most common construction problems and how construction management software can solve them

11
MOST COMMON CONSTRUCTION PROBLEMS AND HOW CONSTRUCTION MANAGEMENT SOFTWARE CAN SOLVE THEM 0 1

Upload: thomas-goubau

Post on 16-Apr-2017

126 views

Category:

Software


6 download

TRANSCRIPT

Page 1: Most Common Construction Problems and How Construction Management Software Can Solve Them

MOST COMMON CONSTRUCTION PROBLEMS AND HOW CONSTRUCTION MANAGEMENT SOFTWARE CAN SOLVE THEM

01

Page 2: Most Common Construction Problems and How Construction Management Software Can Solve Them

02

CONSTRUCTION INDUSTRY'S CURRENT STATE

Infrastructure industry to double by 2030 with $57 trillion in investment.

Global infrastructure investment by industries

Selected years, constant 2005 price and exchange rates, in $ trillion

Mega project share in the future12% share by number of projects77% share by project value

1Forecast assumes price of capital goods increases at same rate as other goods. 2Project award date 2015 and beyond. McKinsey&Company

Donna Longstocking
Hey guys, I just edited the details with regards to the label of the table and properly placed the important data (mega project share) as focus.
Page 3: Most Common Construction Problems and How Construction Management Software Can Solve Them

03

Productivity in manufacturing has nearly doubled, wheres in construction in has remained flat

Overview of productivity improvement over time

Source: Expert interviews; HIS Global Insight

Productivity ( Value added per worker ), real, $2005

Productivity is low because of slow digitization

Page 4: Most Common Construction Problems and How Construction Management Software Can Solve Them

04

Source: Expert interviews; HIS Global Insight

Labor productivity, gross value added per hour worked, constant price

Construction labor productivity has not kept pace with overall economic productivity

Page 5: Most Common Construction Problems and How Construction Management Software Can Solve Them

05

Estimated overrun in capital expenditure, % of original quoted capital expenditure

Cost and schedule overruns are the norm in the construction sector

Page 6: Most Common Construction Problems and How Construction Management Software Can Solve Them

06

Estimated overrun in capital expenditure (% of original quoted capital expenditure)

Ninety-eight percent of megaproject face cost overruns or delay

• 98% of project incur cost overruns or delay• The average cost increase is 80% of

original value• The average slippage is 20 months behind

original schedule

Page 7: Most Common Construction Problems and How Construction Management Software Can Solve Them

Large projects take 20% longer to finish with up to 80% overspending

Only 1% of the industry's revenue is spent on R&D

Less than 1% is spent on industry-specific software solutions

CONSTRUCTION INDUSTRY'S

CURRENT STATE

07

Page 8: Most Common Construction Problems and How Construction Management Software Can Solve Them

SOME FACTORS CONTRIBUTING TO CONSTRUCTION PROBLEMS

08

Bad Organizational

StructureNon-Universality of

InformationWeak

Performance Management

Deficient Communication

Inadequate Risk

Management

Connection Gaps

Poor Shoer Term

Calculations

Limited Skill Capabilities

Page 9: Most Common Construction Problems and How Construction Management Software Can Solve Them

SAFETY ISSUES

09

Work injuries can delay project by at least one week

Using tech-integrated safety management reduce injury rates, improve schedule and budget outcomes, improve ROI and company reputation.

Page 10: Most Common Construction Problems and How Construction Management Software Can Solve Them

SOLUTIONS OFFERED BY APROPLAN'S CONSTRUCTION MANAGEMENT SOFTWARE

10

Everyone is on the same page. Track everyone's progress in complete transparency.

Everyone can collaborate in real-time. Everyone in the office and outside the field are able to work together and keep everyone updated even when offline.

Effectively communicate in-progress reports. Generate and distribute clear and detailed reports to the whole team and subcontractors.

Document safety concerns. Everyone can document safety concerns when they see them, thus, the ease to follow up on incidences and action plans

Data will always be yours, safe and encrypted. You will always have access to your information that's protected and encrypted.

Page 11: Most Common Construction Problems and How Construction Management Software Can Solve Them

THANK YOU

Thomas Goubau CEO