NORTH EASTERN COALFIELDS COAL INDIA LIMITED ^ (A Maharatna Company under Ministry of Coal) Margherita - 786181 (ASSAM) SIX MONTHLY STATUS REPORT ON ENVIRONMNNTAL PRoTECTIoN MEASURES ADOPTED AT LEDO OPENCAST PROJECT Report from Aprilr2}lT to Septemb err20l7 ' E.c. No.J-r101sr226t2007-IA(M) Dt. 10rh December,2008 A. SPECIFIC CONDITION : I I I I I r I L sl. No. Condition j Status Report I I Mtnins operation is being presently carriecl out le I only in Pit No.II keeping adequate distance as I p.t statue from Ledopani nallah flowing within | ,1. lease and railway tract and NH-3 g passing I throueh the ML ltt I No diversion has been done. I I Mrning operation has not yet been commenced I i" Pit No.III. same will be undertaken in due I course as per specification of the EC condition I *d competent approval from competent I authoritv. I Action has been taken for development of Green I belt along the road site facing National Highway and township. properly and is used on regular basis for reclamation and development of green belt" since June, 2015 and the backfilled quantity during the period from April, zo1 to September, 2017 is 35 144.84 N{3" No external dumpitrg is carried out in this period. External oB dumping is also being monitored with respect to self sustainability of the vegetation. Compliance status is being submitted six monthly to MoEF. i) Mining in the three pits shall be carried out as per statue from the Ledopani Nallah flowing within the lease and railway track and NH-3 g passing through the ML ii) There shall be no diversion of ihe reoo p.rni nallah without prior aporoval of this Minisrrv ii i) iv) An embanKment should be constructed along the bank of the Ledo pani Nallah along Quarry No.3. The slope of the embankment shall at lease 2:l towards the ML. The height of the embankment shall be atleast 3m higher l@llbg_-HFL. A tri along the site of the ML facing the Ledo Township, colony within the mine and along the 2.45 km main apDroach roads to the mine v) ,-rr r opsorl snall be stacked properly with proper slope at earmarked site(s) and shall not be active and shall be used for reclamation and t vi) Of the total 8.81 of the oB generated would be backiilled into the mined out voids through sequential backfilling and the balance 17% of the oB would be stored in one external oB dump. Dumping of oB in the external oB dump shall cease from the 5'h year of mining operation. Monitoring and management of reclaimed of existing dump site shall continue I until the vegetation becomes self sustainins I and tg be rehandled back into the decoatei I &N

Upload: others

Post on 20-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

NORTH EASTERN COALFIELDSCOAL INDIA LIMITED

^ (A Maharatna Company under Ministry of Coal)

Margherita - 786181 (ASSAM)SIX MONTHLY STATUS REPORT ON ENVIRONMNNTAL PRoTECTIoN MEASURES

ADOPTED AT LEDO OPENCAST PROJECTReport from Aprilr2}lT to Septemb err20l7

' E.c. No.J-r101sr226t2007-IA(M) Dt. 10rh December,2008

A. SPECIFIC CONDITION :

III

II

r

I

L

sl.No.

Condition j Status ReportI

I Mtnins operation is being presently carriecl outle

I only in Pit No.II keeping adequate distance as

I p.t statue from Ledopani nallah flowing within

| ,1. lease and railway tract and NH-3 g passing

I throueh the MLlttI No diversion has been done.I

I Mrning operation has not yet been commenced

I i" Pit No.III. same will be undertaken in due

I course as per specification of the EC condition

I *d competent approval from competent

I authoritv.

