Building Morphology Factors
-
8/12/2019 mophology-120524133908-phpapp02
3/20
Building Construction process comprises with many stages.
They basically consist of two parts
Pre Construction
Post Construction
The Designing process of a building project belongs to the Pre
construction stage.
Considering about the Design Morphology Factors comes
under this Designing stage.
-
8/12/2019 mophology-120524133908-phpapp02
4/20
Cost of Construction changes in a rapid manner due to many
reasons.
Therefore a proper analysis of Building Morphology Factors are
essential to reduce cost of Construction.
This presentation is aimed at understanding what the Design
Morphology Factors are.
This discusses about;What the Morphology Factors are.
A practical example on implementing Morphology Factors.
Analysis and Recommendations of alternatives Designs
using Morphology Factors.Impact of Morphology Factors on Cost of Construction.
-
8/12/2019 mophology-120524133908-phpapp02
5/20
Main design Morphology Factors that are considered are;
Shape of the building
Orientation, Proximity and Similarity factors
Size of the building
Storey height
Total height of the building
Number of storey
Grouping Buildings
Orientation, Proximity and Similarity factors
-
8/12/2019 mophology-120524133908-phpapp02
6/20
Shape and Size are interrelated factors.
Both relates with the floor space required by the client.
Research has showed that SQUARE shape is the most costeffective shape.
When designing the shape the ORIENTATION, PROXMITY
and SIMILARITY factors must be concerned.
If the new building is in a similar shape as the existing
buildings, placing the building in the correct orientation and
proximity becomes easy.
-
8/12/2019 mophology-120524133908-phpapp02
7/20
Service integration must be concerned.
For example;
Air conditioning
Fire fighting system
Electrical lighting
Telecommunication systems
If storey height is not decided according to service integration
requirement;
Problems occur during installation
Service lines will be installed in an irregular manner.
Proper height must be selected during designing.
-
8/12/2019 mophology-120524133908-phpapp02
8/20
Directly connects with the number of storey and storey height.
Higherthe building goes;
Stronger the structureshould be.
Workers, equipment,
material etc must be
transported continuously to
upper floors.
More scaffolding
requirement.
RESULT
More
Financial
Requirement
-
8/12/2019 mophology-120524133908-phpapp02
9/20
Must design to the required number only.
Over designing could result in a stronger structure.
If designed correctly, can avoid expensive foundation types.
-
8/12/2019 mophology-120524133908-phpapp02
10/20
Two methods can be used;Vertical Grouping
- Common Walls and Foundations
Horizontal Grouping
- Common Roofs
Can be used in Building complexes like Apartment buildings.
Another advantage is reduction of circulation spaces and
service cores.
When grouped buildings can share circulation spaces and
service cores.
-
8/12/2019 mophology-120524133908-phpapp02
11/20
SHAPE and SIZE
Designed by UDA designers.
Shape Designed due to
Architectural Influence.
Office areas are located on
either side of the vertical
circulation area.
-
8/12/2019 mophology-120524133908-phpapp02
12/20
Recommendation on SHAPE and SIZE
If built in square shape, spaces on either side of the vertical
circulation space could be used.
It increases the efficiency of land usage.
Land value is very high.
Design Efficiency Calculation
Floor area of H-shaped building = 2744.28 m2
Floor area if designed as a square shape = 3528.36 m2
Wastage of Floor Area = 784.08 m2
-
8/12/2019 mophology-120524133908-phpapp02
13/20
Recommendation on SHAPE and SIZE
If the building is built without changing the required floor area
land area could have been saved.
Design Efficiency Calculation
Perimeter of the H-shaped building = 1039.36 ft.
Perimeter if designed as a square shape =692.82 ft
Design efficiency = (1039.36 692.82) x 100 = 50.02%
692.82
Square shape is 50.02% more effective.
-
8/12/2019 mophology-120524133908-phpapp02
14/20
Recommendation on SHAPE and SIZE
The existing main building has a L shape.
If the new building is designed to have the same shape(similarity factor) orientation of the building could have beeneasy.
Since the shape is different the main parts of the building faceseast and west.
Therefore the heat gain through direct sun light is more anduncomfortable.
-
8/12/2019 mophology-120524133908-phpapp02
15/20
HEIGHT of th e Bu i lding
Storey height is 3600 mm.
Ceiling to be a Lowered 600 mm from the soffit of the slab.
Each floor is designed to be constructed with a proper ducting
for A/C, and other services.
Comprising with 14 storeys.
-
8/12/2019 mophology-120524133908-phpapp02
16/20
Recommendation on HEIGHT
The location has natural ventilation.
Natural ventilation method can be easily applied for upper floors.
Therefore A/C ducting is not required for upper floors.
So storey height can be reduced.
It is cost effective because;
Reduces Construction cost.
Reduces service installation cost.Reduces services maintenance cost.
-
8/12/2019 mophology-120524133908-phpapp02
17/20
GROUPING BUILDINGS
New building is constructed few feet away from the existingmain building.
At the designing stage it was decided to group the buildings.
But later it was decided not to due to heavy demolition work ofthe existing building.
Recommendation on GROUPING BUILDINGS
Grouping buildings could have reduced the circulation space
needed for the new building.
-
8/12/2019 mophology-120524133908-phpapp02
18/20
Design economics helps us to understand the best costeffective way proceed with the construction.
Discussion between construction professionals prior the
construction helps them to understand these cost effective way.
Each construction has its own cost effective ways.
To understand these ways Building Morphology Factors can beused.
Concerning about Morphology factors during designing stage isvery important.
-
8/12/2019 mophology-120524133908-phpapp02
19/20
The designing stage of a building project is the best stage to
reduce unnecessary costs of the project.
Building Morphology Factors are the key to understand theways of reducing unnecessary costs.
Shape, Size, Storey height, Total height, Grouping factors can
be analyzed carefully to make a project cost effective.
Therefore a proper knowledge on Building Morphology is
necessary for construction professionals.
-