Page 1: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

MT OWEN COMPLEX

APPENDICES OF THE ANNUAL REVIEW

1 January 2014 – 31 December 2014

Page 2: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table of Contents

............................................................................................................ 3

Appendix A: Glencore Code of Conduct – Environment and Compliance ........................................................................................ 3

4

Appendix B: Meteorological Monitoring Summary ....................... 5

1 MONTHLY WINDROSES (SENTINEX 13, HEBDEN RD/ENVIRONMENTAL MET STN – DATA) ................................................................................................................................................ 5

Appendix C: Air Quality Monitoring Summary 2014 ..................... 8

DEPOSITIONAL DUST GAUGE RESULTS 2014 – MT OWEN .................................................... 8

DEPOSITIONAL DUST GAUGE RESULTS 2014 – GLENDELL ................................................... 8 MOC TOTAL SUSPENDED PARTICULATE RESULTS 2014 ....................................................... 9 HVAS PM10 RESULTS 2014 .......................................................................................................... 10

CONTINUOUS PM10 RESULTS 2014 ........................................................................................... 12 MOC ELEVATED (≥50 µG/M³) CONTINUOUS PM10 RESULTS 2014 ..................................... 20

Appendix D: Water Monitoring Summary 2014............................ 23

SURFACE WATER MONITORING RESULTS ............................................................................. 23

GROUNDWATER MONITORING RESULTS ................................................................................ 27

Appendix E: Collated Attended Noise Monitoring Results ........ 29

Appendix F: Blast Monitoring Summary 2014 ............................. 41

MT OWEN BLAST RESULTS ........................................................................................................ 41

GLENDELL BLAST MONITORING RESULTS ............................................................................. 43 RAVENSWORTH EAST BLAST RESULTS .................................................................................. 48

Appendix G: Daily Train Activity Statement 2014 ....................... 50

Appendix H: MOC 2014 Community Complaints Summary ....... 59

Page 3: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix A: Glencore Code of Conduct – Environment and Compliance

Page 4: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Page 5: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix B: Meteorological Monitoring Summary

1 MONTHLY WINDROSES (Sentinex 8, Hebden Rd/Environmental Met Stn – Data)

January 2014

February 2014

March 2014

April 2014

Page 6: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

May 2014

June 2014

July 2014

August 2014

Page 7: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

September 2014

October 2014

November 2014

December 2014

Page 8: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix C: Air Quality Monitoring Summary 2014

Depositional Dust Gauge Results 2014 – Mt Owen

Gauge Ref Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DD6 1.8 0.8 1.2 0.9 0.6 0.4 0.4 0.7 0.5 0.7 1.3 1.2

DD7 1.1 1.6 1.4 2.1 2.2 5.4 3.7 3.3 2.1 1.7 3.5 2.6

DD9 1.2 1.5 1.8 1.8 4.9 4.5 6.0 6.0 8.8c 3.4 4.5 3.2

DD11 1.1 2.4 1.5 1.8 2.7 4.7 5.5 5.0 2.2 2.8 2.9 2.4

DD12 0.8 1.7 1.0 2.1 2.0 3.1 2.5 3.4 1.1 1.9 3.0 2.3

DD14 1.2 1.5 1.4 1.1 1.2 2.0 1.3 1.3 0.7 1.5 4.7 2.7

DD15 1.6 2.5 2.1 2.2 2.2 2.9 2.4 2.5 6.9 76c 16.0c 2.6

DD16 0.8 1.6 1.3 1.1 2.0 3.2 4.1 3.9 2.2 1.8 4.6 3.9

c – Dust gauge deemed contaminated after analysis of influencing factors. These factors include an ash residue result of <50%, the presence of bird droppings or other contaminants such as insects in the dust gauge and analysis of historical results from the dust gauge

Depositional Dust Gauge Results 2014 – Glendell

Gauge Ref Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DG3 0.8 1.6 1.0 0.9 0.8 3.0 6.5c 1.5 1.3 1.7 4.7 1.3

DG4 1.6 2.5 2.1 2.2 2.2 2.9 2.4 2.5 6.9c 76c 16c 2.6

DG5 1.1 1.8 1.4 1.6 2.2 2.8 2.4 1.9 1.0 1.1 2.1 2.5

DG6 3.5 5.2 13.3c 6.6 13.4c 6.7c 4.4c 2.7 3.3 16.2 3.9 6.1

DG7 1.7 1.8 2.6 2.4 3.3 2.6 4.5c 2.2 1.5 2.3 3.5 2.8

DG8 1.8 1.9 2.7 5.3c 2.3 8.1c 4.1c 3.1 3.6 2.4 3.6 2.6

c – Dust gauge deemed contaminated after analysis of influencing factors. These factors include an ash residue result of <50%, the presence of bird droppings or other contaminants such as insects in the dust gauge and analysis of historical results from the dust gauge

Page 9: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

MOC Total Suspended Particulate Results 2014

Sampling

Date

TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell

Village

TSP (µg/m3) Rolling Mean TSP (µg/m3) Rolling Mean TSP (µg/m3) Rolling Mean

04-Jan-14 77 47 86 86 77 73

10-Jan-14 91 47 37 85 52 72

16-Jan-14 118 48 63 86 77 73

22-Jan-14 89 49 27 86 54 73

28-Jan-14 75 50 65 87 49 73

03-Feb-14 112 51 74 88 59 74

09-Feb-14 95 52 41 87 55 74

15-Feb-14 41 52 23 87 26 74

21-Feb-14 74 52 37 87 51 74

27-Feb-14 76 52 43 88 56 74

05-Mar-14 65 53 47 87 59 75

11-Mar-14 68 53 22 87 28 75

17-Mar-14 30 53 49 87 91 75

23-Mar-14 68 53 75 86 81 75

29-Mar-14 20 52 28 85 36 74

04-Apr-14 31 52 19 85 28 74

10-Apr-14 87 52 50 85 51 74

16-Apr-14 34 52 30 83 36 73

22-Apr-14 66 52 132 85 123 74

28-Apr-14 28 52 21 83 29 73

04-May-14 26 52 105 83 85 73

10-May-14 23 51 102 84 83 74

16-May-14 23 51 97 83 64 73

22-May-14 28 50 152 80 121 73

28-May-14 56 51 215 83 140 74

03-Jun-14 21 51 109 83 65 75

09-Jun-14 31 51 25 83 30 75

15-Jun-14 41 51 120 83 69 75

21-Jun-14 24 51 96 84 59 75

27-Jun-14 52 51 137 85 140 77

03-Jul-14 71 52 184 88 107 78

09-Jul-14 62 52 147 89 95 79

15-Jul-14 81 53 76 88 63 79

21-Jul-14 59 54 53 88 43 79

27-Jul-14 12 54 47 86 36 78

02-Aug-14 43 54 111 87 57 79

08-Aug-14 34 53 92 86 61 78

14-Aug-14 47 54 17 82 27 76

20-Aug-14 44 54 34 81 32 74

26-Aug-14 35 54 7 77 17 72

01-Sep-14 50 54 112 76 86 72

07-Sep-14 42 54 19 74 19 70

13-Sep-14 76 54 46 72 46 68

19-Sep-14 35 54 76 72 83 69

Page 10: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling

Date

TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell

Village

TSP (µg/m3) Rolling Mean TSP (µg/m3) Rolling Mean TSP (µg/m3) Rolling Mean

25-Sep-14 29 53 113 71 84 67

01-Oct-14 76 54 100 71 111 67

07-Oct-14 114 55 121 72 139 67

13-Oct-14 74 55 176 73 110 67

19-Oct-14 45 54 90 73 96 67

25-Oct-14 79 54 106 73 120 68

31-Oct-14 123 55 160 75 191 70

06-Nov-14 70 55 61 75 58 70

12-Nov-14 63 56 28 75 37 70

18-Nov-14 108 57 124 77 112 71

24-Nov-14 99 58 73 78 102 72

30-Nov-14 62 59 83 78 67 72

06-Dec-14 32 59 23 77 38 72

12-Dec-14 29 57 16 75 25 70

18-Dec-14 95 58 101 77 81 71

24-Dec-14 36 58 30 76 49 69

30-Dec-14 50 58 73 76 93 70

HVAS PM10 Results 2014

Sampling Date

PM10 1 - Picton PM10 2 – Falbrook Rd PM10 3 – Cnr Middle Fallbrook Rd

and Glennies Creek Rd

PM10 (µg/m3) Rolling Mean TSP (µg/m3) Rolling Mean PM10 (µg/m3) Rolling Mean

04-Jan-14 34 15 38 27 35 21

10-Jan-14 24 15 14 26 12 21

16-Jan-14 37 15 31 26 30 21

22-Jan-14 30 16 15 26 13 21

28-Jan-14 20 16 14 26 13 22

03-Feb-14 27 16 17 27 16 22 09-Feb-14 25 16 18 26 16 22

15-Feb-14 12 16 8 26 10 22

21-Feb-14 28 17 21 27 17 22

27-Feb-14 24 17 16 27 16 22

05-Mar-14 24 17 17 27 16 22

11-Mar-14 14 17 7 27 7 22

17-Mar-14 8 17 11 27 13 22

23-Mar-14 24 17 25 26 20 22

29-Mar-14 9 17 8 26 13 22 04-Apr-14 10 17 6 26 10 22

10-Apr-14 34 17 27 26 22 22

16-Apr-14 10 17 10 25 9 21

22-Apr-14 24 17 36 26 32 22

28-Apr-14 8 17 6 25 5 20

04-May-14 5 17 22 25 15 20

10-May-14 8 17 30 25 30 21

16-May-14 7 17 23 25 27 21

22-May-14 8 16 42 24 44 21

Page 11: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

PM10 1 - Picton PM10 2 – Falbrook Rd PM10 3 – Cnr Middle Fallbrook Rd

and Glennies Creek Rd

PM10 (µg/m3) Rolling Mean TSP (µg/m3) Rolling Mean PM10 (µg/m3) Rolling Mean

28-May-14 15 16 50 25 34 19

03-Jun-14 4 17 22 25 18 14

09-Jun-14 5 17 5 25 10 5

15-Jun-14 6 17 25 25 20 14

21-Jun-14 9 16 32 25 27 18

27-Jun-14 21 17 25 26 19 22

03-Jul-14 22 17 49 26 44 22

09-Jul-14 29 17 70 27 46 23

15-Jul-14 25 17 25 27 17 23

21-Jul-14 18 18 13 27 12 23 27-Jul-14 2 18 11 27 11 22

02-Aug-14 11 18 20 27 14 22

08-Aug-14 14 18 23 27 21 22

14-Aug-14 16 18 8 26 7 22

20-Aug-14 10 18 7 25 8 21

26-Aug-14 7 18 3 25 4 21

01-Sep-14 16 18 29 25 22 21

07-Sep-14 7 18 3 24 4 20

13-Sep-14 15 18 10 23 8 19

19-Sep-14 10 18 19 23 13 19

25-Sep-14 9 17 31 23 29 19

01-Oct-14 28 17 35 23 28 19

07-Oct-14 37 17 41 23 32 19

13-Oct-14 30 18 66 23 49 19

19-Oct-14 16 17 27 23 23 19

25-Oct-14 29 17 37 23 30 19

31-Oct-14 50 18 71 24 49 20

06-Nov-14 25 18 24 24 21 20

12-Nov-14 16 18 12 24 12 20 18-Nov-14 29 18 30 24 27 20

24-Nov-14 35 19 27 24 30 21

30-Nov-14 19 19 27 25 24 21

06-Dec-14 10 19 9 24 9 21

12-Dec-14 11 18 7 24 8 20

18-Dec-14 35 19 36 24 34 21

24-Dec-14 17 19 16 24 16 21

30-Dec-14 20 19 29 24 30 21

Page 12: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Continuous PM10 Results 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

