Sl No Name & Location of the workEstimated Cost (in lakhs)
Stage of the WorkIMPLEMENTING AGENCY
Amount Released to IA
Balance If Any
Type of works
1 2 3 4 5 6 7 8
1
Providing cement concerte pavement from Bandappa's house to Somashettihalli halli Road at Kereguddahalli village, Bangalore North Taluk,Bangalore Dist.
4.50 work completedEE, PRED, Bangalore
4.50 0.00 Road
2 Construction of RCC Drain from Kereguddahalli Village, to Bandappa's Garden at Bangalore North Taluk, Bangalore District.
7.99 work completedEE, PRED, Bangalore
7.99 0.00 Road
3 Providing concerte Road at Ganigarahalli Village, Somashetty halli Grama Panchayath, Bangalore North Taluk, Bangalore District.
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
4Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist.
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
5Providing concrete road at chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmipuram, Bangalore North, Bangalore Dist
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
6Providing concrete road - stage 1, at Hosahalli village, Jala hobli, Bangalore North, Bangalore Dist
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
7Providing concrete road at Kodagalahatti village, Jala hobli, Bangalore North, Bangalore Dist
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
8Improvement to the road that joins Tharahunase to Bettenahalli in Jala hobli, Bangalore urban district
10.00 work completedEE, PRED, Bangalore
10.00 0.00 Road
9Improving the road that joins Marenahalli, Jala hobli
4.00 work completedEE, PRED, Bangalore
4.00 0.00 Road
10Providing cement concrete road at 17th ward, 4th Cross, Vrushabhavti Nagar,N.G.O colony,Bangalore. ( Stage 1)
3.49 work completedEE, PRED, Bangalore
3.49 0.00 Road
11Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)
7.10 work completedEE, PRED, Bangalore
7.10 0.00 Road
12Providing cement concrete road and drainage from Narayanappa's house to Munimuttappa's house and Chikka Kempanna's house to Doddayya's house in Chagalatti, Jala hobli, Bangalore district.
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
13Building of community hall for Margadarshi Mahila Samaaja (R) at No.114, 6th cross, Narasipura layout, Vidyaranyapura, Bangalore
1.00 work completed
Project Manager, Nirmithi Kendra Urban
1.00 0.00Civic Amenities
14Construction of Size Stone masonery Drain at first main road near School in kamala nagar, Bangalore urban District. Stage-1
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
15 Construction of Size Stone masonery Drain first main road near Deenaseva School in kamala nagar, Bangalore urban District.
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
16Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
17Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.
Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2009-10
18Building concrete road from Narasimha Murthy's house to Philomina school in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
19
Building concrete road from Rangaswamy's house to Muneshwara temple in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
20
Building concrete road from Shivalingayya's house to Krishnappa's house in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
21
Building concrete road from Shankara's house to Muneshwar temple in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
22 Building cement concrete road from Palakamma Nagara main road to Nagaraju's house in Chikkajaga village, Bangalore North
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
23Road development work from Bagalur main road to towards hosahalli (500 meters) Bangalore north talluk, vidya nagara
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
24Cement concrete road from Chikkabasavaraju home to Bhimarao home, Bangalore north talluk, uttanahalli vilage
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
25Cement concrete road from Venkoba rao home to Aanjanappa home, Bangalore North Talluk Sonnappanahalli grama panchayath, Kaadigaanahalli village
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
26Cement concrete road from Rajanna home to Sampangappa home, Kaadigaanahalli village
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
27Cement concrete road from Main road to Minchappa home, Bangalore North talluk, Uttanahalli Village
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
28Cement concrete road from Muniraju home to Krishnappa home, Bangalore North Talluk, Uttanahalli Village
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
29Cement concrete road from Palakammanagara Patil home to Krishnappa home, Bangalore North Talluk, Chikkajala Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
30 Road Development work from Bagaluru Main road to Hosahalli side (500-1000 meters), Vidya Nagar, Bangalore North Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
31Cement concrete road, Behind Mutyalamma Temple, Doddajala village, Bangalore north Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
194.08 194.08 0.00
Released from Govt. of India
Amount Released
to IABalance
EE PRED 193.08 193.08 0.00
Nirmithi Kendra 1.00 1.00 0.00
Other DC's 0.00 0.00 0.00194.08 194.08 0.00
Administrative sanction
200.00
YearSl No Name & Location of the work
Estimated Cost (in lakhs)
Stage of the WorkIMPLIMENTING
AGENCY
Amount Released
to IA
Balance If Any
Type of works
1 2 3 4 5 6 7 8
2009-20101
Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk,Bangalore Dist.
4.50 work completedEE, PRED, Bangalore
4.50 0.00 Road
2009-20102
Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District.
7.99 work completedEE, PRED, Bangalore
7.99 0.00 Road
2009-20103
Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District.
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-20104
Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist.
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-20105
Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-20106
Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-20107
Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli8.00 work completed
EE, PRED, Bangalore
8.00 0.00 Road
2009-20108
Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli10.00 work completed
EE, PRED, Bangalore
10.00 0.00 Road
2009-20109
Road Development work, Marenahalli Joining road, Jaalahalli Hobli4.00 work completed
EE, PRED, Bangalore
4.00 0.00 Road
2009-201010 Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony,
Bangalore. ( Stage 1)3.49 work completed
EE, PRED, Bangalore
3.49 0.00 Road
2009-201011
Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)
7.10 work completedEE, PRED, Bangalore
7.10 0.00 Road
2009-201012 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa
home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli8.00 work completed
EE, PRED, Bangalore
8.00 0.00 Road
2009-2010
13Community hall construction for Margadarshi Mahila Samaja ® , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore
1.00 work completed
Project Manager,
Nirmithi Kendra Urban
1.00 0.00Civic
Amenities
2009-201014
Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201015
Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201016
Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-201017
Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-201018
Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-201019
Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-201020
Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-201021
Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72
8.00 work completedEE, PRED, Bangalore
8.00 0.00 Road
2009-201022
Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201023
Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201024
Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201025
Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village5.00 work completed
EE, PRED, Bangalore
5.00 0.00 Road
2009-201026
Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201027
Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201028
Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk5.00 work completed
EE, PRED, Bangalore
5.00 0.00 Road
2009-201029
Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village
5.00 work completedEE, PRED, Bangalore
5.00 0.00 Road
2009-201030
Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk5.00 work completed
EE, PRED, Bangalore
5.00 0.00 Road
189.08 189.08 0.00
Released from Govt. of India
Amount Released
to IABalance
EE PRED 188.08 188.08 0.00
Nirmithi Kendra 1.00 1.00 0.00 188.08
Other DC's 0.00 0.00 0.00189.08 189.08 0.00
Administrative sanction
200.00
Year
Sl No Name & Location of the workEstimated
Cost (in lakhs)
Status of the WorkIMPLIMENTING
AGENCY
Amount Released to
IABalance If Any Remarks
1 2 3 4 5 6 7 8
2010-2011 1Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 2Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 3 Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli 5.00 work completed EE PRED 5.00 0.00 Road2010-2011 4 Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 5Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 6Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 7Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 8Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011
9Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt)
5.00 work completed EE PRED 5.00 0.00 Road
2010-2011
10Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt)
5.00 work completed EE PRED 5.00 0.00 Road
2010-2011
11Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt)
5.00 work completed EE PRED 5.00 0.00 Road
2010-2011
12Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt)
5.00 work completed EE PRED 5.00 0.00 Road
2010-2011
13Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)
5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 14Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 15Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 16Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 17Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 18 Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 19Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 20Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 21Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 22Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 23Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011
24Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.
8.00 work completed EE PRED 8.00 0.00Civic
Amenities
2010-2011 25 One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk 1.50 work completed EE PRED 1.50 0.00 Water
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2010-11
2010-2011
26Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side)
5.00 work completed EE PRED 5.00 0.00Civic
Amenities
2010-2011
27Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)
5.00 work completed EE PRED 5.00 0.00Civic
Amenities
2010-2011 28Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk 1.50 work completed EE PRED 1.50 0.00 Water
2010-2011
#REF!Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011
#REF!Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011
#REF!Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF!
Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)
4.41 work completed Nirmithi Kendra 4.41 0.00Street
lighting
2010-2011#REF! R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights) 1.47 work completed Nirmithi Kendra 1.47 0.00
Street lighting
2010-2011 #REF!Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43 1.50 work completed EE PRED 1.50 0.00 Water
2010-2011
#REF! Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore
1.00 work completed EE PRED 1.00 0.00Civic
Amenities
2010-2011 #REF!Road Development work Stage - 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 #REF!Road Development work Stage - 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 #REF!Road Development work Stage - 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road
2010-2011 #REF! Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road208.48 208.48 0.00
Released from Govt. of India
Amount Released to IA
Balance
EE PRED 158.50 158.5 0.00
Nirmithi Kendra 49.98 49.98 0.00
Other DC's 0.00 0.00 0.00
Administrative sanction
200.00
208.48 208.48 0.00
YearSl No Name & Location of the work
Estimated Cost (in lakhs)
Stage of the Work
IMPLIMENTING AGENCY
Amount Released to IA
Balance If Any
Type of Works
1 2 3 4 5 6 7 8
2011-20121 Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore 2.00 work completed EE PRED 2.00 0.00 Water
2011-20122
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross
5.00 work completed EE PRED 5.00 0.00 Others
2011-20123
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross
5.00 work completed EE PRED 5.00 0.00 Others
2011-20124
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross
5.00 work completed EE PRED 5.00 0.00 Others
2011-20125
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross
5.00 work completed EE PRED 5.00 0.00 Others
2011-20126
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross
5.00 work completed EE PRED 5.00 0.00 Others
2011-20127
Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work
5.00 work completed EE PRED 5.00 0.00 Road
2011-20128
Maruthi Nagara subroad (cross) road Development work5.00 work completed EE PRED 5.00 0.00 Road
2011-20129
Maruthi Nagara New Layout Road development work5.00 work completed EE PRED 5.00 0.00 Road
2011-201210
Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development
5.00 work completed EE PRED 5.00 0.00 Road
2011-201211 Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara,
Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-201212
Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201213
Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201214
Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201215
Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli
5.00 work completed EE PRED 5.00 0.00 Road
2011-201216
Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli
5.00 work completed EE PRED 5.00 0.00 Road
2011-201217
Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201218
Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201219
Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201220
Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201221
Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201222
Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village,
5.00 under progress EE PRED 2.50 2.50 Water
2011-201223
Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00 under progress EE PRED 2.50 2.50 Water
2011-201224
Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00 under progress EE PRED 2.50 2.50 Water
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.
Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2011-12
2011-201225
Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00 under progress EE PRED 2.50 2.50 Water
2011-201226
Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00 work completed EE PRED 5.00 0.00 Road
2011-201227
Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00 work completed EE PRED 5.00 0.00 Road
2011-201228
Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00 work completed EE PRED 5.00 0.00 Road
2011-201229
Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00 work completed EE PRED 5.00 0.00 Road
2011-201230
Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201231
Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201232
Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201233
Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201234
Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201235
Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201236
Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201237
Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201238
Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201239
Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201240
Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201241
Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201242
Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201243
Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201244
Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201245
Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50 work completed EE PRED 2.50 0.00 Road
2011-201246
Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.
5.00 work completed EE PRED 5.00 0.00 Water
2011-201247
Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.
5.00 work completed EE PRED 5.00 0.00 Water
2011-201248
Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk
5.00 work completed EE PRED 5.00 0.00 Water
2011-201249
Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk
5.00 work completed EE PRED 5.00 0.00 Water
2011-201250
Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk
5.00 work completed EE PRED 5.00 0.00Civic
Amenities
2011-201251
Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk
5.00 work completed EE PRED 5.00 0.00Civic
Amenities
2011-201252 Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli
Village, Kengeri Hobli3.00 work completed EE PRED 3.00 0.00
Civic Amenities
2011-201253
Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk
4.25 work completed EE PRED 4.25 0.00 Road
2011-201254
Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk
1.50 work completed EE PRED 1.50 0.00 Road
2011-201255 Pipeline implementation and Getting power supply from KEB, Maralukunte village,
Marenahalli Gramapanchayath, Jala Hobli5.00 work completed EE PRED 5.00 0.00
Civic Amenities
2011-201256 Road Development work from H.Gollahalli main road to Kabbalamma Temple,
K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-201257
Library construction, Gonipura vilage, Yashawanthapura limits5.00 work completed EE PRED 5.00 0.00
Civic Amenities
2011-201258 Women empowerment Building work (streeshakti bhavana) Gonipura village,
Yashawanthapura limits5.00 work completed EE PRED 5.00 0.00
Civic Amenities
2011-201259 Gutter construction work from Mallappa home to Narayanaswamy home,
Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk4.00 work completed EE PRED 4.00 0.00
Civic Amenities
2011-201260
Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2.
4.00 work completed EE PRED 4.00 0.00 Road
2011-201261
Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2.
4.00 work completed EE PRED 4.00 0.00 Road
2011-201262
Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency
2.50 work completed EE PRED 2.50 0.00 Road
2011-201263
Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency
2.50 work completed EE PRED 2.50 0.00 Road
2011-201264
Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency.
2.50 work completed EE PRED 2.50 0.00 Road
2011-201265
Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency.
2.50 work completed EE PRED 2.50 0.00 Road
2011-201266
Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency.
2.50 work completed EE PRED 2.50 0.00 Road
2011-201267
Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency.
2.50 work completed EE PRED 2.50 0.00 Road
2011-201268
Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Education
2011-201269
Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201270
Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk
4.00 work completed EE PRED 4.00 0.00 Education
2011-201271 Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22
Ganganagar, Bangalore North18.62 work completed Nirmithi Kendra 18.62 0.00
Civic Amenities
2011-201272 Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura
village, Uttarahalli Hobli, Bangalore South Village.5.00 work completed EE PRED 5.00 0.00
Civic Amenities
2011-201273 Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura
village, Uttarahalli Hobli, Bangalore South Village.5.00 work completed EE PRED 5.00 0.00
Civic Amenities
2011-201274 Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura
village, Uttarahalli Hobli, Bangalore South Village.5.00 work completed EE PRED 5.00 0.00
Civic Amenities
2011-201275
Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201276
Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201277
Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201278
Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201279
Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201280
Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201281
Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201282
Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201283
Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201284
Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-201285
Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201286
Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201287
Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201288
Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201289
Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201290
Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201291
Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1
5.00 work completed EE PRED 5.00 0.00 Road
2011-201292
Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2
5.00 work completed EE PRED 5.00 0.00 Road
2011-201293
Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3
5.00 work completed EE PRED 5.00 0.00 Road
2011-201294
Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201295
Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201296
Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201297
Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201298
Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-201299
Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012100
Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012101
Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012102
Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012103
Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012104
Concrete road development work, Tirumalapura Village, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012105
Development work in New Layout, Banapathi nagara, GanigaraHalli village, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012106
5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012107
Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012109
Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts)
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012110
Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts)
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012111
Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts)
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012112
Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts)
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012113
Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North.
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012114
Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North.
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012115
Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North.
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012116
Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North.
2.50 work completed EE PRED 2.50 0.00 Road
2011-2012117 Improvement and metalling the roads from channasandra main road to NRI layout,
in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)2.50 work completed EE PRED 2.50 0.00 Road
2011-2012118 Improvement and metalling the roads from channasandra main road to NRI layout,
in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)2.50 work completed EE PRED 2.50 0.00 Road
2011-2012119 Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli,
Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.5.00 work completed EE PRED 5.00 0.00 Road
2011-2012120 Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli,
Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.5.00 work completed EE PRED 5.00 0.00 Road
2011-2012121 Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli,
Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.5.00 work completed EE PRED 5.00 0.00 Road
2011-2012122
Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk
13.00 work completed EE PRED 13.00 0.00 Road
2011-2012123
Road development work, 1st cross, Ganesha Layout, Bangalore Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012124
Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012125
Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012126
Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012127 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara
mainroad, Yashwanthpura Hobli, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012128 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara
mainroad, Yashwanthpura Hobli, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012129
4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village
22.50 work completed EE PRED 22.50 0.00 Education
2011-2012130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout 2.00 work completed EE PRED 2.00 0.00 Water
2011-2012131 To dig Borewel in Amrutha Nagar 2.00 work completed EE PRED 2.00 0.00 Water
2011-2012132 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore 10.00 work completed KRIDL 10.00 0.00
Civic Amenities
2011-2012133
Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency
10.00 work completed EE PRED 10.00 0.00Civic
Amenities
2011-2012134
Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012135 Road development work from Basavaraju home to Nagaraju home, Kempapura
Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk5.00 work completed EE PRED 5.00 0.00 Road
2011-2012136
Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk
5.00 work completed EE PRED 5.00 0.00 Road
2011-2012137
Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara
10.00 work completed EE PRED 10.00 0.00 Road
2011-2012 138 2 % Administration expinditure 10.00 DC 10.00 0.00 Others624.87 614.87 10.00
Released from Govt. of India
Amount Released
to IABalance
EE PRED 596.25 586.25 10.00Nirmithi Kendra 18.62 18.62 0.00DC 10.00 10.00
TOTAL 624.87 614.87 10.00
Administrative sanctioned Accurded
580.30
YearSl No Name & Location of the work
Estimated Cost (in lakhs)
Stage of the Work
IMPLIMENTING AGENCY
Expenditure incurred
Balance If Any
Type of works
1 2 3 4 5 6 7 8
2012-20131
Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura
2.00 Under Progress EE PRED, Bangalore 0.00 2.00 Water
2012-20132
Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20133
Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20134
Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20135
1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20136
3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20137 Road development work Stage - 1, Maragondanahalli village Main road to
Maragondanahalli Lake road, Channasandra Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20138 Road development work Stage -2, Maragondanahalli village Main road to
Maragondanahalli Lake road, Channasandra Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20139 Road development work, Maragondanahalli village Mainroad to
Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201310 Road development work, Cross road, Maragondanahalli village Mainroad to
Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201311
from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201312
Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli
6.00 Completed EE PRED, Bangalore 6.00 0.00 Road
2012-201313
Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201314
Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201315
Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201316
Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201317
Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201318
Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201319
Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201320
Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201321
Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201322
Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2012-13
2012-201323
3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout,
12.00 Completed EE PRED, Bangalore 12.00 0.00 Water
2012-201324
Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00Civic
Amenities
2012-201325 CC road construction work, from Main road to till Amir saab home, Kengeri
main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201326
CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201327
Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits
10.00 Completed EE PRED, Bangalore 10.00 0.00 Water
2012-201328
Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 Completed EE PRED, Bangalore 4.90 0.00 Road
2012-201329
Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 Completed EE PRED, Bangalore 4.90 0.00 Road
2012-201330
Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 Completed EE PRED, Bangalore 4.90 0.00 Road
2012-201331
1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201332
1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201333 Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe
Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201334
Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201335
Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201336
Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk,
5.00 Completed EE PRED, Bangalore 5.00 0.00Civic
Amenities
2012-201337
Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201338
Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201339
Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201340
Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201341
Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201342
Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201343
Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201344
Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201345
Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201346
Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201347
Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
48Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
49Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
50Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201351
Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201352
Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201353 Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli
Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201354
Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201355
Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201356
Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201357
Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201358
Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201359
Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201360
Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201361
Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201362 Road development work, from Maragondanahalli mainroad lake main road
to Kachaaramma temple road, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201363
Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201364
Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201365
Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201366
Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201367
Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013 68 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0.00 Health
2012-2013 69 2 Borewell digging work in Bhuvaneshwari Nagara layout 4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201370
Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201371
Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201372
Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201373
Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201374
Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore
4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-2013 75 Drinking water supply to Saptagiri layout, Doddabidarakallu village 4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201376
Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201377
Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201378
Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201379
Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201380
Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201381
Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201382
water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201383
Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency
13.00 Under Progress EE PRED, Bangalore 0.00 13.00Civic
Amenities
2012-2013 84 Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore 2.00 completed EE PRED, Bangalore 2.00 0.00 Water
2012-201385
Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013 86Road development work from, AK colony to Devegere village, Devagere village,
K.Gollahalli village, Kengeri Hobli, Bangalore South talluk3.00 Completed EE PRED, Bangalore 3.00 0.00 Road
2012-201387
Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore
south Talluk1.00 Under Progress EE PRED, Bangalore 0.00 1.00 Road
2012-201388
Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013 89Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli
Gramapanchayath, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201390
2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli
4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-2013 91Building construction for councelling center and other activities, Mahila Dakshata
samiti Bengaluru, 10.00 Completed Nirmithi Kendra 10.00 0.00
Civic Amenities
2012-201392
Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga ®
5.00 Completed EE PRED, Bangalore 5.00 0.00Civic
Amenities
2012-201393
Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201394
PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk
10.00 Completed EE PRED, Bangalore 10.00 0.00 Education
2012-2013 95 1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-2013 96 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-2013 97 Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk 2.50 Completed EE PRED, Bangalore 2.50 0.00 Road
2012-2013 98 Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 2.50 Under Progress EE PRED, Bangalore 0.00 2.50 Road
2012-2013 991 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency,
Bangalore2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-2013100
Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013101
Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013102 Road developmentwork, from Mahalingam home to Ganganna home, Brother
colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013103 Road developmentwork, from Harish Home to Manohar home, Brother
colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013104
Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Total 505.54 482.04 23.50
Released from Govt. of India
Expenditure
incurredBalance
EE PRED 492.70 469.20 23.50Nirmithi Kendra 12.84 12.84 0.00Other DC's 0.00 0.00 0.00
TOTAL 505.54 482.04 23.50
Administrative sanctioned Accurded
500.00
YearSl No Name & Location of the work
Estimated Cost (in lakhs)
Stage of the Work
IMPLIMENTING AGENCY
Expenditure incurred
Balance If AnyType of works
1 2 3 4 5 6 7 8
2013-2014 1 Road development work, Maruthi Nagara, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-20142
Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-20143
Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-20144
Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-20145
Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-20146
Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 7 Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 8 Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 9 Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 10 Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201411
Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201412
Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201413
Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201414
Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 15 Road development road, Sadguru Layout, Bangalore North Layout 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201416
Road development work, Main road, Shiradi Layout, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201417
Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201418
Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 19 Road development work, Netravathi Layout, Bangalore north talluk 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 20 RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201421
1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk
2.00 Under Progress EE PRED, Bangalore 0.00 2.00 Water
2013-201422
Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201423
Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201424
Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201425
Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201426
Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2013-14
2013-201427
Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201428 Road development work, Kodigehalli main road to Kodigehalli lake road,
Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201429
Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201430
Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201431
Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201432
Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201433
Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201434
RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk,5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201435
Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201436
Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201437
Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201438
Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201439
Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201440
Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201441
Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201442
Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201443 Student hostel constructio work, KR Puram vidhanasabha constituency, Shri
ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency5.00 Under Progress Nirmithi Kendra 2.50 2.50
Civic Amenities
2013-201444
Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201445 Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa
home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201446
Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201447 Concrete road construction work, from dalappa home to gramapanchayath new
building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201448 Cement concrete road construction work for rest of the village roads, chagalahatti
village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 0.00 5.00 Road
2013-201449
concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk
15.00 Under Progress Nirmiti Kendra 7.50 7.50 Road
2013-201450
RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Others
2013-201451
Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 52 Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 53 Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201454
Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201455
Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201456
Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk
4.00 Completed EE PRED, Bangalore 4.00 0.00 Road
2013-201457
Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk
4.00 Completed EE PRED, Bangalore 4.00 0.00 Road
2013-201458 concrete road work, from Kempapur main road to Palani home, Somashettihali
gramapanchayath, Yashwanthpura hobli, Banglaore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201459
Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201460
Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201461
Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201462
Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 63Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 64 and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 65Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 66Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 67Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-2014 68Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 69Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 70Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 71Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 72improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014 73Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201474
Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201475
Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road
2013-201476
Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Others
2013-201477
Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Others
2013-201478
Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk
2.00 Under Progress EE PRED, Bangalore 0.00 2.00 Water
2013-201479
pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Water
2013-201480
compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist
5.00 Completed DC Chikkamagalur 5.00 0.00Civic
Amenities
2013-201481
Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist
5.00 Completed DC Chikkamagalur 5.00 0.00Civic
Amenities
2013-2014 82formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads
2013-2014 83Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads
2013-2014 84formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore
5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads
2013-201485 Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School,
Manjunath nagara, KR Pura hObli, Bangalore East talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads
2013-201486 Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School,
Manjunath nagara, KR Pura hObli, Bangalore East talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads
2013-201487
Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward
4.00 Under Progress EE PRED, Bangalore 0.00 4.00 Water
2013-2014 88 UttaraKhand Floods rehabilatiton fund 10.00 - - 0.00 10.00 OthersTotal 446.00 253.00 193.00
Released from Govt. of India
Expenditure incurred
Balance
EE PRED 406.00 233.00 173.00Nirmithi Kendra 20.00 10.00 10.00Other DC's 10.00 10.00 0.00Uttar Khand 10.00 0.00 10.00
TOTAL 446.00 253.00 193.00
Abstract:
Sl No Name & Location of the workEstimated
Cost (in lakhs)
Expenditure incurred
Balance If Any
1Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in M Hosahalli village,
5.00 2.50 2.50Water
2Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Chokkanahalli Village, Marenahalli Gramapanchayath, Jala hobli
5.00 2.50 2.50Water
3Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Marasandra village, Marenahalli Gramapanchayath, Jala hobli
5.00 2.50 2.50Water
4Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Marasandra village, Marenahalli Gramapanchayath, Jala hobli
5.00 2.50 2.50Water
Total 20.00 10.00 10.00
For the year 2011-12
For the year 2012-13
Administrative sanctioned Accurded
250.00
payment to be made towards works sanction during previous year since
Sl.No Name & Location of the workEstimated
Cost (in lakhs)
Expenditure incurred
Balance If Any
1Concrete road construciton work, TurahuNase village, Jala Hobli, Bangalore north Talluk
2.50 0.00 2.50Road
2Bus stop shelter in Tavarekere village, Tavarekere hobli, Bangalore South Talluk
5.00 0.00 5.00 Civic Amenities
3Concrete road construction work form Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengeri hobli
1.00 0.00 1.00Road
4 Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency
13.00 0.00 13.00 Civic Amenities
5Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura
2.00 0.00 2.00Water
Total 23.50 0.00 23.50
2011-12 20.00 10.00 10.002012-13 23.50 0.00 23.502013-14 446.00 253.00 193.00Total 489.50 263.00 226.50
2% administrative charges for the year 2012-13 0.00 0.00 10.002% administrative charges for the year 2013-14 0.00 0.00 10.00
Toal 0.00 0.00 20.00Grand total 489.50 263.00 246.50
FinalName of The M.P : D.B.Chandre Gowda
Year
Sl No Name & Location of the workEstimated Cost (in lakhs)
Stage of the Work
IMPLIMENTING AGENCY
Amount Released to IA
Balance If AnyType of works
1 2 3 4 5 6 7 8 9
2009-2010
1
Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk,Bangalore Dist.
4.50work completed
EE, PRED, Bangalore 4.50 0.00 Road
2009-20102 Construction of RCC Drain from Kiveguddahalli Village, to
Banmddappa's Garden at Bangalore North Taluk, Bangalore District.7.99
work completed
EE, PRED, Bangalore 7.99 0.00 Road
2009-20103 Providing concerte Road at Ganigarahalli Village, Samashutty halli
Grama Panchayath, Bangalore North Taluk, Bangalore District.8.00
work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-20104 Improvements to Bangalore Mittaganahalli road in Jala Hobli,
Bangalore North Taluk, Bangalore Urban Dist.8.00
work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-20105
Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist
8.00work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-20106 Cement concrete road construstion work stage -1, Hosahalli village,
Jaalahalli Hoobli, Bangalore North Talluk8.00
work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-20107 Cement concrete road construction work, Kodagalahatti Village,
Jalahalli Hobli8.00
work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-20108 Road Development work, from Tarahunase to Bettenahalli village
joining road, Jaalahalli Hobli10.00
work completed
EE, PRED, Bangalore 10.00 0.00 Road
2009-20109
Road Development work, Marenahalli Joining road, Jaalahalli Hobli4.00
work completed
EE, PRED, Bangalore 4.00 0.00 Road
2009-201010
Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony,Bangalore. ( Stage 1)
3.49work completed
EE, PRED, Bangalore 3.49 0.00 Road
2009-201011 Providing cement concrete road at 17th ward, 3rd main road,
Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)7.10
work completed
EE, PRED, Bangalore 7.10 0.00 Road
2009-2010
12Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli
8.00work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-201013 Community hall construction for Margadarshi Mahila Samaja ® ,
No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore1.00
work completed
Project Manager, Nirmithi Kendra Urban
1.00 0.00Civic Amenities
2009-201014
Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.
