mosul db v9 copy option1
TRANSCRIPT
Mosul Emergency Response Plan 18 October 2016
- 1.2 - 1.5 millionpeople impacted
up to 1 milliondisplaced
700,000 in need
Cluster Planning Figures:
90,000 Tents Camps & Shelter Alternatives
90,000 Shelter kits Shelter Alternatives
Current Stock & Pipelinevs UNHCR Gap:
140,000 NFI Kits
Plots in UNHCR Constructed/Supported Camps
USD 196.2 million required
USD 95 million committed
ISLAMICREPUBLICOF IRAN
IRAQ
SYRIAN ARABREPUBLIC
TURKEY
ANBAR
DAHUK
DIYALA
ERBIL
NINEWA
SALAHAL-DIN
SULAYMANIYAH
KIRKUK
Domiz 1Domiz 2
Akre
GawilanCamp
Kawergosk
Darashakran
BasirmaCamp
QushtapaCamp
ArbatCamp
Al-ObaidiCamp
Shikhan
Tilkaif
Hamdaniya
Mosul
Telafar
Sumel
Dahuk
Akre
Erbil
Ba'aj
Sinjar
Hatra
Zakho
Shirqat
Baiji
HadithaKhanaqin
Kifri
BaladroozMuqdadiya
Khalis
Tooz
Kalar
Heet
Ka'im
Ramadi
Tikrit
Hawiga
Makhmur
Chamchamal
Mergasur
AmediSoran
Choman
PshdarRania
Shaqlawa
Koisnjaq
Dokan
Sulaymaniya
Sharbazher
Halabja
Darbandihkan
Ana
Ru'ua
Daur
BaladThethar
Kirkuk
Dabes
Samarra
SABKHATALBU
GHARZ
UNK
Dawadia
BajetKandala
Kabarto 1Kabarto 2
RwangaCommunity
KhankeShariya
Berseve 1Berseve 2
Chamishku
Alwand1
Al Adheam
Mansouriya
Al-Wand 2Alyawa
Baharka
Harshm
Ankawa 2St. Elijah Church
Yahyawa
Nazrawa
Bardarash
Mamilian
Bawa(Baidawa)
Essian
SheikhanMamrashan
Al-Hwesh
Tazade
Samaraa'Cent.
Ba'Aj
Bazyan
Choman
Dahuk
Erbil
Hawiga
Kelar
Kirkuk
Mosul Rania
Samarra
Shaqlawa
Soran
Sulaymaniyah
Tekrit
Zakho
Al Walid
Barzan
Barzan
Mahmudia
Qarah Qosh
Rabiah
Sananik
Shirqat
Zumar
Chamchamal
Khabat
Kalak
Khabat
Gwer
Kharaib Jabr
Khazir
Dibs
Aski Mosul
Ba'Shiqa
Ijhala
Shura
Sinjar
Talafar
Janbur
Tulul Baq
Al Holcamp
Nargizlia
Wardak
Hasiyah
Laylan
Surdash
Planned Capacity (plots)2.8002,0001,0005002000
10,0005,0003,0002,0001,000400
20km
CityTown
IDP CampRefugee Camp
Main RoadRoad
B Constructed/Existing camps with spare capacity (5) (3,200 plots)
Planned (2) (1,500 plots)
Camps/Plots Construction
Debaga
UNHCR Protection Monitoring for Mosul Response
UNHCR Funding Requirements
HHs with unaccompanied or separated children
HHs missing documents
1,685
2,586 2,674 2,032 1,955
9,247 Individuals
B Under construction (5) (9,000 plots)
B
Debaga 3
Debaga 2B
Amalla
B
Daquq
BBLeylan 2
Zelikan
B
Garmawa
B
BHasansham
ArbatArbat
Ashti
B
B
BQoratu
Ü
The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations. Sources: UNHCR Registration Unit, UNCS, UNOCHA, UNHCR CCCM Cluster. Geographic Coordinate System: GCS_WGS_1984The plan includes a small return component of 10,000 IDP families.
BBBB
Tikrit UniversityAl Alam
Olympic Stadium 4th Camp in Salah Al Din
B Potential (3) (5,000 plots)
B
Total 18,700 plots
Capacity112,200 IDPs
1 Family per plot and 6 Individuals per family
* Tazade, Alwand1 and Surdash were constructed by the Government and Debaga (Extension) by the Emirates Red Crescent
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
HHs Assessed
400 500 500 500
600 700
1,000 1,000 1,000 1,000 1,000
1,600 2,900
3,000 3,000
Surdash*Al AlamOlympic Stadium in TikritTazade*QoratuAlwand1*Tikrit UniversityLeylan 24th Camp in Salah Al DinZelikanDebaga (Extension)*DaquqHasanshamAmallaDebaga 3
Target 20,000 plots
55,000Camp/Site Plots
Debaga (Extension)
B Assessed and suitable emergency site or camp by other partners
B
BB
B
Tal Aswad 1
Al HasudiyaNorth Kanhish village
Bustan Al Sheuokh
B
BNargizlia 2
Nargizlia
BHasansham(2)
Al QaiyaraB
Qayyarah-Jad’ahQayyarah Airstrip
BAl Alam/Rubeida
BChamchamal1
Cluster Planning for winter is separate
1,000
44,000 32,000
18,000
Cluster MOMD UNHCR UNHCR Gap
40,000 50,000
Cluster UNHCR UNHCR Gap
90,000 25,000
25,000
Cluster UNHCR UNHCR Gap
206,000 Heaters
66,000
140,000
UNHCR UNHCR Gap
36,300 11,600
7,100
Cluster/MOMD UNHCR UNHCR Gap
67%
2%
Camps and emergency sites include locations within the broader Mosul corridor.
48%
Committed