    Major Resource Projectsin Canada

    September 2013

  • 8/13/2019 MPMO September 2013 Quarterly Report

    2/20

    i

    AcknowledgementsThe Major Projects Management Office Initiative was established by the Government of Canada in order

    to improve the performance of the regulatory system for major resource projects by creating a moreefficient, effective, predictable, accountable, and transparent regulatory review process.

    The Initiative is a collaborative effort among key departments and agencies that are responsible for theregulatory review of major resource projects. These departments and agencies include:

    Canadian Nuclear Safety Commission (CNSC)Environment Canada (EC)National Energy Board (NEB)Fisheries and Oceans Canada (DFO)Natural Resources Canada (NRCan)Aboriginal Affairs and Northern Development Canada (AANDC)Canadian Environmental Assessment Agency (CEAA)Transport Canada (TC)Canadian Northern Economic Development Agency (CanNor)Justice Canada (DOJ)Privy Council Office (PCO)

  • 8/13/2019 MPMO September 2013 Quarterly Report

    3/20

    ii

    Table of Contents

    Projects Overview.......................................................................................................................1

    Projects Map ...............................................................................................................................4

    BRITISH COLUMBIA...............................................................................................................5

    BRITISH COLUMBIA and ALBERTA......................................................................................9

    ALBERTA..................................................................................................................................9

    ALBERTA and SASKATCHEWAN.........................................................................................10

    SASKATCHEWAN..................................................................................................................10

    MANITOBA.............................................................................................................................11

    ONTARIO ................................................................................................................................11

    QUEBEC..................................................................................................................................13

    QUEBEC and NEWFOUNDLAND AND LABRADOR...........................................................14

    NEWFOUNDLAND AND LABRADOR..................................................................................14

    NEWFOUNDLAND AND LABRADOR and NOVA SCOTIA................................ ................15

    NOVA SCOTIA........................................................................................................................15

    NEW BRUNSWICK................................................................ ................................ .................15

    COMPLETED MPMO PROJECTS ..........................................................................................16

  • 8/13/2019 MPMO September 2013 Quarterly Report

    4/20

    1

    Major Resource Projects in CanadaProjects Overview

    The federal regulatory review process can be described as occurring in 3 key phases:

    1) The Pre-Environmental Assessment (Pre-EA) Phasecommences with the formalsubmission of a Project Description by a Proponent.

    2) TheEnvironmental Assessment (EA) Phasebegins with the posting of a Notice ofCommencement of an Environmental Assessmenton the Canadian EnvironmentalAssessment Registry Internet Site.

    3) The Regulatory Decis ion-Making (Reg) Phasecommences once a federal departmentor agency receives adequate information that a proposed project will likely require aregulatory decision.

    As of September 30, 2013, the Major Projects Management Office (MPMO) was responsible formanaging federal regulatory reviews for 76 active major resource project proposals (see fig. 1).

    Figure 1: Current Portfo lio of MPMO Projects

    Pre-EA Phase Environmental Assessment Phase Regulatory Decision -Making Phase

    2projects

    63projects

    11projects

    In addition, twelve projects for which the reviews have been completed are also included in thisreport. Three of these continue to be subject to a follow-up program pursuant to the formerCanadian Environmental Assessment Act(CEAA), and are thus still being tracked under the

    MPMO Initiative. The MPMO is also engaged in providing advice and guidance on manyprojects where a formal project proposal has not yet been submitted by the Proponent or that donot require a federal EA.

    It is important to note that the phases outlined above are described as being separate anddistinct in order to provide a clear means of reporting on the status and progress of each project.However, on a project-by-project basis, certain activities or processes can occur simultaneouslybetween phases.

  • 8/13/2019 MPMO September 2013 Quarterly Report

    5/20

    2

    Projects by Province

    Major resource projects are undergoing federal reviews in all regions across Canadarepresenting over $231.1 billion in capital investment and over 100 000 jobs. 55% of MPMOprojects are located in western provinces; the remaining 45% are located in eastern provinces(see Fig. 2).

    Investment by Province

    Currently, western provinces account for 75% of projected capital investment; eastern provincesaccount for the remaining 25% (see Fig. 3). This is in large part due to the high capitalinvestment required for oil and gas projects, which have an average investment of $16.1 billionper project. Thirty six percent, or approximately $83.2 billion, of the projected capital investmentfor major resource projects is in British Columbia. Alberta follows closely with approximately

    $74.2 billion in projected capital investment. Ontario and Newfoundland and Labrador followwith approximately $24.4 billion and $21.2 billion respectively.

    Figure 2: Number of Projects by Province & Sector

    0

    5

    10

    15

    20

    25

    30

    BC AB SK MB ON QC NL NB NS

    Pipelines

    Oil and Gas

    Transmission

    Wind Power

    Hydro

    Nuclear

    Minerals & Metals

    No te: Since projects may be located in multiple provinc es (e.g. pipelines), tota l by prov ince (83) is

    greater than actual number of pro jects (77)

    Figure 3: Investment by Province ($ Billions)

    $0

    $10

    $20$30

    $40

    $50

    $60

    $70

    $80

    $90

    BC AB SK MB ON QC NL NB NS

  • 8/13/2019 MPMO September 2013 Quarterly Report

    6/20

    3

    Projects by Sector

    The mining sector accounts for 69%of all MPMO proposals in Canada 53 proposed projects (see Fig. 4).

    The energy sector accounts for theother 31% of MPMO projects. More

    than half of these are related to oiland gas development 7 oil and gasproduction proposals and 8 pipelineproposals. The remaining projectsare related to electricity production 1 wind power proposal, 2 nuclearproject proposals1, 4 hydroelectricityproposals, and 2 electricitytransmission proposals.

    Investment by Sector

    The disclosed capital investment forMPMO projects is more than $231.1billion (see Fig. 5). Although theenergy sector accounts for 31% ofMPMO projects, this sector accountsfor 78%, or approximately $183.9billion of the overall projectedinvestment.

    The mining sector accounts for theremaining $47.2 billion in projectedinvestment. These projects accountfor 22% of total projected investment;whereas they represent 69% of thetotal number of major resourceprojects.

    ll

    1 Although uranium mining is regulated by the Canadian Nuclear Safety Commission, these projects are counted inthe mining sector.

    Figure 4: Proportion of Projects by Sector

    Figure 5: Investment by Sector

  • 8/13/2019 MPMO September 2013 Quarterly Report

    7/20

    4

    Major Resource Projects in CanadaProjects Map

    The map below illustrates the distribution of MPMO project proposals across Canada. All MPMOprojects are tracked publicly as they progress through the regulatory system. For additionalinformation on any MPMO project, please visit the MPMO web site at www.mpmo-bggp.gc.ca.