5.00work completed
EE, PRED, Bangalore 5.00 0.00 Road
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore NorthYears 2009-2014
Page 24
Final
2009-201015
Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.
5.00work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201016 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara
ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 18.00
work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-201017 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara
ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd8.00
work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-2010
18Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency
8.00work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-2010
19Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency
8.00work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-201020
Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72
8.00work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-201021
Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72
8.00work completed
EE, PRED, Bangalore 8.00 0.00 Road
2009-201022 Road development chain 0-500, from Vidya Nagara Main road to
Hosahalli village side, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201023 Cement Concrete road from ChikkaBasavaraju Home to Bhimarav
road, Uttanahalli Village, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201024 Cement Concrete Road from Venkobarao home to Anjanappa home,
Sonnappanahalli Village, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201025 Cement Concrete Road from Rajanna Home to Sampangappa Home,
Kadiganahalli Village5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201026 Cement Concrete Road from Main road to Virajappa Home,
Ukkenahalli village, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201027 Cement Concrete road from Muniraju home to Krishnappa home,
Uttanahalli Village, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201028 Cement concrete road till Palakammanagara Home, Chikkajaga
village, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201029 Road development work (500-1000 meter) Bangalore North Talluk,
Vidyanagara, Bagaluru Mairn road to Hosahali village5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
2009-201030 Cement concrete road behind Mutyalamma temple, Doddajaala,
Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore 5.00 0.00 Road
189.08 189.08 0
Page 25
Final
2010-20111
Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,
5.00work completed
EE PRED 5.00 0.00 Road
2010-20112
Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,
5.00work completed
EE PRED 5.00 0.00 Road
2010-20113
Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-20114
Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-20115
Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2010-20116 Road Development work, from Doddagollarahatti Pipeline road to
Govt Primary school, Yashavantapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-20117 Concrete Road construction work for all the (cross) subroads,
Doddagollarahatti village, Yashavanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-20118 Culvert and Road development work for Doddagollarahatti (cross
roads) Subroads, Yashavanthapura hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-2011
9Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt)
5.00work completed
EE PRED 5.00 0.00 Road
2010-2011
10Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt)
5.00work completed
EE PRED 5.00 0.00 Road
2010-2011
11Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt)
5.00work completed
EE PRED 5.00 0.00 Road
2010-2011
12Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt)
5.00work completed
EE PRED 5.00 0.00 Road
2010-2011
13Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)
5.00work completed
EE PRED 5.00 0.00 Road
2010-201114 Road development work Stage - 1 for Ganapathi nagara,
Chikkabanavara village, Yashavanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201115 Road development work Stage - 2 for Ganapathi nagara,
Chikkabanavara village, Yashavanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
Page 26
Final
2010-201116 Road development work Stage - 3 for Ganapathi nagara,
Chikkabanavara village, Yashavanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201117 Road development work Stage - 4 for Ganapathi nagara,
Chikkabanavara village, Yashavanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201118 Road construction work, MM Road, Chikkabanavara,
Yashawanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201119 Road Construction work Stage - 1, Janatha Colony, Chikkabanavara
village, YashawanthaPura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201120 Road Construction work Stage - 2, Janatha Colony, Chikkabanavara
village, YashawanthaPura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201121 Road Construction work Stage - 3, Janatha Colony, Chikkabanavara
village, YashawanthaPura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201122 Road Construction work Stage - 4, Janatha Colony, Chikkabanavara
village, YashawanthaPura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201123 Road Construction work Stage - 5, Janatha Colony, Chikkabanavara
village, YashawanthaPura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2010-201124
Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.
8.00work completed
EE PRED 8.00 0.00Civic Amenities
2010-201125 One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North
Talluk1.50
work completed
EE PRED 1.50 0.00 Water
2010-201126
Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side)
5.00work completed
EE PRED 5.00 0.00Civic Amenities
2010-2011
27Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)
5.00work completed
EE PRED 5.00 0.00Civic Amenities
2010-201128 Borewell digging work, Bagalahalli village, Marenahalli
Gramapanchayath, Jala Hobli, Bangalore North Talluk1.50
work completed
EE PRED 1.50 0.00 Water
2010-2011
#REF!
Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
Page 27
Final
2010-2011#REF!
K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011
#REF!
Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011
#REF!Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00Street lighting
2010-2011#REF!
R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights)
1.47work completed
Nirmithi Kendra 1.47 0.00Street lighting
2010-2011#REF! Borewell work, for Drinking water to Parimala Nagara, Nandini
Layout, Mahalakshipuram ward no. 431.50
work completed
EE PRED 1.50 0.00 Water
2010-2011#REF! Oldage Home building construction work, Sy no.113, Shree Shankara
Balaga, New Park road, Malleshwaram, Bangalore1.00
work completed
EE PRED 1.00 0.00Civic Amenities
2010-2011#REF! Road Development work Stage - 1, Lake Behind Road, Ganigara
village, Yashawanthapura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2010-2011#REF! Road Development work Stage - 2, Lake Behind Road, Ganigara
village, Yashawanthapura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2010-2011#REF! Road Development work Stage - 3, Lake Behind Road, Ganigara
village, Yashawanthapura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2010-2011#REF! Road Development work, from Kempapura Maruthi Nagara
Mainroad, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
208.48 208.48 0
2011-20121
Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore
2.00work completed
EE PRED 2.00 0.00 Water
Page 28
Final
2011-20122 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara
village, Maruthi Nagara 1st Cross5.00
work completed
EE PRED 5.00 0.00 Others
2011-20123 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara
village, Maruthi Nagara 2nd Cross5.00
work completed
EE PRED 5.00 0.00 Others
2011-20124 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara
village, Maruthi Nagara 3rd Cross5.00
work completed
EE PRED 5.00 0.00 Others
2011-20125 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara
village, Maruthi Nagara 4th Cross5.00
work completed
EE PRED 5.00 0.00 Others
2011-20126 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara
village, Maruthi Nagara 5th Cross5.00
work completed
EE PRED 5.00 0.00 Others
2011-20127 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara
village, Maruthi Nagara, Dwaraka Nagara Road development work5.00
work completed
EE PRED 5.00 0.00 Road
2011-20128
Maruthi Nagara subroad (cross) road Development work5.00
work completed
EE PRED 5.00 0.00 Road
2011-20129
Maruthi Nagara New Layout Road development work5.00
work completed
EE PRED 5.00 0.00 Road
2011-201210 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara
village BET School Road Development5.00
work completed
EE PRED 5.00 0.00 Road
2011-201211
Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201212 Road Development work, 1st Cross, Sandhya Nagara,
Yashawanthapura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201213 Road Development work, 2nd Cross, Sandhya Nagara,
Yashawanthapura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201214 Road Development work, 3rd Cross, Sandhya Nagara,
Yashawanthapura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201215 Road development work 250-500, Kempapura, Maruthi Nagara,
Bangalore North talluk, Yashawanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2011-201216 Road development work 500-750, Kempapura, Maruthi Nagara,
Bangalore North talluk, Yashawanthapura Hobli5.00
work completed
EE PRED 5.00 0.00 Road
2011-201217 Cement Concrete road construction work, Lakshmipura village,
Yashwanthpura Hobli, Bangalore North tAlluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201218 Cement concrete road construction work, near Ashwathkatte,
Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
Page 29
Final
2011-201219
Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201220 Cement concrete road work, till Sangappa home, Lakshmipura village,
Yashwanthapura village, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201221 Cement concrete road construction work, for Bipass road,
Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201222
Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village,
5.00under progress
EE PRED 2.50 2.50 Water
2011-201223
Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00under progress
EE PRED 2.50 2.50 Water
2011-201224
Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00under progress
EE PRED 2.50 2.50 Water
2011-201225
Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00under progress
EE PRED 2.50 2.50 Water
2011-201226 Road development work, Cross -1, New Layout, Ganiganahalli village,
Yashwanthpura village, Bangalore North tallku5.00
work completed
EE PRED 5.00 0.00 Road
2011-201227 Road development work, Cross -2, New Layout, Ganiganahalli village,
Yashwanthpura village, Bangalore North tallku5.00
work completed
EE PRED 5.00 0.00 Road
2011-201228 Road development work, Cross -3, New Layout, Ganiganahalli village,
Yashwanthpura village, Bangalore North tallku5.00
work completed
EE PRED 5.00 0.00 Road
2011-201229 Road development work, Cross Roads, New Layout, Ganiganahalli
village, Yashwanthpura village, Bangalore North tallku5.00
work completed
EE PRED 5.00 0.00 Road
2011-201230 Road development work, Ganapathi nagara cross road,
Yashwanthpura hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201231
Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201232
Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201233
Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201234
Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201235 Road development work, Ganapathi nagara cross road,
Yashwanthpura hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00 Road
Page 30
Final
2011-201236
Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201237
Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201238
Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201239
Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201240
Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201241
Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201242
Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201243
Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201244
Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201245
Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00 Road
2011-201246
Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.
5.00work completed
EE PRED 5.00 0.00 Water
2011-201247
Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.
