November 14, 2016 Shady Hill School
Mount Auburn Street Corridor Study
![Page 2: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/2.jpg)
Mount Auburn Street Corridor Study
Commonwealth of Massachusetts
Governor Charles D. Baker
Lieutenant Governor
Karyn E. Polito
Energy and Environmental Secretary Matthew A. Beaton
Department of Conservation and Recreation Commissioner
Leo P. Roy
![Page 3: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/3.jpg)
Mount Auburn Street Corridor Study
DCR Mission Statement
To protect, promote and enhance our common wealth of natural, cultural
and recreational resources for the well-being of all.
![Page 4: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/4.jpg)
Mount Auburn Street Corridor Study
Agenda
• Welcome
• History – Shared Goals
• Short-term Concept
• Long-term Concepts
![Page 5: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/5.jpg)
Mount Auburn Street Corridor Study
Project Area
![Page 6: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/6.jpg)
Mount Auburn Street Corridor Study
Schedule
![Page 7: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/7.jpg)
Mount Auburn Street Corridor Study
Project Overview
![Page 8: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/8.jpg)
Mount Auburn Street Corridor Study
Spring 2016: Gathering Public Input and Setting Goals
• April – Site Walk • 5/5 Stakeholder meeting • 6/1 Public Meeting • Wikimap: May to June • Targeted briefings
Shared Goals Adopted: June 23, 2016
![Page 9: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/9.jpg)
Mount Auburn Street Corridor Study
Shared Goals
1. Calm traffic, provide clarity, reduce crashes and severity of crashes
2. Improve connectivity, air quality and expand mobility choices by: a. Measuring people, not cars b. Reducing transit delays c. Improving safety, access, parking and comfort for bicycles. d. Maintaining mobility for motor vehicles e. Improving safety, attractiveness, noise, and comfort for pedestrians
and residents
3. Address cut-through traffic in the Larchwood, Huron Village, and Coolidge Hill Neighborhoods
4. Offer short-term and long-term solutions
5. Acknowledge enforcement and special uses by BB&N, Mt. Auburn Cemetery, Mt. Auburn, Shady Hill, and Tufts Health Plan
![Page 10: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/10.jpg)
Mount Auburn Street Corridor Study
Summer 2016: Developing Concepts
• July 21 – Major intersections – Mt. Auburn at Fresh Pond – Mt. Auburn at Brattle
• August 18 – Major intersections – Gerry’s Landing Interchanges – Fresh Pond at Huron and Brattle – Explored Alternative Approaches
• Fresh Pond at Mt. Auburn Underpass, Roundabout, or Rotary
![Page 11: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/11.jpg)
Mount Auburn Street Corridor Study
Summer 2016: Developing Concepts
2 1 8
0 0 9
![Page 12: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/12.jpg)
Mount Auburn Street Corridor Study
Fall 2016: Refining and Advancing Concepts
• September 15 – Introduction to transit priority – Mt. Auburn at Belmont – Refinements to:
• Gerry’s Landing 2-T • Fresh Pond at Huron and Brattle
– Plaza Charrette – Short-term Improvements
• November 11 – Parkway Road Diet Feasibility – Transit Priority in Depth – Landscape Improvements – Project-wide Design Concepts:
• Option A and Option B – VISSIM Proof of Concepts – Road Safety Audit (RSA) Results
![Page 13: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/13.jpg)
Mount Auburn Street Corridor Study
RSA Results Supportive of Concepts
Some Overall Recommendations: – Reduce Pavement Area Where Excessive – Clarify Signage, Signals, and
Pavement Markings – Tighten Turns to Reduce Speed and
Pedestrian/Vehicle Conflicts – Improve Pedestrian and Bicycle Conditions
![Page 14: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/14.jpg)
Mount Auburn Street Corridor Study
PLEASE NOTE: The following concepts are drafts;
works in progress shown only for the purpose of collecting public feedback for their improvement
![Page 15: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/15.jpg)
Mount Auburn Street Corridor Study
Short-term Concept
![Page 16: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/16.jpg)
Mount Auburn Street Corridor Study
Mt. Auburn Street at Fresh Pond Parkway
Additional Short-term Improvements: • Signal Improvements • Dedicated Bus Lane
![Page 17: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/17.jpg)
Mount Auburn Street Corridor Study
Long-term Concept
![Page 18: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/18.jpg)
Mount Auburn Street Corridor Study
North of Mount Auburn Street
![Page 19: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/19.jpg)
Mount Auburn Street Corridor Study