  • 8/13/2019 MPMO September 2013 Quarterly Report

    8/20

    5

    BRITISH COLUMBIAAjax Copper-GoldMineKGHM Ajax Mining Inc.

    Phase:EAEA Type: Transitional CS2

    The project consists of the construction andoperation of the Ajax Mine located partiallywithin the City of Kamloops, BritishColumbia. The Ajax Mine Project is anopen pit copper/gold mine and is expectedto process 60,000 tonnes of ore per day forexport over a mine life of 23 years.

    Projected CapitalInvestment:$795 million

    Projected Employment:Construction: 580 jobsOperations: 380 jobsIndirect: 1,240 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FAs3: EC, HC, TC

    Arctos AnthraciteCoal MineArctos Anthracite JointVenture

    Phase:EAEA Type: Substituted EA

    The project consists of the construction,operation and decommissioning of ananthracite coal mine in northwestern BritishColumbia, approximately 90 kilometressoutheast of Iskut. The proposed projectwould produce 3 million tonnes per year ofanthracite coal over a 25 year mine life.The proposal also includes constructing a147 kilometre extension to an existingrailway from its current terminus to themine site.

    Projected CapitalInvestment:$788.6 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA

    FAs: DFO, EC,HC, NRCan, TC

    Bingay Main CoalMine

    Centermount Coal Ltd.Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation, and decommissioning of anopen pit and underground coal mine

    located approximately 21 kilometres northof Elkford, in southeastern BritishColumbia. As proposed, the project wouldproduce 2 million tonnes of coal per yearover a mine life of 20 years.

    Projected CapitalInvestment:$480 million

    Projected Employment:Construction: 494 personyearsOperations: 331 jobs

    Regulatorydepartments/agencies:

    CEAA, TC, DFO,NRCan, CTA

    FAs: EC, HC

    Blackwater GoldMineNew Gold Inc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation, and decommissioning of anopen pit gold and silver mine locatedapproximately 100 kilometres south ofVanderhoof, British Columbia. Asproposed, the project would produce60,000 tonnes per day of gold and silverore, over a mine life of 17 years.

    Projected CapitalInvestment:$1.8 billion

    Projected Employment:Construction: 1,500 jobsOperations: 500 jobs

    Regulatorydepartments/agencies:CEAA, TC, DFO,NRCan, EC, CTA

    FA: HC

    Brucejack Gold-

    Silver MinePretium Resources Inc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of a gold-silver underground mine locatedapproximately 65 km north-northwest ofStewart, B.C. The proposed project wouldproduce approximately 16 million tonnes ofmineralized material at a rate of up to 2,700tonnes per day over a minimum 16-yearmine life.

    Projected CapitalInvestment:

    $436.3 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, NRCan,TC

    FAs: DFO, EC,HC

    BURNCO AggregateMineBURNCO Rock ProductsLtd.

    Phase:EAEA Type: Transitional CS

    The project (formerly the McNab ValleyAggregate Project), consists of a sand andgravel mine located on the northwest shoreof Howe Sound, approximately 22kilometres southwest of Squamish, BritishColumbia. The proposed project has anexpected mine life of 20-30 years with a

    production capacity of approximately 1-1.6million tonnes per year.

    Projected CapitalInvestment:$60 million

    Projected Employment:Construction: 80 personyears

    Operations: 360 personyears

    Regulatorydepartments/agencies:CEAA, DFO

    FAs: NRCan, EC,HC, TC

    2 CS: Comprehensive Study3 FA: Federal Authorities

  • 8/13/2019 MPMO September 2013 Quarterly Report

    9/20

    6

    BRITISH COLUMBIACanpotex PotashExport TerminalCanpotex Terminals Ltd.

    Phase:RegulatoryEA Type: Completed

    The project consists of a 20 million tonnesper year potash export terminal andrail/road/utilities loop proposal on RidleyIsland. The proposal consists of adeepwater marine wharf, potash storagesheds, a railcar unloading and conveyorsystem and a rail, road and utilities corridortransmission line that connects to theBritish Columbia grid.

    Projected CapitalInvestment:$400 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:EC, DFO, TC,Prince Rupert PortAuthority

    FA: HC

    Carbon Creek CoalMineCardero Coal Ltd.

    Phase:EAEA Type: Substituted EA

    The project consists of the developmentand operation of an open pit metallurgicalcoal mine located approximately 60kilometres northwest of Chetwynd and 40kilometres west of Hudson's Hope, innortheast British Columbia. The productionrate would be 4.1 million metric tonnes ofmetallurgical coal per year, over 20 years.

    Projected CapitalInvestment:$475 million

    Projected Employment:Operations: 876 jobs

    Regulatorydepartments/agencies:CEAA

    FAs: DFO, EC,NRCan, TC, HC

    Coastal GaslinkPipelineCoastal GasLink PipelineLtd.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction andoperation of an approximately 650 kmpipeline to deliver natural gas from the areanear the community of Groundbirch, B.C. toa proposed liquefied natural gas (LNG)facility near Kitimat, B.C. The project will

    initially have the capacity to flowapproximately 1.7 billion cubic feet ofnatural gas per day and could deliver up toapproximately 5.0 billion cubic feet per dayof natural gas after further expansion.

    Projected CapitalInvestment:$4 billion

    Projected Employment:Construction: 2,000 to

    2,500 jobsOperations:15 to 20 jobs

    Regulatorydepartments/agencies:CEAA, TC

    FAs: DFO, EC,

    HC

    Echo Hill Coal MineHillsborough ResourcesLtd.

    Phase:EAEA Type: Substituted EA

    The project consists of the construction,operation and decommissioning of a coalmine located 44 kilometers north ofTumbler Ridge, British Columbia. Theproposed project would produce 1 to 1.5million tonnes of thermal coal per year for amine life of 10 to14 years.

    Projected CapitalInvestment:$70 million

    Projected Employment:Construction: 25 jobsOperations: 120 jobs

    Regulatorydepartments/agencies:CEAA

    FAs: DFO, EC,NRCan, TC, HC

    Harper CreekCopper-Gold-Silver

    MineYellowhead Mining Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction andoperation of the Harper Creek Mine90 kilometres northeast of the District ofKamloops, British Columbia. Theproduction rate would be 25 million tonnesper year for export over a mine life of 18 to24 years.

    Projected CapitalInvestment:$839 million

    Projected Employment:Construction: 450 jobsOperations: 360 jobsIndirect: 1 050 jobs

    Regulatorydepartments/agencies:

    CEAA, DFO,NRCan

    FAs: EC, HC, TC

    Kingsvale-OliverNatural GasPipelineFortisBC Energy Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction of anew 161 km long natural gas transmissionpipeline generally alongside the existingnatural gas transmission pipeline betweenKingsvale and Oliver, B.C.