01-Jan-14 20.5 9.2 23.8 19.9 25.5

02-Jan-14 48.9 11.0 30.4 33.5 34.7

03-Jan-14 40.6 12.1 36.7 27.7 36.6

04-Jan-14 37.1 23.9 37.4 34.6 39.2

05-Jan-14 32.1 39.1 31.1 24.0 30.3

06-Jan-14 37.6 18.0 34.5 40.0 39.1

07-Jan-14 23.6 24.9 31.6 20.9

Technical difficulty

required repairs

08-Jan-14 13.7 21.5 23.5 11.4

09-Jan-14 23.9 41.1 18.1 10.8

10-Jan-14 21.6 39.1 20.3 13.1

11-Jan-14 27.2 35.2 26.5 19.0

12-Jan-14 28.3 24.0 26.6 15.6

13-Jan-14 27.7 29.4 23.3 16.6

14-Jan-14 35.9 18.2 30.7

Technical difficulty

required repairs

15-Jan-14 26.1 15.7 34.1 21.2

16-Jan-14 49.5 15.2 32.8 35.7

17-Jan-14 34.0 15.2 27.0 21.3

18-Jan-14 24.8 14.1 21.9 17.5

19-Jan-14 38.0 14.3 32.1 24.9

20-Jan-14 35.4 27.9 24.2 18.6

21-Jan-14 28.4 41.2 22.4 19.0

22-Jan-14 25.6 32.2 21.3 17.5

23-Jan-14 34.8 43.3 14.6 12.5

24-Jan-14 29.3 18.6 25.8 27.8

25-Jan-14 21.8 12.3 21.3 18.0

26-Jan-14 20.4 7.9 21.0 15.2

27-Jan-14 17.4 8.4 20.2 13.2

28-Jan-14 23.3 10.8 22.1 19.7

29-Jan-14 41.4 26.9 28.2 26.7

30-Jan-14 28.3 26.7 24.7 19.1

31-Jan-14 24.5 25.1 28.6 19.9

01-Feb-14 27.0 21.7 37.2 23.4

02-Feb-14 27.1 14.0 23.9

Power Outage

16.1

03-Feb-14 21.9 20.6 25.8 21.2

04-Feb-14 42.9 26.2 30.5 50.1

05-Feb-14 23.5 25.8 26.8 20.4

06-Feb-14 24.2 17.9 18.4 15.9

07-Feb-14 19.3 20.1 21.9 5.9 16.5

08-Feb-14 27.8 14.6 19.0 11.9 14.6

09-Feb-14 19.3 19.5 27.6 13.3 17.8

10-Feb-14 38.8 33.1 31.1 22.6 28.6

11-Feb-14 30.9 22.5 22.3 15.3 18.9

12-Feb-14 32.0 23.2 24.1 14.6 19.2

Page 13: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

13-Feb-14 37.5 29.8 31.5 23.1 28.9

14-Feb-14 16.2 17.6 17.9 12.1 16.4

15-Feb-14 15.2 12.8 15.3 10.5 12.2

16-Feb-14 18.9 33.3 20.3 21.7 22.3

17-Feb-14 18.9 17.0 16.8 14.7 16.5

18-Feb-14 19.9 20.5 20.7 15.3 20.0

19-Feb-14 17.3 18.0 19.7 13.5 17.6

20-Feb-14 23.5 29.2 24.3 19.7 39.2

21-Feb-14 23.0 28.6 27.3 18.9 20.5

22-Feb-14 27.2 26.1 28.3 21.8 20.5

23-Feb-14 19.3 20.4 25.8 16.6 16.9

24-Feb-14 13.1 13.8 17.6 9.2 10.9

25-Feb-14 15.2 18.0 21.9 11.2

Air conditioner failure required

repairs

26-Feb-14 24.1 34.8 24.8 29.1

27-Feb-14 25.1 23.2 26.5 16.9

28-Feb-14 6.2 8.3 9.4 6.4

01-Mar-14 10.5 10.6 11.8 9.6

02-Mar-14 13.1 10.5 12.1 9.0

03-Mar-14 15.9 9.7 9.9 7.3

04-Mar-14 9.0 9.0 9.8 6.7

05-Mar-14 16.2 20.7 16.1 14.1

06-Mar-14 20.3 24.7 24.2 18.4

07-Mar-14 19.4 20.7 24.2 15.6

08-Mar-14 16.1 8.1 13.5 7.9

09-Mar-14 14.3 9.9 14.2 9.5

10-Mar-14 14.3 13.5 18.6 New part fitted

11-Mar-14 12.4 11.7 16.2 5.7

12-Mar-14 20.9 22.7 23.1 18.1

13-Mar-14 23.2 20.4 24.9 15.4

14-Mar-14 13.6 17.1 19.4 15.5 15.8

15-Mar-14 12.1 19.7 13.3 15.2 15.3

16-Mar-14 17.5 25.6 22.2 25.6 21.2

17-Mar-14 10.8 27.2 10.6 13.5 16.5

18-Mar-14 22.1 26.8 19.8 24.7 22.7

19-Mar-14 28.9 38.1 30.8 34.3 28.4

20-Mar-14 15.3 16.7 17.3 11.5 13.8

21-Mar-14 10.2 12.1 16.0 11.3 11.9

22-Mar-14 16.8 24.4 14.2 17.6 18.4

23-Mar-14 24.3 28.4 28.2 25.2 22.7

24-Mar-14 16.1 17.0 18.9 14 14.4

25-Mar-14 12.8 18.7 19.8 11.2 14.3

26-Mar-14 10.8 12.6 13.2 8.8 10.6

27-Mar-14 5.7 8.0 9.5 7.7 9.1

28-Mar-14 7.5 10.2 10.5 8.1 9.6

Page 14: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

29-Mar-14 9.9 14.3 11 10.8 12.4

30-Mar-14 13.5 13.7 18.2 11.7 13.1

31-Mar-14 12.6 13.8 16.3 10.1 12.6

01-Apr-14 12.6 15.1 17.5 12.4 13.6

02-Apr-14 19.8 25.6 24.8 16.0 18.5

03-Apr-14 22.1 24.9 22.5 21.1 20.2

04-Apr-14 12.8 14.5 16.0 12.1 14.4

05-Apr-14 8.7 10.6 13.8 13.8 12.7

06-Apr-14 7.7 8.6 10.4 7.9 9.1

07-Apr-14 11.7 11.7 5.1 7.8 10.7

08-Apr-14 15.2 16.9 Technical error 12.0 14.8

09-Apr-14 15.4 16.8 5.2 17.5 15.7

10-Apr-14 23.5 25 23.9 22.1 20.2

11-Apr-14 15.2 17.4 14.5 21.4 16.3

12-Apr-14 8.0 11.7 10.2 10.9 10.0

13-Apr-14 11.1 13.1 12.6 9.5 10.8

14-Apr-14 11.9 14.1 15.4 10.4 Maintenance and calibration

15-Apr-14 Technical Fault

11.2 12.9 8.8

16-Apr-14 15.9 8.8 9.5 14.1

17-Apr-14 12.6 20.4 13.3 13.3 13.7

18-Apr-14 27.8 26.9 14.2 27.4 22

19-Apr-14 25.6 34.3 19.1 23.8 23.1

20-Apr-14 15.4 29.5 17.2 25.2 19.4

21-Apr-14 25.2 34.9 16.6 27 23.5

22-Apr-14 19.8 39.4 22.4 38.9 35

23-Apr-14 32.5 41.2 25 43.1 36

24-Apr-14 30.6 42.2

Fuse blew and required repair

34.3 27.1

25-Apr-14 12.3 13.1 10 4.1

26-Apr-14 18.7 32.5 20.2 21.9

27-Apr-14 18.3 17.4 15.1 13.6

28-Apr-14 12.3 9.4 8.2 8.7

29-Apr-14 14.0 19.3 20.6 16.3

30-Apr-14 15.8 25.4 22.8 23.5

01-May-14 16.0 20.4 16.3 18.3

02-May-14 17.9 25.7 21.7 21.9

03-May-14 19.0 26.1 18.8 Technical issue

04-May-14 15.5 33.2 26 15.3

05-May-14 12.8 23.4 16.8 11.7

06-May-14 24.6 24.7 16.1 15.2 22.6

07-May-14 17.3 26.5 22.2 22.7 21.3

08-May-14 16.1 19.9 15 14 14.9

09-May-14 12.6 18.8 14.9 14.5 11.6

10-May-14 19.3 27.8 15.8 29.5 21.7

11-May-14 12.0 15.4 12 14.6 8.5

Page 15: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

12-May-14 14.0 20.9 17.9 16.5 15.3

13-May-14 12.0 14.2 13.4 10.1 12.4

14-May-14 16.8 16.6 14.5 13.9 9.9

15-May-14 14.9 26 13.9 25.5 18.6

16-May-14 15.7 18.8 10.5 22.7 17.2

17-May-14 17.4 28.3 12.1 34.5 25.5

18-May-14 17.9 29.7 14.2 51.7 33.4

19-May-14 21.1 49.9 19 41.9 30.1

20-May-14 40.1 36.9 17.6 56 29.5

21-May-14 25.9 No Data 18.3 32 23.3

22-May-14 27.0 No Data 19.3 44 35.5

23-May-14 29.1 46.8 16 39.7 36

24-May-14 31.4 45.8 20.6 38.2 30.2

25-May-14 36.9 45.5 18.3 34.5 32.8

26-May-14 26.8 44.6 27.9 55.4 34.2

27-May-14 34.0 48.6 26.1 47.8 35.5

28-May-14 24.5 36.9 17.6 43.8 26.3

29-May-14 19.5 28.8 18.9 25.8 18.7

30-May-14 12.1 11.9 11.1 8.5 10.5

31-May-14 13.0 8.4 8.9 6.3 7.5

01-Jun-14 11.9 9.8 11.5 9.3 9.5

02-Jun-14 6.0 16.4 8 11.8 10.3

03-Jun-14 15.9 20.7 7.7 21 13.7

04-Jun-14 12.5 19.6 11.1 14.9 12.5

05-Jun-14 13.1 22.3 13.8 22.1 18.2

06-Jun-14 8.9 11.1 12.1 8 10.1

07-Jun-14 13.3 13.2 13.7 8.2 10.5

08-Jun-14 13.1 16.1 13 18.4 13.7

09-Jun-14 9.4 11.8 9.8 11 8.9

10-Jun-14 12.7 13 12.9 7.7 9.3

11-Jun-14 9.8 15.3 12.7 9.7 9.3

12-Jun-14 18.4 31.5 18 31.5 27

13-Jun-14 35.2 45.3 34.6 39.7 36.3

14-Jun-14 11.6 16.3 8 17.1 15.7

15-Jun-14 24.2 21.4 10.2 10.2 25.5

16-Jun-14 17 25.9 9.5 17.1 12.8

17-Jun-14 12.4 25.7 6.7 11.8 12.5

18-Jun-14 13.6 20.4 15.7 23.5 18.3

19-Jun-14 19.0 20.9 18.7 24.8 17.5

20-Jun-14 20.1 31.0 14.2 40.3 26.4

21-Jun-14 15 21.9 16.2 26.7 19.9

22-Jun-14 14 23.2 15 30.9 18.4

23-Jun-14 20.1 27.5 10.3 34.5 18.8

24-Jun-14 Power outage 53.5 Scheduled maintenance

61.4 46.8

Page 16: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

25-Jun-14 38.3 27.6 13.1 35.1 23.1

26-Jun-14 28.2 33 12.8 35 22.1

27-Jun-14 18.1 31.3 9.3 21.7 18.7

28-Jun-14 38.4 29.9 44.3 28.9 17

29-Jun-14 22.4 36.6 10.1 37.5 26

30-Jun-14 15.3 22.9 9.4 25.7 14.5

01-Jul-14 13.3 20.0 6.5 21.5 9.9

02-Jul-14 Technical Fault

16.8 11.7 16.6 13.2

03-Jul-14 31 17.4 44.4 30.3

04-Jul-14 25.1 45.2 13.4 43.5 31.6

05-Jul-14 23.4 36.8 19.8 48 29.5

06-Jul-14 14.7 16.7 7.4 35.3 12.1

07-Jul-14 14.4 18 5.7 22 11.3

08-Jul-14 11.1 26.5 6.8 19.6 16.4

09-Jul-14 36.6 49.3 24.7 52.4 34.9

10-Jul-14 33.4 35.4 16.0 51.5 26.1

11-Jul-14 22.2 22.8 10.1 37.2 15.5

12-Jul-14 19.1 28.1 11.2 31.5 21.2

13-Jul-14 16.0 15.6 12.2 19.0 12.8

14-Jul-14 25.4 28 28.6 30.9 22.3

15-Jul-14 26.0 28.8 26.2 23.7 20.2

16-Jul-14 16.7 25.8 15.1 30.9 23.2

17-Jul-14 12.8 24.3 8.0 26.5 13.3

18-Jul-14 11.7 20.7 9.3 22.1 13.7

19-Jul-14 17.9 20.1 13.9 25.9 18.6

20-Jul-14 30.5 27.1 21.4 24.8 26

21-Jul-14 22.1 15.8 26.3 12.9 14.1

22-Jul-14 14.3 15.1 19.1 9.4 11.0

23-Jul-14 12.8 13.4 15.1 17.2 9.8

24-Jul-14 38.5 26.0 21.5 21.2 18.4

25-Jul-14 8.3 24.3 19.5 28.3 25.1

26-Jul-14 1.3 10.2 6.0 5.4 6.1

27-Jul-14 12.0 17.5 6.5 12.3 8.8

28-Jul-14 16.3 19.8 10.0 17.1 16.5

29-Jul-14 18.4 28.4 9.1 18.1 16.9

30-Jul-14 35.6 31.5 12.1 38.0 27.5

31-Jul-14 29.2 39.7 30.2 33.9 29.6

01-Aug-14 41.8 46.6 21.7 52.9 32.4

02-Aug-14 18.8 16.2 11.0 19.7 17.1

03-Aug-14 14.4 25.7 18.4 22.7 25.8

04-Aug-14 15.8 20.1 21.4 21.9 16.4

05-Aug-14 16.1 23.7 19.5 29.3 22.6

06-Aug-14 35.4 34.5 20.8 49.0 25.0

07-Aug-14 24.3 24.3 16.2 28.0 23.0

Page 17: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

08-Aug-14 16.3 20.6 21.0 23.7 16.2

09-Aug-14 15.6 32.6 14.0 24.3 22.2

10-Aug-14 37.8 34.9 17.1 57.7 37.7

11-Aug-14 24.8 29.5 23.9 32.5 24.5

12-Aug-14 23.6 17.0 26.2 14.6 17.9

13-Aug-14 17.8 16.9 19.3 10.0 12.7

14-Aug-14 13.6 13.7 14.4 10.5 10.2

15-Aug-14 20.9 17.5 16.9 14.5 11.0

16-Aug-14 11.6 9.7 10.6 9.7 9.0

17-Aug-14 9.8 8.4 5.6 13.3 7.2

18-Aug-14 4.9 8.6 6.1 9.8 7.1

19-Aug-14 8.7 11.0 10.3 9.8 9.9

20-Aug-14 13.9 14.2 17.7 11.1 13

21-Aug-14 12.1 10.9 16.0 9.0 10.9

22-Aug-14 8.1 6.8 11.5 6.3 7.9

23-Aug-14 9.4 6.8 14.0 6.2 6.8

24-Aug-14 12.5 8.1 15.8 6.3 7.9

25-Aug-14 12.5 12.8 14.1 17.8 11

26-Aug-14 10.3 9.3 13.9 7.1 8.4

27-Aug-14 5.9 8.1 10.2 6.9 8.2

28-Aug-14 8.7 11.6 10.7 8.7 10.9

29-Aug-14 10.4 12.6 11.0 9.1 10.8

30-Aug-14 10.4 11.2 14.8 11.2 12

31-Aug-14 10.5 16.2 10.9 14.5 13.2 Commissioned

01-Sep-14 16.0 32.3 8.9 30.1 21.0 23.2

02-Sep-14 21.4 27.7 15.4 20.3 Technical issue 12.9

03-Sep-14 10.1 14.1 10.7 11.2 11.6 12.2

04-Sep-14 11.3 22.1 13.1 19.2 14.2 18.4

05-Sep-14 11.2 19.7 15.1 15.2 14.9 14.7

06-Sep-14 9.9 10.6 12.5 8.4 9.1 7.7

07-Sep-14 6.7 8.1 12.4 6.0 7.4 6.3

08-Sep-14 5.7 6.8 10.0 9.5 5.9 7.1

09-Sep-14 11.9 17.0 10.2 13.9 12.0 13.7

10-Sep-14 24.7 25.8 18.0 23.2 22.4 18.9

11-Sep-14 28.9 31.3 12.1 22.2 23.7 18.4

12-Sep-14 19.8 19.2 20.5 15.1 16.5 13.8

13-Sep-14 13.8 14.9 17.4 12.4 14.1 11.4

14-Sep-14 21.3 25.3 14.9 21.9 23.3 18.1

15-Sep-14 27.3 26.1 30.0 20.5 23.5 19.7

16-Sep-14 22.5 32.0 31.9 37.8 25.7 27.1

17-Sep-14 29.2 35.5 17.4 32.6 33.9 21.3

18-Sep-14 26.6 27.5 14.8 37.0 25.9 21.0

19-Sep-14 13.6 24.8 11.6 20.3 19.5 15.5

20-Sep-14 19.0 27.8 24.3 33.3 25.4 29.6

Page 18: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

21-Sep-14 15.3 13.6 18.2 12.1 12.3 11.0

22-Sep-14 14.8 13.5 16.9 10.7 12.3 10.8

23-Sep-14 18.7 15.1 18.8 12.8 12.4 11.2

24-Sep-14 27.6 25.6 20.7 21.7 21.6 19.6

25-Sep-14 7.6 27.5 12.0 11.4 11.4 25.8

26-Sep-14 11.5 15.8 13.2 12.1 15.2 12.2

27-Sep-14 12.9 16.0 17.5 11.4 13.8 12.3

28-Sep-14 13 21.8 12.5 16.9 17.3 16.7

29-Sep-14 36.7 39.5 17.7 32.4 36.8 30.2

30-Sep-14 48.2 65.9 34.3 51.0 53.2 35.5

01-Oct-14 36.6 40.8 27 28.5 24.8 23.6

02-Oct-14 29.4 45.7 19.3 22.8 27.6 16.4

03-Oct-14 27.2 37.4 27.3 28.5 30.3 28.6

04-Oct-14 28.7 29.8 24.2 27.4 29.2 25.7

05-Oct-14 24.4 53.5 21.0 39.6 27.2 34.3

06-Oct-14 40.2 44.1 42.3 30.3 39.1 31.7

07-Oct-14 38.1 48.8 28.7 38.6 39.9 27.5

08-Oct-14 19.1 15.1 18.6 10.2 12.7 9.8

09-Oct-14 13.3 11.8 17.6 8.2 10.0 9.3

10-Oct-14 21.0 28.2 24.8 22.8 20.6 19.8

11-Oct-14 26.3 29.8 27.1 22.0 23.2 21.1

12-Oct-14 25.6 28.0 30.8 27.5 24.3 29.9

13-Oct-14 31.5 63.4 25.6 58.7 43.0 49.5

14-Oct-14 14.0 19.6 12.4 21.4 13.9 13.6

15-Oct-14 6.9 9.3 8.9 8.4 8.4 7.1

16-Oct-14 19.9 26.1 20.7 23.1 20.5 20.2

17-Oct-14 18.5 19.9 20.7 17.9 17.5 18.8

18-Oct-14 12.1 12.5 16.4 10.7 11.8 10.9

19-Oct-14 23.8 29.3 16.5 23 23.7 22.6

20-Oct-14 32.5 30.3 Technical Fault 27.9 27.9 33.9

21-Oct-14 19.3 12.3 Circuit Breaker repair required

9.8 7.0 10.8

22-Oct-14 20.3 18.2 14.9 10.6 11.5

23-Oct-14 37.0 33.6 22.4 28.6 27.7 27.5

24-Oct-14 37.0 30.3 40.0 27.7 23.9 23.7

25-Oct-14 38.0 39.8 35.2 34.9 33.9 30

26-Oct-14 35.9 38.2 37.5 35.9 34.3 32

27-Oct-14 43.5 57.8 51.0 52.7 51.4 38.6

28-Oct-14 50.9 53.2 31.1 50.4 42.1 31.8

29-Oct-14 39.3 57.2 31.3 38.4 39.6 33.6

30-Oct-14 32.5 36.0 27.4 31.2 29.4 26.9

31-Oct-14 48.8 78.9 50.3 64.9 46.1 48.8

01-Nov-14 50.2 61.6 24.2 63.9 28.7 23.1

02-Nov-14 26.9 23.0 28.7 28.3 28.6 21.8

03-Nov-14 52.9 40.1 37.3 28.3 34.5 29.5

Page 19: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

04-Nov-14 48.5 45.5 44.8 31 35.5 30.4

05-Nov-14 21.4 28.6 24.6 21.4

Technical issue

16.8

06-Nov-14 25.4 24.6 24.7 22 20.5

07-Nov-14 29.6 24 26.7 20.4 18.9

08-Nov-14 18.5 14.3 17.6 11.6 13.1 11.4

09-Nov-14 38.6 34.6 31.5 31.1 32.6 28.5

10-Nov-14 43.6 30.4 35.8 27.6 27.6 25.1

11-Nov-14 27.2 20.8 25 18.8 19.6 17.8

12-Nov-14 28.2 20.5 23.1 19.6 19.8 17.1

13-Nov-14 28.3 21.4 21.9 17.5 19.7 16.9

14-Nov-14 32.9 79.7 22.7 31.7 36.2 25.5

15-Nov-14 61.9 46.1 55.9 38.8 43.4 35.9

16-Nov-14 22.4 45 31.1 30.2 29.3 18.4

17-Nov-14 26.4 36 17.3 28.8 24.3 19.6

18-Nov-14 38.1 36.9 31.3 36.5 33.9 31.8

19-Nov-14 30.7 21.5 23.8 17.8 19.8 17

20-Nov-14 33 45.3 27.3 26 26.4 19.8

21-Nov-14 58 57.7 48.4 76 54.6 60.5

22-Nov-14 29 25.6 29.9 23.3 24.8 21.4

23-Nov-14 42.3 46.8 42 43.3 38.6 34

24-Nov-14 41.8 40 28.9 26.3 37.9 26.7

25-Nov-14 14.9 18.6 18.7 18.4 15.1 15.5

26-Nov-14 28.2 25.4 29 22.4 24.7 22.3

27-Nov-14 21.2 20.9 23.8 16.5 18.7 15.8

28-Nov-14 18.2 17.1 23.7 13.3 14.7 12.8

29-Nov-14 24.8 27.9 27.3 23.2 22.3 20.1

30-Nov-14 26.7 26.7 27.1 29.9 20.2 25.3

01-Dec-14 23.2 29.7 21.0 25.8 25.3 21.5

02-Dec-14 21.2 29.3 22.1 25.9 22.8 22.5

03-Dec-14 34.3 34.6 34.7 39.6 22.3 21.5

04-Dec-14 13.5 22.4 16.9 16.1 17.5 14.6

05-Dec-14 14.9 21.8 12.7 16.4 17.6 12.3

06-Dec-14 9.3 11.8 11.6 8.9 10.1 9.1

07-Dec-14 7.5 15.2 12.1 10.6 12.2 8.8

08-Dec-14 17.1 19.1 19.8 21.1 21.2 12.4

09-Dec-14 27.2 23.7 24.4 20.0 21.1 19.9

10-Dec-14 19.4 16.6 17.6 12.9 15.9 14.7

11-Dec-14 6.8 8.6 7.1 Outage due to storm

8.6 Storm outage

12-Dec-14 16.1 15.0 14.6 14.0 12.2

13-Dec-14 10.7 12.4 14.7 3.9 11.6 9.7

14-Dec-14 15.8 16.2 18.3 12.6 14.3 14.3

15-Dec-14 19.0 18.2 18.1 11.8 15.3 12.9

16-Dec-14 20.2 23.7 25.3 19.7 18.1 Technical Issue

17-Dec-14 45.7 Technical Issue 45.2 46.4 48.2 43.2

Page 20: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

Sx13

(µg/m3)

