DATE: 2nd Jul 2015
PHOTO REPORT OF INSPECTION
MV PARIA
AND DEMO DETAILS
Eng. David Sourdis Jaimes Commercial Manager Email: [email protected] Skype: dsourdis Mobil and whats app. (57)3162716774
![Page 2: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/2.jpg)
REMARKS:
VESSEL DETAILS AS CHECKED: PREVIOUS NAME: LAGOVEN PARIA PLACE: JETTIES OF ASTINAVE, PARAGUANÁ, FALCÓN,VENEZUELA. SHIPOWNER: IMO NUMBER: 8114699 TYPE OF VESSEL: OIL TANKER REGISTRATION: AJZL – 11411 PORT OF REGISTRATION: MARACAIBO FLAG: VENEZUELAN
NUMBER YYBG MMSI – NUMBER: 775027000
HULL MATERIAL: MARINE STEEL COUNTRY / YEAR OF CONSTRUCTION: JAPAN / 1982 CONSTRUCTION SHIPYARD: INNOSHIMA CLASSIFICATION COMPANY: LOYD´S REGISTER CLASSIFICATION: OUT OF CLASS MAIN DIMENSIONS LENGTH: 208.01 m. LENGTH BETWEEN PERPENDICULARS: 199.02 m. BREADTH: 35.40 m. DEPTH: 16.60 m. DRAUGHT (SUMMER): 11.61 m. FREEBOARD (SUMMER) 3.02 m. DEAD WEIGHT (SUMMER): 55,991 MT DISPLACEMENT: 68,224 MT GROSS TONNAGE: 31,186.85 NET TONNAGE: 17,080.60 LIGHTWEIGHT: 12,227 MT BALLST CAPACITY: 23,146.8 M3 POTABLE WATER CAPACITY 351.3 + 119.7 (TOTAL370.0)M3 HFO CAPACITY: 2,024.9 MT MDO CAPACITY: 314,3 MT CARGO CAPACITY:: 350,000 Bbls NUMBER OF TANKS/CARGO COMPARTMENTS:10 + 02 SLOPS TANKS CONTAINER CRANE (TYPE/SWL): 10 Tons MAIN ENGINES MAN – B&W MODEL/ POWER 6L806A / 13720 KW. LIFE RAFTS DAMAGED, 2 NOS 25 MEN ON BOARD, 2 NOS LIFE BOATS WITH ENGINES 25 CAP prop missing No statutory or classification certificates sighted
GENERAL :
1. PROPELLER 1 NO SPARE 23680 kg 2. BOTH ANCHOR INTACT, NO SPARE , WT NOT KNOWN 3. 1 MAIN ENGINE AND 4 AUX ENGINES 4. 1 LINER / OLD PISTON ON BOARD – OTHER SPARES DECENT
![Page 3: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/3.jpg)
5. ALL CARGO PIPELINES BADLY RUSTED ON DECK, GALLEY AND COLD ROOMS SS CLADDING MOSTLY DAMAGED
6. NO SPARE TAIL SHAFT FUEL AND LUBES ROB: COULD NOT BE CHECKED A) IFO 380 CST – NO DATA B) MGO – NO RECORD C) LUBES – (NOT CONFIRMED)
OTHERS :- 1. ER seems to fairly BAD CONDITION, 2. SOME AUX ENG PARTS AND MANY MOTORS AND PUMPS MISSSING 3. VESSEL AT BERTH 4. STEEL IN GENERAL LOOKED BAD ON DECK, HULL 5. A GOOD AMOUNT OF USED SPARES. 6. ALL INSTRUCTIONS AND SIGNS AND MANUALS OTHERS ARE IN ENGLISH 7. PROPELLER AND SEA CHESTS AND HULL WILL NEED TO CLEAN, HULL SEA GROWTH
IMP SPARES : 1. ME LINER 1 NOS 2. 1 CYL HEAD, ONE USED PISTON, 2 EXH VVS 3. ALL OTHER SPARES SEEM OK FOR VOYAGE 4. NO SPARE ANCHOR 5. 1 NO SPARE PROPELLER 6. 4 X AUX ENGINES
![Page 4: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/4.jpg)
PISTON DISMANTELLED
![Page 5: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/5.jpg)
A)DOCUMENTS –note none available as not in captain’s cabin-no crew on board – only watchmen
NO PROOF OF PROPELLER MATERIAL NIAL BRONZE
NO CAPACITY PLAN IN ACCOMODATION AND TANK CAPACITIES
HULL – IN GENERAL
MANY RUST PATCHES ON SHELL
MAIN DECK HEAVY RUST AND HOLES
SEA GROWTH ON HULL HEAVY
![Page 6: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/6.jpg)
WINDLASS AREA
TOWING ARRANGEMENT
AFT MOORING AND TOW WIRE
![Page 7: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/7.jpg)
ACCOMODATION MOST CABINS DAMAGED BEDS AND FURNITURE MISSING, MANY WINDOWS GLASSES MISSING
