mr. tony davis · unclassified requirements vs. capabilities • tactical comms: type-1,...

8
UNCLASSIFIED UNCLASSIFIED Mr. Tony Davis Program Executive Officer COMMAND, CONTROL, COMMUNICATIONS, AND COMPUTERS

Upload: others

Post on 21-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED UNCLASSIFIED

Mr. Tony Davis Program Executive Officer

COMMAND, CONTROL, COMMUNICATIONS,

AND COMPUTERS

Page 2: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

• Big pipe and multiple classifications to small teams in austere locations

• Enterprise services to TSOCs and deployed forces supporting COCOMs

• Video and other big data

critical to decision making/situational awareness

0100200300400500600700800900

1000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

Deployed SatelliteNodes

Satellite Bandwidth(Mhz)

02000400060008000

1000012000140001600018000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

Data Storage (TB)

VTC Sessions

CONTINUED DEMAND/COMPLEXITY

Page 3: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF-specific apps

• FY14 RFI/RFPs for Next Gen handheld/manpack/fixed mount radios • Multiple channel, SW configurable, high throughput, MANET, SA, ISR

• Mobile Comms Initiative: Secure mobile access to apps and data • COTS smart device through commercial/Government networks • Targeted at tactical customer, not US office environment • Secure, but not locked down (camera, wireless, apps, etc.) • >85% mobile in next 3-5 years

• Continuing Requirements: • Global ISR architecture • Deployable/mobile 3G/4G infrastructure • Next generation encryption products

• Tokens, CSFC, Data-at-rest

• Wideband SATCOM-on-the-move • MANET that’s location agnostic • Smaller, lighter, faster, more integrated

Page 4: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

SOF TACTICAL COMMS

• Handheld radio – Draft RFP: 3Q FY14

– RFP: 4Q FY14

• Manpack radio – Draft RFP: 1Q FY15

– RFP: 2Q FY15

• HF Radio – Review/Evaluate wideband technologies

– Potential solicitation FY15

Page 5: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

SITEC II • Enable and improve IT in support of mission operations and

customer satisfaction • Provide reliable SIE Core services worldwide • Provide flexible and scalable services for all SOF site

unique requirements • Foster innovation while providing an agile approach to insert

new technologies • Establish flexible and scalable contracts • Align SIE Services with the JIE Framework

ACQUISITION STRATEGY

POINT OF CONTACT

• 813.826.9482 (TILO)

• Under development

PERIOD OF PERFORMANCE

FUNDING

• 1 Apr 2016 - TBD • Depends on acquisition strategy

• HQ C4I: FY14-15 $225M • Campus TOs: TBD

MILESTONES

CURRENT CONTRACT/OEM

• Draft RFP: 4Q FY14 • Industry Day: 4Q FY14 • RFP: 2Q FY15

• SITEC/Various • Specialty Services/Various • Applications Management/Various

Page 6: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

FY14 FY15 FY16 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3

Acquisition Concept

Acquisition Strategy

Requirements Development

Socialize Requirements

Develop SLAs

Draft RFP

Revise Draft RFP

Prepare RFP

Release RFP

Evaluation

Contract Award

Phase In

Start Date

Site T.O. Awards

Socialize Requirements RFI

SITEC SCHEDULE

Industry Day

Note: All SITEC II information shown is pre-decisional

Page 7: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

SITEC II DRAFT REQUIREMENTS

Enterprise Task Order

Note: All SITEC II information shown is pre-decisional

Page 8: Mr. Tony Davis · UNCLASSIFIED REQUIREMENTS VS. CAPABILITIES • Tactical Comms: Type-1, software-defined with SOF -specific apps • FY14 RFI/RFPs for Next Gen handheld/manpack/fixed

UNCLASSIFIED

Campus Task Orders

SITEC II DRAFT REQUIREMENTS

Note: All SITEC II information shown is pre-decisional