I Action has been taken for development of Green

I belt along the road site facing National Highwayand township.

properly and is used on regular basis forreclamation and development of green belt"

since June, 2015 and the backfilled quantityduring the period from April, zo1 toSeptember, 2017 is 35 144.84 N{3" No externaldumpitrg is carried out in this period. ExternaloB dumping is also being monitored withrespect to self sustainability of the vegetation.Compliance status is being submitted sixmonthly to MoEF.

i) Mining in the three pits shall be carried out asper statue from the Ledopani Nallah flowingwithin the lease and railway track and NH-3 gpassing through the ML

ii) There shall be no diversion of ihe reoo p.rninallah without prior aporoval of this Minisrrv

ii i)

iv)

An embanKment should be constructed alongthe bank of the Ledo pani Nallah alongQuarry No.3. The slope of the embankmentshall at lease 2:l towards the ML. The heightof the embankment shall be atleast 3m higher

l@llbg_-HFL.A trialong the site of the ML facing the LedoTownship, colony within the mine and alongthe 2.45 km main apDroach roads to the mine

v) ,-rrr opsorl snall be stacked properly with properslope at earmarked site(s) and shall not beactive and shall be used for reclamation and

t

vi) Of the total 8.81of the oB generated would be backiilled intothe mined out voids through sequentialbackfilling and the balance 17% of the oBwould be stored in one external oB dump.Dumping of oB in the external oB dumpshall cease from the 5'h year of miningoperation. Monitoring and management ofreclaimed of existing dump site shall continue

I

until the vegetation becomes self sustainins I

and tg be rehandled back into the decoatei I

&N

Page 2: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

void and thereafter there shall be no externalOB dump. Compliance status shall besubmitted to the Ministry of Environment andForest and its Rpgional office located at

$b{long on year basis.vii) Catch drains and siltation ponds of the

appropriate size shall be constructed to arrestsilt and sediment flows from soil, OB andmineral dumps. The water so collected shallbe utilized for wateritrg the mine area, roads,green belt development etc. The drains shallbe regularly desilted and maintained properly.Garland drains (size, gradient and length) andsump capacity shall be designed keeping 50%safety margin over and above the peak suddenrainfall and maximum discharge in the areaadjoining the mine site. Sump capacity shallalso be provided adequ ate retention period toallow proper settlitrg of silt material.

A11 existing passage channel peripheral draincarrying run-off from coal stock yard / OB dumpI others are designed and contoured such a waythat all run-off water / silt are carried to the minesump at the bottom of the pit. Special care istaken for supervising the drain during rainyseason to notice any obstruction and necessaryactions are taken forthwith.Sump Capacity is sufficient to hold peak suddenrainfall discharge.

viii) Dimensions of the reiithe dumps and OB benches within the mine tocheck run-off and siltation shall be based onthe rainfall data.

4 Nos. of toe wall I check dams are constructedwith the boulders from the mine to prevent flowof soil mass.30 Nos. of gully pluggit.g are provided toprevent soil erosion.

ix) The existing road network shall be augmentedby constructing an approach road of 2.5 km.service road of 1 km. and a colony road of 4.2km. length all of which shall be black topped.Thick green belt shall be developed on bothsides of the roads

Colony road 2 km. has been augmented and backtopped.

x) Major haul roads shall be fitted with highefficiency water sprinkling system to checkfugitive emissions at the tiansfer point,haulage roads, etc. Dry fogging system / Mistspray arrangement shall be provided forcrushing I loading operation for dust controlat the CHP.

Water sprinkling is done as routine workconstantly round the clock at all the haul roadsand other strategic points.There is no CHP at Ledo OCP.

xi) Drills shall be wet operated only. Wet operated drills are only used.xii) Controlled blasting for OB shall be practiced

for removal of OB only with use of delaydetonators and a minimum statutory safedistance from the habitation shall bemaintained. The mitigative measure forcontrol of ground vibrations and to arrest theqyfqc\s and boulders shall be implemented.