GALLEY
![Page 8: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/8.jpg)
ENGINE ROOM Main Engine seems in fairly good condition
Aux engines some parts missing
![Page 9: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/9.jpg)
Purifiers in place will need ohaul before use
Steering gear ROOM HYD PUMPS
![Page 10: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/10.jpg)
ECR all appears normal
MSB all seems intact
Main air comp parts missing
![Page 11: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/11.jpg)
Stern tube
Pipelines bad pumps missing
Life boats some damage. Missing prop
![Page 12: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/12.jpg)
Life rafts damaged
Pumps mostly damaged or missing
Missing FWG parts
![Page 13: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/13.jpg)
Main boiler 2 nos
ER flooded
Plate coolers intact
![Page 14: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/14.jpg)
BRIDGE AREA most equip inplace, steering wheel missing
Radars damaged
Bridge front
![Page 15: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/15.jpg)
Chart table and other bridge equip, no charts ,will need supply some equip missing
Radio equipment most in place
Monkey island, mast corroded, light fittings damaged
![Page 16: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/16.jpg)
Pipelines heavily corroded
Cargo tanks no entry made but seems some oil and water Deck plating badly damaged
THE END OF PHOTOGRAPHIC REPORT
![Page 17: Mt paria sky group](https://reader034.vdocuments.us/reader034/viewer/2022042503/55cc7c30bb61ebc47e8b4654/html5/thumbnails/17.jpg)
Points to note 1 –both anchors in place, do not know how much chain each side 2 – Missing parts on aux engines, need to activate all 4. 3 – Missing pumps and motors to be fitted back mainly aircond, reefer, air comp, sw pumps. All motors and pumps in bottom flat insulation checks and repair if needed 4 – T&S book and capacity plan originals to supply Also GA, Fire plan, docking plan 5 - Original ship certificates
6 – Original port clearance
7 – Last 10 ports list with cargo and security levels 8 – Boiler plant to reactivate, main engine and aux eng lubs to either puify and do lub oil anlysis. 9 – Main engine inspections to do in scavenge and crankcase, check of piston ring and liner condition and bearing clearances. Crankcase oil analysis to do. 10 – Turbocharger clearance and bearing check renew oils. 11 – Test of main engine for sea speed for minm 2 hrs, speed, consumptions of fuel and lubs to record. All pressures and temperatures to check during trials and confirm in recommended range. 12 – Genes function test for sea load and check of temperatures and pressures in normal range. Each gen should be able to take sea load and do parallel operation . Safety cut outs to function check. 13 – All cargo and slop tanks to clean, gas free for hot work and patch weld holes on deck. Weather deck many openings damaged including tank covers. 14 – Conditions on deck, hull and ER in advanced state of decay. Possibility of sailing on own power low without extensive hull and deck repairs. For considering tow also need to repair the towing arrangements.