REPORT For details contact: [email protected]
MONTHLY PROGRESS
Highlights of the Month Pictoral Review
Statistical Overview Graphical Analysis
INSTITUTE OF RURAL MANAGEMENT Volume: 10 Issue: 04/13 March: 2013
Enrolment and Learning In-
crease through Demonstra-
tion (UKAID ILM-IDEAS)
• With the project activities
well underway, an official
visit to Muzaffargarh was
undertaken to conduct in-
terviews for the positions
of M&E Officer, Community
Outreach Education Officers
(2 females) and Admin and
Finance Assistant. Further-
more, TORs were devel-
oped, and Participants pro-
files were prepared.
• Meetings were held with Ad-
visor ILM-UKAID Dr. Nazir
to discuss the revised work
plan, and lists of schools
were acquired (2600) for
Tehsil Muzaffargarh and Kot
Addu, with the identification
of 10 Schools identified for
Tehsil Muzaffargarh (6 girls
schools & 4 boys schools)
with the assistance of the
Department of Education.
• Preparation was also made
for the conducting of the
baseline survey.
VTEC Success Stories
The Vocational Technical and
Educational Center- Rawal-
pindi team shared the suc-
cess stories of its training par-
ticipants with the staff. It was
encouraging to hear that most
of the participants who were
trained in various vocational
courses such as, Waitress-
ing & Housekeeping, Cooking
training Motor cycle repairing
and Excavator Operator Train-
ing, have found good employ-
ment opportunities in their re-
spective sectors.
Management Development
Programme
Training of Trainers-19
The Ten days Training of Train-
ers (ToT) – 19 (Roomi S. Hayat
Signature Training), was suc-
cessfully launched under the
Management Development
Programme on the 28th of
March 2013. This training is
exclusively designed for the
trainers involved in design,
organization and delivery of
training. The training has par-
ticipants from various organi-HIG
HLI
GH
TS
zations such as CSSD, AU-
SAID, CHRS, Malteser Int.,
Spectrum, NRSP and IRM. It
will be concluding on the 6th
of April, 2013
Center for Executive Educa-
tion
The Summer Internship Pro-
gramme 2013 has been an-
nounced by the CEE section
in collaboration with HRDN. It
is a great opportunity and pro-
vides a unique learning expe-
rience for students to acquire
both theoretical knowledge
and practical field experience
in research during their at-
tachment in host organiza-
tions in their various locations
nationwide.
ness sessions and meetings were conducted as an ongoing activity in the month of March. The training activities under the project include Heavy Machin-ery Training, Beautician Train-ing, and Tailoring Training.
Other Events
Annual Promotional Hi-Tea
The Annual Promotional Hi-
Tea was held at the Serena
Hotel for the staff on the 22nd
March, 2013. The formal get
together provided an opportu-
nity for the staff members to
interact in an enjoyable envi-
ronment.
Accelerated Learning Pro-gramme (ALP), FATA. Phase 2The Accelerated Learning Pro-gramme (ALP), FATA- Phase 2 has been initiated with the gen-der wise enrollment percentage comprising of 68% boys and 32% girl students. The project focuses on bringing approxi-mately 1,000 out of school chil-dren back to education in Bajaur and Mohmand Agency of FATA. The inception workshop was conducted last month with the hiring of 50 teachers. The proj-ect activities included the estab-lishment of the learning centers and the development of teach-er’s modules.