    Projected CapitalInvestment:$440 million

    Projected Employment:Construction: 1,760person years

    Regulatorydepartments/agencies:CEAA, AANDC,DFO, TC

    FAs: NRCan, EC,HC

    Kitsault

    Molybdenum MineAvanti Kitsault Mine Ltd.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction and

    operation of an open-pit molybdenum mine,located approximately 140 kilometres northof Prince Rupert, British Columbia, andsouth of the head of Alice Arm, BritishColumbia. The proposed ore productionrate is 40,000 tonnes per day overapproximately a 15-year operation period.

    Projected Capital

    Investment:$837 million

    Projected Employment:Construction: 700 jobsOperations: 300 jobs

    Regulatory

    departments/agencies:CEAA, DFO,NRCan

    FA: EC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    10/20

    7

    BRITISH COLUMBIAKSM Gold-CopperMineSeabridge Gold Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the development ofa copper, gold and silver deposit locatedapproximately 65 kilometres northwest ofStewart, British Columbia. The proposedmine is expected to process between100,000 - 120,000 tonnes per day of oreover a minimum 30 year mine life.

    Projected CapitalInvestment:$5.3 billion

    Projected Employment:Construction: 1,800 jobsOperations: 1,040 jobsIndirect: 8,550 jobs

    Regulatorydepartments/agencies:CEAA, DFO, EC,NRCan, TC

    FA: HC

    Kutcho CreekCopper-Gold MineKutcho Copper Corp.

    Phase:EAEA Type: TransitionalScreening

    The project consists of the construction andoperation of an underground copper-zinc-silver-gold mine and processing mill locatedin the Cassiar Mountains of north westernBritish Columbia, approximately 100 kmeast of Dease Lake and 600 km north ofSmithers. The proposed ore mining rate is2,500 tonnes per day over an anticipated12 year operation period.

    Projected CapitalInvestment:$187.3 million

    Projected Employment:Operations: 150 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FA: EC

    LNG Canada ExportTerminalLNG CanadaDevelopment Inc.

    Phase:EAEA Type: Substituted EA

    The project consists of the construction andoperation of a natural gas liquefactionfacility and marine terminal for the export ofliquefied natural gas (LNG) in the District ofKitimat, British Columbia. The proposedproject would convert natural gas to LNG,

    approximately 24 million tonnes per annum,for export to global markets. The project isexpected to have a life of at least 25 years.

    Projected CapitalInvestment:$15 billion

    Projected Employment:Construction: 5,500 jobs

    Operations: 200 to 400jobs

    Regulatorydepartments/agencies:CEAA, TC

    FA: TBD

    Morrison Copper-Gold MinePacific Booker MineralsInc.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction andoperation of an open pit copper-gold-molybdenum mine, located approximately65 kilometers northeast of Smithers and 35kilometers north of the Village of Granisle,British Columbia. The proposed oreproduction rate will be 30,000 tonnes perday over a minimum 21 year operationperiod.

    Projected CapitalInvestment:$517 million

    Projected Employment:Construction: 360 jobsOperations: 251 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FAs: EC, HC, TC

    Murray River CoalMine

    HD Mining InternationalInc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of anunderground coal mine and supporting

    infrastructure, including a 5.8 kilometre railload-out. The project is located 12.5kilometres southwest of Tumbler Ridge,British Columbia. The proposed projectwould produce 6 million tonnes ofmetallurgical coal per annum for anestimated mine life of 31 years.

    Projected CapitalInvestment:$300 million

    Projected Employment:Construction andoperations: 600 jobsIndirect: 700 jobs

    Regulatorydepartments/agencies:

    CEAA, NRCan,DFO, TC

    FAs: EC, HC,CTA

    NaiKun OffshoreWind EnergyNaiKun Wind EnergyGroup

    Phase:RegulatoryEA Type: Complete

    The project consists of the construction andoperate of a 320 megawatt offshore windenergy located in Hecate Strait off thenorth-east shores of Haida Gwaiiconnecting to the British ColumbiaTransportation Corporation grid near PrinceRupert on the mainland side and near Tlellon Haida Gwaii.

    Projected CapitalInvestment:$2 billion

    Projected Employment:Construction: 1,113 jobsOperations: 65 jobs

    Regulatorydepartments/agencies:DFO, TC, NRCan,Prince Rupert PortAuthority, PWGSC

    FAs: EC, HC

    New ProsperityGold-Copper MineTaseko Mines Ltd.

    Phase:EAEA Type: Review Panel

    The project consists of the construction andoperation of a gold-copper mine locatedapproximately 125 km southwest ofWilliams Lake, British Columbia. Theproposed project would produce 108 millionpounds of copper and 247 thousandounces of gold over a 20 year mine life.

    Projected CapitalInvestment:$1 billion

    Projected Employment:Construction: 1,000 jobsOperations: 550 jobsIndirect: 1,280 jobs

    Regulatorydepartments/agencies:CEAA, DFO,TC,NRCan

    FAs: EC, HC,PCA

  • 8/13/2019 MPMO September 2013 Quarterly Report

    11/20

    8

    BRITISH COLUMBIAPacific NorthwestLNG FacilityProgress Energy CanadaLtd.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction andoperation of a liquefied natural gas (LNG)facility and marine terminal near PrinceRupert, within the District of Port Edward.The Pacific Northwest LNG facility wouldbe located on Lelu Island. The proposedproject would convert natural gas to LNGfor export to Pacific Rim markets in Asia.

    Projected CapitalInvestment:$11 billion

    Projected Employment:Construction: 3,500 jobsOperations: 200 to 300

    jobs

    Regulatorydepartments/agencies:CEAA, TC

    FA: TBD

    Prince Rupert LNGFacilityPrince Rupert LNG Ltd.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction andoperation of a liquefied natural gas (LNG)facility on Ridley Island at the Port of PrinceRupert, British Columbia.The proposedproject is to be developed in two phases,reaching a nominal capacity of up to 21million tonnes per annum.

    Projected CapitalInvestment:$16 billion

    Projected Employment:Construction: 9,000person years for Phase 1,3,500 for Phase 2Operations: 250 jobs

    Regulatorydepartments/agencies:CEAA, TC

    FA: TBD

    Raven UndergroundCoal MineCompliance Coal Corp.

    Phase:EAEA Type: Transitional CS

    The project consists of the development ofan underground coal mine near BuckleyBay on eastern Vancouver Island. Themine would produce approximately 30million tonnes of coal and rock (raw coal)over a 16 year period.

    Projected CapitalInvestment:$213.1 million

    Projected Employment:Construction: 122 jobs

    Operations: 350 jobs

    Regulatorydepartments/agencies:CEAA, DFO, PortAlberni PortAuthority

    FAs: NRCan, EC,HC, TC

    Site C HydroelectricGenerationBC Hydro

    Phase:EAEA Type: Review Panel

    The project consists of the constructoin andoperation of 1,100-megawatt hydroelectricgenerating station including the associatedstructures on the Peace River in north-eastern British Columbia.