5.00work completed
EE PRED 5.00 0.00 Water
2011-201248
Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk
5.00work completed
EE PRED 5.00 0.00 Water
2011-201249
Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk
5.00work completed
EE PRED 5.00 0.00 Water
2011-201250
Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk
5.00work completed
EE PRED 5.00 0.00Civic Amenities
2011-201251
Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk
5.00work completed
EE PRED 5.00 0.00Civic Amenities
2011-201252 Gutter construction work, from Acharappa home to Mahimaraju
home, K.Gollahalli Village, Kengeri Hobli3.00
work completed
EE PRED 3.00 0.00Civic Amenities
Page 31
Final
2011-201253
Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk
4.25work completed
EE PRED 4.25 0.00 Road
2011-201254 Road development work form Kenchanapalya village to Paadri
colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk1.50
work completed
EE PRED 1.50 0.00 Road
2011-201255 Pipeline implementation and Getting power supply from KEB,
Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli5.00
work completed
EE PRED 5.00 0.00Civic Amenities
2011-201256
Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-201257
Library construction, Gonipura vilage, Yashawanthapura limits5.00
work completed
EE PRED 5.00 0.00Civic Amenities
2011-201258 Women empowerment Building work (streeshakti bhavana) Gonipura
village, Yashawanthapura limits5.00
work completed
EE PRED 5.00 0.00Civic Amenities
2011-201259
Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk
4.00work completed
EE PRED 4.00 0.00Civic Amenities
2011-201260
Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2.
4.00work completed
EE PRED 4.00 0.00 Road
2011-201261
Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2.
4.00work completed
EE PRED 4.00 0.00 Road
2011-201262 Formation and metalling the roads of siddappa layout 1st cross,
K.R.puram hobli Bangalore North Parlimentary Constituency2.50
work completed
EE PRED 2.50 0.00 Road
2011-201263 Formation and metalling the roads of siddappa layout 2st cross,
K.R.puramhobli Bangalore North Parlimentary Constituency2.50
work completed
EE PRED 2.50 0.00 Road
2011-201264 Formation and metalling the roads of Motappa Layout 1st cross, K.R.
Puram hobli, Bangalore north, Parliamentary constituency.2.50
work completed
EE PRED 2.50 0.00 Road
2011-201265 Formation and metalling the roads of Motappa Layout 2st cross, KR
Puram hobli, Bangalore north, Parliamentary constituency.2.50
work completed
EE PRED 2.50 0.00 Road
2011-201266 Formation and metalling the roads of Motappa Layout 3rd cross, KR
Puram hobli, Bangalore north, Parliamentary constituency.2.50
work completed
EE PRED 2.50 0.00 Road
2011-201267 Formation and metalling the roads of Motappa Layout 4th cross, KR
Puram hobli, Bangalore north, Parliamentary constituency.2.50
work completed
EE PRED 2.50 0.00 Road
2011-201268 Chainlink Compund construction work, ChikkaBanavara Govt high
School, yashawanthapura hobli, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Education
2011-201269 Concrete road development work, Beside ChikkaBanavara Govt high
School, yashawanthapura hobli, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
Page 32
Final
2011-201270 Primary School Building construction, Gonipura village, K.Gollahalli
Gramapanchayath, Kengeri hobli, Bangalore South Talluk4.00
work completed
EE PRED 4.00 0.00 Education
2011-201271 Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No.
22 Ganganagar, Bangalore North18.62
work completed
Nirmithi Kendra 18.62 0.00Civic Amenities
2011-201272 Community hall construction work Stage -1, Near Pattalamma temple,
Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.5.00
work completed
EE PRED 5.00 0.00Civic Amenities
2011-201273 Community hall construction work Stage -2, Near Pattalamma temple,
Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.5.00
work completed
EE PRED 5.00 0.00Civic Amenities
2011-201274 Community hall construction work Stage -3, Near Pattalamma temple,
Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.5.00
work completed
EE PRED 5.00 0.00Civic Amenities
2011-201275 Road Development work, Tirumalapura, Yashawanthapura hobli,
Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201276 Road Development work Stage-1, Tirumalapura, Yashawanthapura
hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201277 Road Development work Stage-2, Tirumalapura, Yashawanthapura
hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201278 Road development work, Anjeneya temple road, Veerashettihalli
village, Yashawanthpura hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201279 Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar,
Yashwanthpur hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201280 Gutter Work, From chikkaBanavara to Kempapura Road,
Yashwanthpura hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201281 Gutter work, From Dwarakanagara Cross to Kodohalla,
Yashwanthpura hobli, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201282 Road Development work, New layout, Maruthi Nagar, Yashwanthpur
hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201283 Concret road work, from Dasappanapalya main road to
Kereguddadahalli, Bangalore north talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201284 Concrete road work from Chowdeshwari layotu borewell to mini
water tank, Kereguddadahalli, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-201285 Road development work and jalli work Stage - 1, Siddappa layout,
Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201286 Road development work and jalli work Stage - 2, Siddappa layout,
Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
Page 33
Final
2011-201287 Road development work and Jalli work Stage - 1, Kariyappa Layout,
Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201288 Road development work and Jalli work Stage - 2, Kariyappa Layout,
Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201289 Road development work and Jalli work Stage - 1, Motappa ayout,
Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201290 Road development work and Jalli work Stage - 2, Motappa ayout,
Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201291
Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1
5.00work completed
EE PRED 5.00 0.00 Road
2011-201292
Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2
5.00work completed
EE PRED 5.00 0.00 Road
2011-201293
Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3
5.00work completed
EE PRED 5.00 0.00 Road
2011-201294 Road development work, Muneshwara Layout, Kalkere Village,
Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201295 Road development work, 2nd cross, Muneshwara Layout, Kalkere
village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201296 Road development work, 3rd cross, Muneshwara Layout, Kalkere
village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201297 Road development work, 4th cross, Muneshwara Layout, Kalkere
village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201298 Road development work 0 - 250, from Vanirashi channasandra
Mainroad to NRI Layout, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-201299 Road development work 250-500, from Vanirashi channasandra
Mainroad to NRI Layout, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012100 Road development work 500 - 750, from Vanirashi channasandra
Mainroad to NRI Layout, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012101 Road development work 750-1000, from Vanirashi channasandra
Mainroad to NRI Layout, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012102
Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012103 Rock Guttor construction, Brothers colony, Chikkabanavara,
Yashwanthpura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
Page 34
Final
2011-2012104 Concrete road development work, Tirumalapura Village, Bangalore
north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012105 Development work in New Layout, Banapathi nagara, GanigaraHalli
village, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012106 5th Concrete Road Development work, Maruthi Nagara, Bangalore
north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012107 Concrete road development work, 6th cross, Gulbarga Slum,
Newlayout, Ganigarahalli, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012
work completed
Road
2011-2012
109Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts)
2.50work completed
EE PRED 2.50 0.00 Road
2011-2012
110Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts)
2.50work completed
EE PRED 2.50 0.00 Road
2011-2012
111Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts)
2.50work completed
EE PRED 2.50 0.00 Road
2011-2012
112Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts)
2.50work completed
EE PRED 2.50 0.00 Road
2011-2012113 Improvement and metalling the road in sunny layout 1st cross in
ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012114 Improvement and metalling the road in sunny layout 2st cross in
ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012115 Improvement and metalling the road in sunny layout 3st cross in
ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012116 Improvement and metalling the road in sunny layout 4st cross in
ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00 Road
2011-2012117
Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)
2.50work completed
EE PRED 2.50 0.00 Road
2011-2012118
Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)
2.50work completed
EE PRED 2.50 0.00 Road
2011-2012119
Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.
5.00work completed
EE PRED 5.00 0.00 Road
Page 35
Final
2011-2012120
Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.
5.00work completed
EE PRED 5.00 0.00 Road
2011-2012121
Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.