Sx14

(µg/m3)

Sx8

(TEOM 1)

(µg/m3)

Sx10

(TEOM 2)

(µg/m3)

Sx9

(TEOM 3)

(µg/m3)

Sx10 – G2

(TEOM 4)

(µg/m3)

18-Dec-14 35.1 40.6 30.8 33.3 31.5 31.7

19-Dec-14 31.3 35.9 28.7 Technical Issue 33.8 31.3

20-Dec-14 15.2 19.4 19.3 17.6 19.1 16.7

21-Dec-14 14.2 16.5 17.4 14.3 16.5 12.7

22-Dec-14 13.9 14.7 15.9 13.2 16.2 11.7

23-Dec-14 11.8 12.7 14.1 11.3 12.3 9.6

24-Dec-14 17.3 21.7 18.6 17.5 20.0 16.9

25-Dec-14 15.2 15.1 15.4 13.7

Air conditioner failed

12.6

26-Dec-14 9.1 12.8 10.4 8.6 10.7

27-Dec-14 Pump and

power cable required replacing

20.9 20.5 18.6 18.3

28-Dec-14 8.2 7.7 6.3 6.2

29-Dec-14 7.6 5.9 5.4 5.6

30-Dec-14 45 27.1 31.8 29.3

31-Dec-14 30.1 31.3 27.1 24.5

MOC Elevated (≥50 µg/m³) Continuous PM10 Results 2014

Sample Date PM10 Results

(µg/m³) Comments

4-Feb-2014 Sx9 – 50.1

Winds were predominantly from the SE direction at an average wind speed of 3.9 m/s. As MOC is situated NW from the Sx9 monitor and downwind from the elevated dust levels, it is considered that the elevated PM10 24hr average is not attributable to MOC.

24-Jun-2014 #Sx10 – 61.4 Sx14 – 53.5

Winds were predominantly from the NW direction a strong average wind speed of 6.71 m/s. It was not possible to estimate a site contribution as the upwind TEOM (Sx8) and Sx14 were not working due to a scheduled Energy Australia power outage. On this day the E&C Manager visually inspected dust around the mine site and observed a significant amount of dust coming from Ravensworth mine. Upon investigation it was determined that Ravensworth had an area of recently seeded rehabilitation which was losing topsoil due to the high winds on this day.

9-Jul-2014 #Sx10 – 52.4

Winds were predominantly from the NW direction at an average wind speed of 4.06 m/s. Mt Owen mine is situated NW from Sx10 monitor and Glendell is situated W. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 27.7 µg/m³.

10-Jul-2014 #Sx10 – 51.5

Winds were predominantly from the NW direction at an average strong wind speed of 6.02 m/s. Mt Owen mine is situated NW from the Sx10 monitor and Glendell is situated W. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 35.5 µg/m³.

1-Aug-2014 #Sx10 – 52.9

Winds were predominantly from the NW direction at a strong average wind speed of 5.72 m/s. Mt Owen mine is situated NW from Sx10 monitor and Glendell is situated W. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 31.2 µg/m³.

Page 21: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sample Date PM10 Results

(µg/m³) Comments

10-Aug-2014 #Sx10 – 57.7

Winds were predominantly from the NW direction at an average wind speed of 2.91 m/s. Mt Owen mine is situated NW from the Sx10 monitor and Glendell is situated W. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 40.6 µg/m³.

30-Sep-2014 #Sx10 – 51.0 Sx9 – 53.2 Sx14 – 65.9

Winds were predominantly from the NW direction at an average wind speed of 3.78 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 16.7µg/m³.

5-Oct-2014 Sx14 – 53.5

Winds were predominantly from the NW direction at an average wind speed of 1.71 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 29.1µg/m³.

13-Oct-2014

#Sx10 – 58.7 Sx14 – 63.4

At Mt Owen, winds were predominantly from the NW direction at an average wind speed of 2.06 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 33.1µg/m³. At Glendell, winds were predominantly from the NW direction at an average wind speed of 2.35 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 29.1µg/m³. Therefore Mt Owen Complex potentially contributed between 29.1 and 33.1 µg/m³.

27-Oct-2014

Sx8 – 51.0 Sx9 – 51.4 #Sx10 – 52.7 Sx14 – 57.8

At Mt Owen, winds were predominantly from the W direction at an average wind speed of 3.38 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 1.7 µg/m³. At Glendell, winds were predominantly from the NW/W direction at an average wind speed of 3.92 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 14.3µg/m³. Therefore Mt Owen Complex potentially contributed between 1.7 and 14.3 µg/m³.

28-Oct-2014

#Sx10 – 50.4 Sx14 – 53.2

At Mt Owen, winds were predominantly from the NW direction at an average wind speed of 3.14 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 19.3 µg/m³. At Glendell, winds were predominantly from the NW direction at an average wind speed of 3.33 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 2.3 µg/m³. Therefore Mt Owen Complex potentially contributed between 2.3 and 19.3 µg/m³.

29-Oct-2014 Sx14 – 57.2

Winds were predominantly from the SE direction at an average wind speed of 1.25 m/s. As MOC is situated NW from the Sx14 monitor and downwind from the elevated dust levels, it is considered that the elevated PM10 24hr average is not attributable to MOC.

Page 22: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sample Date PM10 Results

(µg/m³) Comments

31-Oct-2014 Sx8 – 50.3 #Sx10 – 64.9 Sx14 – 78.9

At Mt Owen, winds were predominantly from the NW direction at an average wind speed of 2.0 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 14.6 µg/m³. At Glendell, winds were predominantly from the NW direction at an average wind speed of 1.81 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 11.4µg/m³. Therefore Mt Owen Complex potentially contributed between 11.4 and 14.6 µg/m³.

1-Nov-2014

#Sx10 – 63.9 Sx13 – 50.2 Sx14 – 61.6

At Mt Owen, winds were predominantly from the NW direction at an average wind speed of 5.22 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 39.7 µg/m³. At Glendell, winds were predominantly from the NW direction at an average wind speed of 5.12 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 11.4µg/m³. Therefore Mt Owen Complex potentially contributed between 11.4 and 39.7 µg/m³.

3-Nov-2014 Sx13 - 52.9

Winds were predominantly from the SE direction at an average wind speed of 2.07 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx14 and Sx13), it is considered that the site potentially contributed approximately 12.8 µg/m³.

14-Nov-2014 Sx14 – 79.7

Winds were predominantly from the NW direction at an average wind speed of 2.03 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 46.8 µg/m³.

15-Nov-2014 Sx8 – 55.9 Sx14 – 61.9

At Mt Owen, winds were predominantly from the SE direction at an average wind speed of 3.07 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 17.1 µg/m³. At Glendell, winds were predominantly from the SE direction at an average wind speed of 3.72 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 15.8 µg/m³. Therefore Mt Owen Complex potentially contributed between 15.8 and 17.1 µg/m³.

21-Nov-2014

Sx9 – 76.0 Sx10- 54.6 Sx10 – G2 – 60.5 Sx13 – 58.0 Sx14 – 57.7

At Mt Owen, winds were predominantly from the NW direction at an average wind speed of 3.07 m/s. Taking into account the differential variance between the upwind and downwind dust levels (Sx8 and Sx10), it is considered that the site potentially contributed approximately 27.6 µg/m³. At Glendell, winds were predominantly from the NW direction at an average wind speed of 2.89 m/s.taking into account the differential variance between the upwind and downwind dust levels (Sx13 and Sx14), it is considered that the site potentially contributed approximately 0.3µg/m³. Therefore Mt Owen Complex potentially contributed between 0.3 and 27.6 µg/m³.

# Sx10 is located near HVAS PM10 2 and is located on mine owned land and is not representative of nearby private residences. Mt Owen utilise this monitor as an early warning unit to assess dust impacts.

Page 23: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix D: Water Monitoring Summary 2014

Surface Water Monitoring Results

Sampling Date

BMC1 – Bowman’s Creek Upstream BMC2 – Bowman’s Creek Midstream

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 7.88 1050 7 583 8.01 1160 10 659

21-Feb-14 8.07 1100 5 633 8.12 1270 8 712

20-Mar-14 8.01 1090 7 646 8.01 1260 10 761

23-Apr-14 8.21 1090 <5 656 8.15 1300 20 766

22-May-14 8.07 1060 <5 586 8.09 1340 <5 744

24-Jun-14 8.11 1210 <5 656 8.09 1290 13 697

23-Jul-14 7.96 1290 <5 630 8.18 1480 <5 746

20-Aug-14 7.80 1230 <1 710 7.90 1540 7 944

17-Sep-14 7.60 1210 6 714 7.80 1350 28 790

16-Oct-14 7.80 1300 6 816 7.90 1410 8 815

12-Nov-14 7.60 1370 2 843 7.80 1620 28 1050

17-Dec-14 7.60 1410 11 810 7.50 1220 12 709

Sampling Date

BMC3 – Bowman’s Creek Downstream

Sampling Date

BMC4 – Bowman’s Creek (Hebden Road)

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 7.93 1850 15 1060 22-Jan-14 7.57 1190 5 684

21-Feb-14 8.06 2130 12 1230 21-Feb-14 7.62 1220 10 623

20-Mar-14 8.04 1260 11 748 20-Mar-14 7.40 1220 11 683

23-Apr-14 8.05 2020 48 1180 23-Apr-14 7.66 1280 6 738

22-May-14 7.95 1900 <5 1070 22-May-14 7.69 1390 7 786

24-Jun-14 7.91 2090 12 1160 24-Jun-14 8.00 1360 <5 728

23-Jul-14 8.06 2300 <5 1240 21-Jul-14 7.73 1480 <5 742

20-Aug-14 7.80 2180 63 1380 27-Aug-14 7.75 1390 6 838

17-Sep-14 7.70 1720 20 1010 22-Sep-14 7.80 1510 <5 744

16-Oct-14 7.90 1860 18 1110 20-Oct-14 7.85 1480 <5 861

12-Nov-14 8.00 2330 12 1470 21-Nov-14 7.69 1400 <5 814

17-Dec-14 7.8 1670 28 970 17-Dec-14 7.52 1350 13 706

Page 24: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

YC1 – Yorks Creek Upstream YC2 – Yorks Creek Midstream

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 Dry Dry

21-Feb-14 7.14 3910 6 2320 Dry

20-Mar-14 7.84 580 <5 368 Dry

23-Apr-14 7.63 4000 <5 2450 7.38 11900 <5 7650

22-May-14 7.57 4620 <5 2530 7.52 13200 <5 7680

24-Jun-14 7.59 5130 <5 3090 7.50 16700 <5 9900

21-Jul-14 8.05 4760 6 2980 7.57 15300 <5 8900

27-Aug-14 7.30 5960 2 3780 7.40 13500 8 9300

22-Sep-14 7.30 5170 8 3190 7.40 12500 <1 8520

20-Oct-14 Too low to sample 7.80 12900 10 9300

21-Nov-14 Dry 7.40 13200 20 9720

17-Dec-14 7.40 4970 13 3060 7.60 8470 7 5530

Sampling Date

YC3 – Yorks Creek Downstream

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1)

22-Jan-14 Dry

21-Feb-14 Dry

20-Mar-14 Dry

23-Apr-14 Dry

22-May-14 7.43 4920 <5 2880

24-Jun-14 7.28 9440 <5 5810

21-Jul-14 Dry

27-Aug-14 Dry

22-Sep-14 7.10 2400 12 1570

20-Oct-14 Too low to sample

21-Nov-14 Dry

17-Dec-14 7.2 1370 13 996

Page 25: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

SC1 – Swamp Creek Upstream (Dam 5) SC2 – Swamp Creek Midstream (Dam 1)

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 7.83 387 <5 238 7.96 331 10 202

21-Feb-14 8.22 412 8 269 8.17 394 12 286

20-Mar-14 8.84 384 12 267 8.10 336 <5 256

23-Apr-14 8.14 382 6 276 7.59 306 8 171

22-May-14 7.89 380 <5 253 7.63 131 <5 206

24-Jun-14 7.81 386 <5 221 7.20 145 8 188

21-Jul-14 8.32 404 42 224 7.66 172 <5 190

27-Aug-14 8.10 391 <1 660 7 193 10 294

22-Sep-14 7.80 410 4 264 6.90 185 12 198

20-Oct-14 8.30 426 18 307 7.10 210 10 259

21-Nov-14 No access 7.40 250 13 497

17-Dec-14 No access 6.90 239 36 300

Sampling Date

SC3 – Swamp Creek Downstream SC4 – Prior to Ashton

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 Dry Dry

21-Feb-14 Dry Dry

20-Mar-14 8.19 5510 <5 3250 Dry

23-Apr-14 Dry Dry

22-May-14 7.91 6410 <5 4280 Dry

24-Jun-14 8.23 6910 <5 4350 Dry

21-Jul-14 8.21 8470 <5 5490 Dry

22-Aug-14 8.01 5700 45 3460 Dry

19-Sep-14 8.20 6840 5 4150 Dry

31-Oct-14 8.31 9260 6 3690 Dry

25-Nov-14 8.04 9560 <5 6390 Dry

17-Dec-14 7.69 808 60 530 Dry

Page 26: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

BC1 – Bettys Creek Upstream BC2 – Bettys Creek Downstream

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 Dry Dry

21-Feb-14 Dry Dry

20-Mar-14 Dry Dry

23-Apr-14 Dry 8.30 6170 <5 4060

22-May-14 Dry 8.28 6310 <5 3620

24-Jun-14 Dry 8.25 6400 <5 4220

21-Jul-14 Dry 8.27 6530 <5 3980

27-Aug-14 Dry 8.20 6350 1 4270

19-Sep-14 Dry 8.00 6330 4 4120

31-Oct-14 Dry 8.10 6300 2 4380

25-Nov-14 Dry 8.10 6330 2 4230

17-Dec-14 6.90 786 21 568 8.10 4120 4 2510

Sampling Date

BC3 – Bettys Creek Prior to Ashton BC4 – Bettys Creek 4

pH EC

(uS.cm-1) TSS

(mg.L-1) TDS

(mg.L-1) pH

EC (uS.cm-1)

TSS (mg.L-1)

TDS (mg.L-1)

22-Jan-14 Dry Dry

21-Feb-14 Dry 6.97 1640 56 1060

20-Mar-14 Dry 7.60 447 17 314

23-Apr-14 No access 7.57 642 <5 405

22-May-14 Dry 7.51 455 6 284

24-Jun-14 Dry Too low to sample

21-Jul-14 Dry Dry

27-Aug-14 8.08 3690 133 2640 6.73 329 277 768

22-Sep-14 8.24 6570 <5 3860 8.04 6370 14 3470

20-Oct-14 8.32 6830 5 3910 8.25 6960 <5 3990

21-Nov-14 Dry 8.08 7390 10 4930

17-Dec-14 7.63 696 17 494 7.58 560 52 471

Page 27: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Groundwater Monitoring Results

Sampling Date

North East South

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 No access – too wet Dry Dry

18-Jun-14 7.87 7.96 4.34 Dry Dry

25-Sep-14 8.29 8.10 3.73 Dry Dry

19-Jan-15 9.06 7.19 4.69 Dry Dry

Sampling Date

GW1 NPZ1 - Large NPZ1 - Small

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 Sludge 14.45 7.8 13.58 33.26 8.71 6.67