    Projected CapitalInvestment:$7.9 billion

    Projected Employment:Construction: 1,000 jobs

    Regulatorydepartments/agencies:CEAA, DFO, TC

    FAs: NRCan, EC,HC

    Spanish MountainGold MineSpanish Mountain GoldLtd.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction andoperation of the Spanish Mountain GoldMine, approximately 70 kilometresnortheast of Williams Lake, BritishColumbia. The project is anticipated to

    process 40,000 tonnes of ore per day andis expected to produce approximately 116metric tonnes of gold dor over 10 years.

    Projected CapitalInvestment:$496 million

    Projected Employment:

    Construction: 2,000 to2,500 person yearsOperations: 285 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    Sukunka Coal MineXstrata Coal Canada

    Phase:EAEA Type: Substituted EA

    The project consists of the developmentand operation of coal mine locatedapproximately 55 kilometres south ofChetwynd and 40 kilometres west ofTumbler Ridge, in northeast BritishColumbia. The proposed project wouldinitially produce 1.5 to 2.5 million tonnesper year increasing to 6 million tonnes peryear over a mine life of 20 years.

    Projected CapitalInvestment:$1.8 billion

    Projected Employment:Construction: 250 jobsOperations: 700 jobs

    Regulatorydepartments/agencies:CEAA

    FA: TBD

  • 8/13/2019 MPMO September 2013 Quarterly Report

    12/20

    9

    BRITISH COLUMBIA and ALBERTANorthern GatewayPipelineEnbridge Inc.

    Phase:EAEA Type: Review Panel

    The project consists of a 525,000 barrels perday petroleum export pipeline connectingEdmonton, Alberta to Kitimat on the north-central coast of British Columbia. Theproposal consists of a 1,170 km-longpetroleum export pipeline, a condensateimport pipeline, and a marine terminal.

    Projected CapitalInvestment:$6.5 billion

    Projected Employment:Construction: 3,000 jobsOperations: 1,150 jobs

    Indirect: 62,000 personyears

    Regulatorydepartments/agencies:CEAA, CTA, EC,DFO, AANDC,NEB, TC

    FAs: NRCan, HC,PCA

    Trans Mountain OilPipeline ExpansionKinder Morgan Canada

    Phase:Pre-EAEA Type: TBD

    The project consists of increasing capacityof the existing pipeline (981 km of newburied pipeline) from 300,000 barrels perday (b/d) to 890,000 b/d and transportingcrude oil from Edmonton, Alberta toBurnaby, British Columbia.

    Projected CapitalInvestment:$5.4 billion

    Projected Employment:Construction: 4,500 jobsOperations: 90 jobs

    Regulatorydepartments/agencies:TBD

    FA: TBD

    ALBERTAEdmonton to

    Hardisty OilPipelineEnbridge Pipelines Inc.

    Phase:RegulatoryEA Type:Completed

    The project consists of a 180 km of newpipeline between Edmonton to Hardisty,Alberta. Temporary infrastructure will berequired during construction.

    Projected CapitalInvestment:

    $814.8 million

    Projected Employment:Undisclosed

    Regulatorydepartments/

    agencies:NEB

    FA: EC

    Frontier Oil SandsMineTeck Resources Ltd.

    Phase:EAEA Type: Review Panel

    The project consists of the construction,operation and reclamation of an oil sandsMine located approximately 110 kilometresnorth of Fort McMurray in Alberta. Theproduction capacity is of 277,000 barrels perday of bitumen.

    Projected CapitalInvestment:$23 billion

    Projected Employment:Construction: 41,600person yearsOperations: 2,500 jobs

    Regulatorydepartments/agencies:CEAA, DFO, TC

    FAs: NRCan, EC,HC, PCA

    Jackpine Oil SandsMine ExpansionShell Canada Ltd.

    Phase:EAEA Type: Review Panel

    The project consists of the expansion of theJackpine Mine located about 70 km north ofFort McMurray on the east side of theAthabasca River. The expansion projectwould increase bitumen production by100,000 barrels per day.

    Projected CapitalInvestment:$7.9 to 12 billion

    Projected Employment:Construction: 12,410person years

    Regulatorydepartments/agencies:CEAA, DFO, TC

    FAs: NRCan, EC,HC, PCA

    Pierre River OilSands MineShell Canada Ltd.

    Phase:EAEA Type: Review Panel

    The project consists of the construction,operation, and reclamation of an oil sandssurface mine and bitumen extractionfacilities located approximately 90 km northof Fort McMurray on the west side of theAthabasca River. The project is designed toproduce a total of 200,000 barrels ofbitumen per day.

    Projected CapitalInvestment:$14 to 22 billion

    Projected Employment:Construction: 23,360person years

    Regulatorydepartments/agencies:CEAA, DFO, TC

    FAs: NRCan, EC,HC, PCA

    Robb Trend CoalMine ExpansionCoal Valley ResourcesInc.

    Phase:EAEA Type: TransitionalScreening

    The project consists of the expansion of itsexisting coal mining activities in the CoalBranch area of Alberta. The project islocated near the community of Robb, isapproximately 37 km in length and thePembina, Embarras and Erith Rivers arewithin the proposed development area.

    Projected CapitalInvestment:$85 million

    Projected Employment:Operations: 490 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FA: EC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    13/20

    10

    ALBERTA and SASKATCHEWANKeystone XLPipelineTransCanada

    Phase:RegulatoryEA Type:Completed

    The project consists of a 529 km oil pipelineKeystone XL that would originate in Albertaand traverse southwestern Saskatchewanbefore entering the US. The proposal willrequire 69 km of new, non-contiguous right-of-way.

    Projected CapitalInvestment:$7 to 11 billion

    Projected Employment:Construction: 1,200person years

    Regulatorydepartments/agencies:AAFC, CTA, NEB,TC

    FAs: DFO,NRCan, EC, HC

    SASKATCHEWANMidwest UraniumMining and MillingAREVAResourcesCanada Inc.

    Phase:RegulatoryEA Type:Completed

    The project consists of the constuction andoperation of an uranium mine and mill innorthern Saskatchewan. The proposal is todevelop the Midwest ore deposit by way ofan open pit, transport the ore along a newhaul road linking the Midwest site to itsexisting McClean Lake Operation, and millthe ore at its on-site mill.

    Projected CapitalInvestment:$400 million

    Projected Employment:Construction: 200 jobsOperations: 80 jobs

    Regulatorydepartments/agencies:CNSC, DFO,NRCan, TC

    FAs: EC, HC

    MillenniumUranium MineCameco Corp.