Fresh Pond Parkway: North of Mount Auburn Street
![Page 20: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/20.jpg)
Mount Auburn Street Corridor Study
Tactics Used to Reach Shared Goals
• Narrow Lanes • Enhance
Neighborhood Feel
![Page 21: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/21.jpg)
Mount Auburn Street Corridor Study
Relevant Plans
Highway Safety Imp. Program Crash Clusters (2011-13)
Lowell Park Cultural Landscape Report (2014)
Huron Ave Reconstruction (2013-16)
![Page 22: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/22.jpg)
Mount Auburn Street Corridor Study
Road Diet for Traffic Calming
![Page 23: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/23.jpg)
Mount Auburn Street Corridor Study
Tree Replacements for Traffic Calming
FIRST PLANTINGS LIKELY SPRING 2018
![Page 24: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/24.jpg)
Mount Auburn Street Corridor Study
Gateway Treatment Opportunity?
![Page 25: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/25.jpg)
Mount Auburn Street Corridor Study
Raised Intersection, Stamped Asphalt, or Both?
![Page 26: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/26.jpg)
Mount Auburn Street Corridor Study
Huron Avenue at Fresh Pond Parkway
![Page 27: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/27.jpg)
Mount Auburn Street Corridor Study
Calming Neighborhood Cut-throughs in Larchwood
• Speed Tables
• Raised Crossings
• Speed Humps
![Page 28: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/28.jpg)
Mount Auburn Street Corridor Study
Option A: Maintain Existing Geometry
DRAFT
DRAFT CONCEPT
![Page 29: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/29.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Circulation Change, Mid-Block Crossing
• Concerns About: – Circulation – Sight lines – RRFB Visibility
and Recognition – Speeds – Noise – Lack of Desire Line
DRAFT
![Page 30: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/30.jpg)
Mount Auburn Street Corridor Study
Brattle Street at Fresh Pond Parkway
![Page 31: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/31.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: 4:3 Road Diet
A.M. QUEUES
![Page 32: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/32.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: 4:3 Road Diet
P.M. QUEUES
![Page 33: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/33.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: 4:3 Road Diet – Impacts
![Page 34: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/34.jpg)
Mount Auburn Street Corridor Study
South of Mount Auburn Street
![Page 35: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/35.jpg)
Mount Auburn Street Corridor Study
Gerry’s Landing: Option A
![Page 36: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/36.jpg)
Mount Auburn Street Corridor Study
Gerry’s Landing: Option B
![Page 37: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/37.jpg)
Mount Auburn Street Corridor Study
Gerry’s Landing: Tactics Used
• Increase Parkland
• Road Diet
• Lane Narrowing
• Protected Bike Lane
• Shorten Pedestrian Crossings
• T-up Intersections
• Organize School and Boathouse Curb Use
![Page 38: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/38.jpg)
Mount Auburn Street Corridor Study
Gerry’s Landing: Relevant Plans
Cambridge Riverfront Plan (2011)
Charles River Connectivity Study (2014)
Greenough Boulevard Road Diet
![Page 39: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/39.jpg)
Mount Auburn Street Corridor Study
Gerry’s Landing: Main Flow of Traffic
Blue Arrows Show High Volume Movement
![Page 40: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/40.jpg)
Mount Auburn Street Corridor Study
Road Diet and Lane Narrowing
![Page 41: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/41.jpg)
Mount Auburn Street Corridor Study
Pedestrian Crossings Improved
One-Stage Crossings
![Page 42: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/42.jpg)
Mount Auburn Street Corridor Study
Organize Curb Use: Option A
![Page 43: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/43.jpg)
Mount Auburn Street Corridor Study
Organize Curb Use: Option B
![Page 44: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/44.jpg)
Mount Auburn Street Corridor Study
Additional Benefit: 4+ Acres of New Accessible Open Space
![Page 45: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/45.jpg)
Mount Auburn Street Corridor Study
Greenough Side: New Parkland
![Page 46: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/46.jpg)
Mount Auburn Street Corridor Study
Park Programming Exercise
1.6 ACRES OF 3.5 TOTAL
![Page 47: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/47.jpg)
Mount Auburn Street Corridor Study
What Can This Look Like?