18-Jun-14 Sludge 14.63 7.7 14.71 33.39 8.5 7.05

25-Sep-14 Sludge 14.20 7.5 13.21 34.29 7.91 6.95

19-Jan-15 Sludge 14.37 7.4 15.29 35.55 7.8 7.40

Sampling Date

NPZ3 - Large NPZ3 - Small NPZ4 - Large

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 15.18 8.16 11.54 44.52 8.07 12.93 No access – too wet

18-Jun-14 16.29 Mud 41.55 7.81 12.19 5.87 7.92 22.39

25-Sep-14 15.94 7.87 13.06 41.37 7.71 12.10 5.55 8.01 21.69

19-Jan-14 15.19 7.8 10.52 41.75 7.4 11.55 6.05 7.35 22.62

Sampling Date

NPZ4 - Small NPZ6 – Large NPZ6 - Small

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 No access – too wet 54.56 7.6 11.28 Blocked

18-Jun-14 5.58 7.75 21.20 55.08 7.5 11.60 Blocked

25-Sep-14 5.67 7.84 21.68 55.28 7.3 11.64 Blocked

19-Jan-15 5.92 7.21 21.52 55.66 7.1 11.95 Blocked

Page 28: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Sampling Date

NPZ7 - Large NPZ7 - Small NPZ8 – Large

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 14.22 8.22 7.59 24.05 7.90 7.20 9.81 7.52 13.23

18-Jun-14 14.12 8.03 7.74 25.92 7.84 7.35 9.75 8.35 14.43

25-Sep-14 14.11 7.72 7.63 25.95 7.60 7.26 9.26 8.03 14.79

19-Jan-15 14.07 7.5 8.06 26.78 7.3 7.49 9.60 7.8 15.91

Sampling Date

NPZ8 - Small NPZ9 - Large NPZ9 - Small

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 30.38 8.22 2.13 No Access – Train in Rail Loop No Access – Train in Rail Loop

18-Jun-14 31.27 8.21 2.35 No Access – Train in Rail Loop No Access – Train in Rail Loop

25-Sep-14 31.94 8.00 2.28 3.05 6.87 9.70 Blocked

19-Jan-15 32.13 7.14 2.51 3.16 6.73 10.28 Blocked

Sampling Date

NPZ10 - Large NPZ10 - Small NPZ11 - Large

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 No Access – Train in Rail Loop No Access – Train in Rail Loop 14.58 7.98 12.00

18-Jun-14 No Access – Train in Rail Loop No Access – Train in Rail Loop 14.66 8.12 12.30

25-Sep-14 25.55 8.36 2.11 Blocked 14.58 7.94 11.59

19-Jan-15 26.60 7.28 2.32 Blocked 14.74 7.43 12.34

Sampling Date

NPZ11 - Small NPZ12 - Large NPZ12 - Small

Water (m)

pH EC

(uS.cm-1) Water

(m) pH

EC (uS.cm-1)

Water (m)

pH EC

(uS.cm-1)

27-Mar-14 Pipe Bent 22.46 7.66 6.44 Blocked

18-Jun-14 Pipe Bent 22.90 7.94 6.53 Blocked

25-Sep-14 Pipe Bent 23.12 7.70 6.44 Blocked

19-Jan-15 Pipe Bent 23.84 7.12 6.66 Blocked

Page 29: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix E: Collated Attended Noise Monitoring Results The summary of results of the attended noise monitoring program for Mt Owen Mine and Glendell Mine for the period summer 2013/2014 to summer 2014/15 are presented in the Table A1.1 to Table A1.9.

Page 30: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.1 – Summary of Attended Noise Monitoring – Round 1 Summer 2013/2014, dB(A)

Location Start Time

(15 min

period)

Measured Noise Levels Estimated

1

Mt Owen Contribution

Estimated 1

Glendell Contribution Local Meteorological

Conditions 2 LA90,

15minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

Day Period – 31 January 2014

N1 11.04 40.0 45.5 63.3 < 30

Not applicable

I/A

Not applicable

SE at 1.2 to 2.2 m/s, Cloudless sky

N2 10.27 46.4 51.5 57.2 < 30 I/A ESE to SE at 0.7 to 1.4 m/s, Cloudless sky

N3 09.56 67.3 69.9 75.7 31 I/A E to SSE at 0 to 0.7 m/s, Cloudless sky

N4 09.28 35.8 46.9 71.3 31 33 SE to SW at 1.2 to 1.6 m/s, Cloudless sky

N5 08.53 41.7 46.8 63.1 I/A I/A SSE to SW at 0.7 to 1.1 m/s, Cloudless sky

N6 08.28 38.0 41.5 58.7 I/A I/A ENE to E at 0 to 0.6 m/s, Cloudless sky

N8 08.01 34.6 36.9 45.7 I/A I/A Calm winds, Cloudless sky

Evening Period – 30 January 2014

N1 21.09 32.6 38.1 44.7 I/A

Not applicable

I/A

Not applicable

Calm winds, Cloudless sky

N2 20.36 35.5 42.4 61.3 I/A 25 ESE at 1 to 1.6 m/s, Cloudless sky

N3 20.06 53.6 60.3 74.7 < 30 I/A E at 0.9 to 1.2 m/s, Cloudless sky

N4 19.39 43.5 51.4 72.3 I/A I/A ESE at 4.8 to 5.5 m/s, Cloudless sky

N5 18.00 46.6 50.8 60.8 I/A I/A Calm winds, Cloudless sky

N6 18.25 43.0 46.7 62.8 I/A I/A SE at 3.5 to 4.2 m/s, Cloudless sky

N8 18.57 38.7 43.9 51.9 I/A I/A ESE at 3 to 4.3 m/s, Cloudless sky

Night-time Period – 30/31 January 2014

N1 22.07 32.2 41.1 48.7 < 20 < 20 I/A I/A Calm winds, Cloudless sky

N2 22.37 27.5 35.0 49.2 < 20 < 20 < 20 < 20 Calm winds; Cloudless sky

N3 23.03 32.8 36.1 43.0 35 40 I/A I/A Calm wind, Cloudless sky

N4 23.31 37.6 53.7 74.8 35 <42 35 <42 SE at 2.5 m/s to 2.9 m/s, Cloudless sky

N5 01.20 46.1 49.5 56.7 I/A I/A I/A I/A SE at 0 to 0.5 m/s, Cloudless sky

N6 00.52 36.0 44.5 57.4 I/A I/A I/A I/A Calm wind; Cloudless sky

N8 00.23 35.5 41.3 50 I/A I/A < 35 37 Wind S at 0.9 to 1.2 m/s, Cloudless sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 31: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.2 – Summary of Attended Noise Monitoring – Round 1 Autumn 2014, dB(A)

Location

Start Time

(15 min

period)

Measured Noise Levels Estimated

1

Mt Owen Contribution

Estimated 1

Glendell Contribution Local

Meteorological

Conditions 2 LA90,

15minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

Day Period – 15 May 2014

N1 07:51 31.7 48.1 68.6 Not Audible

Not applicable

Not Audible

Not applicable

Calm; Cloudless sky

N2 08:17 37.6 39.3 49 38 Not Audible Calm; Cloudless sky

N3 09:18 32 59.1 82.5 < 30 < 30 Calm; Cloudless sky

N4 09:44 32.3 55.6 77.5 Not Audible Not Audible NE to NE at 0.5 to 0.8 m/s, gusting to 1.1 m/s;

Cloudless sky

N5 10:45 35.0 43.2 58.5 Not Audible < 30 W to W at 0.5 to 0.8 m/s, gusting to 1.2 m/s;

Cloudless sky

N6 11:09 37.2 41.1 48.6 Not Audible Not Audible SW to WNW at 0.9 to 1.4 m/s, gusting to 2 m/s;

Cloudless sky

N8 10:16 33.1 37.6 51.1 Not Audible Not Audible WNW to NW at 1 to 1.5 m/s, gusting to 1.9 m/s;

Cloudless sky

Evening Period – 15 May 2014

N1 18:26 24.7 51.2 72.4 Not Audible

Not applicable

Not Audible

Not applicable

Calm; Cloudless sky

N2 19:23 30.3 38.3 48.8 26 Not Audible ENE to ENE at 0.9 to 1 m/s, gusting to 1.1 m/s;

Cloudless sky

N3 20:09 25.0 27.2 42.1 26 Not Audible NW to NNW at 0 to 0 m/s, gusting to 1 m/s;

Cloudless sky

N4 20:40 33.0 40.4 53.1 30 30 E to E at 0.9 to 1.2 m/s, gusting to 1.3 m/s;

Cloudless sky

N5 21:10 41.1 47.6 57.7 Not Audible < 39 Calm; Cloudless sky

N6 21:32 41.3 48.7 67.2 Not Audible < 37 Calm; Cloudless sky

N8 21:54 37.6 44.8 62.4 Not Audible < 31 Calm; Cloudless sky

Night-time Period – 15/16 May 2014

N1 02:13 30.7 32.7 40 31 40 Not Audible Not Audible Calm; Cloudless sky

N2 01:49 32.6 34.0 38.6 33 38 30 30 NNE to NNE at 0 to 0 m/s, gusting to 0.6 m/s;

Cloudless sky

N3 01:21 31.6 34.1 40.2 < 35 < 35 < 35 < 35 Calm; Cloudless sky

Page 32: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

N4 01:00 35.1 40.0 47.6 Not Audible Not Audible < 31 38 Calm; Cloudless sky

N5 00:08 37.7 41.8 52.5 Not Audible Not Audible < 34 38 Calm; Cloudless sky

N6 23:20 39.8 46.8 54.8 Not Audible Not Audible < 35 < 35 Calm; Cloudless sky

N8 22:36 35.4 45.6 57.3 Not Audible Not Audible Not Audible Not Audible Calm; Cloudless sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5 metres and at a corresponding height of the noise monitoring microphone.

Page 33: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.3 – Summary of Attended Noise Monitoring – Round 1 Winter 2014, dB(A)

Location

Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological Conditions

2 LA90,

15minute LAeq,

15minute LA1,

1minute LAeq,

15minute LA1,

1minute LAeq,

15minute LA1,

1minute

Day-time Period – Supplementary Monitoring Round - Day time Period not required

Evening Period – 25 June 2014

N1 21:20 42.1 48.8 61.6 I/A

Not applicable

I/A

Not applicable

WNW to NW at 3.4 to 4.1 m/s, gusting to 6.4 m/s;

Cloudless sky

N2 20:48 39.7 42.7 53.4 40 I/A W to WNW at 2.4 to 3.5 m/s, gusting to 4.4 m/s; Cloudless sky

N3 20:19 45.4 55.2 73.9 <35 I/A WWNW at 4.5 to 5.3 m/s, gusting to 6.1 m/s; Cloudless sky

N4 19:51 47.9 55.0 70.5 I/A I/A NW at 6.1 to 6.8 m/s, gusting to 8.5 m/s;

Cloudless sky

N5 18:30 44.7 48.0 57.6 I/A I/A WNW to NW at 1.8 to 2.7 m/s, gusting to 4.5 m/s; Cloudless sky

N6 18:01 47.5 50.9 58.8 I/A I/A WNW to NW at 4.3 to 5.5 m/s, gusting to 6.7 m/s; Cloudless sky

N8 19:03 42.0 46.4 60.2 I/A I/A NW at 4.8 to 6.1 m/s, gusting to 6.9 m/s; Cloudless sky

Night-time Period – 25 to 26 June 2014

N1 22:02 41.4 45.6 56.4 I/A I/A I/A I/A WNW to NW at 3.1 to 4.2 m/s, gusting to 5.9 m/s; Cloudless sky

N2 22:36 44.7 47.5 57.4 41 41 41 41 NW at 3.3 to 4 m/s, gusting to 5.4 m/s; Cloudless sky

N3 23:04 50.9 55.7 65.0 <35 <35 I/A I/A WNW at 4 to 5.4 m/s, gusting to 6.7 m/s;

Cloudless sky

N4 23:33 50.4 55.8 69.6 I/A I/A I/A I/A WNW to NNW at 7.4 to 7.9 m/s, gusting to 8.9 m/s; Cloudless sky

N5 00:44 42.3 45.2 58.1 I/A I/A I/A I/A WNW to NW at 1.4 to 2 m/s, gusting to 3.3 m/s; Cloudless sky

N6 01:10 49.9 56.3 68.6 I/A I/A I/A I/A NNW at 5.4 m/s, gusting to 8.9 m/s; Cloudless sky

N8 00:12 38.3 42.0 52.1 I/A I/A I/A I/A NW at 3.3 to 3.8 m/s, gusting to 4.9 m/s;

Cloudless sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 34: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.4 – Summary of Attended Noise Monitoring – Round 2 Winter 2014, dB(A)

Location

Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological Conditions

2 LA90,

15minute LAeq,

15minute LA1,

1minute LAeq,

15minute LA1,

1minute LAeq,

15minute LA1,

1minute

Day-time Period – Supplementary Monitoring Round - Day time Period not required

Evening Period – 29 July 2014

N1 18:18 34.4 42.5 66.9 33

Not applicable

I/A

Not applicable

W to WNW at 1.2 to 1.4 m/s, gusting to 1.8 m/s; Cloudless sky

N2 18:44 32.8 35.5 41.9 34 I/A NNW at 0 m/s, gusting to 0.5 m/s; Cloudless sky

N3 19:09 34.7 50.9 74.8 32 32

WNW to NW at 1.7 to 2 m/s, gusting to 2.4 m/s;

Cloudless sky

N4 19:38 34.1 36.9 51.5 <35 <35

NW at 2.7 to 3.1 m/s, gusting to 3.7 m/s; Cloudless sky

N5 20:30 41.8 45.4 52 I/A 38

NW at 1.5 to 2 m/s, gusting to 3.1 m/s; Cloudless sky

N6 20:07 40.9 48.3 59 I/A <35

WNW to NW at 3.2 to 3.8 m/s, gusting to 5.1 m/s;

Cloudless sky

N8 21:00 37.3 41.8 51.7 I/A I/A

NNW at 0.9 to 1.3 m/s, gusting to 2.1 m/s; Cloudless sky

Night-time Period – 29 July 2014

N1 22:14 32.1 33.5 37.8 31 35 I/A I/A Calm; Cloudless sky

N2 22:41 37.3 40.8 50.9 37 38 I/A I/A Calm; Cloudless sky

N3 23:05 36.7 37.9 41.3 33 39 33 33 WNW at 1.4 to 1.7 m/s, gusting to 2 m/s; Cloudless sky

N4 23:32 33.8 38.4 50.9 30 32 32 37 NW at 1.7 to 2.1 m/s, gusting to 2.5 m/s;

Cloudless sky

N5 00:59 41.0 44.6 56.6 I/A I/A 33 44 Calm; Cloudless sky

N6 00:36 40.4 45.1 57.8 I/A I/A 30 41 W at 0.8 to 1.1 m/s, gusting to 1.5 m/s; Cloudless sky

N8 00:07 36.4 40.1 48.5 I/A I/A I/A I/A NW at 0 to 0.6 m/s, gusting to 1 m/s; Cloudless sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 35: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.5 – Summary of Attended Noise Monitoring – Round 3 Winter 2014, dB(A)

Location Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological Conditions

2

LA90,

15minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

Day Period – 25 August 2014

N1 13:37 25.2 41.8 64.8 I/A

Not applicable

I/A

Not applicable

ESE to SE at 1 to 1.8 m/s, gusting to 2.9 m/s; 1/8

Cloud Cover

N2 14:26 25.3 34.6 50.9 < 25 I/A ESE to SE at 0.6 to 1.3 m/s, gusting to 2.2 m/s;

1/8 Cloud Cover

N3 14:57 27.1 49.4 73.3 < 30 I/A ESE to SE at 0.4 to 0.8 m/s, gusting to 1.3 m/s;

1/8 Cloud Cover

N4 15:26 28.9 57.9 78.7 I/A I/A ESE to SE at 1.5 to 1.9 m/s, gusting to 2.6 m/s;

1/8 Cloud Cover

N5 16:17 34.9 40.0 57.8 I/A I/A ESE to SE at 0.8 to 1.1 m/s, gusting to 1.7 m/s;

1/8 Cloud Cover

N6 15:54 39.5 47.8 66.4 I/A I/A ESE to SE at 0.9 to 1.4 m/s, gusting to 1.9 m/s;

1/8 Cloud Cover

N8 16:50 37.2 40.5 49.2 I/A I/A ESE to SE at 1.7 to 2.1 m/s, gusting to 4.6 m/s;

1/8 Cloud Cover

Night-time Period – 29 August 2014

N17 22:13 39.5 40.7 42.8 I/A I/A I/A I/A ESE to SSE at 0.4 to 0.5 m/s, gusting to 0.6 m/s;

1/8 Cloud Cover

B17 22:35 39.1 40.3 46.8 I/A I/A I/A I/A SE to SSE at 0.4 m/s, gusting to 0.6 m/s; 1/8

Cloud Cover

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 36: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.6 – Summary of Attended Noise Monitoring – Round 1 Spring 2014, dB(A)