    Phase:EAEA Type: EA by CNSC

    The project consists of the development anunderground uranium mine located in thesoutheastern part of the Athabasca Basin innorthern Saskatchewan, approximately 600

    km north of Saskatoon. The proposedMillennium mine would produce 150,000 to200,000 tonnes of ore annually for six toseven years. Ore and associated wastematerials would be transported to a licensedmill along a new 21 km access road thatwould connect to the existing road network.

    Projected CapitalInvestment:$600 million

    Projected Employment:Construction andOperations: 250 jobs

    Regulatorydepartments/agencies:CNSC, TC

    FAs: DFO,NRCan, EC, HC

    MuskowekwanPotash mineFirst Potash Ventures

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of a potashmine approximately 100 km north-northeastof Regina, Saskatchewan. The project wouldcomprise a solution mine producingapproximately 2.8 million tonnes of potashper year for a predicted mine life of 50 years.

    Projected CapitalInvestment:$2.99 billion

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, AANDC

    FAs: DFO, EC,CTA

    Star-Orion SouthDiamond MineShore Gold Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction,operation, maintenance and eventualdecommissioning of an open-pit diamondmine, processing facilities and associatedinfrastructure in the Fort la CorneProvincial Forest located approximately 60km east of Prince Albert, Saskatchewan.

    Projected CapitalInvestment:$1.487 billion

    Projected Employment:Construction: 372 jobsOperations: 436 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    Tazi TweHydroelectricGenerationBlack Lake FN andSaskatchewan Power Corp.

    Phase:EA

    EA Type: EA by CEA Agency

    The project consists of the construction andoperation of a 42 to 50 megawatt waterdiversion type electrical generating station atElizabeth Falls located adjacent to the Fonddu Lac River between Black Lake andMiddle Lake, on Black Lake First NationReserve lands in northern Saskatchewan.

    Projected CapitalInvestment:$300 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, AANDC,DFO

    FAs: TC, EC,NRCan, HC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    14/20

    11

    MANITOBAKeeyaskHydroelectricGeneratorKeeyask HydropowerLtd.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction andoperation of a 695-megawatt hydroelectricgenerating station at Gull Rapids on thelower Nelson River, immediately upstream ofStephens Lake in northern Manitoba. Theproject would include a powerhousecomplex, spillway, dams and dykes.

    Projected CapitalInvestment:$5.6 billion

    Projected Employment:Construction: 4,335person yearsOperations: 46 jobs

    Regulatorydepartments/agencies:CEAA, DFO, TC

    FAs: NRCan, EC,HC

    ONTARIOCliffs ChromiteMineCliffs Natural Resources

    Phase:EAEA Type: Transitional CS

    The project consists of the construction,operation and eventual decommissioning ofa chromite ore mine located approximately540 km north of the City of Thunder Bay,Ontario and 240 km west of James Bay inan area known as the "Ring of Fire". Thepredicted extraction rate is 6,000 to 12,000tonnes/day over 30 year mine life.

    Projected CapitalInvestment:$0.95 to 3.35 billion

    Projected Employment:Construction: 850 to1,250 jobsOperations: 850 to1,250 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    Ct Gold MineIAMGOLD Corp.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the development,construction, operation, and remediation of agold mine and associated infrastructurelocated 20 kilometers southwest of thecommunity of Gogama in northeasternOntario. The project consists of the 60,000tonnes per day of ore, with a mine life ofapproximately 15 years.

    Projected CapitalInvestment:

    Undisclosed

    Projected Employment:Undisclosed

    Regulatorydepartments/

    agencies:CEAA, DFO, EC,TC, NRCan

    FA: HC

    Darlington NewNuclear PowerPlantOntario PowerGeneration Inc.

    Phase:RegulatoryEA Type: Completed

    The project consists of the construction andoperation of up to four new nuclear reactorsat the Darlington nuclear site for theproduction of up to 4,800 megawatts ofelectricity located in the regional municipalityof Durham, 70 km east of Toronto.

    Projected CapitalInvestment:$9 to 13 billion

    Projected Employment:Construction: 3,800 to5,200 jobsOperations: 2,800 jobs

    Regulatorydepartments/agencies:CNSC, DFO, TC

    FAs: NRCan EC,HC

    Deep GeologicRepositoryOntario PowerGeneration Inc.

    Phase:EAEA Type: Review Panel

    The project consists of the Deep GeologicRepository, a below-ground facility for thelong-term management of low-level andintermediate-level radioactive wastescurrently stored on the Bruce site and fromthe continued operations of nucleargenerating stations at Bruce, Pickering andDarlington. The facility would be located onthe Bruce Power Nuclear site in themunicipality of Kincardine.

    Projected CapitalInvestment:$1 billion

    Projected Employment:Construction: 80 to 200

    jobsOperations: 40 jobs

    Regulatorydepartments/agencies:CNSC

    FAs: DFO, EC,HC, NRCan

    Detour Lake GoldMineDetour Gold Corp.

    Phase:RegulatoryEA Type: Completed

    The project consists of the construction andoperation of a gold mine approximately 185km northeast of Cochrane. The extraction isevaluated at 40,000 to 50,000 tonnes perday.

    Projected CapitalInvestment:$1.45 billion

    Projected Employment:

    Construction: 1,200 jobsOperations: 500 jobs

    Regulatorydepartments/agencies:DFO, NRCan

    FAs: EC, HC

    Eagle's Nest MetalMineNoront Resources Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction,operation and eventually decommission anickel-copper-platinum multi-metal minelocated approximately 540 km north of theCity of Thunder Bay and 240 km west ofJames Bay in an area known as the "Ring ofFire" in Ontario. The mining rate isapproximately 2,960 tonnes per day whichrepresents an anticipated mine life ofapproximately 11 years.

    Projected CapitalInvestment:$734 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    15/20

    12

    ONTARIOGoliath Gold MineTreasury Metals Ltd.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the development,construction, operation and closure of a goldmine located 20 km east of the city ofDryden. It would process 2,500 tonnes perday of gold for an anticipated mine life ofapproximately 10 to 12 years.

    Projected CapitalInvestment:$90 million

    Projected Employment:Construction: 200 jobsOperations: 150 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    Griffith Iron Ore

    MineNorthern Iron Corp.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the redevelopment ofthe former Griffith Mine within the Townshipof Ear Falls in northwestern Ontario. It wouldproduce approximately 16,000 tonnes of oreper day, with a mine life of approximately 20years. The iron ore would be milled on-siteto produce slightly more than 4,000 tonnesper day of hot briquetted iron.

    Projected CapitalInvestment:

    $4 billion

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, DFO, CTA

    FAs: EC, TC,NRCan, HC

    Hammond ReefGold MineOsisko Hammond ReefGold Ltd.