Control Blasting is done with NONEL (DTH-DTH-Down the Hole and TLDOTrunk LineDelay) to minimrze noise generation, groundvibration and to prevent fly rock" Controlledblasting is done as per the permission granted byDirector General of Mines Safety.

xiii) The total are that shall be brought under \ecessary action has been taken for sufficient

M

Page 3: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

afforestation shall include reclaimedbackfilled area, green belt along MLboundffiy, safety zone and undisturbed area,along roads anq infrastructure and intownship within the lease by planting nativespecies in consultation within the local DFO /Agriculture Department. The density of thetrees shall be around 2500 plants per ha.

plantation along the roads and infrastructure andin township area with native species grown inour central nursery at Margherita.Plantation covered a total area of 1.19 Hect.

xiv) A Progressive Mine Closure Plan shall beimplemented by reclamation of the threequaries, which shall be sequentially minedand backfilled and afforested by plantingnative plants species in consultation with thelocal DF'O I Agriculture Department, Thedensity of the trees shall be around 2500plants per ha. The entire decoaled void shallbe completely backfilled and thre shall be novoid left at the post mining state.

Mine Closure Plant has been prepared andapproved CIL Board and submitted to Ministryof Coal. Progressive reclamation is already inprocess. Final reclamation will start towards endof mine life.

XV) Prior approval of the CGWB I CGWA shallbe obtained in case of use of ground water formining operations.

Prior approval has been taken however noground water is used for mining operation.

xvi) The Ledopani Nallah and the mine waterdischarged out of the ML shall be monitoredat the outlet points and treated before theirdischarge so as to conform to the standardsprescribed particularly for pH under GSR422(E) dated 19th Muy, lg93 and 3 I'tDecember, 1993 and further amendments.

Mine water is being treated at mechantzed ETPof Ledo OCP with chemical doztng in the ETPand discharged after proper monitoring at theoutlet point. Treated water eonforms to prescribestandards. Report is enclosed for readyreference.

xvii) Regular monitoring of ground water level andquality particularly for Acid Mine Drainage(AMD) shall be carried out by establishing anetwork of existing wells and construction ofnew peizometers. The monitoriirg for quantityshall be done four times a yeffi in premonsoon (May), Monsoon (August), Postmonsoon Qrlovember) and Winter (January)seasons and for quality in May. Data thuscollected shall be submitted to the Ministry ofEnvironment & Forest and to the CentralPollution Control Board quarterly within onemonth of monitoring.

Regular monitoring of ground water quality isbeing conducted by taking samples of waterfrom tube wells in the buffer zone. The analysisresult can be seen in the monitoring reportsenclosed"

xviii) The project authority shall undertakerainwater harvesting measures and shall alsomeet water requirement of nearby village(s)in case the village wells go dry due todewatering of mine or quality detoriates due

Due to high rainfall in this part of the country,no case of village wells going dry has been seen

or reported. Total rainfall in this period was1662.2A mm.

Page 4: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

lggiritrg operation.xix) Sewage treatment plant of adequate capacity

shall be installed in the colony. ETP shall alsobe provided for workshop and CHPwastewater. Treated wastewater meetingprescribed norms only shall be permitted to bedischarged into the natural water courses.

Sewage treatment of the colony of Ledo oCP isbeing carried out through septic tank and soakpits as laid down in EIA-EMP submitted toMoEF. For mine water ETP is runningefficiently.

XX) Besides canying out regular periodic healthcheck up of their workers. l0% of the workersidentified from workforce engaged in activemining operations shall be subjected to healthcheck up for occupational diseases andhearing impairment, if dfry, through an agencysuch as NIOH, Ahmedabad within a period ofone yeff and the results report to this Ministryand to DGMS.

Periodic medical examination of the workers asper the norms of DGMS is being conducted (asper rule 29(B) of Mines Rule 1955). lllth of thetotal work force i.e. 20% are made to undergosuch medical examination every year. No casesof occupational health disease or hearingimpairments have been detected.

xxi) Detailed socio-economic measures shall beimplemented under CSR until the end of minelife

Socio economic measures are being taken underCSR polity of CIL.

xvii) For monitoring land use pattern and for postmining land use, a time series of land usemaps, based on satellite imagery (on a scaleof 1:5000( of the core zone and buffer zone,from the start of the project until end of minelife shall be prepared once in 3 yars (for anyone particular season which is consistent inthe time series) and the report submitted toMoEF and its regional office at Shillong.