THE LAWN ON D
![Page 48: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/48.jpg)
Mount Auburn Street Corridor Study
What Can This Look Like?
HARVARD UNDERPASS PARK
![Page 49: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/49.jpg)
Mount Auburn Street Corridor Study
How Would You Like to Use This Space?
![Page 50: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/50.jpg)
Mount Auburn Street Corridor Study
Eliot Bridge Intersection
![Page 51: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/51.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried
• Double Roundabout • Crossover Diamond
![Page 52: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/52.jpg)
Mount Auburn Street Corridor Study
Mount Auburn Street
![Page 53: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/53.jpg)
Mount Auburn Street Corridor Study
Mount Auburn Street: Option A Mount Auburn Street: Option A
![Page 54: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/54.jpg)
Mount Auburn Street Corridor Study
Mount Auburn Street: Option B
![Page 55: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/55.jpg)
Mount Auburn Street Corridor Study
Tactics Used
• Road Diet
• Bus-only Lanes
• Bus Signal Queue Jump
• Eliminate Merge
• T-up Intersection
• Protected Two-stage Turn Queue
• Bicycle-only Slip Lanes
![Page 56: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/56.jpg)
Mount Auburn Street Corridor Study
Relevant Plans Highway Safety Imp. Program
Crash Clusters (2011-13) Watertown Comprehensive Plan (2013)
Cambridge Bicycle Plan (2015)
MBTA Key Bus Route Improvement Program (2013)
Cambridge Transit Strategic Plan (2014)
Watertown Bicycle Transportation Plan (2003)
Strawberry Hill Neighborhood Plan (2003)
![Page 57: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/57.jpg)
Mount Auburn Street Corridor Study
Belmont Street at Mount Auburn Street: Option A
![Page 58: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/58.jpg)
Mount Auburn Street Corridor Study
Cambridge - Watertown Greenway Connection: Option A
![Page 59: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/59.jpg)
Mount Auburn Street Corridor Study
Bicycle Slip Lane
![Page 60: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/60.jpg)
Mount Auburn Street Corridor Study
Star Market Driveway
![Page 61: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/61.jpg)
Mount Auburn Street Corridor Study
Eliminate Lefts into Star Market Driveway: Option A
![Page 62: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/62.jpg)
Mount Auburn Street Corridor Study
Eliminate Lefts into Star Market Driveway: Option B
![Page 63: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/63.jpg)
Mount Auburn Street Corridor Study
Homer Street Entrance into Star Market
![Page 64: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/64.jpg)
Mount Auburn Street Corridor Study
Star Market Plaza Concepts – Please Leave Your Comments
![Page 65: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/65.jpg)
Mount Auburn Street Corridor Study
Star Market Plaza Concepts – Please Leave Your Comments
![Page 66: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/66.jpg)
Mount Auburn Street Corridor Study
At Brattle Street
MOUNT AUBURN
![Page 67: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/67.jpg)
Mount Auburn Street Corridor Study
At Brattle Street: Option A
![Page 68: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/68.jpg)
Mount Auburn Street Corridor Study
At Brattle Street: Option B
![Page 69: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/69.jpg)
Mount Auburn Street Corridor Study
At Brattle Street: RSA Recommends T-up of Intersection
![Page 70: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/70.jpg)
Mount Auburn Street Corridor Study
At Brattle Street: T-up Intersection (Option A)
![Page 71: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/71.jpg)
Mount Auburn Street Corridor Study
Signal Warranted
• Peak-hour, Four-hour Volumes Warrant a Traffic Signal, Estimates for Eight-hour Volumes also Warrant a Signal (MUTCD 2009)