    Phase:EAEA Type: Transitional CS

    The project consists of the development of agold mine located approximately 23kilometres northeast from the Town ofAtikokan in northwestern Ontario, nearMarmion Lake. It is expected to operate forabout 14 years with a production rate ofapproximately 60,000 tonnes per day.

    Projected CapitalInvestment:$614 million

    Projected Employment:Operations: 465 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    Josephine ConeIron MineBending Lake IronGroup Ltd.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction,operation and decommissioning of an ironore mine located approximately49 kilometres southwest of Ignace, Ontario.It will process approximately 56,000 tonnesof iron ore per day and move approximately43,000 tonnes of waste rock per day duringthe entire 25 years mine life.

    Projected CapitalInvestment:$990 million

    Projected Employment:Construction: 900 jobsOperations: 350 jobs

    Regulatorydepartments/agencies:CEAA, DFO, TC

    FAs: NRCan, EC,HC

    Magino Gold MineProdigy Gold Inc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the re-developmentof the Magino Gold Project, located 14kilometres south-west of the town ofDubreuilville, in Northern Ontario. Theproduction rate is approximately 25,000 to30,000 tonnes per day over an estimatedmine life of seven to eight years.

    Projected CapitalInvestment:Undisclosed

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FAs: EC, TC, HC

    Marathon CopperMineStillwater Canada Inc.

    Phase:EAEA Type: Review Panel

    The project consists of the construction,operation and decommissioning of aplatinum group metals and copper mineapproximately 10 km from Marathon,Ontario. The rate of production would beapproximately 22,000 tonnes per day with aproposed operating mine life ofapproximately 11.5 years.

    Projected CapitalInvestment:$386 million

    Projected Employment:Construction: 1,000person yearsOperations: 300 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FAs: EC, HC,PCA, TC CTA

    Rainy River Goldand Silver MineRainy River ResourcesLtd.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of a goldmine located approximately 65 kilometresnorthwest of Fort Frances in Ontario. Open-pit mining is proposed to occur at a rate ofapproximately 18,000 to 20,000 tonnes perday of ore production during the anticipated

    mine life of 15 to 20 years.

    Projected CapitalInvestment:$713 million

    Projected Employment:Construction: 600 to 700

    jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    Victor DiamondMine ExtensionDe Beers Canada Inc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of a secondpit and additional ancillary components,approximately 6.5 kilometres northwest ofthe existing Victor Diamond Mine, locatedapproximately 100 kilometres west of theAttawapiskat First Nation. The second pit isexpected to have a production capacity of

    just over 9,000 tonnes per day with a minelife of roughly seven years.

    Projected CapitalInvestment:Undisclosed

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    16/20

    13

    QUEBECArnaud Apati te-Magnetite MineMine Arnaud Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction,operation and decommissioning of anapproximately 24-million-tonne apatiteconcentrate and 48-million-tonne titaniferousmagnetite concentrate mine.

    Projected CapitalInvestment:$153 million

    Projected Employment:Construction: 533 personyearsOperations: 380 jobs1,060 indirect jobs

    Regulatorydepartments/agencies:CEAA, DFO, CTA,Sept-les PortAuthority

    FAs: NRCan, EC,HC

    BlackRock MetalMineBlackrock Metals Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the development ofan iron, titanium and vanadium mine with anestimated production capacity of 20,000 to50,000 tons per day, located on James Bayand Northern Quebec Agreement territory inthe municipality of James Bay. The projectincludes an open pit, a processing plant, anaccess road, and a transmission line.

    Projected CapitalInvestment:$600 million

    Projected Employment:Operations: 260 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FA: EC

    Dumont NickelMineRoyal Nickel Corp.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction,operation and decommissioning of an openpit nickel mine located approximately 25 kmnorthwest of Amos, in Qubec. The oretreatment facility will have an initial capacityof 50,000 t/d which will be increased to

    100,000 t/d over an estimated mine life of 31years.

    Projected CapitalInvestment:$1.8 billion

    Projected Employment:Construction: 1,400 jobs

    Operations: 618 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FAs: EC, HC

    Fire Lake NorthIron MineChampion Iron MinesLtd.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of a ironmine and concentrate processing plant onthe mine site located near Fermont, Quebec.The proponent predicts that the mine wouldgenerate 65,700 tonnes per day for a periodof 25 years.

    Projected CapitalInvestment:$1.4 billion

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, TC, EC,DFO, NRCan,Sept-les PortAuthority

    FA: HC

    Hopes AdvanceIron MineOceanic Iron Ore Corp.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of an ironore mine near Aupaluk, in Nunavik. Theproponent estimates that the mine will

    generate from 10 to 20 million tonnes of ironore concentrate product per year over aplanned operation period of 48 years.

    Projected CapitalInvestment:$2.85 billion

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, EC, TC,

    DFO, NRCan

    FA: HC

    Kipawa Rare EarthMineMatamec ExplorationsInc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of a rareearths mine about 40 kilometers east of themunicipality of Kipawa. The proposedproject would process 1.5 million tonnes ofore per year over a 13-year operationperiod.

    Projected CapitalInvestment:$315.8 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, TC, DFO,EC, NRCan

    FA: HC

    NiobecFerroniobium MineExpansion

    Mine NiobecPhase:EAEA Type: EA by CEA Agency

    The project consists of substantiallyincreased ore production at the Niobec minelocated in Saint-Honor, in the Saguenayregion. Its production will increase from 2.2

    to 10 million tonnes per year and triple theannual production of ferroniobium over a 40-year life span.

    Projected CapitalInvestment:$829.5 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, EC, TC,

    DFO, NRCan

    FA: HC

    North ShoreNatural GasPipeline ExtensionGaz Mtro

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the extension of thecurrent distribution network to supplyQuebecs North Shore region with naturalgas. The project involves the construction ofa pipeline of about 450 km in length betweenthe cities of Saguenay (Jonquire) and Sept-

    les, via Baie-Comeau and Port-Cartier.

    Projected CapitalInvestment:$750 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, DFO, TC,AANDC

    FAs: EC, HC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    17/20

    14

    QUEBECQuebec L ithiumSpodumene MineQuebec Lithium Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the development of alithium spodumene mine located about 60km north of Val-d'Or, 38 km South-East ofAmos and 15 km South-West of Barraute,Quebec. It would process 3,800 tonnes ofspodumene per day over an estimated 15years life span.

    Projected CapitalInvestment:$202 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, DFO

    FAs: NRCan, EC,HC

    Renard Diamond

    MineStornoway DiamondCorp.

    Phase:RegulatoryEA Type: Transitional CS

    The project consists of the development of adiamond mine and local infrastructure in theJames Bay region of Northern Quebec. Itsproduction is evaluated at 5 000 to 7 000tonnes per day.

