monthly pr ogre ss report · les were insta school – air c acting service 11. rd middle sch...
TRANSCRIPT
MMOOOONNTTHH
O
Cap
HHLLYY PPRR
T
Octob
Strong Spital Impr
P
fs
RROOGGRREE
Through
ber 20
Schools Brovement
repared by
s3|Hodges
EESSSS RREE
014
Bond t Projects
EEPPOORRTT
s
Pa
TT
age | 1
TABLE O
Executive At
Capital Pro
G
G
Pa
Pa
Pa
Pa
Completed
GGGGPaPaPaJoJ.J.TeDFaOPrJoGJ.FaElPaGGMTe
Inactive Ca
GHHEl
Appendix Ex
OF CONTENSummary ttachment 1 –
ojects
unn High Scho
unn High Scho
alo Alto High S
alo Alto High S
alo Alto High S
alo Alto High S
d Capital Proje
unn High Schounn High Schounn High Schounn High Schoalo Alto High Salo Alto High Salo Alto High Sordan Middle SL. Stanford MidL. Stanford Miderman Middle uveneck Elemeairmeadow Elehlone Elementroperty Acquisordan Middle Sunn High SchoL. Stanford Midairmeadow Elelementary Clasalo Alto High Sunn High Schounn High Scho
Middle School Pechnology
apital Projects
arland Elemenigh School Maoover Elementlementary Clas
xhibit A – Bond
NTS
Consolidated
ool – Traffic Sig
ool – Central Bu
School – Perfor
School – Scienc
School – Indoor
School – Buildin
ects
ool – New Classool – New Gymool – Existing Gool – E and K (LSchool – AthletSchool – HaymaSchool – New CSchool ddle School ddle School – LSchool entary School –ementary Schotary School sition – 525 SanSchool – Interimool – Air Conditddle School – Iementary Schossroom ImprovSchool – Multi‐ool – Industrial ool – Aquatic CePre‐Design
ntary School ster Plan tary School ssroom Improv
d Project List
Expenditure R
nal Replaceme
uilding Project
rming Arts Cen
ce Building Add
r PE and Athlet
ng 500 Renova
sroom Buildingnasium ymnasium Mo31 and MS) Buic Stadium Imparket and TowClassroom Build
Landscape and
– New Classroool – New Class
n Antonio Rd m Classroomstioning of ExistInterim Classrool – Portable Rvements – Inteuse FieldArts Renovatioenter
vements
eport
ent (Phase I‐ Im
ter
dition
tic Facilities
tion
g and World La
odernizationuildings Renovaprovementser Building Impding and Medi
d Site Improvem om Buildings asroom Building ting Buildingsooms Relocationractive Whiteb on
mprovements)
anguages Build
ation
provements a Arts
ments
and Modernizags and Modern
board & Sound
ing
ation nization
d Assist System
Pa
page 3
page 6
page 7
page 8
page 9
page 10
page 11
page 12 page 13 page 14 page 15 page 16 page 17 page 18 page 19 page 20 page 21 page 22 page 23 page 24 page 25 page 26 page 27 page 28 page 29 page 30
m page 31 page 32 page 33 page 34 page 35 page 36
page 37 page 38 page 39 page 40
age | 2
Gunn HighThe bid op4, 2014. BDecember Gunn HighDLM conticlassroomssite visit oschematic Palo Alto HAlten Consaccess roabasement paving the Palo Alto HThe constrconstraintssubmittal t Palo Alto HJeremiah Tcomments Palo Alto HDLM presereceived awith stakeFacilities S2014. DLM COMPLETE
Gunn HighThe new MBuilding cla Gunn HighThe new gThe tennis Gunn HighThe moder Gunn HighStudents oSeptember
h School –Traffpening for thetBoard award is2014.