Location Start Time

(15 min

period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological

Conditions 2

LA90, 15minute

LAeq, 15minute

LA1, 1minute

LAeq, 15minute

LA1, 1minute

LAeq, 15minute

LA1, 1minute

Day-time Period – 18 September 2014

N1 17:30 26.8 34.8 52.1 27

Not applicable

Not audible

Not applicable

SSE to S at 1 to 1.6 m/s, gusting to 2.7 m/s; 1/8 Cloud Cover

N2 16:34 42 52.2 64.2 <40 Not audible W at 2.8 to 3.6 m/s, gusting to 4.6 m/s; 2/8 Cloud Cover

N3 17:01 28 51.1 73.5 <30 Not audible WSW at 0 m/s, gusting to 1.2 m/s; 1/8 Cloud Cover

N4 16:06 36.8 56.1 77.5 Not audible Not audible WSW to W at 3.5 to 4.2 m/s, gusting to 4.8 m/s;

5/8 Cloud Cover

N5 15:34 41.1 46.1 63.2 Not audible Not audible W at 1.8 to 2.4 m/s, gusting to 3.9 m/s; 1/8 Cloud Cover

N6 15:09 45.2 50.8 61.4 Not audible Not audible W to WNW at 4.3 to 5.2 m/s, gusting to 7 m/s; 1/8 Cloud Cover

N8 14:41 37 43.4 56.7 Not audible Not audible WNW at 4.3 to 5.1 m/s, gusting to 6.5 m/s; 1/8 Cloud Cover

Evening Period – 18 September 2014

N1 18:04 30.3 53.4 73.6 30

Not applicable

I/A

Not applicable

E to S at 0 to 0.8 m/s, gusting to 1.9 m/s; 2/8

Cloud Cover

N2 18:31 31.9 34.0 44 Not audible 32 E to ESE at 0.4 to 1 m/s, gusting to 2.7 m/s; 5/8 Cloud Cover

N3 18:59 33.7 54.7 76.2 Not audible 30 E at 0.7 to 1 m/s, gusting to 1.3 m/s; Cloudless sky

N4 19:24 34.2 50.4 73 Not audible 34 ENE at 2.6 to 3.1 m/s, gusting to 4.2 m/s; 2/8 Cloud Cover

N5 19:55 37.2 43.4 53.4 Not audible Not audible WSW at 0 to 0.7 m/s, gusting to 1 m/s; 2/8 Cloud

Cover

N6 20:19 37.6 45.2 54.5 Not audible Not audible ESE at 1.2 to 1.4 m/s, gusting to 1.7 m/s; 2/8 Cloud Cover

N8 20:47 37.6 42.2 48.9 Not audible Not audible ESE at 1 to 1.1 m/s, gusting to 1.3 m/s; 2/8 Cloud Cover

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 37: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.6 (continued) – Summary of Attended Noise Monitoring – Round 1 Spring 2014, dB(A)

Location

Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution

Estimated 1

Glendell Contribution Local

Meteorological Conditions

2

LA90, 15minute

LAeq, 15minute

LA1, 1minute

LAeq, 15minute

LA1, 1minute

LAeq, 15minute

LA1, 1minute

Night-time Period – 18 to 19 September 2014

N1 01:10 26.5 28.0 40.9 24 33 Not audible Not audible Calm; Cloudless sky

N2 00:32 29.1 32.7 48.3 26 30 26 30 NNW at 0 m/s, gusting to 0.9 m/s; Cloudless sky

N3 00:05 31.4 36.6 44.4 Not audible Not audible Not audible Not audible Calm; Cloudless sky

N4 23:38 33.8 50.9 74.6 Not audible Not audible Not audible Not audible N at 0.7 to 1 m/s, gusting to 1.2 m/s; Cloudless

sky

N5 23:03 33.7 44.0 61.8 Not audible Not audible Not audible Not audible ESE at 0.5 to 0.8 m/s, gusting to 1 m/s; Cloudless sky

N6 22:40 39.3 48.6 60 Not audible Not audible Not audible Not audible ESE at 0 m/s, gusting to 1 m/s; Cloudless sky

N8 22:08 33.2 38.2 47.7 Not audible Not audible Not audible Not audible E at 0 to 0.9 m/s, gusting to 1.1 m/s; Cloudless

sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 38: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.7 – Summary of Attended Noise Monitoring – Round 2 Spring 2014, dB(A)

Location Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological Conditions

2 LA90,

15minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

Day-time Period – Supplementary Monitoring Round - Day time Period not required

Evening Period – 22 October 2014

N17 21:41 29.4 32.1 37.8 Not audible Not applicable Not audible Not applicable SSE at 0.3 to 0.7 m/s gusting to 0.7 m/s; Cloud

1/8 octas

Night-time Period – 22 October 2014

N17 22:15 31.2 35.3 47.8 Not audible Not audible Not audible Not audible SE to SW at 0.3 to 0.5 m/s gusting to 0.7 m/s;

Cloud 1/8 octas

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period taken from the closest SentineX weather station.

Note 3: The October Spring evening and night monitoring session was undertaken at location N17, to the north west of Mt Owen mine due to the occurrence of prevailing winds from the south

east during monitoring session. Monitoring at location N17 under south easterly prevailing winds provided for worst case noise propagation conditions from the Mt Owen complex to receivers in the vicinity of Hebden Road and Scrumlo Road.

Page 39: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.8 – Summary of Attended Noise Monitoring – Round 3 Spring 2014, dB(A)

Location Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological Conditions

2

LA90,

15minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

Evening Period – 19 November 2014

N1 18:23 34.8 38.6 52.2 Not audible

Not applicable

Not audible

Not applicable

SE at 5.8 to 6 m/s, gusting to 6.1 m/s; 4/8 Cloud

cover

N2 18:59 33.2 44.1 66.9 31 Not audible SSE at 5.1 to 5.4 m/s, gusting to 5.5 m/s; 3/8 Cloud cover

N3 19:26 36.2 51.3 70.5 Not audible Not audible SE to SSE at 3.9 to 4.9 m/s, gusting to 5.1 m/s; 2/8 Cloud cover

N4 20:13 36.8 40.4 52.7 Not audible Not audible SE at 4 to 4.2 m/s, gusting to 4.4 m/s; Cloudless

sky

N5 21:12 37.4 40.8 48.5 Not audible 33 SSE at 1.9 to 2 m/s, gusting to 2.1 m/s; Cloudless

sky

N6 20:46 52.2 53.4 60.5 Not audible <35 SSE at 2.3 to 3.1 m/s, gusting to 3.5 m/s; Cloudless sky

N8 21:47 37.7 39.4 45.7 Not audible 33 SSE at 2.1 to 2.3 m/s, gusting to 2.4 m/s; Cloudless sky

Night-time Period – 19 to 20 November 2014

N1 22:46 36.1 40.1 46 Not audible Not audible Not audible Not audible S at 0.5 to 0.6 m/s, gusting to 0.8 m/s; Cloudless sky

N2 23:28 27.3 30.0 37.5 20 25 20 25 SSW at 0 m/s, gusting to 0.2 m/s; Cloudless sky

N3 23:55 27.6 29.2 33 <30 30 <30 31 Calm conditions; Cloudless sky

N4 00:30 34.5 38.1 55.4 Not audible Not audible <35 36 Calm conditions; Cloudless sky

N5 01:39 34.8 39.6 50.1 Not audible Not audible Not audible Not audible Calm conditions; Cloudless sky

N6 02:04 38.3 44.8 58.6 Not audible Not audible Not audible Not audible NW at 0 to 0.7 m/s, gusting to 1.1 m/s; Cloudless sky

N8 01:08 33.8 36.1 42.7 Not audible Not audible Not audible Not audible NE at 0 m/s, gusting to 0.8 m/s; Cloudless sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 40: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Table A1.9 – Summary of Attended Noise Monitoring – Round 1 Summer 2014, dB(A)

Location Start Time

(15 min period)

Measured Noise Levels Estimated

1

Mt Owen Contribution Estimated

1

Glendell Contribution Local

Meteorological Conditions

2

LA90,

15minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

LAeq,

15minute

LA1,

1minute

Evening Period – 16 December 2014

N1 18:20 35.9 42.3 60.7 33

Not applicable

Not audible

Not applicable

Wind ENE to NW at 1.9 to 3.1 m/s, gusting to 4.4

m/s; 2/8 Cloud Cover

N2 18:56 36.7 39.2 52.9 36 Not audible Wind SW to NNW at 1 to 1.6 m/s, gusting to 2.6 m/s; 2/8 Cloud Cover

N3 19:29 37.7 42.7 56.9 37 Not audible Wind NW at 2.1 to 2.5 m/s, gusting to 3.7 m/s; Cloudless sky

N4 19:52 36.3 50.6 70.4 34 33 Wind WNW to NW at 2 to 2.5 m/s, gusting to 3.6

m/s; 2/8 Cloud Cover

N5 20:43 42.1 45.8 53.7 Not audible 42 Wind W to WNW at 0.7 to 1.1 m/s, gusting to 1.8

m/s; 2/8 Cloud Cover

N6 20:19 42.4 48.1 56.7 Not audible 41 Wind WNW at 1.6 to 1.9 m/s, gusting to 2.7 m/s; 2/8 Cloud Cover

N8 21:16 39.4 41.1 45.6 Not audible 35 Wind WNW at 1.7 to 2 m/s, gusting to 2.5 m/s; Cloudless sky

Night-time Period – 16/17 December 2014

N1 22:06 46.7 49.0 53.9 36 40 Not audible Not audible Wind NW at 3.4 to 3.9 m/s, gusting to 4.6 m/s; 2/8 Cloud Cover

N2 22:42 38.9 41.0 44.5 34 38 Not audible Not audible Wind WNW at 0 m/s, gusting to 0.9 m/s;

Cloudless sky

N3 23:07 37.3 38.4 43.5 36 45 Not audible Not audible Wind W at 0.6 to 0.8 m/s, gusting to 1.1 m/s; Cloudless sky

N4 23:31 36.3 37.7 42.6 33 39 33 36 Wind WNW at 1.9 to 2.2 m/s, gusting to 3 m/s; Cloudless sky

N5 0:41 41.8 45.2 54.2 Not audible Not audible 42 44 Calm; Cloudless sky

N6 1:04 42.4 45.9 57.6 Not audible Not audible <35 40 Wind W to NW at 0.5 to 0.7 m/s, gusting to 1.3

m/s; Cloudless sky

N8 0:14 37.8 40.1 47.4 Not audible Not audible <35 40 Wind WNW at 1.4 to 1.8 m/s, gusting to 2.2 m/s; Cloudless sky

Note 1: Assessed by the operator during the monitoring session.

Note 2: Meteorological conditions are a summary of meteorological data from the attended monitoring period from a Kestrel 4500 weather monitor, Serial Number 645400, positioned within 5

metres and at a corresponding height of the noise monitoring microphone.

Page 41: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix F: Blast Monitoring Summary 2014

Mt Owen Blast Results

Date Fired Time Fired

M1 M2 M3

Peak Overpressure

(dBL)

Peak Vibration

(mm/s)

Peak Overpressure

(dBL)

Peak Vibration

(mm/s)

Peak Overpressure

(dBL)

Peak Vibration

(mm/s)

7/01/2014 16:25 93.9 0.384 97.8 0.180 107.6 0.290

10/01/2014 12:15 98.3 0.269 100.8 1.600 95.7 0.190

13/01/2014 12:50 93.9 0.358 106.6 0.100 97.4 0.260

16/01/2014 16:20 94.5 0.378 99.2 0.210 105.0 0.240

21/01/2014 16:15 99.1 0.250 101.0 0.130 100.2 0.180

24/01/2014 12:28 98.1 0.474 100.1 0.240 87.8 0.060

24/01/2014 12:30 98.1 0.740 100.1 0.240 93.3 0.230

29/01/2014 16:30 98.3 0.294 99.2 0.220 104.3 0.240

3/02/2014 12:20 94.5 0.422 96.2 0.396 92.5 0.150

6/02/2014 12:30 98.7 0.262 98.4 0.180 105.5 0.200

7/02/2014 12:30 89.3 0.288 92.9 0.120 94.1 0.150

8/02/2014 7:08 108.5 0.130 105.8 0.180 108.0 0.130

13/02/2014 12:25 96.1 0.134 <110 <0.2 111.9 0.060

14/02/2014 10:35 101.3 0.294 103.9 0.170 99.0 0.130

25/02/2014 16:20 98.3 0.384 100.5 0.230 95.9 0.300

26/02/2014 12:25 93.3 0.102 <110 <0.2 98.9 0.040

28/02/2014 9:20 87.5 0.595 97.5 0.110 90.8 0.120

5/03/2014 12:19 98.7 0.403 102.9 0.190 98.9 0.220

5/03/2014 12:20 98.7 0.403 102.9 0.190 98.9 0.220

6/03/2014 12:25 88.6 0.358 98.7 0.120 101.1 0.140

11/03/2014 12:15 95.6 0.365 95.5 0.270 94.4 0.210

13/03/2014 16:20 93.9 0.237 98.1 0.160 93.9 0.150

19/03/2014 16:21 99.7 0.346 100.8 0.250 108.1 0.240

21/03/2014 12:15 96.9 0.301 97.8 0.100 93.1 0.110

21/03/2014 12:45 <110.0 <0.2 <110.0 <0.2 85.0 0.050

26/03/2014 9:55 95.1 1.062 99.7 0.520 92.1 0.390

9/04/2014 16:25 111.0 0.218 <110 <0.2 90.5 0.09

14/04/2014 16:38 99.8 0.275 100.1 0.378 101.4 0.13

17/04/2014 12:15 97.7 0.346 89.1 0.290 90.2 0.2

22/04/2014 16:20 116.7 0.403 108.3 0.563 98.9 0.15

24/04/2014 12:30 102.9 0.320 105.6 0.426 100.1 0.21

30/04/2014 10:50 107.5 0.237 105.1 0.190 100.1 0.21

1/05/2014 16:20 98.1 0.256 98.7 0.1 95.1 0.13

5/05/2014 16:34 102.9 0.346 102.1 0.2 103.6 0.24

7/05/2014 16:18 93.9 0.237 96.6 0.2 92.9 0.14

9/05/2014 12:20 96.2 0.55 98.9 0.2 94.6 0.21

15/05/2014 12:45 88.3 0.294 101.8 0.2 96.8 0.24

19/05/2014 16:20 102.7 0.57 104 0.2 101.3 0.41

Page 42: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

21/05/2014 12:20 101.6 0.288 105.7 0.4 94.3 0.19

21/05/2014 12:15 101.6 0.288 105.7 0.4 94.3 0.19

27/05/2014 12:15 99.1 0.32 107.5 0.2 92.4 0.15

29/05/2014 16:20 96.4 0.301 97.2 0.2 92.4 0.15

4/06/2014 12:41 <110.0 <0.05 <110.0 <0.05 104.5 0.13

6/06/2014 7:27 97.9 0.352 95.5 0.24 93.5 0.32

11/06/2014 16:25 92.2 0.23 97.8 0.43 86 0.06

11/06/2014 16:34 86.2 0.275 91.5 0.376 93.4 0.13

17/06/2014 12:29 91.2 0.213 89.3 0.152 105.9 0.13

19/06/2014 12:48 99.9 0.474 103.4 0.22 99.8 0.35

27/06/2014 12:25 95.3 0.282 97.8 0.326 104.5 0.19

27/06/2014 12:30 107.8 0.25 98.9 0.34 106.2 0.2

1/07/2014 12:24 104.9 0.224 102.5 0.356 104 0.13

4/07/2014 12:35 101.9 0.307 110 0.3 102.9 0.17

8/07/2014 12:29 109.6 0.474 109.7 0.22 105.3 0.44

11/07/2014 12:21 106 0.384 112.1 0.34 111.3 0.28

15/07/2014 12:30 102.2 0.602 99.7 0.25 102.2 0.25

22/07/2014 16:27 96.6 0.39 99.7 0.24 109 0.33

24/07/2014 13:22 102.6 0.256 101.5 0.21 103.6 0.16

30/07/2014 16:25 104.4 0.442 101.6 0.375 101.8 0.19

30/07/2014 16:35 110.2 0.371 106.2 0.422 107.1 0.36

5/08/2014 12:12 105.2 0.17 98.6 0.28 105.2 0.17

5/08/2014 12:13 99.8 0.13 107.4 0.21 105.2 0.17

7/08/2014 16:12 107.3 0.51 101.9 0.34 101.4 0.56

14/08/2014 12:15 99.2 0.453 100.5 0.24 95.6 0.21

15/08/2014 12:10 105.3 0.205 103.2 0.08 105.6 0.14

22/08/2014 12:47 103.1 0.32 104.8 0.16 100 0.18

2/09/2014 12:20 109.6 0.46 107.5 0.19 107.4 0.45

5/09/2014 13:13 <110 <0.5 <110 <0.5 100.7 0.01

5/09/2014 13:30 104.2 0.467 101.9 0.29 104.0 0.31

9/09/2014 12:15 109.8 0.32 <110 <0.5 105.2 0.27

10/09/2014 9:13 <110 <0.5 <110 <0.5 107.4 0.17

16/09/2014 12:28 100.9 0.422 104.4 0.25 106.8 0.22

19/09/2014 13:00 99.3 0.442 101.2 0.27 98 0.48

24/09/2014 16:13 100.4 0.461 <110 <0.5 97.8 0.16

24/09/2014 16:25 99 0.224 94.3 0.17 73.1 1.16

1/10/2014 12:21 104.1 0.41 <110 <0.5 101.6 0.24

2/10/2014 16:23 106 0.346 <110 <0.5 103.7 0.23

8/10/2014 16:13 97.5 0.384 <110 <0.5 112.7 0.03

13/10/2014 16:19 <110 <0.5 <110 <0.5 101.2 0.31

16/10/2014 12:19 <110 <0.5 <110 <0.5 101.5 0.07

20/10/2014 16:15 100.5 0.595 100.3 0.43 107.8 0.45

23/10/2014 12:18 <110 <0.5 <110 <0.5 100.8 0.45

23/10/2014 12:19 <110 <0.5 <110 <0.5 94 0.09

24/10/2014 12:15 <110 <0.5 <110 <0.5 96.2 0.15

29/10/2014 12:15 109.1 0.985 99.2 0.59 96.4 0.43

Page 43: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

29/10/2014 12:20 <110 <0.5 <110 <0.5 98 0.47

4/11/2014 12:20 115 0.269 <110 <0.5 101.6 0.18

7/11/2014 12:15 113.7 0.307 <110 <0.5 99.1 0.18

12/11/2014 12:30 103.9 0.339 104.8 0.24 112.3 0.33

19/11/2014 12:07 97.9 0.665 101 0.24 102 0.17

19/11/2014 12:15 92.2 0.589 90.6 0.22 102 0.17

25/11/2014 12:18 98.2 0.46 98.4 0.33 94.7 0.5

4/12/2014 12:16 101.1 0.12 99.8 0.23 99.8 0.23

5/12/2014 12:30 96.2 0.339 <100 <0.5 100.5 0.22

16/12/2014 16:15 105.8 0.403 <110 <0.5 101.4 0.24

17/12/2014 16:20 101.5 0.416 <110 <0.5 112.3 0.16

17/12/2014 16:28 99.7 0.096 107.5 0.021 114.9 0.1

Glendell Blast Monitoring Results

Date Fired Time Fired

GM1 GM2 GM5

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Vibration

(mm/s)

