MOSCOW CITYDEPARTMENT OF SCIENCE, INDUSTRIAL POLICY AND ENTERPRENEURSHIP
IMPORT FROM GERMANY TO RUSSIA. MOSCOW SHARE
TOP-5 ITEMS IMPORTED FROM GERMANY TO MOSCOW
18 %
17,8 %
16,2 %
7,2 %
1,33
1,3
0,53
1,2
0,48 6,4 %
INVESTMENT PROJECT MANAGEMENTPersonal manager at each stage of the project
>1 750 resident companies
including foreign ones:
<5% % is a share of vacant lease areas
Technopolis Moscow:
• Berendsen, Great Britain• Merck, Germany• Acrostak, Switzerland• ABB, Switzerland• Schneider Electric, France
Technopark Otradnoe:
• Sartorius RUS, Germany• Bang & Bonsomer, Finland
TAX BENEFITS TO ANCHOR RESIDENTS
• Income tax — 12.5%• Property tax — 0%
• Investments is from 294 EUR/sq.m./5 years
• Payroll budget is from 943 EUR/sq.m.
• Revenue is from 3.14 ths EUR/sq.m.
• Wages are not less than the average monthly income for
Moscow x1.2 (at least 1,020 EUR)
BUSINESS REQUIREMENTS
33
2 168597,9
109vacant area
• Detached territory with a special regime of production and
innovative activities
• Established according to the Federal Law “On Special Economic
Zones in the Russian Federation“, dated July 22, 2005 N 116-FZ
• Supervisor – Moscow city Department of Science, Industrial
Policy and Enterpreneurship
• Microelectronics;
• Energy Saving Technologies;
• Biotechnology and Pharmaceuticals;
• Information and Communication Technologies;
• Mechanical engineering;
• Nanotechnologies
SEZ TECHNOPOLIS MOSCOW OTHER SEZ IN RUSSIA
INCOME TAX Federal part
Regional part
PROPERTY TAX
TRANSPORT TAX
CONTRIBUTIONS TO OFF-BUDGET FUNDS
AVERAGE LAND PLOT COST
LAND PLOT BUYOUT COST
* Amendments to the Moscow City Law, dated December 19, 2007 N48 «On land use in the City of Moscow» are introduced. Decree of the Moscow City Government on 1% land plot buyout cost is under approval.Planned period of approval May 2018.
2%2%0%
for 10 years up to 13,5%
0%for 10 years
0%up to 15 years
0%up to 10 years
up to 426 ths. EUR
up to 25 %of cadastral value
21%till 2019
28%till 2020
LAND TAX0%up to 5 years
0%for 10 years
653 ths. EUR
1%**of cadastral value
0%for 10 years
21%till 2019
28%till 2020
Utilities Cost Limits
Power supply 7,5*eurocent/kWh
60 MW
Heat supply 26,47** EUR/Gcal/h
184 Gcal/h
Water supply 43 eurocent/m3 2419,92 m3/day
Wastewater 30 eurocent/m3 1807,45 m3/day
Gas supply 77,0***eurocent/1000*m3
Gas supply is under on-site construction
Administrative and Business Center
Onsite utilities
Customs post
Road network
Optical communication channel
Fire station
1st Phase
MULTILEVEL PARKING
Commissioning 1Q 2020
Built-up area 7 239 sq.m.
900 parking lots
2nd PhaseCommissioning 4Q. 2020
3innovative laboratory and industrial buildings
totalarea28 527
sq.m.
2innovative laboratory and industrial buildings
total area19 018
sq.m.
* According to business-plans received ** Including companies, approved by inter-departmental commission
1,5 years
comparing to 2006-2016
(09.2016-03.2018*)(2006 - 2016*)
10 years
Number of SEZ residents38 12*
Number of SEZ residents
+32%
comparing to 2006-2016
Number of employees3 563 3 385
Number of employees
+95%
comparing to 2006-2016
Investments, EUR mln273 176
Investments, EUR mln
+65%
comparing to 2006-2016
Revenue, EUR mln177 421 Revenue,
EUR mln
x2,4
09.2016SEZ management is transferred to
the City of Moscow
BROWNFIELD (VOLGOGRADSKY PROSPECT)
BROWNFIELD ( )
OFFICE SPACE
Vacant space11,4 ths. sq. m
LABORATORY SPACE
Vacant space12,8 ha
0,29 ths. sq. m
Total area size for production activity
44,9 ha 23,7ths sq. m
Floor area 4,83ths. sq. m
Office space
Production facilities
9,9%
91,1%
63,5 ths. sq. m
Vacant space, including350
ths sq. m
Floor area
Vacant space
Floor area
Production of professional test and measurement equipment
Plant operating since 2017
Production of CNC-turning and milling centres, grinders, bearings, underfloor profiling machines
plant opening in “TechnopolisMoscow” Special Economic
Zone - 2019
Production of pumping equipment and fittings
plant opening - May 2018
Life science laboratory
resident of TechnopolisMoscow” Special Economic
Zone since 2017
Germany Russia
Wages fund expenses 41 757 31 391
Utility costs 1 520 1 469
Customs duties 14 485 0
Taxes, besides customs duties
9 242 2 400
• Production of medicines for ambulatory and hospital care as well as medical diagnostics
• Main stages of project
• Construction planning I qr.2018
• Construction (including connection to utilities)
II qr. 2018-IV qr. 2018
• Launching (equipment installation, license) I qr.2019
• Start of production II qr.2019
• Achievement of design capacity I qr.2022
2В
2 га
2,02 hа
PROJECT DETAILS
• Floor area– 12 120 sq. m
• Area size – 2,02 hа in Zelenograd
• Number of employed– 101 persons
CAPEX (THS. EUR)
Germany Russia
Buyout of the land plot 364 11
Construction and installation works
7 546 5 182
Including connection to utilities
359 0
TOTAL
OPEX (THS. EUR, FOR PROJECT, FORECAST
PERIOD TILL 2035)
7910 5194 67 005 35 260TOTAL
Germany Russia
Wages fund expenses 10 873 4 941
Utility costs 396 231
Customs duties 3 772 0
Taxes, besides customs duties
1 987 1 783
Rent cost 2 292 1 783
• Production of interactive electronic equipment: interactive panels, information terminals, multisensory tables, hardware and software complexes for telemedicine
• Main stages of project
• Construction planning II qr.2018
• Construction and installation activities III qr. 2018
• Equipment installationIII qr. 2018-IV qr. 2018(2 stages)
• Start of production I qr.2019
• Achievement of design capacity I qr.2022
PROJECT DETAILS
• Floor area – 1 612 sq. m
• Number of employed– 16 persons
CAPEX (THS. EUR)
Germany Russia
Buyout of plot - -
Preparation of premises, construction and installation works
535 350
Including connection to engineering networks
48 0
TOTAL
OPEX (THS. EUR, FOR PROJECT, FORECAST
PERIOD TILL 2035)
535 350 19 320 7 306TOTAL
2В
2га
2,2га
1 612sq. m
WWW.MOS.RU/DNPP
22, Voznesenskiy lane, Moscow
+7 (495) 620 20 00