Advantages
Separate Route Cards
Materials Tied to CorrectLevels
Can sell as separate items • Rotor Sets• Males• Females
Sets are tied together
Males & Female Rotors do not go through Stores
Single Job to manage, schedule, move etc.
Disadvantages
No Sales order – WorkPegging / Links
Sales Order Demand10 Sets of rotors
STOCK
Job Number 1
Assembly 0Rotor Set
Assembly 1Male Rotor
Assembly 2Female Rotor
Demand
Multi Level Jobs(Rotor Set marked as Pull Make to Order)
Advantages
Separate Route Cards
Materials Tied to CorrectLevels
Can sell as separate items • Rotor Sets• Males• Females
Sets are tied together
Males & Female Rotors do not go through Stores
Single Job to manage, schedule, move etc.
SO pegged to WO
Disadvantages
None
Questions?