Moving Toward Hybrid Power Systems Creating value with utility scale energy storage ERCOT Renewable Technology Working Group April 2009

Upload: vinny

Post on 07-Jan-2016

23 views

Category:

Documents


5 download

DESCRIPTION

Moving Toward Hybrid Power Systems Creating value with utility scale energy storage. ERCOT Renewable Technology Working Group April 2009. Pioneers: Over a decade of energy storage projects have set the stage. 1994. 2003. 2007. 2008. What does it mean to be “hybrid”?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

Moving Toward Hybrid Power SystemsCreating value with utility scale energy storage

ERCOT Renewable Technology Working Group

April 2009

Page 2: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

2

Pioneers: Over a decade of energy storage projects have set the stage.

1994

2003

2007

2008

Page 3: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

3

What does it mean to be “hybrid”?

Hybrid Lessons

Better performance can be achieved through faster response and increased power capacity.

More efficient use of combustion engine can be delivered through steady throttling.

Ancillary functions of the vehicle, such as braking, can be delivered by using energy storage to recycle energy.

Energy storage can be integrated into the electric grid to deliver a similar set of benefits. The result will be a Hybrid Power System.

Page 4: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

4

Drivers: RPS goals creating a need for capacity and ancillary services.

Page 5: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

5

Different Services Would Require Different Type of Storage Device

Battery Options:–Li-ion: quick charge/discharge, more efficient–Flow (Zinc-Bromide): longer charge/discharge, smaller MW units, more expensive

Potential Service Options:–Ancillary Services markets

RegulationResponsive ReserveVAR supportBlack Start

–Internal plant usage (auxiliary load, demand mitigation)–Transmission constraints (intermittent renewable sources)–Price arbitrage

Page 6: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

6

Li-ion Energy Storage for Ancillary Services System Characteristics:

Self-contained 2MW modules with 15 min of run-time

Scalable by paralleling containers

90% round-trip efficiency

Faster response than any existing plant units

IEEE power quality standards

7-10 yr life

Less than 12 months to deploy

Portable

Page 7: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

7

Flow Energy Storage for Ancillary Services and Constrained System Characteristics:

Self-contained 0.5MW modules with ~5 hours of run-time

Scalable by paralleling containers

70% round-trip efficiency

Faster response than any existing plant units

IEEE power quality standards

20 yr life

Less than 12 months to deploy

Portable

Page 8: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

8

Near-term Value in U.S.: ISO Ancillary Services Markets

Regulation is a near zero-energy service compensating for minute-to-minute fluctuations in total system load and uncontrolled generation.

Page 9: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

9

Proof of Solution System: AES has built and interconnected a 2 MW grid-scale battery energy storage system using Lithium Ion batteries.

This system was validated by KEMA Consulting for Ancillary Services applications. The scope included safety, performance, and application testing

Operational 2 x 1MW system installed at IPL substation.

Meets IEEE 519, 1547

Power factor of 0.96

Less than 1-sec response time to any dispatch level

Over 90% round-trip efficient in regulation test

Page 10: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

10

Four second dispatch area control error (ACE) signal on 1MW system(4 hr test) shows manageable thermals due to high system efficiency.

Page 11: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

11

Advanced batteries provide “instant” response to +1MW to -1MW swing.

Page 12: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

12

An AES commissioned dynamic simulation study of NYISO, PJM, and CAISO shows significant system benefits from energy storage systems with 15 min of storage capability.

Conclusions:“…What is extremely interesting is that the effectiveness of the storage device increases if the AGC is adapted to take advantage of a fast-acting device that also needs to be "repaid" to restore its energy levels in a finite period of time. The improvement in ACE itself is not the major benefit but the ability to achieve regulation services using storage devices with lower energy-to-power ratios (shorter duration periods) may be very important. The reduced capital cost implied by the lower energy-to-power ratio translates into lower overall costs for regulation services from the storage device.”

“Storage devices responding to the filtered ACE signal are more effective than conventional generation at providing AGC regulation, in terms of system ACE performance, when used as described in this paper. This strongly implies that a lesser MW amount of regulation procured from storage and utilized as the primary resource for responding to ACE can be used as compared with the volume of regulation procured today from conventional resources.”

“Depending on the relative extent of storage used for regulation, the use of storage also results in decreased regulation signals to conventional units, which provides benefits in terms of incremental maintenance and possibly reduced adverse emissions effects.”

Page 13: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

13

Commercial Project Example: Spinning Reserve Replacement in Chile

12MW for 20 minutes system comprised of 8 containers of Advanced Lithium-ion storage

Increases energy sales from existing power plant by 4% by sell additional 12MW

Received local system operator approval based on transient system study

Page 14: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

14

Commercial Project Example: Spinning Reserve Replacement in Chile

50 Spinning Reserve events per

year

Page 15: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

15

Commercial Project Example: Spinning Reserve Replacement in Chile

Improved frequency response versus power plant.

Plant with 8MW Reserveand 12MW Storage

Plant with 20MW Reserve

Simulated loss of 332MW of generation.

Page 16: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

16

Renewable Integration Opportunity: Wind Projects

Problem: Curtailments due to transmission constraints are limiting delivery to customer under PPA

Duty Profile: At least a 20MW system with 4-5 hrs of charge and discharge capability per day

Technical Solution:

Premium Power ZincFlow-2000 Flow Battery 40 x 2.8MWh 1000kW/500kW units

Page 17: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

17

Page 18: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

18

Internal architecture

Comms BOX

Ops Center

Internet

Relay

DNP

Page 19: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

19

Interconnection Scheme

The project consists of a modular system, easily serviceable, and sectionalized into inverter sections supplying a common battery string.

Grid protection meets utility requirements

The system is connected to the operations center

Grid

Step-up Transformer

Disconnect / Switchgear

Isolation Transformers

Inverters

Batteries

Internal Load

Page 20: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

20

Inverters are “off-the-shelf” and proven.

Trusted PCS Suppliers:

Parker 1 MW Inverter System

ABB

American Superconductor

Parker Hannifin

S&C

Siemens

Page 21: Moving Toward Hybrid Power Systems Creating value with utility scale energy storage

21

System benefits from a storage enabled grid:

“Better and Cheaper Today”–Increasing capability of existing generating units by delivering ancillary services from dedicated energy storage units.

–Same cost for better quality service – “faster response to variations”

–Better use of existing assets – “steady throttling of plants”

“Enable the Future”–Faster response to support varying nature of new supply.