    Building Morphology Factors

  • 8/12/2019 mophology-120524133908-phpapp02

    3/20

    Building Construction process comprises with many stages.

    They basically consist of two parts

    Pre Construction

    Post Construction

    The Designing process of a building project belongs to the Pre

    construction stage.

    Considering about the Design Morphology Factors comes

    under this Designing stage.

  • 8/12/2019 mophology-120524133908-phpapp02

    4/20

    Cost of Construction changes in a rapid manner due to many

    reasons.

    Therefore a proper analysis of Building Morphology Factors are

    essential to reduce cost of Construction.

    This presentation is aimed at understanding what the Design

    Morphology Factors are.

    This discusses about;What the Morphology Factors are.

    A practical example on implementing Morphology Factors.

    Analysis and Recommendations of alternatives Designs

    using Morphology Factors.Impact of Morphology Factors on Cost of Construction.

  • 8/12/2019 mophology-120524133908-phpapp02

    5/20

    Main design Morphology Factors that are considered are;

    Shape of the building

    Orientation, Proximity and Similarity factors

    Size of the building

    Storey height

    Total height of the building

    Number of storey

    Grouping Buildings

    Orientation, Proximity and Similarity factors

  • 8/12/2019 mophology-120524133908-phpapp02

    6/20

    Shape and Size are interrelated factors.

    Both relates with the floor space required by the client.

    Research has showed that SQUARE shape is the most costeffective shape.

    When designing the shape the ORIENTATION, PROXMITY

    and SIMILARITY factors must be concerned.

    If the new building is in a similar shape as the existing

    buildings, placing the building in the correct orientation and

    proximity becomes easy.

  • 8/12/2019 mophology-120524133908-phpapp02

    7/20

    Service integration must be concerned.

    For example;

    Air conditioning

    Fire fighting system

    Electrical lighting

    Telecommunication systems

    If storey height is not decided according to service integration

    requirement;

    Problems occur during installation

    Service lines will be installed in an irregular manner.

    Proper height must be selected during designing.

  • 8/12/2019 mophology-120524133908-phpapp02

    8/20

    Directly connects with the number of storey and storey height.

    Higherthe building goes;

    Stronger the structureshould be.

    Workers, equipment,

    material etc must be

    transported continuously to

    upper floors.

    More scaffolding

    requirement.

    RESULT

    More

    Financial

    Requirement

  • 8/12/2019 mophology-120524133908-phpapp02

    9/20

    Must design to the required number only.

    Over designing could result in a stronger structure.

    If designed correctly, can avoid expensive foundation types.

  • 8/12/2019 mophology-120524133908-phpapp02

    10/20

    Two methods can be used;Vertical Grouping

    - Common Walls and Foundations

    Horizontal Grouping

    - Common Roofs

    Can be used in Building complexes like Apartment buildings.

    Another advantage is reduction of circulation spaces and

    service cores.

    When grouped buildings can share circulation spaces and

    service cores.

  • 8/12/2019 mophology-120524133908-phpapp02

    11/20

    SHAPE and SIZE

    Designed by UDA designers.

    Shape Designed due to

    Architectural Influence.

    Office areas are located on

    either side of the vertical

    circulation area.

  • 8/12/2019 mophology-120524133908-phpapp02

    12/20

    Recommendation on SHAPE and SIZE

    If built in square shape, spaces on either side of the vertical

    circulation space could be used.

    It increases the efficiency of land usage.

    Land value is very high.

    Design Efficiency Calculation

    Floor area of H-shaped building = 2744.28 m2

    Floor area if designed as a square shape = 3528.36 m2

    Wastage of Floor Area = 784.08 m2

  • 8/12/2019 mophology-120524133908-phpapp02

    13/20

    Recommendation on SHAPE and SIZE

    If the building is built without changing the required floor area

    land area could have been saved.

    Design Efficiency Calculation

    Perimeter of the H-shaped building = 1039.36 ft.

    Perimeter if designed as a square shape =692.82 ft

    Design efficiency = (1039.36 692.82) x 100 = 50.02%

    692.82

    Square shape is 50.02% more effective.

  • 8/12/2019 mophology-120524133908-phpapp02

    14/20

    Recommendation on SHAPE and SIZE

    The existing main building has a L shape.

    If the new building is designed to have the same shape(similarity factor) orientation of the building could have beeneasy.

    Since the shape is different the main parts of the building faceseast and west.

    Therefore the heat gain through direct sun light is more anduncomfortable.

  • 8/12/2019 mophology-120524133908-phpapp02

    15/20

    HEIGHT of th e Bu i lding

    Storey height is 3600 mm.

    Ceiling to be a Lowered 600 mm from the soffit of the slab.

    Each floor is designed to be constructed with a proper ducting

    for A/C, and other services.

    Comprising with 14 storeys.

  • 8/12/2019 mophology-120524133908-phpapp02

    16/20

    Recommendation on HEIGHT

    The location has natural ventilation.

    Natural ventilation method can be easily applied for upper floors.

    Therefore A/C ducting is not required for upper floors.

    So storey height can be reduced.

    It is cost effective because;

    Reduces Construction cost.

    Reduces service installation cost.Reduces services maintenance cost.

  • 8/12/2019 mophology-120524133908-phpapp02

    17/20

    GROUPING BUILDINGS

    New building is constructed few feet away from the existingmain building.

    At the designing stage it was decided to group the buildings.

    But later it was decided not to due to heavy demolition work ofthe existing building.

    Recommendation on GROUPING BUILDINGS

    Grouping buildings could have reduced the circulation space

    needed for the new building.

  • 8/12/2019 mophology-120524133908-phpapp02

    18/20

    Design economics helps us to understand the best costeffective way proceed with the construction.

    Discussion between construction professionals prior the

    construction helps them to understand these cost effective way.

    Each construction has its own cost effective ways.

    To understand these ways Building Morphology Factors can beused.

    Concerning about Morphology factors during designing stage isvery important.

  • 8/12/2019 mophology-120524133908-phpapp02

    19/20

    The designing stage of a building project is the best stage to

    reduce unnecessary costs of the project.

    Building Morphology Factors are the key to understand theways of reducing unnecessary costs.

    Shape, Size, Storey height, Total height, Grouping factors can

    be analyzed carefully to make a project cost effective.

    Therefore a proper knowledge on Building Morphology is

    necessary for construction professionals.