7/01/2014 9:26:31 103.2 0.27 103.5 0.11 0.56

8/01/2014 13:35:50 101.5 0.31 104.4 0.23 0.22

10/01/2014 13:38:07 91.6 0.47 90.8 0.27 0.6

16/01/2014 13:25:37 93.9 1.34 94.8 0.25 1.7

22/01/2014 13:28:09 94.5 1.52 95.2 0.31 1.22

24/01/2014 12:56:57 96.4 0.2 95.4 0.07 0.11

29/01/2014 13:27:40 97.4 0.22 93.9 0.08 0.14

4/02/2014 13:28:10 94.1 1.16 93 0.44 1.17

4/02/2014 13:28:07 108.1 0.64 106.9 0.24 0.42

6/02/2014 11:16:29 94.2 0.12 97.7 0.06 0.06

7/02/2014 11:20:08 102.7 0.84 96.5 0.44 0.86

14/02/2014 16:49:23 101.3 0.64 100.6 0.37 1.02

14/02/2014 14:00:25 94.1 0.37 93 0.1 0.26

20/02/2014 14:53:54 92.6 0.25 95 0.05 0.09

20/02/2014 12:37:58 98.2 0.03 105.7 0.02 0.05

27/02/2014 13:30:38 100.8 1.44 96.2 0.43 1.01

28/02/2014 12:40:54 102.9 0.37 95.6 0.27 0.41

6/03/2014 13:30:40 101.1 0.28 98.9 0.13 0.2

7/03/2014 14:09:19 100.3 0.36 97.8 0.18 0.28

13/03/2014 13:33:37 103 0.82 102.9 0.46 0.82

14/03/2014 12:10:08 102.7 0.27 102.9 0.25 0.25

20/03/2014 13:30:19 91.9 0.26 91 0.07 0.14

25/03/2014 13:37:42 102.6 1.24 100.3 0.42 0.56

27/03/2014 9:19:15 86.6 0.1 87.2 0.05 0.13

2/04/2014 13:40:05 89.5 0.19 89.8 0.16 0.14

2/04/2014 13:43:10 98.8 0.39 98 0.15 0.48

8/04/2014 14:09:49 98.6 0.45 99.4 0.12 0.35

8/04/2014 14:13:09 93.4 0.94 94.3 0.49 0.69

Page 44: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Fired Time Fired

GM1 GM2 GM5

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Vibration

(mm/s)

11/04/2014 11:53:18 101.2 0.82 100 0.32 0.62

14/04/2014 13:45:05 89 0.45 88.2 0.17 0.75

16/04/2014 13:32:28 101.4 0.45 97.7 0.14 0.24

17/04/2014 12:20:33 102.1 0.82 103.3 0.24 0.68

24/04/2014 13:54:49 97.8 0.56 97.7 0.17 0.59

24/04/2014 14:03:35 101.2 0.59 101.1 0.38 0.48

1/05/2014 13:43:19 100.9 0.87 98.2 0.41 0.62

6/05/2014 13:29:51 109.2 0.54 106.6 0.21 0.39

9/05/2014 13:32:53 97.8 0.54 98.1 0.45 0.43

14/05/2014 13:45:29 100.2 0.42 99.3 0.24 0.64

15/05/2014 13:26:36 105 0.53 102.1 0.29 0.41

16/05/2014 12:30:27 99.3 0.31 99.9 0.24 0.21

21/05/2014 13:44:38 92 0.78 92.2 0.51 0.65

23/05/2014 12:28:06 102.3 0.38 99.5 0.21 0.27

23/05/2014 12:35:31 94 0.29 94.4 0.19 0.31

29/05/2014 13:26:46 96.5 0.25 95.3 0.18 0.16

30/05/2014 12:37:00 98.2 0.43 96.2 0.3 0.63

6/06/2014 11:19:36 101.4 0.66 104.6 0.44 0.87

6/06/2014 14:29:27 96.6 0.48 95.5 0.38 0.37

11/06/2014 13:42:31 96.5 0.49 95.5 0.2 0.67

11/06/2014 13:45:26 98.7 0.36 98.1 0.18 0.23

13/06/2014 13:25:31 100.6 0.36 98.5 0.22 0.45

18/06/2014 13:51:44 91.5 0.41 91.2 0.3 0.32

20/06/2014 10:12:50 104.6 0.17 101.6 0.07 0.17

20/06/2014 10:19:10 113.5 0.66 113.5 0.31 0.63

27/06/2014 12:38:45 108.1 0.77 107.9 0.3 0.95

27/06/2014 12:42:26 98.7 0.92 98.9 0.53 0.7

2/07/2014 13:37:30 103.4 0.88 103 0.29 0.68

8/07/2014 9:01:51 104.1 0.72 104.6 0.65 0.83

14/07/2014 11:32:16 106.5 1.31 107.8 0.62 0.95

14/07/2014 11:34:42 98.2 0.59 97.1 0.38 0.35

19/07/2014 11:51:48 93.6 0.36 99.6 0.17 0.37

25/07/2014 11:57:13 98.9 0.42 96.1 0.32 0.61

29/07/2014 13:52:54 98.6 0.12 106.3 0.11 0.1

4/08/2014 13:34:25 98.3 0.88 97.4 0.21 0.65

4/08/2014 13:36:51 97.0 0.53 93.8 0.36 0.87

5/08/2014 13:29:18 108.7 0.66 111 0.25 0.49

6/08/2014 11:15:15 95.6 0.15 94.4 0.06 0.13

8/08/2014 13:37:49 96.6 0.4 93.8 0.11 0.15

8/08/2014 13:41:40 95.1 0.69 93.2 0.32 0.97

14/08/2014 13:31:29 95.1 0.68 92.9 0.27 0.84

14/08/2014 13:35:05 102.4 0.76 100.8 0.26 0.48

15/08/2014 12:26:07 86.6 0.06 89.9 0.03 0.05

Page 45: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Fired Time Fired

GM1 GM2 GM5

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Vibration

(mm/s)

20/08/2014 13:41:33 89.7 0.25 98.9 0.15 0.28

22/08/2014 12:29:24 93.5 0.72 93.5 0.23 0.64

26/08/2014 13:29:37 101.5 1.6 101.1 0.3 0.56

27/08/2014 13:40:49 102.8 0.75 104.8 0.22 0.37

2/09/2014 11:35:20 98.7 0.37 98.2 0.26 0.4

5/09/2014 13:42:03 103.9 0.16 108.5 0.18 0.27

5/09/2014 13:44:52 101.5 1.35 95.3 0.4 0.62

9/09/2014 10:32:44 100.1 0.63 101.7 0.4 0.79

10/09/2014 13:34:03 98.3 0.68 107.7 0.38 0.66

12/09/2014 13:27:57 94.6 0.93 94.7 0.17 0.44

18/09/2014 14:07:17 97.8 0.3 104.3 0.23 0.29

18/09/2014 14:09:56 95.5 0.17 102.5 0.07 0.07

24/09/2014 13:34:41 99.7 0.62 96.6 0.23 0.37

24/09/2014 13:38:09 95.5 0.41 94.8 0.12 0.34

25/09/2014 14:05:01 96.5 0.32 94 0.13 0.22

1/10/2014 13:51:42 96.5 1 96 0.23 0.37

8/10/2014 13:32:45 103.1 0.31 103.2 0.19 0.19

8/10/2014 13:38:11 97.5 0.52 102.7 0.33 0.47

14/10/2014 13:45:39 105 0.52 101.7 0.28 0.4

16/10/2014 13:26:45 92.9 0.27 101.1 0.11 0.65

17/10/2014 13:29:20 103.5 0.67 100.2 0.34 0.58

21/10/2014 13:49:14 94.1 0.07 97.3 0.05 0.05

24/10/2014 12:27:48 92.1 0.47 91.5 0.28 0.45

24/10/2014 12:31:57 97.2 1.15 94.1 0.52 0.96

29/10/2014 12:16:48 102.3 2.15 100.8 0.52 0.93

30/10/2014 13:29:21 99.7 0.86 99.7 0.19 0.24

6/11/2014 13:29:40 100.6 1.24 100.1 0.38 0.97

7/11/2014 13:33:43 101.1 0.48 100.7 0.12 0.13

12/11/2014 13:34:57 101.1 0.81 101.3 0.29 0.29

13/11/2014 13:28:39 96.2 0.71 96.3 0.45 0.37

17/11/2014 13:28:49 93.4 0.11 94.1 0.08 0.11

20/11/2014 13:36:57 99.2 0.56 100.1 0.3 0.3

22/11/2014 12:29:29 94.6 0.38 94.8 0.26 0.53

25/11/2014 13:35:22 93.8 0.36 95.3 0.26 0.29

27/11/2014 13:42:51 101.9 0.14 100.1 0.07 0.08

1/12/2014 13:29:39 100.0 0.62 100.9 0.29 0.39

2/12/2014 13:25:08 97.3 0.43 94.7 0.22 0.35

4/12/2014 9:39:18 98.4 0.38 97.6 0.28 0.27

5/12/2014 13:35:06 103.1 0.83 105.6 0.31 0.31

5/12/2014 13:40:36 101.6 0.10 94.1 0.03 0.03

9/12/2014 13:36:52 95.4 0.16 96.0 0.13 0.14

18/12/2014 13:53:36 102.9 0.93 102.3 0.45 0.49

Page 46: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Fired Time Fired

GM3 GM4 GM6

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Vibration

(mm/s)

7/01/2014 9:26:31 108.6 0.09 101.0 0.09 0.20

8/01/2014 13:35:50 108.2 0.12 111.8 0.13 0.27

10/01/2014 13:38:07 87.5 0.25 92.1 0.23 0.48

16/01/2014 13:25:37 94.8 0.31 96.2 0.35 0.90

22/01/2014 13:28:09 106.5 0.40 103.7 0.31 0.62

24/01/2014 12:56:57 93.6 0.06 92.1 0.04 0.08

29/01/2014 13:27:40 96.6 0.04 90.9 0.05 0.07

4/02/2014 13:28:10 91.1 0.26 93.0 0.20 0.41

4/02/2014 13:28:07 109.4 0.18 100.7 0.11 0.29

6/02/2014 11:16:29 97.8 0.04 104 0.03 0.05

7/02/2014 11:20:08 97.3 0.17 105.6 0.45 0.64

14/02/2014 16:49:23 97.2 0.18 96.2 0.16 0.51

14/02/2014 14:00:25 90.3 0.05 86.5 0.10 0.21

20/02/2014 14:53:54 94.0 0.04 104.5 0.03 0.11

20/02/2014 12:37:58 106.8 0.02 106.2 0.03 0.04

27/02/2014 13:30:38 99.5 0.32 105.4 0.46 1.13

28/02/2014 12:40:54 105.2 0.25 107.9 0.20 0.54

6/03/2014 13:30:40 101.0 0.08 102.4 0.07 0.11

7/03/2014 14:09:19 95.8 0.13 88.4 0.11 0.19

13/03/2014 13:33:37 99.1 0.16 99.6 0.21 0.54

14/03/2014 12:10:08 98.9 0.14 99.7 0.19 0.24

20/03/2014 13:28:06 103.3 0.20 104.3 0.30 0.87

20/03/2014 13:30:19 103.3 0.04 99.2 0.06 0.12

25/03/2014 13:37:42 101.0 0.18 97.8 0.17 0.43

2/04/2014 13:40:05 84.5 0.05 98.3 0.03 0.20

2/04/2014 13:43:10 96.5 0.12 94.3 0.14 0.38

8/04/2014 14:09:49 94.8 0.08 101.0 0.11 0.22

8/04/2014 14:13:09 97.5 0.27 101.9 0.31 0.70

11/04/2014 11:53:18 110.0 0.15 102.2 0.20 0.74

14/04/2014 13:45:05 100.9 0.07 101.7 0.11 0.37

16/04/2014 13:32:28 94.3 0.05 93.8 0.10 0.17

17/04/2014 12:20:33 97.3 0.14 95.2 0.19 0.76

24/04/2014 13:54:49 95.5 0.10 93.2 0.15 0.33

24/04/2014 14:03:35 102 0.25 94.0 0.23 0.39

1/05/2014 13:43:19 92.6 0.21 97.8 0.29 0.65

6/05/2014 13:29:51 99.1 0.09 95.4 0.14 0.26

9/05/2014 13:32:53 90.7 0.23 95.6 0.21 0.44

14/05/2014 13:45:29 94.9 0.18 95.1 0.17 0.39

15/05/2014 13:26:36 98.9 0.11 94.0 0.18 0.31

16/05/2014 12:30:27 93.8 0.11 89.5 0.12 0.20

21/05/2014 13:44:38 89.2 0.40 90.5 0.49 0.78

23/05/2014 12:28:06 100.3 0.07 104.5 0.07 0.19

23/05/2014 12:35:31 94.2 0.11 106.0 0.10 0.17

Page 47: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Fired Time Fired

GM3 GM4 GM6

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Vibration

(mm/s)

29/05/2014 13:26:46 91.3 0.21 91.2 0.12 0.16

30/05/2014 12:37:00 88.4 0.20 94.6 0.19 0.58

6/06/2014 11:19:36 97.7 0.31 108.7 0.33 0.64

6/06/2014 14:29:27 99.8 0.23 99.6 0.14 0.26

11/06/2014 13:42:31 86.7 0.20 101.6 0.17 0.40

11/06/2014 13:45:26 95.9 0.13 100.3 0.05 0.15

13/06/2014 13:25:31 90.7 0.21 93.6 0.25 0.46

18/06/2014 13:51:44 86.2 0.20 96 0.25 0.29

20/06/2014 10:12:50 104.8 0.04 95.6 0.04 0.10

20/06/2014 10:19:10 107.5 0.22 87.6 0.13 0.36

27/06/2014 12:38:45 107.7 0.15 99.2 0.11 0.40

27/06/2014 12:42:26 106.7 0.64 102 0.34 0.59

2/07/2014 13:37:30 98.1 0.23 91.8 0.32 0.52

8/07/2014 9:01:51 96.4 0.36 91.5 0.17 0.51

14/07/2014 11:32:16 97.8 0.61 91.5 0.32 0.83

14/07/2014 11:34:42 92.2 0.23 94.6 0.23 0.29

19/07/2014 11:51:48 90.9 0.19 106.1 0.10 0.21

25/07/2014 11:57:13 99.0 0.20 93.6 0.17 0.52

29/07/2014 13:52:54 94.2 0.05 104.5 0.05 0.06

4/08/2014 13:34:25 91.6 0.23 90.8 0.29 0.45

4/08/2014 13:36:51 91.6 0.35 93.2 0.31 0.51

5/08/2014 13:29:18 107.4 0.21 100.9 0.1 0.28

6/08/2014 11:15:15 94.0 0.04 90.7 0.03 0.08

6/08/2014 13:34:02 108.1 0.04 98.3 0.14 0.07

8/08/2014 13:37:49 86.0 0.05 102.6 0.06 0.12

8/08/2014 13:41:40 91.2 0.44 94.7 0.82 0.89

14/08/2014 13:31:29 99.5 0.19 96.3 0.13 0.48

14/08/2014 13:35:05 98.6 0.13 101.5 0.18 0.31

15/08/2014 12:26:07 91.4 0.01 90.6 0.02 0.04

20/08/2014 13:41:33 99.6 0.14 107.5 0.1 0.33

22/08/2014 12:29:24 96.5 0.14 99.9 0.28 0.41

27/08/2014 13:29:37 95.5 0.21 96.1 0.32 0.33

26/08/2014 13:40:49 96.7 0.25 107.2 0.14 0.34

2/09/2014 11:35:20 102.6 0.32 109.4 0.19 0.34

5/09/2014 13:42:03 99.1 0.09 113.3 0.08 0.32

5/09/2014 13:44:52 105.5 0.25 104.1 0.28 0.31

9/09/2014 10:32:44 98.3 0.21 99.4 0.2 0.54

10/09/2014 13:34:03 99.3 0.39 104.2 0.34 0.5

12/09/2014 13:27:57 95.4 0.15 103.1 0.21 0.55

18/09/2014 14:07:17 97.7 0.17 101.8 0.09 0.21

18/09/2014 14:09:56 101.2 0.03 108 0.03 0.06

24/09/2014 13:34:41 95.1 0.12 91.4 0.09 0.22

24/09/2014 13:38:09 94.9 0.08 96 0.11 0.38

Page 48: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Fired Time Fired

GM3 GM4 GM6

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Vibration

(mm/s)