Land use plan have been prepared by CMPDIL,Ranchi with satellite imagery of IRS,Hyderabad. Last report for 2015 have alreadybeen submitted to Regional Office of MoEF,Shillong.

xviii) A final mine closure plan along with detailsof corpus Fund shall be submitted to theMinistry of Environment &, Forest 5 year inadvance of final closure for approval.

Final Mine Closure Plan aiong *itn corp* fr"dhas been approved by CIL Board and alreadysubmitted.

M

Page 5: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

B. SPECIAL CONDITION:

Condition Status Report

No change in mining teworking shall be made without prior approvalof the Ministry of Environment and Foiests.

No change in mining techroi

No change in the ralendexcavation, quantum of mineral coal undwaste shall be made.

The quantity of the *itretexceeded the scheduled calend ar plan as per pR.

Four ambient atr quality mottitoringstationsshall be established in the core zone as well asin the buffer zone for monitoring spM,RSPM, s oz, Nox and heavy metals such asHg, Pb, cr, As, etc. Location of the stationsshall be decided based on the meteorologicaldata, topographical features andenvironmentally and ecologically andsensitive targets in consultation with the StatePollution Control Board.

Five ambient air quality monito,being monitoring stations are being monitored incore and buffer zone.

Data on Ambient Air qualittSOz, NOx and heavy metals such as Hg, pb,cr, AS etc) shall be regularly submitted to theMinistry includirg its regional office atShillong and to the State Pollution ControlBoard and the central pollution controlBoard once in 6 months.

Being submitted as per statutory pr*r,rr"*Ambient air quality monitoring analysis reportsare enclosed herewith for ready reference.

Fugitive dust emissionsNox and heavy metals such as Hg, pb, cr, Asetc) from all the sources shall be controlledregularly monitored and data recordedproperly. water spraying arrangement on haulroads, wagon loading, dumps truck (Loadingand unloading) points shall be provided undroperly monitored.

Water spraying affangementdump, loaditrg and unloading points have beenprovided and maintained. Environmentmonitoring for air, water, noise are also carriedout monthly and its report are submitted.

Adequate measures shallAoequate measures shall be taken for controlof noise level below 85 dB (A) in the workenvironment. Workers engaged in blastingand drilling operations, operation of HEMMetc" shall be provided with ear plugs / muffb.

Adequate measures have beenof noise levels. Machines are maintained andregular checks are carried out to minim ize noiseproduction. control blasting with NONEL andless charge per hole "is being done in propersequence to reduce noise and ground vibrationand are kept within limit. workers have beenrovided with ear plugs /muffs.

Industrial waste water (wwater from the mine) shall be properlycollected, treated so as to conform to the

Waste water from the mine isETP with chemical dozing before discharging"Report enclosed as ready reference.

Page 6: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

standards presctib19th of May, lgg3 and 3 I't Dec, lgg3 or asamended from time to time before discharge.oil and grease trap shall be installed beforedischarge of workshop effluent.

viii) Vehicular emissioncontrol and regul arly monitored. Vehiclesused for transporting the mineral shall becovered with tarpaulins and optimally loaded.

Smoke emission test of all the vehicles are beingcarried out regularly through State GovernmentAgencies. Vehicles used for transporting ofminerals are covered with tarpaulins.

ix) Environmental laboratory shall be establishedwith adequate number and type of pollutionmonitoring and analysis equipment inconsultation with the State Pollution ControlBoard.

