PARKS VICTORIA ALTONA PIER DATE JOB NO. DRAWING NO ISSUE landscape architecture urban design environmental management 27.04.2020 V191484 5 PLAN 1:500 NORTH RESPITE SEATING PROVIDED ALONG LENGTH OF PIER RESPITE SEATING PROVIDED ALONG LENGTH OF PIER MOTION SENSOR LIGHTING AT 30M SPACING TO MINIMISE IMPACT ON WILDLIFE WHILE ENSURING SAFE PEDESTRIAN ACCESS. WATER DEPTH 0 - 1m 1 - 2.8m 2.8 - 4.5m APPROXIMATE LOCATION OF NO BOATING ZONE (Water depths are approximate) SK-AL-03 SCALE 1:500 @ A1 0 10 20 30 50m SCALE 1:100 @ A1 0 2 4 6 10m CONCEPT DESIGN - OPTION TWO - T HEAD T-HEAD TO END OF JETTY WITH SEATING AND SHELTER PROVIDED LEAVING ADEQUATE SPACE FOR AN EMERGENCY VEHICLE TO TURN AROUND LARGE SEATING STEPS TO WRAP AROUND EASTERN EDGE WITH BIGGER LOWER PLATFORM BALUSTRADE TO EDGE OF PIER CAPPING BOARD FOR SAFETY LARGE FORMAT SEATING STEPS DOWN TO LOWER LEVEL LARGER LOWER LEVEL ALLOWS MORE CIRCULATION AND SPACE FOR ACTIVITIES WHILE PROVIDING SEATING ELEMENTS GANGWAY RAMP TO LOWER LANDING GANGWAY TO 24m FIXED LOW LANDING PROVIDING MOORING FACILITIES FOR BOATS WIDENED CONCRETE ABUTMENT TO JOIN SEAWALL DEVELOPMENT. CENTRALLY LOCATED PUBLIC ART / SCULPTURAL ELEMENT. POTENTIAL FOR REUSE OF TIMBERS FROM DEMOLISHED PIER TO CREATE A PUBLIC ART PIECE TO ACKNOWLEDGE THE HERITAGE SIGNIFICANCE EXISTING PIER TO BE REMOVED AS PART OF THIS PROJECT NEW PIER TO FOLLOW ALIGNMENT OF PIER STREET PIER STREET ESPLANADE ADJOINING SEAWALL DEVELOPMENT (NOT PART OF THIS SCOPE OF WORKS) APPROXIMATE LOCATION OF ARTIFICIAL REEF - CONCRETE REEF MODULES TO BE MOVED IF THEY IMPACT CONSTRUCTION ADDITIONAL ARTIFICIAL REEF MODULES AWAY FROM PIER SECTION 2 1:100

Upload: others

Post on 10-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MORE CIRCULATION AND SPACE FOR ACTIVITIES WHILE … · parks victoria altona pier job no. drawing no issuedate landscape architecture urban design environmental management v191484

PARKS VICTORIA ALTONA PIER

DATEJOB NO. DRAWING NO ISSUE

landscape architectureurban design

environmental management 27.04.2020V191484 5

PLAN1:500

NORTH

RESPITE SEATING PROVIDED ALONG LENGTH OF PIER

RESPITE SEATING PROVIDED ALONG LENGTH OF PIER

MOTION SENSOR LIGHTING AT 30M SPACING TO MINIMISE IMPACT ON WILDLIFE WHILE ENSURING SAFE PEDESTRIAN ACCESS.

WATER DEPTH

0 - 1m

1 - 2.8m

2.8 - 4.5m

APPROXIMATE LOCATION OF NO BOATING ZONE

(Water depths are approximate)

SK-AL-03SCALE 1:500 @ A1

0 10 20 30 50m

SCALE 1:100 @ A1

0 2 4 6 10m

CONCEPT DESIGN - OPTION TWO - T HEAD

T-HEAD TO END OF JETTY WITH SEATING AND SHELTER PROVIDED LEAVING ADEQUATE SPACE FOR AN EMERGENCY VEHICLE TO TURN AROUND

LARGE SEATING STEPS TO WRAP AROUND EASTERN EDGE WITH BIGGER LOWER PLATFORM

BALUSTRADE TO EDGE OF PIER

CAPPING BOARD FOR SAFETY

LARGE FORMAT SEATING STEPS DOWN TO LOWER LEVEL

LARGER LOWER LEVEL ALLOWS MORE CIRCULATION AND SPACE FOR ACTIVITIES WHILE PROVIDING SEATING ELEMENTS

GANGWAY RAMP TO LOWER LANDING

GANGWAY TO 24m FIXED LOW LANDING PROVIDING MOORING FACILITIES FOR BOATS

WIDENED CONCRETE ABUTMENT TO JOIN SEAWALL DEVELOPMENT.

CENTRALLY LOCATED PUBLIC ART / SCULPTURAL ELEMENT. POTENTIAL FOR REUSE OF TIMBERS FROM DEMOLISHED PIER TO CREATE A PUBLIC ART PIECE TO ACKNOWLEDGE THE HERITAGE SIGNIFICANCE

EXISTING PIER TO BE REMOVED AS PART OF THIS PROJECT

NEW PIER TO FOLLOW ALIGNMENT OF PIER STREET

PIER STREET

ESPL

ANAD

E

ADJOINING SEAWALL DEVELOPMENT (NOT PART OF THIS SCOPE OF WORKS)

APPROXIMATE LOCATION OF ARTIFICIAL REEF - CONCRETE REEF MODULES TO BE MOVED IF THEY IMPACT CONSTRUCTION

ADDITIONAL ARTIFICIAL REEF MODULES AWAY FROM PIER

SECTION 21:100

Page 2: MORE CIRCULATION AND SPACE FOR ACTIVITIES WHILE … · parks victoria altona pier job no. drawing no issuedate landscape architecture urban design environmental management v191484

PARKS VICTORIA ALTONA PIER

DATEJOB NO. DRAWING NO ISSUE

landscape architectureurban design

environmental management 27.04.2020V191484 5SK-AL-04SCALE 1:200 @ A1

0 4 6 12 20m

CONCEPT DESIGN - OPTION TWO - T HEAD (DETAILPLANS)

DETAIL PLAN - ABUTMENT1:200

DETAIL PLAN - PIER HEAD1:200

WIDENED CONCRETE ABUTMENT TO JOIN SEAWALL DEVELOPMENT.

CENTRALLY LOCATED PUBLIC ART / SCULPTURAL ELEMENT. POTENTIAL FOR REUSE OF TIMBERS FROM DEMOLISHED PIER TO CREATE A PUBLIC ART PIECE TO ACKNOWLEDGE THE HERITAGE SIGNIFICANCE

ESPL

ANAD

E

WATER DEPTH

0 - 1m

1 - 2.8m

2.8 - 4.5m

(Water depths are approximate)

MOTION SENSOR LIGHTING AT 30M SPACING TO MINIMISE IMPACT ON WILDLIFE WHILE ENSURING SAFE PEDESTRIAN ACCESS.

T-HEAD TO END OF JETTY WITH SEATING AND SHELTER PROVIDED LEAVING ADEQUATE SPACE FOR AN EMERGENCY VEHICLE TO TURN AROUND

LARGE SEATING STEPS TO WRAP AROUND EASTERN EDGE WITH BIGGER LOWER PLATFORM

GANGWAY RAMP TO LOWER LANDING

SEATING

GANGWAY TO 24m FIXED LOW LANDING PROVIDING MOORING FACILITIES FOR BOATS

EXISTING PIER TO BE REMOVED AS PART OF THIS PROJECT