25/09/2014 14:05:01 97.0 0.07 101.4 0.07 0.16

1/10/2014 13:51:42 94.9 0.3 98.9 0.22 0.27

8/10/2014 13:32:45 98.9 0.13 101.2 0.06 0.15

8/10/2014 13:38:11 102.6 0.37 106.8 0.25 0.5

14/10/2014 13:45:39 106.2 0.17 112 0.16 0.33

16/10/2014 13:26:45 92.2 0.09 99.8 0.15 0.21

17/10/2014 13:29:20 113.3 0.41 106.6 0.35 0.66

21/10/2014 13:49:14 101.9 0.03 104.9 0.02 0.05

24/10/2014 12:27:48 91.3 0.24 86.9 0.17 0.43

24/10/2014 12:31:57 93.6 0.31 98.3 0.28 0.7

29/10/2014 12:16:48 99.1 0.6 102.9 0.44 0.99

30/10/2014 13:29:21 104.8 0.24 95.5 0.09 0.23

6/11/2014 13:29:40 99.1 0.26 102.3 0.26 0.73

7/11/2014 13:33:43 92.9 0.07 92.7 0.06 0.09

12/11/2014 13:34:57 99.6 0.23 90.6 0.21 0.29

13/11/2014 13:28:39 93 0.3 95.8 0.15 0.36

17/11/2014 13:28:49 104.3 0.07 96.4 0.03 0.1

20/11/2014 13:36:57 99 0.2 105.3 0.12 0.26

22/11/2014 12:29:29 90.6 0.27 98.2 0.22 0.31

25/11/2014 13:35:22 93.8 0.22 89.7 0.11 0.25

27/11/2014 13:42:51 104.1 0.05 110.3 0.03 0.05

1/12/2014 13:29:39 97.2 0.29 100.5 0.14 0.27

2/12/2014 13:25:08 96.5 0.14 105.7 0.24 0.46

4/12/2014 9:39:18 91.0 0.30 86.6 0.20 0.37

5/12/2014 13:35:06 101.3 0.29 90.5 0.16 0.23

5/12/2014 13:40:36 103.0 0.01 107.7 0.02 0.02

9/12/2014 13:36:52 95.1 0.08 105.5 0.04 0.10

18/12/2014 13:53:36 99.7 0.35 92.7 0.29 0.54

Ravensworth East Blast Results

Date Fired Time Fired

GM1 GM2 GM3 GM6

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

13/01/2014 13:26:55 90.2 0.06 88.2 0.04 89.6 0.13 108.3 0.19

20/01/2014 13:32:26 90.1 0.14 89.4 0.06 101.9 0.33 103.7 0.45

24/01/2014 12:18:44 87.3 0.11 86.9 0.05 91.1 0.22 95.4 0.5

27/03/2014 9:19:15 86.6 0.1 87.2 0.05 90.5 0.22 91.9 0.26

1/05/2014 14:19:31 89.3 0 82 0.05 86 0.2 92.1 0.21

8/05/2014 13:20:33 87 0.19 99 0.07 95.7 0.49 95.1 0.62

8/05/2014 13:30:11 91.3 0.1 102.2 0.04 91.6 0.18 95.5 0.25

Page 49: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Fired Time Fired

GM1 GM2 GM3 GM6

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

Airblast

(dBL)

Vibration

(mm/s)

22/05/2014 13:39:20 82.5 0.02 79.8 0.01 90.3 0.02 85.7 0.07

18/06/2014 11:34:18 91.2 0.11 89 0.04 94.1 0.16 99 0.29

4/07/2014 12:29:55 95.6 0.11 99.6 0.04 98.7 0.24 95.5 0.09

11/07/2014 13:31:42 102.5 0.08 111 0.03 102.5 0.22 112 0.17

16/07/2014 14:12:03 90.5 0.19 106.9 0.08 96.6 0.28 113.4 0.65

18/07/2014 9:39:20 103.2 0.19 96.8 0.08 101.2 0.11 106.5 0.17

23/07/2014 11:07:55 88.3 0.16 88.2 0.07 93.7 0.38 95.4 0.6

6/08/2014 13:34:02 94.4 0.03 82.6 0.02 108.1 0.04 93 0.07

12/08/2014 13:24:45 88.6 0.08 79.8 0.05 99.5 0.2 100.4 0.5

25/08/2014 13:31:33 80.4 0.04 90.3 0.02 94.5 0.12 90.6 0.23

2/09/2014 15:13:22 94.8 0.17 103.3 0.12 102.1 0.43 96 0.77

15/09/2014 13:27:30 83.1 0.07 83.6 0.03 94 0.13 96.2 0.24

16/09/2014 13:29:22 94.2 0.05 102.1 0.02 89.3 0.11 107.8 0.18

19/09/2014 13:21:55 91.4 0.11 90.6 0.06 95.1 0.44 94 0.61

25/09/2014 13:20:46 93 0.09 91.9 0.04 99 0.28 95.4 0.41

29/09/2014 13:30:17 99 0.02 96.9 0.01 109.9 0.03 105.2 0.1

17/10/2014 14:44:20 103.2 0.02 104.3 0.01 104.2 0.03 111.2 0.1

21/10/2014 10:55:18 89.2 0.05 98.8 0.03 99 0.15 96.9 0.26

14/11/2014 10:28:52 91.1 0.09 95.6 0.01 91.4 0.06 96.8 0.14

16/12/2014 15:42:25 79.8 0.01 83.4 0.01 102.3 0.05 88.2 0.04

Page 50: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix G: Daily Train Activity Statement 2014

Date No. Trains per Day Tonnes Loaded

1/01/2014 1 9421.65

2/01/2014 3 27910.70

3/01/2014 2 18665.90

4/01/2014 2 18783.85

5/01/2014 0 0

6/01/2014 1 9193.65

7/01/2014 0 0

8/01/2014 0 0

9/01/2014 2 18752.45

10/01/2014 4 37489.15

11/01/2014 5 46603.15

12/01/2014 5 45209.65

13/01/2014 4 37311.25

14/01/2014 5 46083.95

15/01/2014 6 55679.80

16/01/2014 5 46695.5

17/01/2014 1 9199.35

18/01/2014 0 0

19/01/2014 3 27902.45

20/01/2014 0 0

21/01/2014 0 0

22/01/2014 1 9393.95

23/01/2014 2 18658.60

24/01/2014 1 9412.20

25/01/2014 5 46421.05

26/01/2014 3 27810.95

27/01/2014 1 9405.30

28/01/2014 0 0

29/01/2014 2 18696.55

30/01/2014 0 0

31/01/2014 0 0

1/02/2014 2 18628.50

2/02/2014 2 18750.25

3/02/2014 3 28175.95

4/02/2014 2 18762.10

5/02/2014 7 65044.15

6/02/2014 3 28173.45

7/02/2014 3 28162.65

8/02/2014 1 9345.15

9/02/2014 3 27396.25

10/02/2014 6 55346.65

11/02/2014 4 37295.75

12/02/2014 3 27712.30

Page 51: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

13/02/2014 4 37400.10

14/02/2014 3 27940.05

15/02/2014 2 18633.05

16/02/2014 0 0

17/02/2014 4 37517.45

18/02/2014 2 18633.85

19/02/2014 5 46787.20

20/02/2014 6 54956.45

21/02/2014 7 64430.60

22/02/2014 6 55139.00

23/02/2014 4 37481.63

24/02/2014 3 28116.10

25/02/2014 3 28074.90

26/02/2014 2 18588.40

27/02/2014 3 27962.10

28/02/2014 2 17995.35

1/03/2014 3 28096.70

2/03/2014 2 18753.50

3/03/2014 3 28054.15

4/03/2014 2 18744.85

5/03/2014 2 18698.05

6/03/2014 0 0

7/03/2014 0 0

8/03/2014 1 9408.65

9/03/2014 1 9395.90

10/03/2014 1 9393.50

11/03/2014 0 0

12/03/2014 0 0

13/03/2014 0 0

14/03/2014 3 28098.10

15/03/2014 1 9378.35

16/03/2014 3 28140.00

17/03/2014 3 26926.85

18/03/2014 2 18592.70

19/03/2014 2 18789.85

20/03/2014 1 9390.65

21/03/2014 0 0

22/03/2014 3 27587.25

23/03/2014 5 46803.00

24/03/2014 3 28083.70

25/03/2014 2 18664.80

26/03/2014 5 46503.13

27/03/2014 4 37477.40

28/03/2014 4 36000.35

29/03/2014 6 55988.05

Page 52: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

30/03/2014 6 55083.25

31/03/2014 6 55723.60

1/04/2014 2 18764.45

2/04/2014 5 46598.45

3/04/2014 5 46553.85

4/04/2014 4 37420.05

5/04/2014 3 28125.25

6/04/2014 2 18698.65

7/04/2014 3 28107.10

8/04/2014 3 28074.15

9/04/2014 1 9347.65

10/04/2014 3 28128.00

11/04/2014 0 0

12/04/2014 1 8597.20

13/04/2014 3 27445.20

14/04/2014 2 18667.15

15/04/2014 0 0

16/04/2014 3 28144.40

17/04/2014 1 9396.85

18/04/2014 1 9120.45

19/04/2014 4 36854.65

20/04/2014 5 46622.80

21/04/2014 5 46769.65

22/04/2014 5 46760.85

23/04/2014 6 53443.40

24/04/2014 3 27480.25

25/04/2014 4 37178.50

26/04/2014 2 17654.95

27/04/2014 5 44867.95

28/04/2014 4 37472.30

29/04/2014 0 0

30/04/2014 0 0

1/05/2014 1 9165.73

2/05/2014 2 18724.40

3/05/2014 0 0

4/05/2014 3 27479.35

5/05/2014 5 45193.45

6/05/2014 0 0

7/05/2014 6 54936.55

8/05/2014 4 36522.10

9/05/2014 3 28067.50

10/05/2014 2 18236.45

11/05/2014 4 36193.90

12/05/2014 4 36662.95

13/05/2014 3 27199.80

Page 53: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

14/05/2014 3 27355.05

15/05/2014 2 18800.45

16/05/2014 3 27097.55

17/05/2014 3 27527.95

18/05/2014 2 18326.60

19/05/2014 1 9053.80

20/05/2014 3 27558.10

21/05/2014 1 9256.00

22/05/2014 4 36437.20

23/05/2014 5 45959.70

24/05/2014 6 54549.20

25/05/2014 2 18234.30

26/05/2014 1 9202.85

27/05/2014 2 18415.65

28/05/2014 1 9074.45

29/05/2014 0 0

30/05/2014 3 27531.35

31/05/2014 5 45520.15

1/06/2014 3 27649.05

2/06/2014 1 8849.15

3/06/2014 0 0

4/06/2014 0 0

5/06/2014 1 8913.25

6/06/2014 4 35731.75

7/06/2014 3 27687.10

8/06/2014 5 45934.15

9/06/2014 4 37260.65

10/06/2014 4 36487.28

11/06/2014 4 36860.90

12/06/2014 1 9072.60

13/06/2014 4 36580.95

14/06/2014 3 26938.25

15/06/2014 3 26552.00

16/06/2014 4 36262.05

17/06/2014 3 27466.90

18/06/2014 3 27180.35

19/06/2014 2 18144.15

20/06/2014 4 37051.70

21/06/2014 5 45468.45

22/06/2014 6 55602.07

23/06/2014 0 0

24/06/2014 0 0

25/06/2014 0 0

26/06/2014 1 9367.58

27/06/2014 6 56144.75

Page 54: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

28/06/2014 4 37150.15

29/06/2014 5 45408.00

30/06/2014 5 45377.30

1/07/2014 4 36960.75

2/07/2014 6 54929.50

3/07/2014 2 18767.85

4/07/2014 4 37227.40

5/07/2014 1 9367.80

6/07/2014 2 18697.75

7/07/2014 3 27796.55

8/07/2014 0 0

9/07/2014 2 18581.85

10/07/2014 3 26952.91

11/07/2014 0 0

12/07/2014 2 18767.10

13/07/2014 2 18567.35

14/07/2014 1 9374.40

15/07/2014 5 44890.10

16/07/2014 4 37236.00

17/07/2014 3 27481.15

18/07/2014 5 46308.70

19/07/2014 6 54781.10

20/07/2014 3 28085.15

21/07/2014 3 27741.75

22/07/2014 2 18523.55

23/07/2014 3 27899.50

24/07/2014 1 9327.70

25/07/2014 3 27447.00

26/07/2014 2 18432.70

27/07/2014 1 9173.85

28/07/2014 3 27652.25

29/07/2014 2 18492.35

30/07/2014 1 9266.40

31/07/2014 3 27894.25

1/08/2014 4 36265.20

2/08/2014 3 26958.60

3/08/2014 3 27345.40

4/08/2014 4 36991.10

5/08/2014 5 45765.80

6/08/2014 6 55235.65

7/08/2014 3 27704.95

8/08/2014 2 18348.55

9/08/2014 3 27954.25

10/08/2014 1 9240.25

11/08/2014 1 9245.50

Page 55: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

12/08/2014 1 9020.10

13/08/2014 3 27586.80

14/08/2014 2 17962.80

15/08/2014 5 45966.30

16/08/2014 3 27909.35

17/08/2014 5 45534.60

18/08/2014 3 27255.90

19/08/2014 1 9324.55

20/08/2014 0 0

21/08/2014 0 0

22/08/2014 4 37157.95

23/08/2014 3 28018.20

24/08/2014 2 17912.05

25/08/2014 0 0

26/08/2014 4 37342.10

27/08/2014 1 9027.75

28/08/2014 2 18678.45

29/08/2014 3 27507.40

30/08/2014 4 37037.85

31/08/2014 4 37333.35

1/09/2014 3 27692.60

2/09/2014 4 37339.10

3/09/2014 2 18663.80

4/09/2014 1 8836.75

5/09/2014 0 0

6/09/2014 0 0

7/09/2014 0 0

8/09/2014 1 9132.15

9/09/2014 2 18383.90

10/09/2014 3 27311.40

11/09/2014 4 36878.20

12/09/2014 3 27935.25

13/09/2014 5 45889.65

14/09/2014 3 27400.60

15/09/2014 2 17909.45

16/09/2014 1 9035.90

17/09/2014 1 9358.50

18/09/2014 6 54322.85

19/09/2014 4 35568.40

20/09/2014 1 9052.90

21/09/2014 2 17121.85

22/09/2014 1 9386.35

23/09/2014 2 17874.70

24/09/2014 0 0

25/09/2014 1 8919.95

Page 56: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

26/09/2014 4 36026.40

27/09/2014 2 18154.80

28/09/2014 2 17930.40

29/09/2014 1 9016.40

30/09/2014 0 0

1/10/2014 0 0

2/10/2014 0 0

3/10/2014 3 26969.20

4/10/2014 0 0

5/10/2014 1 9075.75

6/10/2014 4 35910.75

7/10/2014 5 45500.60

8/10/2014 1 9041.70

9/10/2014 1 8929.55

10/10/2014 0 0

11/10/2014 0 0

12/10/2014 0 0

13/10/2014 1 8970.60

14/10/2014 0 0

15/10/2014 1 9219.80

16/10/2014 0 0

17/10/2014 0 0

18/10/2014 1 9128.80

19/10/2014 3 27105.20

20/10/2014 4 36180.65

21/10/2014 5 44530.20

22/10/2014 5 44180.15

23/10/2014 3 26806.50

24/10/2014 2 17464.35

25/10/2014 0 0

26/10/2014 0 0

27/10/2014 0 0

28/10/2014 1 8838.20

29/10/2014 4 35152.80

30/10/2014 2 18420.45

31/10/2014 2 17704.80

1/11/2014 1 8945.25

2/11/2014 4 36801.10

3/11/2014 3 26502.15

4/11/2014 6 53018.75

5/11/2014 4 34083.70

6/11/2014 5 45664.00

7/11/2014 4 36467.10

8/11/2014 5 46262.40

9/11/2014 3 27614.10

Page 57: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

10/11/2014 4 36151.55

11/11/2014 3 27201.1

12/11/2014 3 26383.75

13/11/2014 4 36008.10

14/11/2014 0 0

15/11/2014 3 27040.25

16/11/2014 4 36446.30

17/11/2014 0 0

18/11/2014 0 0

19/11/2014 0 0

20/11/2014 0 0

21/11/2014 1 9239.80

22/11/2014 3 27320.45

23/11/2014 4 36326.30

24/11/2014 4 35376.40

25/11/2014 8 72709.45

26/11/2014 5 45897.70

27/11/2014 6 54478.85

28/11/2014 4 35505.05

29/11/2014 3 26657.85

30/11/2014 3 26925.80

1/12/2014 3 27010.90

2/12/2014 3 27199.85

3/12/2014 2 18404.65

4/12/2014 2 18333.75

5/12/2014 1 9024.95

6/12/2014 3 27361.65

7/12/2014 3 27592.25

8/12/2014 3 27443.30

9/12/2014 1 9036.95

10/12/2014 0 0

11/12/2014 1 8985.00

12/12/2014 3 27341.35

13/12/2014 4 36833.95

14/12/2014 3 26714.45

15/12/2014 1 9315.90

16/12/2014 1 9044.45

17/12/2014 4 36252.35

18/12/2014 4 35682.47

19/12/2014 5 45571.10

20/12/2014 5 45508.60

21/12/2014 4 35981.95

22/12/2014 3 27587.45

23/12/2014 4 36351.65

24/12/2014 1 9392.70

Page 58: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date No. Trains per Day Tonnes Loaded

