  • 5/26/2018 Mto Material Request ....

    1/2

    No. Uraian Keterangan

    I Pipe Support Tie In " Titik 1 "

    1 Concrete Pile Capfc 30 0.72 m3

    2 Concrete Pedestal fc 30 0.324 m3

    1.044 m3

    3 Rebar D16 Pipe Cap 4 btg

    Rebar D16 Pedestal 4 btg

    8 btg

    4 Anchor Bolt Dia 16mm + Accessories 6 ea

    5 Bolt 16mm + accessories 10 ea

    6 U-Clamp, plate 15mm thk. 1 Ls

    7 HB 300.300 @1.8m 2 Set

    No. Uraian KeteranganII Pipe Support Tie In " Titik 3 "

    1 Concrete Pile Capfc 30 2.316 m3

    2 Concrete Pedestal fc 30 1.0422 m3

    3.3582 m3

    3 Rebar D16 Pipe Cap 11 btg

    Rebar D16 Pedestal 4 btg

    15 btg

    4 Anchor Bolt Dia 16mm + Accessories 2 ea6 U-Clamp, plate 15mm thk. 1 Ls

    No. Uraian Keterangan

    II Pipe Support PL37

    1 Concrete Pile Capfc 30 0.648 m3

    2 Concrete Pedestal fc 30 0.1418 m3

    0.7898 m3

    3 Rebar D19 Pipe Cap 6 btg

    Rebar D19 Pedestal 2 btg

    8 btg

    4 Anchor Bolt Dia 16mm + Accessories 4 ea

    Volume

    Volume

    Volume

    MTO PIPE SUPPORT TIE IN & PL37

  • 5/26/2018 Mto Material Request ....

    2/2