![Page 72: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/72.jpg)
Mount Auburn Street Corridor Study
At Brattle Street: Bike Desire Line Study
![Page 73: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/73.jpg)
Mount Auburn Street Corridor Study
Bicycle-only Slip Lane
![Page 74: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/74.jpg)
Mount Auburn Street Corridor Study
Landscaping Opportunity – Please Leave Your Comments
![Page 75: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/75.jpg)
Mount Auburn Street Corridor Study
Landscaping Opportunity – Please Leave Your Comments
![Page 76: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/76.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Fifth Lane
![Page 77: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/77.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Fifth Lane (at Aberdeen)
![Page 78: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/78.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Fifth Lane (at Brattle)
![Page 79: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/79.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Westbound Bike Lane
AM PEAK
![Page 80: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/80.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Westbound Bike Lane
PM PEAK
![Page 81: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/81.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Maintain Merge (Option B)
![Page 82: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/82.jpg)
Mount Auburn Street Corridor Study
Fresh Pond Parkway at Mount Auburn
![Page 83: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/83.jpg)
Mount Auburn Street Corridor Study
Fresh Pond Parkway and Mt Auburn Street: Tactics Used
• Road Diet
• Reduce Pavement
• Raised Pedestrian Crossing
• Reduce Pedestrian Crossing Time
• Bicycle Crossing
• Two-way Protected Bike Lane
![Page 84: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/84.jpg)
Mount Auburn Street Corridor Study
Fresh Pond Parkway at Mount Auburn Street
![Page 85: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/85.jpg)
Mount Auburn Street Corridor Study
Reduce Pavement
363 feet
376 feet
![Page 86: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/86.jpg)
Mount Auburn Street Corridor Study
Reduce Pavement
212 feet
295 feet
![Page 87: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/87.jpg)
Mount Auburn Street Corridor Study
Single to Two-stage Crossing
![Page 88: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/88.jpg)
Mount Auburn Street Corridor Study
New Bike Crossing
![Page 89: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/89.jpg)
Mount Auburn Street Corridor Study
Pedestrian Crossing Operations
72 feet
22 feet
18 feet 34 feet
35 feet
![Page 90: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/90.jpg)
Mount Auburn Street Corridor Study
Road Safety Audit Finding: Reduce Left-turn Violations
![Page 91: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/91.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Roundabout
![Page 92: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/92.jpg)
Mount Auburn Street Corridor Study
Roundabout Feasibility: Residential Impacts
.22 acres and two homes
![Page 93: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/93.jpg)
Mount Auburn Street Corridor Study
Roundabout Feasibility: Avoiding Residential Impacts
![Page 94: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/94.jpg)
Mount Auburn Street Corridor Study
Roundabout Feasibility: Parkland Impacts
.48 acres
![Page 95: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/95.jpg)
Mount Auburn Street Corridor Study
Roundabout Feasibility: La Rotonda Size Comparison
![Page 96: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/96.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Underpass
![Page 97: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/97.jpg)
Mount Auburn Street Corridor Study
Other Things We Tried: Two Different Double T’s
![Page 98: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/98.jpg)
Mount Auburn Street Corridor Study