5.00work completed
EE PRED 5.00 0.00 Road
2011-2012122 Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara,
Byatarayanapura, Bangalore South Talluk13.00
work completed
EE PRED 13.00 0.00 Road
2011-2012123
Road development work, 1st cross, Ganesha Layout, Bangalore Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012124
Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012125 Road development work from 1 stage to 2nd stage Bhavani Layout,
Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012126 Concrete road development work, Lakshmipura village,
Yashwanthpura Hobli, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00 Road
2011-2012127
Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-2012128
Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-2012129 4 Rooms construction work, 1st floor, Govt Higher Primary School,
Chikkabanavara village22.50
work completed
EE PRED 22.50 0.00 Education
2011-2012130
To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout
2.00work completed
EE PRED 2.00 0.00 Water
2011-2012131 To dig Borewel in Amrutha Nagar 2.00
work completed
EE PRED 2.00 0.00 Water
2011-2012132
Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore
10.00work completed
KRIDL 10.00 0.00Civic Amenities
2011-2012133 Community Hall construction, Near BDA Park, Opposite VaiyalliKaval
education trust, Bangalore north MP constituency10.00
work completed
EE PRED 10.00 0.00Civic Amenities
2011-2012134
Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-2012135
Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00 Road
2011-2012136 Gutter work Stage - 2, Gonipura village, K.Gollahalli
Gramapanchayath, Kengere hobli, Bangalore South Talluk5.00
work completed
EE PRED 5.00 0.00 Road
Page 36
Final
2011-2012137 Concrete road construction work, 4th A, B, & C corss, ward no. 102,
Vrushabhavathi Nagara, Vinayakanagara10.00
work completed
EE PRED 10.00 0.00 Road
2011-2012138
2 % Administration expinditure10.00 DC 10.00 0.00 Others
624.87 614.87 10
2012-20131
Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura
2.00Under Progress
EE PRED, Bangalore 0.00 2.00 Water
2012-20132
Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20133
Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20134
Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20135
1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20136
3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20137
Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20138
Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-20139
Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201310
Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201311
from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201312
Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli
6.00 Completed EE PRED, Bangalore 6.00 0.00 Road
2012-201313
Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201314
Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201315
Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201316
Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201317
Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201318
Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201319
Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201320
Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 37
Final2012-2013
21Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201322 Road development work, Ganesha Temple road, Dasappanapalya,
ChikkaBanavara village, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201323
3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout,
12.00 Completed EE PRED, Bangalore 12.00 0.00 Water
2012-201324 Busstand construction, Tavarekere village, Tavarekere hobli,
Bangalore South Talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00Civic Amenities
2012-201325
CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201326
CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201327
Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits
10.00 Completed EE PRED, Bangalore 10.00 0.00 Water
2012-201328
Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 Completed EE PRED, Bangalore 4.90 0.00 Road
2012-201329
Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 Completed EE PRED, Bangalore 4.90 0.00 Road
2012-201330
Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 Completed EE PRED, Bangalore 4.90 0.00 Road
2012-201331
1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201332
1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201333
Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk
4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201334 Concrete road work stage - 1, from Veternary hospital to Ramesh bin
Bullayya home, Somanahalli village, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201335 Concrete road work stage - 12, from Veternary hospital to Ramesh bin
Bullayya home, Somanahalli village, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201336
Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk,
5.00 Completed EE PRED, Bangalore 5.00 0.00Civic Amenities
2012-201337
Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201338
Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201339
Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201340
Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 38
Final2012-2013
41Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201342
Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201343
Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201344
Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201345
Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201346 Road development work, 1 & 2nd cross, from Maragondanahalli
Mainroad to NRI Layout, Bangalore north MP constituency,5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201347 Road development work, 3rd &4th cross, from Maragondanahalli
Mainroad to NRI Layout, Bangalore north MP constituency,5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
48Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
49
Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
50
Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
51Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
52Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201353
Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
54Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
55Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013
56Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 39
Final
2012-201357
Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201358
Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201359
Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201360
Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201361
Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201362 Road development work, from Maragondanahalli mainroad lake main
road to Kachaaramma temple road, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201363 Road development work, from shivaramegowda home to MWS
borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201364 Road development work, 2nd cross from Shivaramegowda home,
Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201365 Road development work, 3rd cross from Shivaramegowda home,
Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201366 Road development work, 4th cross from Shivaramegowda home,
Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201367
Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201368 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0.00 Health
2012-201369
2 Borewell digging work in Bhuvaneshwari Nagara layout4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201370
Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201371
Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201372
Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201373
Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201374
Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore
4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201375
Drinking water supply to Saptagiri layout, Doddabidarakallu village4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201376
Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201377
Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201378
Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201379
Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 40
Final2012-2013
80Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201381
Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201382
water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201383 Community hall construction, Milk colony, 4th cross, ward no.66, 64,
Bangalore north MP Constituency13.00
Under Progress
EE PRED, Bangalore 0.00 13.00Civic Amenities
2012-201384
Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore
2.00 completed EE PRED, Bangalore 2.00 0.00 Water
2012-2013
85Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201386
Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk
3.00 Completed EE PRED, Bangalore 3.00 0.00 Road
2012-201387
Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk
1.00Under Progress
EE PRED, Bangalore 0.00 1.00 Road
2012-201388
Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201389
Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201390
2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli
4.00 Completed EE PRED, Bangalore 4.00 0.00 Water
2012-201391
Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru,
10.00 Completed Nirmithi Kendra 10.00 0.00Civic Amenities
2012-201392 Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba
Veerashaiva Sanhga ® 5.00 Completed EE PRED, Bangalore 5.00 0.00
Civic Amenities
2012-201393 Gutter construction road, ST colony, Dinnepalya, Kaggalipura
Gramapanchayath, Uttarahalli hobli, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-201394
PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk
10.00 Completed EE PRED, Bangalore 10.00 0.00 Education
2012-201395
1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201396 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-201397
Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk2.50 Completed EE PRED, Bangalore 2.50 0.00 Road
2012-201398
Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk
2.50Under Progress
EE PRED, Bangalore 0.00 2.50 Road
2012-201399
1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore
2.00 Completed EE PRED, Bangalore 2.00 0.00 Water
2012-2013100 Road development work, Cross road, Brothers colony,
Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 41
Final
2012-2013101 Road development, Masjid road, Brother colony, Chikkabanavara,
Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013102
Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013103
Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2012-2013104 Road developmentwork,1st cross, Brother colony, Chikkabanavara,
Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
505.54 482.04 23.5
2013-20141
Road development work, Maruthi Nagara, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20142
Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20143
Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20144
Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20145 Road development work, from Venkataswamy home to
Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20146
Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20147
Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20148
Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-20149
Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201410
Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201411
Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201412
Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201413
Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201414
Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201415
Road development road, Sadguru Layout, Bangalore North Layout5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201416
Road development work, Main road, Shiradi Layout, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201417
Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201418
Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 42
Final2013-2014
19Road development work, Netravathi Layout, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201420
RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201421
1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk
2.00Under Progress
EE PRED, Bangalore 0.00 2.00 Water
2013-201422
Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201423 Road development work, Kudalasangama Main road, Kodigehalli
Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201424
Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201425 Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli
Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201426 Road development work, Commnity hall mainroad, Kodigehalli
Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201427 Road development work, Kuvempu Nagara, Kodigehalli
Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201428
Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201429 Road development work stage - 1, Pillappa Layout, Kanakanagara,
Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201430 Road development work stage - 2, Pillappa Layout, Kanakanagara,
Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201431 Road development work Stage - 1, from Kalkere OM shakti Teple to
Kalkere lake road, Kalkere village, Bangalore North MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201432 Road development work , from Kalkere OM shakti Teple to Kalkere
lake road, Kalkere village, Bangalore North MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201433 Road development work Stage - 3, from Kalkere OM shakti Teple to
Kalkere lake road, Kalkere village, Bangalore North MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201434
RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk,
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201435
Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201436 Road development work stage - 1, Motappa Layout, Kanakanagara,
Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201437 Road development work stage - 2, Motappa Layout, Kanakanagara,
Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 43
Final2013-2014
38Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201439
Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201440 Concrete road work and road development work, Agara colony, Agara
Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014
41Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-2014
42Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201443
Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency
5.00Under Progress
Nirmithi Kendra 2.50 2.50Civic Amenities
2013-201444 Road development work, from Karubele Mainroad to Panchayath,
K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201445
Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201446
Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201447
Concrete road construction work, from dalappa home to gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201448
Cement concrete road construction work for rest of the village roads, chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 0.00 5.00 Road
2013-201449
concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk
15.00Under Progress
Nirmiti Kendra 7.50 7.50 Road
2013-201450
RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Others
2013-201451
Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201452
Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201453
Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201454 Road development work, from Kannalli Sigehalli gate to Banashankari
Layout, Kodigehalli Gramapanchayath, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201455 Concrete road construticon, till suvarnamma home, Dasappanapalya,
Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
Page 44
Final
2013-201456 Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli
village, Yashwanthpura hobli, Bangalore north talluk4.00 Completed EE PRED, Bangalore 4.00 0.00 Road
2013-201457 Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli
village, Yashwanthpura hobli, Bangalore north talluk4.00 Completed EE PRED, Bangalore 4.00 0.00 Road
2013-201458
concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201459
Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201460
Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201461
Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201462
Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201463
Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201464
and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201465
Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201466
Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201467
Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201468
Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201469
Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201470
Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201471
Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201472
improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201473
Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore
5.00 Completed EE PRED, Bangalore 5.00 0.00 Road
2013-201474
Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201475
Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Road
2013-201476 Jalli work, from Paradise home 2nd cross to happy garden, sunil
layout, channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Others
Page 45
Final
2013-201477 Jalli work, from Paradise home 2st cross to happy garden, sunil
layout, channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Others
2013-201478
Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk
2.00Under Progress
EE PRED, Bangalore 0.00 2.00 Water
2013-201479 pump motor and Pipeline implementing work, Chagalahatti village,
Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk5.00
Under Progress
EE PRED, Bangalore 0.00 5.00 Water
2013-201480 compound wall construciton, Daradahalli village temple, Mudigere
talluk, Chikkamagaluru Dist5.00 Completed DC Chikkamagalur 5.00 0.00
Civic Amenities
2013-201481 Lingeshwara Lake development work, Daradahalli, Mudigere talluk,
Chikkamagaluru dist5.00 Completed DC Chikkamagalur 5.00 0.00
Civic Amenities
2013-201482
formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Roads
2013-201483
Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Roads
2013-201484
formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Roads
2013-201485
Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Roads
2013-201486
Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk
5.00Under Progress
EE PRED, Bangalore 0.00 5.00 Roads
2013-201487
Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward
4.00Under Progress
EE PRED, Bangalore 0.00 4.00 Water
2013-201488
UttaraKhand Floods rehabilatiton fund10.00 - - 0.00 10.00 Others
446 253 193
Page 46
Raw data FinalName of The M.P : D.B.Chandre Gowda
Year
Sl No Name & Location of the workEstimated Cost (in lakhs)
Stage of the Work
IMPLIMENTING AGENCY
Amount Released to IA
Balance If Any
2013-20141
Road development work, Maruthi Nagara, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20142
Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20143
Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20144
Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20145
Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20146
Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20147
Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20148
Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-20149
Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201410
Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201411
Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201412
Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201413
Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201414
Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201415
Road development road, Sadguru Layout, Bangalore North Layout5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201416
Road development work, Main road, Shiradi Layout, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201417
Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201418
Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201419
Road development work, Netravathi Layout, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201420
RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201421
1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk
2.00Under Progress
EE PRED, Bangalore
0.00 2.00
2013-201422
Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
Physical and Financial Progress on Implemntation of MPLADS works in Bangalore NorthYears 2009-2014
Page 47
Raw data Final2013-2014
23Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201424
Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201425
Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201426
Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201427
Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201428
Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201429
Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201430
Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201431
Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201432
Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201433
Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201434
RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk,5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201435
Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201436
Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201437
Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201438
Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201439
Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201440
Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201441 Concrete road work and road development work, from Amrutanarayana swamy majjana bavi
road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201442 Concrete road work and road development work, from Amrutanarayana swamy mountain road ,
Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201443
Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency
5.00Under Progress
Nirmithi Kendra 2.50 2.50
2013-201444
Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201445
Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201446
Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201447
Concrete road construction work, from dalappa home to gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
Page 48
Raw data Final2013-2014
48Cement concrete road construction work for rest of the village roads, chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
0.00 5.00
2013-201449
concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk
15.00Under Progress
Nirmiti Kendra 7.50 7.50
2013-201450
RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201451
Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201452
Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201453
Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn5.00 Completed
EE PRED, Bangalore
5.00 0.00
2013-201454
Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201455
Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201456
Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk
4.00 CompletedEE PRED, Bangalore
4.00 0.00
2013-201457
Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk
4.00 CompletedEE PRED, Bangalore
4.00 0.00
2013-201458
concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201459
Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201460
Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201461
Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201462
Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201463
Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201464 and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli 5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201465
Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201466
Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201467
Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201468
Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201469
Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201470
Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201471
Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201472
improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201473
Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore
5.00 CompletedEE PRED, Bangalore
5.00 0.00
Page 49
Raw data Final2013-2014
74Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201475
Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201476
Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201477
Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2013-201478
Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk
2.00Under Progress
EE PRED, Bangalore
0.00 2.00
2013-201479
pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201480
compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist5.00 Completed DC Chikkamagalur 5.00 0.00
2013-201481
Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist5.00 Completed DC Chikkamagalur 5.00 0.00
2013-201482
formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201483
Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201484
formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201485
Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201486
Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk
5.00Under Progress
EE PRED, Bangalore
0.00 5.00
2013-201487
Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward
4.00Under Progress
EE PRED, Bangalore
0.00 4.00
2013-201488
UttaraKhand Floods rehabilatiton fund10.00 - - 0.00 10.00
Total 446 253 193
2012-20131
Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura2.00
Under Progress
EE PRED, Bangalore
0.00 2.00
2012-20132
Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-20133
Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-20134
Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-20135
1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-20136
3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-20137
Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-20138
Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-20139
Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201310
Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
Page 50
Raw data Final2012-2013
11from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201312
Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli
6.00 CompletedEE PRED, Bangalore
6.00 0.00
2012-201313
Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201314
Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201315
Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201316
Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201317
Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201318
Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201319
Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201320
Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201321
Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201322
Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201323
3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout,
12.00 CompletedEE PRED, Bangalore
12.00 0.00
2012-201324
Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk5.00
Under Progress
EE PRED, Bangalore
0.00 5.00
2012-201325
CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201326
CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201327
Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits
10.00 CompletedEE PRED, Bangalore
10.00 0.00
2012-201328
Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 CompletedEE PRED, Bangalore
4.90 0.00
2012-201329
Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 CompletedEE PRED, Bangalore
4.90 0.00
2012-201330
Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk
4.90 CompletedEE PRED, Bangalore
4.90 0.00
2012-201331
1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed
EE PRED, Bangalore
2.00 0.00
2012-201332
1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed
EE PRED, Bangalore
2.00 0.00
2012-201333
Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk
4.00 CompletedEE PRED, Bangalore
4.00 0.00
2012-201334
Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201335
Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201336
Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk,
5.00 CompletedEE PRED, Bangalore
5.00 0.00
Page 51
Raw data Final2012-2013
37Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201338
Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201339
Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201340
Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201341
Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201342
Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201343
Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201344
Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201345
Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201346
Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201347
Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201348 Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara,
Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201349 Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi
Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201350
Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201351 Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara,
Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201352 Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara,
Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201353
Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201354 Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura
village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201355 Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura
village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201356 Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura
village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201357
Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201358
Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
Page 52
Raw data Final2012-2013
59Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201360
Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201361
Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201362
Road development work, from Maragondanahalli mainroad lake main road to Kachaaramma temple road, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201363
Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201364
Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201365
Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201366
Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201367
Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201368 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0.00
2012-201369
2 Borewell digging work in Bhuvaneshwari Nagara layout4.00 Completed
EE PRED, Bangalore
4.00 0.00
2012-201370
Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201371
Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201372
Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201373
Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201374
Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore4.00 Completed
EE PRED, Bangalore
4.00 0.00
2012-201375
Drinking water supply to Saptagiri layout, Doddabidarakallu village4.00 Completed
EE PRED, Bangalore
4.00 0.00
2012-201376
Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201377
Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201378
Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201379
Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201380
Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201381
Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore
2.00 CompletedEE PRED, Bangalore
2.00 0.00
2012-201382
water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore
2.00 CompletedEE PRED, Bangalore
2.00 0.00
2012-201383
Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency
13.00Under Progress
EE PRED, Bangalore
0.00 13.00
2012-201384 Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore 2.00 completed
EE PRED, Bangalore
2.00 0.00
Page 53
Raw data Final
2012-201385 Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree),
Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201386
Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk
3.00 CompletedEE PRED, Bangalore
3.00 0.00
2012-201387
Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk
1.00Under Progress
EE PRED, Bangalore
0.00 1.00
2012-201388
Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201389
Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201390
2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli
4.00 CompletedEE PRED, Bangalore
4.00 0.00
2012-201391
Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru,
10.00 Completed Nirmithi Kendra 10.00 0.00
2012-201392
Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga ® 5.00 Completed
EE PRED, Bangalore
5.00 0.00
2012-201393
Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-201394
PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk
10.00 CompletedEE PRED, Bangalore
10.00 0.00
2012-201395 1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 2.00 Completed
EE PRED, Bangalore
2.00 0.00
2012-201396 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2.00 Completed
EE PRED, Bangalore
2.00 0.00
2012-201397
Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk2.50 Completed
EE PRED, Bangalore
2.50 0.00
2012-201398 Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 2.50
Under Progress
EE PRED, Bangalore
0.00 2.50
2012-201399 1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore 2.00 Completed
EE PRED, Bangalore
2.00 0.00
2012-2013100
Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-2013101
Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-2013102
Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-2013103
Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
2012-2013104
Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk
5.00 CompletedEE PRED, Bangalore
5.00 0.00
Total 505.54 482.04 23.5
2011-20121 Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore 2.00
work completed
EE PRED 2.00 0.00
2011-20122
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross
5.00work completed
EE PRED 5.00 0.00
2011-20123
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross
5.00work completed
EE PRED 5.00 0.00
Page 54
Raw data Final2011-2012
4Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross
5.00work completed
EE PRED 5.00 0.00
2011-20125
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross
5.00work completed
EE PRED 5.00 0.00
2011-20126
Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross
5.00work completed
EE PRED 5.00 0.00
2011-20127
Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work
5.00work completed
EE PRED 5.00 0.00
2011-20128
Maruthi Nagara subroad (cross) road Development work5.00
work completed
EE PRED 5.00 0.00
2011-20129
Maruthi Nagara New Layout Road development work5.00
work completed
EE PRED 5.00 0.00
2011-201210
Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development
5.00work completed
EE PRED 5.00 0.00
2011-201211
Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201212
Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201213
Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201214
Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201215
Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2011-201216
Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2011-201217
Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk
5.00work completed
EE PRED 5.00 0.00
2011-201218
Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201219
Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201220
Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201221
Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201222
Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village, 5.00
under progress
EE PRED 2.50 2.50
2011-201223
Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00under progress
EE PRED 2.50 2.50
2011-201224
Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00under progress
EE PRED 2.50 2.50
2011-201225
Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli
5.00under progress
EE PRED 2.50 2.50
2011-201226
Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00work completed
EE PRED 5.00 0.00
2011-201227
Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00work completed
EE PRED 5.00 0.00
2011-201228
Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00work completed
EE PRED 5.00 0.00
2011-201229
Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku
5.00work completed
EE PRED 5.00 0.00
Page 55
Raw data Final2011-2012
30Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk
5.00work completed
EE PRED 5.00 0.00
2011-201231
Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201232
Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201233
Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201234
Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201235
Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk
5.00work completed
EE PRED 5.00 0.00
2011-201236
Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201237
Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201238
Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201239
Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201240
Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201241
Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201242
Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201243
Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201244
Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201245
Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road
2.50work completed
EE PRED 2.50 0.00
2011-201246
Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.
5.00work completed
EE PRED 5.00 0.00
2011-201247
Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.
5.00work completed
EE PRED 5.00 0.00
2011-201248
Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk
5.00work completed
EE PRED 5.00 0.00
2011-201249 Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near
muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk5.00
work completed
EE PRED 5.00 0.00
2011-201250 Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli
village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk5.00
work completed
EE PRED 5.00 0.00
2011-201251 Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli
village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk5.00
work completed
EE PRED 5.00 0.00
2011-201252
Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli Village, Kengeri Hobli
3.00work completed
EE PRED 3.00 0.00
2011-201253
Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk
4.25work completed
EE PRED 4.25 0.00
Page 56
Raw data Final2011-2012
54Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk
1.50work completed
EE PRED 1.50 0.00
2011-201255
Pipeline implementation and Getting power supply from KEB, Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli
5.00work completed
EE PRED 5.00 0.00
2011-201256
Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201257
Library construction, Gonipura vilage, Yashawanthapura limits5.00
work completed
EE PRED 5.00 0.00
2011-201258
Women empowerment Building work (streeshakti bhavana) Gonipura village, Yashawanthapura limits
5.00work completed
EE PRED 5.00 0.00
2011-201259
Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk
4.00work completed
EE PRED 4.00 0.00
2011-201260
Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2.
