Michael Tomlinson Project Management List with Contract Amount (2014 dollars) 1) US Army Ordnance Reef Followup Investigation, Project Manager, 2014-~$484,275 2) FDOH Suwannee, acting Project Manager, 1998-$150,000 ($217,008) 3) SECI FGD Landfill Study, Project Manager, 1998-$25,826 ($37,363) 4) SECI Integrated Contingency Plan, 1997-$15,000 ($22,037) 5) SJRWMD Orange Lake, Project Manager, 1996-$164,950 ($248,008) 6) SJRWMD Rodman Bathymetry, Project Manager, 1994-$174,700 ($277,943) 7) SJRWMD Rodman Floodplain & SWQ Studies, Task Manager, 1994-$122,710 ($195,228) 8) CEC REA Borrower's Report (EA), 1993-$3,362 ($5,488) 9) NTH DWSD Intake Dye Study, Project Manager, 1992-$20,000 ($33,613) 10) ERM Copper Range Plume Study, Project Manager, 1992-$150,602 ($253,110) 11) IMC Fertilizer Florida Ammonia Study, 1992-$11,490 ($19,311) 12) FPL 500-kV TLSA Water Resources & Ecology, Project Manager, 1991-~$170,000 ($294,376) 13) OEI Peat Mining & Peat Fired Plant POS, Asst. Project Manager, 1991-$57,750 ($100,001) 14) GPR Peat Mining Licensing Feasibility, 1989-$14,904 ($28,352) 15) Dollinger, Esq., Glendale Farm Transactional Audit, 1989-$3,500 ($6,658) 16) Gates Petroleum, St. Johns River Estuary Currents & Sediments, 1989-$7,600 ($14,458) 17) SECI TLSA, Project Manager, 1989-$165,360 ($314,567) 18) MMS SWFLA-Year 6, Assistant Project Manager, 1987-$372,522 ($773,140) 19) NOAA NAS, Project Manager, 1987-$91,108 ($189,087) 20) SECI Lake Istokpoka Peat Study, 1983, ? 21) AECI Thomas Hill Power Plant 316(a) Thermal Plumes, 1983, ? 22) CECO Dresden Nuclear Station Time-of-Travel Study, 1978, ? 23) American Maize Precision Fluorometric Flowmeter Calibration, 1976, ? 24) WADOE NPDES Database, 1973, ? The total for the projects listed is $3,514,023 in 2014 dollars. This total excludes five projects for which I have no record of the total project cost.

Upload: mstomlinson

Post on 31-Jul-2015

20 views

Category:

Documents


2 download

TRANSCRIPT

Michael Tomlinson Project Management List with Contract Amount (2014 dollars)

1) US Army Ordnance Reef Followup Investigation, Project Manager, 2014-~$484,275

2) FDOH Suwannee, acting Project Manager, 1998-$150,000 ($217,008)

3) SECI FGD Landfill Study, Project Manager, 1998-$25,826 ($37,363)

4) SECI Integrated Contingency Plan, 1997-$15,000 ($22,037)

5) SJRWMD Orange Lake, Project Manager, 1996-$164,950 ($248,008)

6) SJRWMD Rodman Bathymetry, Project Manager, 1994-$174,700 ($277,943)

7) SJRWMD Rodman Floodplain & SWQ Studies, Task Manager, 1994-$122,710 ($195,228)

8) CEC REA Borrower's Report (EA), 1993-$3,362 ($5,488)

9) NTH DWSD Intake Dye Study, Project Manager, 1992-$20,000 ($33,613)

10) ERM Copper Range Plume Study, Project Manager, 1992-$150,602 ($253,110)

11) IMC Fertilizer Florida Ammonia Study, 1992-$11,490 ($19,311)

12) FPL 500-kV TLSA Water Resources & Ecology, Project Manager, 1991-~$170,000 ($294,376)

13) OEI Peat Mining & Peat Fired Plant POS, Asst. Project Manager, 1991-$57,750 ($100,001)

14) GPR Peat Mining Licensing Feasibility, 1989-$14,904 ($28,352)

15) Dollinger, Esq., Glendale Farm Transactional Audit, 1989-$3,500 ($6,658)

16) Gates Petroleum, St. Johns River Estuary Currents & Sediments, 1989-$7,600 ($14,458)

17) SECI TLSA, Project Manager, 1989-$165,360 ($314,567)

18) MMS SWFLA-Year 6, Assistant Project Manager, 1987-$372,522 ($773,140)

19) NOAA NAS, Project Manager, 1987-$91,108 ($189,087)

20) SECI Lake Istokpoka Peat Study, 1983, ?

21) AECI Thomas Hill Power Plant 316(a) Thermal Plumes, 1983, ?

22) CECO Dresden Nuclear Station Time-of-Travel Study, 1978, ?

23) American Maize Precision Fluorometric Flowmeter Calibration, 1976, ?

24) WADOE NPDES Database, 1973, ?

The total for the projects listed is $3,514,023 in 2014 dollars. This total excludes five projects for which I have no