Youth Economic Empower-ment Project As part of the project deliver-ables, the required IEC materi-als were developed and aware-H
IGH
LIG
HTS
S#Responsi-ble Section
Project DurationTotal Target
Target As of Mar2013
Achievement As of Mar 2013
Achievement Mar 2013Name of the Project
Project Client From To
Target Mar2013
Overall Achievement(%)
CTP – Anwar ul Haq
LEP( Khushab)LEP(Bhakkar)
PPAF through NRSP 13- Mar 3,261 3,261
837 837106%1 CTP 12-Feb
Combation AbusiveChild Labor II NRSP-ILO 13-Jul 5,490 4,839 4,839 255 255 88%2 Sukkur
Team 11-Feb
SCOPE(Vocational) 13-Apr 20 20 20 20 20 100%3South-Sindh Team 13- Feb
13-Apr 300 300 235 14 14 78%12-FebLEP (Vocational)4
13-Mar 43 43 43 43 43 100%ENRM 12-DecCommunity LivestockExtension WorkerTraining
7
ENRM-Abdul Bari
NRSP-PPAF(LEP Project
PPAF(NRSP)
SCOPE
3,463655 655
IRM South Sindh Team
South-Sindh Team
13-Apr 50 50 46 46 46 92%13-Mar5 TRDP South-Sindh Team
46South-Sindh Team 13-Apr 50 50 45 45 45 90%
420 420 346 125 125 82%
IRM North Sindh Team
SPO(Vocational)6 SPO 13-Mar
Sub Total
Education-Aasim RezaUNICEF FATA(ALP)Children Enrolled inALCs
UNICEF 13-Mar 1,000 1,000 1,000 66 66 100%8 Education 12-Dec
S#Responsi-ble Section
Project DurationTotal Target
Target As of Mar2013
Achievement As of Mar 2013
Achievement Mar 2013Name of the project
Project Client From To
Target Mar2013
Overall Achievement(%)
VTEC, Rawalpindi-Khuwaja Tariq
Basic Tailoring PPAF 13-Mar 200 200 100 100 100 50%9 VTEC 12-Dec
MDP-Nausheen AzamTraining for Local Support Organization LSO 13-Mar 376 376 376 85 85 100%11 MDP 13-Jan
Training or Training Other 13-Apr 20 20 15 15 15 75%12 MDP 13-Mar
Social Mobilization FAO 13-Apr 20 20 20 20 20 99%13 MDP 13-Mar
Diploma in ProjectManagement Other 13-Mar 120 120 124 88 103%14 CEE 13-Feb
Center For Executive Education - Aasim Reza
EntrepreneurshipTraining FATA-DA 13-May 325 325 325 175 175 100%15
Vtec Azakhel 13-Jan
VTEC Azakhel - Muhammad Ishfaq
Waitressing & HouseKeeping DDO 13-Mar 300 286 286 30 30 95%10 VTEC 12-Dec
500 486 386 130 130 77%
99%Sub Total 416 416 411 120 120
11,625 10,960 10,987 2,464 2,464 94%Grand Total
Sub Total
Sub Total
CMST Training forIslamic Relief 13-Feb 50 50 50 50 50 100%Islamic Relief16 CTP 13-Jan
IRM North Sindh Team
255Target For March 2013 Achievement of March 2013
255
Combating Abusive Child Labor II
Target For March 2013 Achievement of March 2013
655 655
837837
LEP KhushabLEP Bhakkar
CTP
Education
Target For March 2013 Achievement of March 2013
Children Enrolledin ALCS
ENRM
Target For March 2013 Achievement of March 2013
43666643
Community LivestockExtension Worker
Training
VTEC-Rawalpindi
Basic Tailoring Waitressing &House Keeping
Target For March 2013 Achievement of March 2013
100100
30 30
Training for LocalSupport Organization
Social Mobilization Training of Trainers-19
MDPAchievement of March 2013Target For March 2013
85 85
20 2015 15
88
Diploma in Project Management
CEETarget For March 2013 Achievement of March 2013
175175
5050
Entreprenuership Training CMST Training for Islamic Relief
Vtec AzakhelTarget For March 2013 Achievement of March 2013
Target For March 2013 Achievement of March 2013
20
20
4646
IRM South Sindh Team
45 45
Thardeep RuralDevelopment
Programme(TRDP)
SPO(Vocational)
SCOPE(Vocational)
LEP(Vocational)
2014 14
ISO 9001:2008