4.00work completed
EE PRED 4.00 0.00
2011-201261
Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2.
4.00work completed
EE PRED 4.00 0.00
2011-201262
Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency
2.50work completed
EE PRED 2.50 0.00
2011-201263
Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency
2.50work completed
EE PRED 2.50 0.00
2011-201264
Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency.
2.50work completed
EE PRED 2.50 0.00
2011-201265
Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency.
2.50work completed
EE PRED 2.50 0.00
2011-201266
Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency.
2.50work completed
EE PRED 2.50 0.00
2011-201267
Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency.
2.50work completed
EE PRED 2.50 0.00
2011-201268
Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201269
Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201270
Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk
4.00work completed
EE PRED 4.00 0.00
2011-201271
Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22 Ganganagar, Bangalore North
18.62work completed
Nirmithi Kendra 18.62 0.00
2011-201272
Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.
5.00work completed
EE PRED 5.00 0.00
2011-201273
Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.
5.00work completed
EE PRED 5.00 0.00
2011-201274
Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.
5.00work completed
EE PRED 5.00 0.00
2011-201275
Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00
2011-201276
Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00
2011-201277
Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk5.00
work completed
EE PRED 5.00 0.00
2011-201278
Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk
5.00work completed
EE PRED 5.00 0.00
2011-201279
Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
Page 57
Raw data Final2011-2012
80Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201281
Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201282
Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201283
Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk5.00
work completed
EE PRED 5.00 0.00
2011-201284
Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-201285
Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201286
Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201287
Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201288
Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201289
Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201290
Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201291
Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1
5.00work completed
EE PRED 5.00 0.00
2011-201292 Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village
K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 25.00
work completed
EE PRED 5.00 0.00
2011-201293 Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village,
K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 35.00
work completed
EE PRED 5.00 0.00
2011-201294
Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00
2011-201295
Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00
2011-201296
Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00
2011-201297
Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk2.50
work completed
EE PRED 2.50 0.00
2011-201298
Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-201299
Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-2012100
Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-2012101
Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk
2.50work completed
EE PRED 2.50 0.00
2011-2012102
Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00
2011-2012103
Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012104
Concrete road development work, Tirumalapura Village, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00
Page 58
Raw data Final2011-2012
105Development work in New Layout, Banapathi nagara, GanigaraHalli village, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012106
5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk5.00
work completed
EE PRED 5.00 0.00
2011-2012107
Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012109 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli
village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts)2.50
work completed
EE PRED 2.50 0.00
2011-2012110 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli
village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts)2.50
work completed
EE PRED 2.50 0.00
2011-2012111 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli
village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts)2.50
work completed
EE PRED 2.50 0.00
2011-2012112 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli
village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts)2.50
work completed
EE PRED 2.50 0.00
2011-2012113
Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00
2011-2012114
Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00
2011-2012115
Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00
2011-2012116
Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North.2.50
work completed
EE PRED 2.50 0.00
2011-2012117
Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)
2.50work completed
EE PRED 2.50 0.00
2011-2012118
Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)
2.50work completed
EE PRED 2.50 0.00
2011-2012119
Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.
5.00work completed
EE PRED 5.00 0.00
2011-2012120
Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.
5.00work completed
EE PRED 5.00 0.00
2011-2012121
Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.
5.00work completed
EE PRED 5.00 0.00
2011-2012122
Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk
13.00work completed
EE PRED 13.00 0.00
2011-2012123
Road development work, 1st cross, Ganesha Layout, Bangalore Talluk5.00
work completed
EE PRED 5.00 0.00
2011-2012124
Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk5.00
work completed
EE PRED 5.00 0.00
2011-2012125
Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012126
Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012127
Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012128
Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012129
4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village22.50
work completed
EE PRED 22.50 0.00
Page 59
Raw data Final2011-2012
130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout 2.00work completed
EE PRED 2.00 0.00
2011-2012131 To dig Borewel in Amrutha Nagar 2.00
work completed
EE PRED 2.00 0.00
2011-2012132 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore 10.00
work completed
KRIDL 10.00 0.00
2011-2012133
Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency
10.00work completed
EE PRED 10.00 0.00
2011-2012134
Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012135
Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012136
Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk
5.00work completed
EE PRED 5.00 0.00
2011-2012137
Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara
10.00work completed
EE PRED 10.00 0.00
2011-2012138
2 % Administration expinditure10.00 DC 10.00 0.00
Total 624.87 614.87 10
2010-20111
Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,
5.00work completed
EE PRED 5.00 0.00
2010-20112
Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,
5.00work completed
EE PRED 5.00 0.00
2010-20113
Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli5.00
work completed
EE PRED 5.00 0.00
2010-20114
Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli5.00
work completed
EE PRED 5.00 0.00
2010-20115
Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2010-20116
Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-20117
Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-20118
Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli
5.00work completed
EE PRED 5.00 0.00
2010-20119
Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt)
5.00work completed
EE PRED 5.00 0.00
2010-201110
Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt)
5.00work completed
EE PRED 5.00 0.00
2010-201111
Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt)
5.00work completed
EE PRED 5.00 0.00
2010-201112
Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt)
5.00work completed
EE PRED 5.00 0.00
2010-201113
Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)
5.00work completed
EE PRED 5.00 0.00
Page 60
Raw data Final2010-2011
14Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201115
Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201116
Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201117
Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201118
Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli5.00
work completed
EE PRED 5.00 0.00
2010-201119
Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201120
Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201121
Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201122
Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201123
Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli
5.00work completed
EE PRED 5.00 0.00
2010-201124
Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.
8.00work completed
EE PRED 8.00 0.00
2010-201125
One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk1.50
work completed
EE PRED 1.50 0.00
2010-201126
Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side)
5.00work completed
EE PRED 5.00 0.00
2010-201127
Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)
5.00work completed
EE PRED 5.00 0.00
2010-201128
Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk
1.50work completed
EE PRED 1.50 0.00
2010-201129
Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201130
Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201131
K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201132
K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201133
Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201134
Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201135
Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201136
Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201137
Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
Page 61
Raw data Final2010-2011
38 Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights) 4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201139
Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)
4.41work completed
Nirmithi Kendra 4.41 0.00
2010-201140 R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights) 1.47
work completed
Nirmithi Kendra 1.47 0.00
2010-201141
Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43
1.50work completed
EE PRED 1.50 0.00
2010-201142
Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore
1.00work completed
EE PRED 1.00 0.00
2010-201143
Road Development work Stage - 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2010-201144
Road Development work Stage - 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2010-201145
Road Development work Stage - 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk
5.00work completed
EE PRED 5.00 0.00
2010-201146
Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk5.00
work completed
EE PRED 5.00 0.00
Total 208.48 208.48 0
2009-20101
Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk,Bangalore Dist.
4.50work completed
EE, PRED, Bangalore
4.50 0.00
2009-20102
Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District.
7.99work completed
EE, PRED, Bangalore
7.99 0.00
2009-20103
Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District.
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-20104
Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist.
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-20105
Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-20106
Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-20107
Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli8.00
work completed
EE, PRED, Bangalore
8.00 0.00
2009-20108
Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli10.00
work completed
EE, PRED, Bangalore
10.00 0.00
2009-20109
Road Development work, Marenahalli Joining road, Jaalahalli Hobli4.00
work completed
EE, PRED, Bangalore
4.00 0.00
2009-201010 Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony,
Bangalore. ( Stage 1)3.49
work completed
EE, PRED, Bangalore
3.49 0.00
2009-201011
Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)
7.10work completed
EE, PRED, Bangalore
7.10 0.00
2009-201012 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa
home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli8.00
work completed
EE, PRED, Bangalore
8.00 0.00
2009-2010
13Community hall construction for Margadarshi Mahila Samaja ® , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore
1.00work completed
Project Manager, Nirmithi Kendra Urban
1.00 0.00
Page 62
Raw data Final2009-2010
14Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201015
Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201016
Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-201017
Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-201018
Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-201019
Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-201020
Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-201021
Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72
8.00work completed
EE, PRED, Bangalore
8.00 0.00
2009-201022
Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201023
Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201024
Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201025
Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village5.00
work completed
EE, PRED, Bangalore
5.00 0.00
2009-201026
Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201027
Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201028
Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore
5.00 0.00
2009-201029
Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village
5.00work completed
EE, PRED, Bangalore
5.00 0.00
2009-201030
Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk5.00
work completed
EE, PRED, Bangalore
5.00 0.00
Total 189.08 189.08 0
Page 63
Number
AmountNumbe
rAmount
Number
Amount
1 2009-10 30 189.08 29 189.08 0 0.00 0.00 200.00 16.75 216.75 189.08 27.672 2010-11 47 212.89 47 212.89 0 0.00 27.67 200.00 1.05 228.72 212.89 15.833 2011-12 138 624.87 134 614.87 4 10.00 15.83 500.00 81.85 597.68 614.87 -17.194 2012-13 104 505.54 99 482.04 5 23.50 -17.19 500.00 8.09 490.90 482.04 8.865 2013-14 88 446.00 50 253.00 38 193.00 8.86 250.00 0.50 259.36 253.00 6.36
407 1978.4 359 1751.9 47 226.50 1751.8810.0010.00 1742.29246.50 1675 9.59
1.59
2% Adiministation Charges for the Year 2013-14Grand Toatl
Interest/Amount on
DistributionTotal
Amount Released
to IABalance
Total2% Adiministation Charges for the Year 2012-13
Physical and Financial Status for the year 2009-10 to 2013-14
Sl No
Physical Status Financial Status [In Lakhs]
Year
Works Sanctioned
Works Completed
Works Under Progress
Opening
Balance
Amount
received by GOI