Pollution Monitoring and analysis is done byengaging an External Laboratory approved byPollution Control Board, Assam.

x) Personnel working in dustry areas shall wereprotective respiratory devices and they shallalso be provided with adequ ate training andinformation on Safety and health aspects.occupational health surveillance programmeof workers shall be undertaken periodically toobserve any contractions due to exposure todust and to take corrective measures, ifneeded

Dust musk are provided to. all the personnelworking in dusty areas. Adequate training onsafety and heal is imparted on regular interval inVT Centre.Periodical Medical Examination is carried outcovering 20% of the workers every year" Nooccupational health concern due to exposure todust is reported till date.

xi) A separate environmental management cellwith suitable qualified personnel shall be setup under the control of senior executive, whoshall report directly to the head of thecompany.

Complied.

xii) The fund earmarkedprotection measure shall be kept in separateaccount and shall not be diverted for otherpurpose. Year wise expenditure shall bereported to this Ministry and its regionaloffice at Shillong.

Environmental protection fundsTotal expenditure for this 6 months was Rs.2" I 1

Lakhs.

xiii) A copy of the environmental clearance lettershall be marked to concern Panch ayat I localNIGO, if dny, from whom any suggestion Irepresentation had been received whileprocessing tbe proposal

Copy of Environmental cleaiattce rcmmarked to concerned Panch ayat I local NGo.

xiv) State Pollution Control B*copy of the clearance letter at the RegionalOffice, District Industry Centre andCollectors Office for 30 days.

A copy of the c{earance letter has beensubmitted to the State Pollution Control Boardfor display at the Regional Office.

XV) The project Authoiin two local newspaper widely circulatedaround the project, one of it shall be in the

Complied.

ffi*-\:,r

Page 7: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

vernacular language of the locality concernedwithin 7 days of the clearance letter informingthat the proj ect" has been accordedenvironmental clqarance and a copy ofclearance letter is available with the StatePollution Control Board and may also be seenat the website of the Ministry of Environmentand Forest at hl1p:/lp:nr&r:;U;=jn. Thecompliance status shall also be uploaded bythe project authorities in their website so as toring the same in the public domain.

ManatlK#'- Ledo OCPffgcnuManlerfLedoPC? NEC

Page 8: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

E(t'tnU'

-iNF{

\o@c\

I

:6-o.9po(u.v

l-d

3(uzbb

€a

caU)c)l-oL)(t)

o-o.90o2OUO&5zET

o

.9V'.9trLq)

a.

q)L)'i3c)

+)

ofr3

c)=o(l)r;tt) |L. l.irs8q)xC q.)

(6-('r-(u(!uo.=(d9=o.uo)(sxo.7oo€c8?.>6C 4-,\JOl{ga-oLl- r-,p,pf,sa')Ed, t-

e.i rtt

L)q)

q)L

.((c)Eotgo

.o

o(J-

boc=(!c)Loq,

0.)ld

!(g

oo)

q,

(d

€(g

C)L(g

10q)+Jtao.0.)Lt

H(ud-.i

tcFoz

{ g,'l

zC)UO&

ztrl

oL<(dEC6.vtr(6

O"\Q.TJa)

-YUq)

5

\N\Q,.

N

$o'o.Eocf2()(Jo&

$eF{xrn '<:(t) .ctrr q)

*JY1sgf'.,9 5E&€waEzAE E'2€#

dP<-r*. bO

-

c]z oz.

Oz.

oz oz

crl

tah<b oc6(jed

cfz r]'!z az oz oz

m

zb c) 16c{2L.c

oz cf,z oz oz oz

ao\O r-'!tT. g

'11 -*dTOcddz oz rf

z.c)z az cfz

tu%-trG\-E' B'

Ocd..;e oz Oz crz az cf,z

e4

A' :-\J hotr

+-J

o.=co:r{I.

Oz oz Oz oz c]z

co

tro<(J bo

J-)

.+. L:

(fz oz oz.

az cfz

(n.4trzbo

OO$,

.4,

c)z c]z oz Oz oz

coNtso<-(t) bo

:1

O@

Cfz cfz cfz oz oz

(nNl<

Zbot-

O@

oz c1z oz ozcqc{

<)%F{Hzboo..1

c)O

ol\o.f

ct?

mr\\o\.tr

\c{\o

(t?