Introduction to Transit Priority
![Page 99: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/99.jpg)
Mount Auburn Street Corridor Study
Bus-only Lane and Transit Signal Priority
![Page 100: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/100.jpg)
Mount Auburn Street Corridor Study
VISSIM Traffic Analysis
![Page 101: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/101.jpg)
Mount Auburn Street Corridor Study
VISSIM Animations
• Existing Conditions • Long Term Option A
![Page 102: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/102.jpg)
Mount Auburn Street Corridor Study
Person Throughput Analysis (AM Peak)
Percent Bus Vehicles = 2% Percent Bus Person Throughput = 43% Bus Throughput = 925 persons/hour Vehicle Throughput = 1,200 persons/hour
Percent Bus Vehicles = 3% Percent Bus Person Throughput = 56% Bus Throughput = 985 persons/hour Vehicle Throughput = 765 persons/hour
![Page 103: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/103.jpg)
Mount Auburn Street Corridor Study
Bus Travel Time Option B (AM Peak)
Existing With Partial Bus Lanes and
Queue Jump
• About 2 minutes bus travel time savings with bus lanes
• About 3.5 minutes
reduction in 90th percentile travel time
![Page 104: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/104.jpg)
Mount Auburn Street Corridor Study
Auto Travel Time Option B (AM Peak)
• Vehicle operations improve on Mt Auburn due to signal timing changes at Fresh Pond Parkway
Existing With Partial Bus Lanes and
Queue Jump
![Page 105: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/105.jpg)
Mount Auburn Street Corridor Study
Bus Travel Time Option A (AM Peak)
Existing With partial bus lane and
queue jump Additional bus lane
between Homer and Aberdeen
• Additional bus lane provides over 2.5 minutes travel time savings
![Page 106: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/106.jpg)
Mount Auburn Street Corridor Study
Auto Travel Time and Pedestrian Delay Option A (AM Peak)
Existing With single-stage
crossing at FP Two-stage crossing at FP
![Page 107: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/107.jpg)
Mount Auburn Street Corridor Study
Bus Travel Time Option A (PM Peak)
Existing With Two-Stage Crossing and 4-Lane Section
• About 1 minutes bus travel time savings with bus lanes in the eastbound direction
• Westbound bus travel
time increases slightly (less than 0.5 minutes) as a result of lane repurposing
![Page 108: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/108.jpg)
Mount Auburn Street Corridor Study
Auto Travel Time Option A (PM Peak)
Existing With Two-Stage Crossing and
4-Lane Section
![Page 109: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/109.jpg)
Mount Auburn Street Corridor Study
Operations at Elliot Bridge and Memorial Drive (PM Peak)
Elliot Bridge Approach Delay and Queue (PM Peak)
![Page 110: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/110.jpg)
Mount Auburn Street Corridor Study
We Want Your Feedback
Please leave your comments on the roll plans around the room, and leave your park exercise on the sign in table when you leave.
![Page 111: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/111.jpg)
Mount Auburn Street Corridor Study
Next Steps
• Final Stakeholder Group Meeting and Public Meeting: January 2017
![Page 112: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road](https://reader035.vdocuments.us/reader035/viewer/2022080717/5f781e5b203f286f003cc834/html5/thumbnails/112.jpg)
Mount Auburn Street Corridor Study
For More Information:
• Project Website: www.mass.gov/dcr/mt-auburn-corridor-study
• If You Have Comments or Suggestions on This Project: – Submit online at: http://www.mass.gov/eea/agencies/dcr/public-
outreach/submit-public-comments/ – Write: Department of Conservation and Recreation, Office of Public
Outreach, 251 Causeway Street, Suite 600, Boston, MA 02114 – Comment Period (pertaining to this meeting):
Monday, November 14 – December 28, 2016
• Note: Public comments submitted to DCR may be posted on the DCR website in their entirety.
• If You Have Questions, Please E-mail: [email protected]