    Projected CapitalInvestment:

    $802 million

    Projected Employment:Construction: 400 jobsOperations: 250 jobs

    Regulatorydepartments/agencies:CEAA, DFO,NRCan

    FA: EC

    Rose TantalumLithium MineCritical Elements Corp.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of atantalum and lithium mine locatedapproximately 38 km north of Nemiscau, inQubec. It would produce about 4,500tonnes of ore per day over a 17-year lifespan.

    Projected CapitalInvestment:$250 million

    Projected Employment:Construction: 200 jobsOperations: 200 jobs

    Regulatorydepartments/agencies:CEAA, DFO, TC,EC, NRCan

    FA: HC

    Whabouchi

    Spodumene MineNemaska Lithium Inc.

    Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation and decommissioning of aspodumene mine for the production oflithium located at 30 km of Nemiscau and280 km north of Chibougamau. The minewould produce about 3,000 tonnes of ore for23-year life span.

    Projected CapitalInvestment:

    $154 million

    Projected Employment:Undisclosed

    Regulatorydepartments/

    agencies:CEAA, DFO, EC,NRCan

    FA: HC

    QUEBEC and NEWFOUNDLAND AND LABRADORJoyce Lake DirectShipping Iron OreMineLabec Century Iron Ore

    Corp.Phase:EAEA Type: EA by CEA Agency

    The project consists of the construction,operation, closure, decommissioning andrehabilitation of an iron mine locatedapproximately 20 kilometres northeast ofSchefferville in Newfoundland and Labrador.The proposed mine would produce up to 4million tonnes of ore per year over a lifespan of up to 7 years.

    Projected CapitalInvestment:Undisclosed

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:CEAA, TC, DFO,NRCan

    FAs: EC, HC

    Kami Iron MineAlderon ResourcesCorp.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction andoperation of an iron ore mine locatedaproximately 10 kilometres west of LabradorCity, Newfoundland and Labrador. It wouldproduce up to 16 million tonnes of iron oreconcentrate annually.

    Projected CapitalInvestment:$1.27 billion

    Projected Employment:Construction: 768 jobsOperations: 268 jobsIndirect: 1,254 jobs

    Regulatorydepartments/agencies:CEAA, DFO, TC,Sept-les PortAuthority

    FAs: NRCan, EC,HC

    NEWFOUNDLAND AND LABRADORHebron OffshoreOil DevelopmentExxonMobil CanadaProperties

    Phase:RegulatoryEA Type: Completed

    The project consists of a 19 000 to 28,000m3 per day offshore oil production proposalat two locations, the Hebron field in theJeanne dArc basin approximately 340 kmoffshore of St. John's, and the Bull Armmarine facilities in Trinity Bay.

    Projected CapitalInvestment:$14 billion

    Projected Employment:Construction: 1,971person yearsOperations: 3,500 jobs

    Regulatorydepartments/agencies:Canada-Newfoundland andLabrador OffshorePetroleum Board,EC, DFO, IndustryCanada, TC

    FA: HC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    18/20

    15

    NEWFOUNDLAND AND LABRADORLabrador-IslandTransmission LinkNalcor Energy

    Phase:EAEA Type: Transitional CS

    The project consists of a 1,100 km longtransmission line and associatedinfrastructure within and between Labradorand the Island of Newfoundland.

    Projected CapitalInvestment:$2.2 billion

    Projected Employment:Construction: 2,200person years

    Regulatorydepartments/agencies:CEAA, DFO, EC,NRCan, TC,PWGSC

    FA: HC

    Lower ChurchillHydroelectricGenerationNalcor Energy

    Phase:RegulatoryEA Type: Completed

    The project consists of the construction of a

    2,800 MW hydroelectric generating facilitiesat Gull Island and Muskrat Falls in Labrador.

    Projected Capital

    Investment:$6.2 billion

    Projected Employment:Construction: 2,000person years

    Regulatory

    departments/agencies:CEAA, DFO,NRCan, TC

    FAs: EC, HC

    NEWFOUNDLAND AND LABRADOR and NOVA SCOTIAMaritime L inkTransmissionENL Maritime Link Inc.

    Phase:RegulatoryEA Type: Completed

    The project consists of the construction andoperation of a new electrical powertransmission system, including a proposed500-megawatt, +/- 200 to 250-kilovolt high

    voltage direct current (HVDC) and highvoltage alternating current (HVAC)transmission line between the Island ofNewfoundland and Cape Breton, NovaScotia.

    Projected CapitalInvestment:$1.2 billion

    Projected Employment:Direct and Indirect:2,700 person years

    Regulatorydepartments/agencies:CEAA, DFO, EC,

    TC, NRCan,PWGSC

    FA: HC

    NOVA SCOTIADonkin ExportCoking CoalXstrata Donkin CoalManagement

    Phase:EA

    EA Type: Transitional CS

    The project consists of the construction,operation and decommissioning of a coalmine facility at the site of the existing DonkinMine located on the northeastern tip ofCape-Breton in Nova Scotia. The minewould have a lifespan of 30 plus years and

    extract approximately 3.6 million tonnes ofcoal per year.

    Projected CapitalInvestment:$500 million

    Projected Employment:Operations: 280 jobs

    Indirect: 1,400 jobs

    Regulatorydepartments/agencies:CEAA, DFO, EC,TC, NRCan

    FA: HC

    NEW BRUNSWICKElmtree PropertyGold MineCastle Resources Inc.

    Phase:EAEA Type: Transitional CS

    The project consists of the development of agold mine located approximately 20kilometres to the northwest of Bathurst, NewBrunswick. The mine would have a lifespanof 18 to 24 months and extract up to559,000 tonnes per year of gold-containingore.

    Projected CapitalInvestment:$3 million

    Projected Employment:Direct and Indirect: 50 to100 jobs

    Regulatorydepartments/agencies:CEAA, DFO

    FAs: NRCan, EC,HC

    Sisson Tungsten-Molybdenum MineNorthcliff Resources Ltd.

    Phase:EAEA Type: Transitional CS

    The project consists of the construction andoperation of a tungsten and molybdenum

    mine and associated infrastructure at SissonBrook, New Brunswick, approximately 60kilometres northwest of Fredericton. Themine would extract between 20,000 and40,000 tonnes per day of tungsten andmolybdenum -containing ore and wouldhave a lifespan of 20 to 30 years.

    Projected CapitalInvestment:

    $300 to 500 million

    Projected Employment:Construction: 500 to 800

    jobsOperations: 200 to 300

    jobs

    Regulatorydepartments/

    agencies:CEAA, DFO,NRCan

    FAs: TC, EC, HC

  • 8/13/2019 MPMO September 2013 Quarterly Report

    19/20

    16

    COMPLETED MPMO PROJECTSHorn River NaturalGas PipelineNOVA GasTransmission Ltd.