@

rn 5-NtrEbA --.)-

c)\o

c?LN

0q\teo

qNF{

ryo\

("?

\o\f

b0

gECgHA c,6(t,

fr.

Oe'!o\qo\O

r\r{Oc.!o\qo\O

Nt-lOc.!(t\qOr-l

t'-\t-iOc.!o\C?Ot-'l

N

Oryo\qr{F{

---->

v,zoF'l

F(Jo.J

t?t,!El-ahl

6o((,boJ(!

L(gq)z

q)

tJuto,dc)

.g5qr- .93fi'a v1

doct

(.7ADc

&L(6oz

Ir!(uF()€

tOrrl tLar-. O)r-. 1J'(!L(r)(6

ZtJ

(6a.)Lr

Q}d

a.t-l

dz+,A.

a rrrrr-l.-'<

mt#lTJJ

#try-lmsnssqI**%l@iryl'elWI

IttlFIJI=llttllrrlelFIlnlutlLIrl-l 3l-l-l

\-/JI ^<l ';=l Iol cJ

Igl -<lFIzl1rlI

-l6l>l<l

ffs-

Page 9: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

erX=-.<

Itr;r-----f

t =,-.'i

@w €NURQCQN

EFFLUENT WATER ANALYSIS RESULTS

fledo oCP)

Water Source Code/ Name:

Wr: Mine Waste Water \

Wz: Treated Water of ETP

Wr: Up-stream of Ledo Pani Nullah

W+: Downstream of Ledo Pani Nullah

Not Detected

l-{\ J!,' _ $&#

NOTE: 1. Results reported are valld at tlre time ofand under the prevailing condltions ofmeasuremenL

2. Results refer only to the particular parameters test€d.

3. This test report shall not be reproduced except in full, without the ryritten permission of ENVIROCON, Digboi Stores Buildin& New MarkeL Digboi - 78617i, Assam.

