No. Uraian Keterangan
I Pipe Support Tie In " Titik 1 "
1 Concrete Pile Capfc 30 0.72 m3
2 Concrete Pedestal fc 30 0.324 m3
1.044 m3
3 Rebar D16 Pipe Cap 4 btg
Rebar D16 Pedestal 4 btg
8 btg
4 Anchor Bolt Dia 16mm + Accessories 6 ea
5 Bolt 16mm + accessories 10 ea
6 U-Clamp, plate 15mm thk. 1 Ls
7 HB 300.300 @1.8m 2 Set
No. Uraian KeteranganII Pipe Support Tie In " Titik 3 "
1 Concrete Pile Capfc 30 2.316 m3
2 Concrete Pedestal fc 30 1.0422 m3
3.3582 m3
3 Rebar D16 Pipe Cap 11 btg
Rebar D16 Pedestal 4 btg
15 btg
4 Anchor Bolt Dia 16mm + Accessories 2 ea6 U-Clamp, plate 15mm thk. 1 Ls
No. Uraian Keterangan
II Pipe Support PL37
1 Concrete Pile Capfc 30 0.648 m3
2 Concrete Pedestal fc 30 0.1418 m3
0.7898 m3
3 Rebar D19 Pipe Cap 6 btg
Rebar D19 Pedestal 2 btg
8 btg
4 Anchor Bolt Dia 16mm + Accessories 4 ea
Volume
Volume
Volume