PARKS VICTORIA ALTONA PIER
DATEJOB NO. DRAWING NO ISSUE
landscape architectureurban design
environmental management 27.04.2020V191484 5
PLAN1:500
NORTH
RESPITE SEATING PROVIDED ALONG LENGTH OF PIER
RESPITE SEATING PROVIDED ALONG LENGTH OF PIER
MOTION SENSOR LIGHTING AT 30M SPACING TO MINIMISE IMPACT ON WILDLIFE WHILE ENSURING SAFE PEDESTRIAN ACCESS.
WATER DEPTH
0 - 1m
1 - 2.8m
2.8 - 4.5m
APPROXIMATE LOCATION OF NO BOATING ZONE
(Water depths are approximate)
SK-AL-03SCALE 1:500 @ A1
0 10 20 30 50m
SCALE 1:100 @ A1
0 2 4 6 10m
CONCEPT DESIGN - OPTION TWO - T HEAD
T-HEAD TO END OF JETTY WITH SEATING AND SHELTER PROVIDED LEAVING ADEQUATE SPACE FOR AN EMERGENCY VEHICLE TO TURN AROUND
LARGE SEATING STEPS TO WRAP AROUND EASTERN EDGE WITH BIGGER LOWER PLATFORM
BALUSTRADE TO EDGE OF PIER
CAPPING BOARD FOR SAFETY
LARGE FORMAT SEATING STEPS DOWN TO LOWER LEVEL
LARGER LOWER LEVEL ALLOWS MORE CIRCULATION AND SPACE FOR ACTIVITIES WHILE PROVIDING SEATING ELEMENTS
GANGWAY RAMP TO LOWER LANDING
GANGWAY TO 24m FIXED LOW LANDING PROVIDING MOORING FACILITIES FOR BOATS
WIDENED CONCRETE ABUTMENT TO JOIN SEAWALL DEVELOPMENT.
CENTRALLY LOCATED PUBLIC ART / SCULPTURAL ELEMENT. POTENTIAL FOR REUSE OF TIMBERS FROM DEMOLISHED PIER TO CREATE A PUBLIC ART PIECE TO ACKNOWLEDGE THE HERITAGE SIGNIFICANCE
EXISTING PIER TO BE REMOVED AS PART OF THIS PROJECT
NEW PIER TO FOLLOW ALIGNMENT OF PIER STREET
PIER STREET
ESPL
ANAD
E
ADJOINING SEAWALL DEVELOPMENT (NOT PART OF THIS SCOPE OF WORKS)
APPROXIMATE LOCATION OF ARTIFICIAL REEF - CONCRETE REEF MODULES TO BE MOVED IF THEY IMPACT CONSTRUCTION
ADDITIONAL ARTIFICIAL REEF MODULES AWAY FROM PIER
SECTION 21:100
PARKS VICTORIA ALTONA PIER
DATEJOB NO. DRAWING NO ISSUE
landscape architectureurban design
environmental management 27.04.2020V191484 5SK-AL-04SCALE 1:200 @ A1
0 4 6 12 20m
CONCEPT DESIGN - OPTION TWO - T HEAD (DETAILPLANS)
DETAIL PLAN - ABUTMENT1:200
DETAIL PLAN - PIER HEAD1:200
WIDENED CONCRETE ABUTMENT TO JOIN SEAWALL DEVELOPMENT.
CENTRALLY LOCATED PUBLIC ART / SCULPTURAL ELEMENT. POTENTIAL FOR REUSE OF TIMBERS FROM DEMOLISHED PIER TO CREATE A PUBLIC ART PIECE TO ACKNOWLEDGE THE HERITAGE SIGNIFICANCE
ESPL
ANAD
E
WATER DEPTH
0 - 1m
1 - 2.8m
2.8 - 4.5m
(Water depths are approximate)
MOTION SENSOR LIGHTING AT 30M SPACING TO MINIMISE IMPACT ON WILDLIFE WHILE ENSURING SAFE PEDESTRIAN ACCESS.
T-HEAD TO END OF JETTY WITH SEATING AND SHELTER PROVIDED LEAVING ADEQUATE SPACE FOR AN EMERGENCY VEHICLE TO TURN AROUND
LARGE SEATING STEPS TO WRAP AROUND EASTERN EDGE WITH BIGGER LOWER PLATFORM
GANGWAY RAMP TO LOWER LANDING
SEATING
GANGWAY TO 24m FIXED LOW LANDING PROVIDING MOORING FACILITIES FOR BOATS
EXISTING PIER TO BE REMOVED AS PART OF THIS PROJECT