Sl. No. ParametersWr Wz Ws W+

a9.09.24fl 09.09.20L7 09.09.2017 09.09.20t7

01 pH 5.3 6.4 6.6 6.5

02 Colour & Odour Turbid & Smelty Acceptable Slightly Turbid Slightly Turbid

03 Temperature, oC 27 27 27 27

04 Particulate Size of Suspended Solids Pass Pass Pass Pass

05 BOD [3 days at 27oC),mg/I 50 t9 15 L6

06 COD, mg/L 254 BB 69 72

07 Oil & Grease, mg/l 5.5 t.4 L.L 1.3

OB Suspended Solids, mg/l 279 49 82 B5

09 Arsenic [As), mg/l ND ND ND ND

10 Mercury (HgJ, mg/l ND ND ND ND

LT Lead (Pb),mg/l 0.01.3 ND ND ND

L7. - Cadmium (Cd),.pgll ND ND ND ND

t3 Hexrralent Chromium (Cr u*), mg/l TIJI:) ND ND ND

t4 Total Chromium (Cr), mg/l 0.28 O.LZ ND ND

L5 Copper [Cu), mg/l 0.01,7 ND ND ND

t6 Zrnc (Zn), mg/l 0.34 0.11 0.16 0.19

t7 Selenium [Se), mg/l ND ND ND ND

1B Nickel (Ni), mg/l 0.49 0.zt ND ND

L9 Manganese (Mn), mg/l 0.0L2 ND ND ND

20 Iron (FeJ, mg/l 7.29 2.22 L.75 L.91,

2L Vanadium [V), mg/l ND ND ND ND

22 Phenolic Compounds (as Co,HsOH), mg/l 0.26 0.0 3 ND ND

23 Ammonical Nitrogen (as N), mg/l 3L.1.4 LL.T9 L6.92 18.51

24 Total Kjeldahl Nitrogen (as NHe), mg/l 42.67 27.27 28.22 30.11

25 Free Ammonia [as NHs), mg/l ND ND ND ND

26 Cyanide (as CN), mg/I ND ND ND ND

27 Fluoride (as F), mg/l 0.45 0.16 ND ND

28 Total Residual Chlorin e, mgf I ND ND ND ND

29 Sulphide fas S), mgll 0.61 0.16 0.13 0.16

30 Dissolved Phosphate (as P), mg/l 7..73 1.05 2.LL 2.L9

3L Nitrate Nitrogen [as NOr) ,mg/l 14.42 6.87 7.74 7.86

32RadioactiveMaterial

AIp ha Ernitter, tnicrocurie/ml ND ND ND ND

Beta Emitter, microcurie/ml ND ND ND ND

33 Bio-assay Test, o/o survival 0 90 90 90

Page 10: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

\,'h. s..\\,Llfw €flutlQcQn

DRINKING WATER ANALYSIS RESULTS

* [Ledo OCP)

Water Source Code/ Name:

DWr: Tube-well Water of Sipe Gaon

DWz: Tube-well Water of Kolpara Gaon

ND; Not Detected

Analysis Protocol: IS 3025

Sl. No. PararnetersDWr DWz

09.09.2417 09.09.20L7

0L Colour (Hazen UnitsJ <l <L

02 Odour Odourless Odourless

03 Turbidity, NTU 0.49 0.52

04 pH\ \L1 6.9

05 - Total Dissolved Solids , mg/l 185 L7B

06 -. Tothl Hardness [as CaCO:), mg/l e6rt

n2

a7 Total Alkaliniff (as CaCOs), mg/l LL4 L27

OB Calcium (as Ca), mg/l 34 32

09 Chlorides (as Cl), mg/l L9 2L

10 Iron [as FeJ, mg/l a.26 0.25

LL Magnesium (as Mg), mg/l L9 L6

L2 Fluoride (as F), mg/l 0.082 0.0 63

1.3 Free Residual Chlorine, mgfl ND ND

L4 Total Arsenic (as As), mg/l ND ND

r5 Lead [as Pb), mg/L ND ND

L6 Sulphate (as S0+J, mg/l 23 2L

L7 Nitrate [as NOa) ,mg/l 0,L7 0.15

1B Phenolic Compounds [as CeHsOH), mg/l ND ND

NOTE: t. Results reported are Valid at the time of and under the prevailing conditions of measuremenL

2. Results refer only to the particular parameters tested. t

3. This test report shall not be reproduced excepr in full, without the wrltten permission of ENVIRoCoN, Digboi stores Buildlng New Market, Dlgbol - 786171, Assam'

Page 11: ILneccoal.co.in/admin/tenderdoc/6 monthly status_Ledo OCP... · 2018-01-23 · Land use plan have been prepared by CMPDIL, Ranchi with satellite imagery of IRS, Hyderabad. Last report

@wijl)

AMBIENT.NOISE LEVEL MEASUREMENT RESULTS

(Ledo OCPJ

€nynpcon

Station Code/Name:

Nr: Mine AreaI

Nz: |harna Basti

J.{r: Near Ledo Polige Station

+

MV.>

\

lllf..-

\

h...-'o

SI. No. Date Location

dB (A), Leq Permissible Limits

Daytime Night time Daytime Night time

01 LL.09.201.7 Nr 70 41, 75 70

02 11.09.2077 ,Nz 44 28 55 45

03 LL,09.20L7 Ns 49 31 55 45

NOTE; 1, Results reported are valid at the time ofand under the prevailing conditions of measurement

2. Results refer only to fie partlcular parameters tested.

3. This test report shall not be reproduced except in full, without the'written permlssion of ENVIROCON, Digboi Stores Bullding; New Market,Digboi'78677 1, Assam'