25/12/2014 0 0

26/12/2014 1 9382.75

27/12/2014 2 17927.80

28/12/2014 2 18703.15

29/12/2014 3 27672.00

30/12/2014 5 45357.45

31/12/2014 3 27240.65

TOTAL 944 8660454.4

Page 59: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Appendix H: MOC 2014 Community Complaints Summary

Date Time Site Nature of Complaint Company Response

6/01/2014 7:15 Glendell Noise

Glendell received a noise complaint via email in regards to noise between 7:15am and 7:40am with specific reference being made to dozer noise at this time. The complaint email was also sent to the Department of Planning and Infrastructure (DP&I). Upon receiving the complaint, Glendell investigated any current activities that may have been contributing to elevated noise levels in Camberwell Village. As the complaint was not received until more than an hour after the indicated time of high noise, it was difficult to pin point what may have caused this. A response was sent to the DP&I detailing noise levels, alarms received and action taken at the time of the complaint.

22/01/2014 13:28 Glendell Blast

Blasting complaint was received through the Department of Planning and Infrastructure regarding a blast at Glendell at 1:28pm on Wednesday the 22 January. Complaint was in regards to vibration from the blast. All blast results were well within compliance limits and these results were relayed to the DP&I over the phone. They were satisfied that Glendell was well within compliance limits with vibration results being 1.52mm/s (95% limit of 5mm/s and 100% limit of 10mm/s) . The DP&I contacted the complainant to relay this information.

24/01/2014 17:30 Glendell Dust

The complainant contacted the Glendell complaint line wanting to know if Glendell had blasted as there was a thick dust cloud that covered his property. Glendell didn't blast at the time. The E&C Manager contacted the complainant to discuss the issue. Complainant was contacted and it was communicated that neither Glendell nor Mt Owen blasted at the time of the complaint. Further investigation into the source of the dust was carried out the following Tuesday morning. A wind gust came down the Valley and had picked up a large amount of dust. The upstream dust monitor recorded a large dust spike in line with the downstream monitor. The results were provided to the resident in a meeting.

9/02/2014 8:00 Glendell Noise

Glendell received a noise complaint from a Camberwell resident via the DP&I. The complaint was regarding noise between 8:00am and 9:30am. No noise alarms were received during this period and monitors recorded noise levels within compliance limits. No immediate action could be taken as the complaint was not received until a day after as it was made via the DP&I. Once the complaint was received the E&C Manager investigated the complaint and responded to the DP&I. One noise alarm was received on Sunday morning. It was from Sx7 at 6:15am (at the beginning of shift change). Noise levels at the Camberwell Village monitor between 8:00 and 9:30am for Sunday show the noise ranged between 32 and 33dB in the Glendell Direction. Noise levels on the monitor on the Ashton Dump ranged between 37 and 35dB for the Glendell Direction. The monitoring indicates that Glendell was well within compliance limits in Camberwell Village.

Page 60: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Time Site Nature of Complaint Company Response

17/04/2014 7:43 Glendell Noise

A resident of Camberwell Village contacted the Environmental Hotline at 07:43 am on Thursday 17 April 2014 with the following complaint "There is a large amount of machinery noise coming from the mine. Caller advised that the noise started at 6 pm the previous night". Noise alarms from SX12 were received at 4:30 and between 5:25 and 6:55 am however, the Mine Manager was in the village during this time and the highway was the predominant noise with minimal mining noise was audible. Glendell began shutting equipment down earlier that morning however, the noise alarms continued so the equipment was recommenced. During the early morning noise alarms, Glendell was on shift change and the noise alarms continued. The Mine Manager visited the Village at 5:15 and the E&C Manager assessed the noise levels from the Village, arriving 10 seconds before the complaint. The noise continued to be sporadic with times the mine was inaudible and other times a dozer was audible. Equipment was shut down and noise was confirmed to be the excavator floor dozer. However, by this time the noise had become faint and no longer an issue. E&C Manager and Mine Manager left the area at 8:45 am.

19/04/2014 3:07 Glendell Noise

Glendell was notified by the Department of Planning (on the 22/4) that they had received a complaint regarding noise on the morning of the 19th April 2014. As the complaint was not received until the 22/4 no immediate actions were taken. However, the DP&I requested further information which Glendell returned including the presence of a temperature inversion, six noise alarms were received from Sx7 (Ashton Dump) with no noise alarms at Sx12 (Camberwell Village).

26/04/2014 8:33 Glendell Noise

Complainant called the Glendell hotline at 8:30 and left no other details apart from making a noise complaint. Inspection of the work area was conducted by the OCE and the tracked dozer was shut down and replaced with a grader. Investigation into the complaint found the following: - Sx 12 alarms were received from 5:55 through to 8:40, including through crib break when all machinery was shut down. Indicating that other noise sources were contributing to noise levels in Camberwell village. - A temperature inversion was present in the region during the period. - The noise rose from 8-8:30 indicates that Glendell mine was contributing to noise levels, however other sources to the south east and west/ southwest of the operation were also significantly contributing to noise levels. -Review of the noise recording from Sx12 during the period of the complaint indicated that dozer track slap and other general mine noise was audible during the period. Other noise sources identified included highway traffic, livestock and train traffic.

10/05/2014 8:19 Glendell Noise

Complainant contacted the hotline about noise from Glendell Mine. Glendell personnel was already positioned in Camberwell village monitoring noise, while trucks and excavator noise was audible the highway was the dominant noise source. Upon receiving the complaint operations were shut down in the Barrett Pit immediately. Alarms from Camberwell monitor were still received up until 8:45am despite equipment being shut down. Noise files and alarms were reviewed and it was determined that mining noise was audible throughout the period. However Highway and train noise appear to be the dominant noise sources during that time. On a number of occasions throughout the period when the Barrett pit was not operating alarms from Sx12 were still being received, indicating that external sources were influencing the alarms being received.

Page 61: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Time Site Nature of Complaint Company Response

15/05/2014 7:00 Glendell Noise

A complaint was made to the DP&E at 7:00am. No immediate actions were taken as the complaint was received at 9:05am. In response to the alarms, The OCE organised for the step up supervisor to drive to the Village at around 5:15 am for 30 minutes. The Mine Manager stopped into the Village around 5:45 and stayed there until shift change around 6 am. The E&C Officer stopped into the Village around 7:30 am. The E&C Officer stopped into the Village at 7:45 am and left at 8:10 am. It was noted by all that visited the area in the morning that trucks from Glendell could be intermittently heard, however, not at levels that would necessitate changes. The highway was definitely the louder source of noise, trains and train horns were also audible in the Village, while neighbouring mining operations were also audible at times. From the EnvMet model a strong temperature inversion was present this morning. In response to the expected conditions, the tracked dozers were removed from the elevated dumps and under the excavator and replaced with the wheeled dozers prior to the morning period. As well as this, alarms were received during shift change at Glendell, when no machinery was operating. This indicates that other sources were contributing to the sound levels in Camberwell village.

17/05/2014 8:00 Glendell Noise

A noise complaint was received via the hotline at 8:00am on 17th of May. An inspection was carried out by the mining supervisor. All machinery was shut down in block 11, the southernmost area of the operation, drills were moved to a pattern deeper in the pit. Noted that highway noise was evident and that alarms had been received throughout shift change when no machinery was operating, indicating other sources were impacting on noise levels in Camberwell Village.

20/05/2014 22:00 Glendell Noise

Complainant rang the community hotline and stated that Dozer noise was very loud. Step up supervisor was sent to Camberwell village to monitor noise, noticed that highway noise and truck differential could be heard with intermittent dozer track slap. As a result the entire dozer fleet was shut down for 45 minutes. In this time noise alarms continued to be received. Dozers were brought back to work one by one in lower areas to determine which machines were contributing most to the noise heard in Camberwell. Constant communication between the Step up Supervisor in the village and the OCE was had as the dozers were restarted.

23/05/2014 8:00 Glendell Noise

Complaint was received via the hotline. The E&C Coordinator was in Camberwell Village at the time of the complaint to monitor noise levels in response to noise alarms received during the morning. At the time noise did not seem to be excessive and there were a number or other contributing noise sources including the highway and dozer noise from surrounding operations. Glendell was audible at times of low traffic noise from the New England Highway. Noise may have been exacerbated during the morning as a temperature inversion was present until it lifted at approximately 9am (based on EnvMet modelling).

25/05/2014 20:00 Glendell Noise

Glendell received a noise complaint from Camberwell Village, via the DP&E. The complaint was in regards to noise between 20:00 and 00:00 on the 25th of May and 04:30-08:00 on the 26th of May. Immediate action was not possible as the complaint was not received at the time of alleged high noise. Noise and Meteorological results from the times in question were sent through to the DP&E as requested.

27/05/2014 8:00 Glendell Noise

E&C Coordinator was contacted by DP&E to report a noise complaint from a Camberwell resident at 8am. The Department requested information regarding where Glendell was operating at the time and relevant noise and meteorological data. Requested data was compiled and sent to the Department the following day.

Page 62: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Time Site Nature of Complaint Company Response

12/06/2014 7:30 Glendell Noise

A complaint was received via an email from DP&E. No immediate actions could be taken, as complaint was received over an hour and a half after actual complaint time. The DP&E requested information about noise, conditions and operations at that time which was compiled and provided to the DP&E.

20/06/2014 7:00 Glendell Noise/Dust

Complainant contacted the hotline which forwarded the message to site personnel. Glendell E&C officer was in the village monitoring noise at the time of the complaint. No mining noise, apart from the faint and intermittent differential whine could be heard originating from Glendell mine. Track slap and banging was audible from other operations to the west. Noise from the highway was the dominant noise source throughout the morning (5:00am-8:30am). No visible dust was seen coming from Glendell mine between 6:45-8:30am while in the village and monitoring levels recorded at the OEH monitor remained in the "Good" range throughout the morning. No machinery was working in elevated areas, all equipment was working in block 10, which is below the natural surface.

22/06/2014 7:30 Glendell Noise

Complainant contacted the Mt Owen Complex complaints line and reported truck noise audible in Camberwell Village since 6:30am. Glendell had not received any noise alarms prior to the complaint being lodged. The step up supervisor attended Camberwell Village from 7:45am to 8:25am monitoring noise. Upon arrival at the village, dozer noise was audible at the adjacent washery. Noise generation predominately from adjacent highway and periodic trains passing. Mining noise barely audible throughout the 40 minute period.

27/06/2014 12:50 Glendell Blast

Vibration/Overpressure

Complaint received via the complaint hotline reporting the house has rattled in conjunction with a noise, the main concern being the movement. Review of the blasting times and results were conducted. Two blasts were fired close to the time of the complaint and all results were found to be well within compliance levels. The pre-blast meteorological assessment was conducted as required. The complainant has been contacted and informed of the results and a meeting with the complainant was requested, however, the complainant advised that they did not wish to follow this up.

27/06/2014 13:00 Glendell Blast Dust

Complainant reported vibrations and dust via the complaints hotline. The complainant was contacted to discuss the complaint. The E&C Coordinator offered to meet with complainant and discuss the results from the blast and also the pre blasting checks that are carried out to ensure vibration, overpressure and dust impacts are minimised. E&C Coordinator met with the resident and discussed the blasting process and results.

27/06/2014 13:00 Glendell Blast Dust

A complaint was lodged with the Department of Planning and Environment (DPE) regarding dust and a fume smell following two blasts at Glendell. Results and met conditions from the blasts as well as fume ratings were submitted to the DP&E in response to the complaint. No further action.

01/07/2014 23:15 Mt Owen Noise

A noise complaint was received via the hotline. The noise levels was investigated and found to be in compliance. The E&C Manager called the complainant back in the morning to discuss the results and no further action was required.

Page 63: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Time Site Nature of Complaint Company Response

4/07/2014 8:30 Glendell Noise

A complaint was received via the hotline reporting mine noise for the hour prior to complaint. E&C Officer had been in Camberwell monitoring noise until 7:50am, and while audible, Glendell mine was not the major noise source. Once the complaint was received E&C Coordinator went to the village to monitor and came to the same conclusion. Noise recordings from Sx12 were also reviewed. All dumping was diverted into the pit prior to the complaint being received.

9/08/2014 21:00 Glendell Noise

A complaint was received via the complaints line on Saturday evening (9/8/14). Mining supervisor investigated the complaint both by live streaming and by checking noise levels from the pit and no excessive mining noise could be identified at the time of complaint. No Sx 12 alarms were received prior to the complaint; however alarms from Sx7 had been received from 20:05. A strong temperature inversion was in place for the majority of the night which may have exacerbated noise levels, however, noise in the Village was within limits.

15/09/2014 22:00 Glendell Noise

Complaint was received by the E&C Manager on the 22/9/14 via email from the EPA. The complaint was originally lodged on the EPA environment line on the 16/9/14 at 09:03. Site didn't receive the complaint until 6 days after the complaint was lodged with the EPA, this made immediate actions difficult to implement. Once received, the time of complaint is investigated and a response was provided to the EPA as requested.

24/09/2014 22:00 Glendell Noise

A noise complaint was received via the EPA. As the complaint was not received until 5 days following the incident immediate action was not possible. Once received the time of complaint was investigated and alarm information etc was sent through to EPA as requested. No further action.

26/09/2014 22:00 Glendell Noise

Noise complaint was received via the EPA. As the complaint was received 3 days following the time of the complaint, no immediate actions could be taken in the pit by the supervisors. Once received the complaint was investigated and alarm details forwarded onto EPA as requested. No further action.

28/09/2014 22:00 Glendell Noise

Noise complaint was received via the EPA. No immediate actions were taken as the complaint was not received until the morning after the complaint was made. The complaint was investigated and alarm information sent to EPA as requested. No further action taken.

29/10/2014 12:30 Glendell Blast

Email was received from the Department of Planning and Environment regarding complaints they had received for blasting on the 27th and 29th of October. Upon receiving the complaint from the department, the times of complaint were investigated and a summary of blast results were sent back in response. Glendell did not blast on the 27th, however, Glendell did blast on the 29th of October at the time of complaint (12:20). All results were well within compliance limits for both overpressure and vibration. Although well within compliance, Glendell’s Camberwell monitor did indicate an elevated vibration result of 2.15mm/s (below the 5% compliance limit of 5mm/s) and this is potentially the reason for the complaint.

6/11/2014 13:30 Glendell Blast

A complaint was received from both the EPA and DP&E regarding a blast at Glendell at 1:30pm on Thursday the 6th of November. All results from the blast were well within compliance limits. Upon receiving the complaint, the results were investigated and provided to both the EPA and Department of Planning and Environment.

Page 64: MT OWEN COMPLEX APPENDICES OF THE ANNUAL REVIEW 1 … · Mt Owen Complex Annual Review 2014 Sampling Date TSP 1 – Picton TSP 2 – Falbrook Road TSP Camberwell – Camberwell Village

Mt Owen Complex Annual Review 2014

Date Time Site Nature of Complaint Company Response

9/11/2014 6:48 Glendell Noise

A noise complaint was made to the hotline. Machinery had just started up again after shift change. All dumping was redirected to dump in pit, tracked dozers were swapped with rubber tyre dozers. No Sentinex 12 alarms were received during the time of complaint. Upon reviewing the noise recordings from the Village, mining noise was intermittently heard. Highway noise was the dominant noise source at the time of complaint.