    Province:BC

    The project consists of an extension of theAlberta System to transport natural gassupply from the Horn River area ofnortheastern British Columbia to existinginfrastructure. The proposal consists of twoparts:1) acquiring the existing NEB regulated

    Ekwan Pipeline and,2) 2 constructing approximately 74 km of

    new pipeline.

    Projected CapitalInvestment:$307 million

    Projected Employment:Direct and Indirect: 1,621person years

    Regulatorydepartments/agencies:NEB, TC

    FAs: DFO,NRCan, EC, HC

    Mount MilliganGold-Copper MineTerrane Metal Corp.

    Province:BC

    The project consists of the construction andoperation of the Mount Milligan Gold-CopperMine in northwestern British Columbia. Theproposal consists of an open pit mine,processing plant and associatedinfrastructure, a tailings impoundment area,explosives factory, a 29 km access road anda 92 km transmission line.

    Projected CapitalInvestment:$1.265 billion

    Projected Employment:Construction: 700 jobsOperations: 400 jobs

    Regulatorydepartments/agencies:DFO, NRCan

    FAs: EC, HC

    Prosperity Gold-Copper Mine4Taseko Mines Ltd.

    Province:BC

    The project consists of a 70,000 tonnes perday gold-copper mine and concentrator insouth-central British Columbia and includesa new 230 KV power supply and roadupgrade

    Projected CapitalInvestment:$814 million

    Projected Employment:

    Construction: 1,000 jobsOperations: 550 jobsIndirect: 1,280 jobs

    Regulatorydepartments/agencies:DFO, NRCan, TC

    FAs: EC, HC

    GroundbirchNatural GasPipelineNOVA GasTransmission Ltd.

    Province:BC, AB

    The project consists of a 77 km natural gaspipeline between the existing meter stationon the TransCanada Alberta System to theGroundbirch Area of British Columbia. Thepipeline will be designed to transport up to28,000 m3/day of natural gas.

    Projected CapitalInvestment:$250 million

    Projected Employment:Construction: 1,000 jobs

    Regulatorydepartments/agencies:NEB, TC

    FAs: DFO,NRCan, EC, HC

    Northwest MainlineKomie NorthNatural Gas

    Pipeline ExpansionNOVA GasTransmission Ltd.

    Province:BC, AB

    The project consists of 130 km of newpipeline to receive and transport natural gasfrom the Horn River area of British Columbiato the Alberta System.

    Projected CapitalInvestment:$333 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:NEB, TC

    FAs: DFO,NRCan, EC, HC

    Northwest MainlineNatural GasPipeline ExpansionNOVA GasTransmission Ltd.

    Province:BC, AB

    The project consists of an expansion of theAlberta System to provide adequate capacityto transport natural gas supply from theNortheast British Columbia and NorthwestAlberta area. The proposal consists of theKyklo Creek Section, the Timberwolf section,and the Cranberry Creek section, totallingapproximately 100 km of pipeline.

    Projected CapitalInvestment:$324 million

    Projected Employment:Construction: 1,350 to1,650 jobs

    Regulatorydepartments/agencies:NEB, DFO, TC

    FA: EC

    Leismer - Kettle

    River CrossoverPipelineNOVA GasTransmission Ltd.

    Province:AB

    The project consists of an 81 km natural gas

    pipeline between the Leismer compressorstation and the Kettle River Lateral Loop andKettle River North Lateral in Alberta.

    Projected Capital

    Investment:$157 million

    Projected Employment:Construction: 450 jobs

    Regulatory

    departments/agencies:NEB, DFO, TC

    FAs: EC, HC

    4The federal government Environmental Assessment Decision stated that the project could not go forward asplanned.

  • 8/13/2019 MPMO September 2013 Quarterly Report

    20/20

    17

    COMPLETED MPMO PROJECTSQuest CarbonCapture andStorageShell Canada Ltd.

    Province:AB

    The project consists of a capture, transport,and store up to 1.2 megatonnes of carbondioxide emissions a year in the AlbertaIndustrial Heartland region.

    Projected CapitalInvestment:1.35 billion

    Projected Employment:Construction: 725 jobsOperations: 14 jobs

    Regulatorydepartments/agencies:DFO, NRCan,CTA

    FAs: EC, HC, TC

    Vantage EthanePipelineVantage PipelinesCanada Inc.

    Province:AB, SK

    The project consists of the construction of a

    578 km 54,000 barrels-per-day of liquidethane pipeline from Tioga, North Dakota tothe Alberta Ethane Gathering System nearEmpress, Alberta.

    Projected Capital

    Investment:$300 million

    Projected Employment:Construction: 350 personyears

    Regulatory

    departments/agencies:NEB, TC, CTA

    FAs: DFO,NRCan, EC, HC

    Bakken OilPipelineEnbridge BakkenPipeline Company Inc.

    Province:SK, MB

    The project consists of the construction of123 km 145,800 barrel per day oil pipelineSteelman, Saskatchewan to Cromer,Manitoba.

    Projected CapitalInvestment:$180 million

    Projected Employment:Undisclosed

    Regulatorydepartments/agencies:NEB, TC

    FAs: DFO,NRCan, EC, HC

    Port Granby Long-

    Term Low-LevelRadioactive WasteManagementNatural ResourcesCanada

    Province:ON

    The project consists of the remediation of

    sites containing low-level radioactive wasteand marginally contaminated soils currentlyin the existing licensed Port Granby wastemanagement facility located in theMunicipality of Clarington, and themanagement of the wastes in a new locallong-term low-level radioactive wastemanagement facility.

    Projected Capital

    Investment:$273 million

    Projected Employment:Undisclosed

    Key decision-

    makingdepartments/agencies:Atomic Energy ofCanada Ltd.,CNSC, NRCan

    FA: EC

    Port Hope Long-Term Low-LevelRadioactive WasteManagementNatural Resources

    CanadaProvince:ON

    The project consists of the remediation ofsites containing low-level radioactive waste,marginally contaminated soils and specifiedindustrial wastes located in the Municipalityof Port Hope, including the Port HopeHarbour, and the management of the wastesin a local long-term low-level radioactive

    waste management facility.

    Projected CapitalInvestment:$1.009 billion

    Projected Employment:Undisclosed

    Key decision-makingdepartments/agencies:Atomic Energy ofCanada Ltd.,CNSC, NRCan,

    DFO

    FA: EC

    Matoush UraniumExploration Ramp

    AccessStrateco Resources Inc.

    Province:QC

    The project consists of the excavation of anexploration ramp to determine the possibilityof a uranium mine on James Bay andNorthern Quebec Agreement Territory,approximately 260 km north ofChibougamau.

    Projected CapitalInvestment:$60 million

    Projected Employment:Exploration: 180 jobs

    Regulatorydepartments/agencies:CNSC

    FAs: EC, DFO,HC, NRCan, TC