h School – Centinued design s and student of the Health adesign approv
High School – Pstruction compd. Finish gradinfootings is in p access road in
High School – Sruction schedus and access tto DSA planned
High School – ITolbert Archites. Completion o
High School – Bented the revpproval on Ocholder groupsSteering CommM anticipates re
ED CAPITAL PR
h School – NewMath and Engassrooms were
h School – Newgymnasium wa courts were c
h School – Existrnized Bow gym
h School – E anoccupied E anr 15, 2014.
fic Signal Replatraffic signal res scheduled fo
tral Building Pdevelopment activities spacand Wellness val will be revie
Performing Artpleted rough grng of the buildprogress. Altenn November 20
Science Buildinule has been ato the site. Dd for June 2015
Indoor PE and ects received Dof a bid set for
Building 500 Rvised conceptutober 14, 2014 and will conti
mittee for theieturning to the
ROJECTS
w Classroom Bulish Building we occupied in F
w Gymnasium s occupied on ompleted Aug
ting Gymnasium was occupie
nd K (L‐31 and nd K buildings
EXECUT
acement (Phaseplacement proor November 1
roject of the two‐stes. DLM reviewCenter at Balewed with the
ts Center (PACrading, and hasing pad, excavn will commenc014.
ng Addition adjusted to ocDLM will resu5.
Athletic FaciliDSA sign‐off inpricing is antic
Renovation (Libual design to 4 to proceed winue meetings r recommendae BOE in Janua
uilding and Wowas occupied February, 2013
June 7, 2013 aust 27, 2013.
um Modernizated by the camp
MS) Buildings on August 1
IVE SUMM
se I ‐ Parking aoject at Arastr18, 2014 and t
tory building twed the plans boa High SchoBoard in Dece
C) s formed and pvation, rebar plce forming wal
ccur after consme work on c
ties September, acipated to be r
brary) the Board of
with schematic through Noveation to the Bry 2015 for sch
orld Languageby staff and s3.
and PE classes
tion pus on Novemb
Renovation 3, 2014, and
MARY
and Drop‐Off Imradero and Mithe target com
that will hous with staff in Sool in San Framber 2014.
poured concrelacement, and lls, running uti
struction of thconstruction d
and continues ready for Vance
Education (BO design. DLM ember 2014. DBOE for schemhematic design
s Building students on A
s were held in
ber 4, 2013.
the flex room
mprovements)iranda is schempletion is ant
se guidance aSeptember 201ancisco. A prog
ete curbs and gpouring concrlities through t
he new gymnadocuments in
to address cone Brown in mid
OE) on Septehas commenc
DLM will reviewmatic design apn approval.
ugust 15, 201
the new gym
m in building
Pa
) duled for Noveticipated to oc
nd counseling14, and condugram change
gutters for the rete for the the building, a
asium, due to January 2015
nstructability rd‐November 2
mber 28, 201ced schematic dw the plans wipproval Decem
3. World Lan
on August 15,
E was occupi
age | 3
ember ccur in
g, new cted a to the
nd
space 5, with
review 014.
14 and design ith the mber 2
nguage
2013.
ed on
Palo Alto H
The conces
the Fall 20
Palo Alto HAll Trusty B Palo Alto HMove in acloseout is Jordan MidStudents o J.L. StanfoStudents o J.L. StanfoScapes com Terman MStudents moderniza Duveneck All building FairmeadoStudents o 525 San AnThis site ha Ohlone EleMove‐in tonew buildi Jordan MidThe portab Gunn HighBest Contrsummer 20 J.L. StanfoCoulter Co FairmeadoRelocation
High School – A
ssions building
13 football sea
High School – HBuilders compl
High School – Nnd occupancy s nearly comple
ddle School occupied all new
rd Middle Schoccupied all new
rd Middle Schmpleted the pr
iddle School occupied the ation was comp
Elementary Scgs were substa
ow Elementaryoccupied all new
ntonio Road – as been leased
ementary Schoo the new buing on January
ddle School ‐ Ibles were insta
h School – Air Cracting Service011.
rd Middle Schonstruction com
ow Elementaryn of the portab
Athletics Stadi
g, track re‐surfa
ason.
Haymarket anleted the insta
New Math/Socof both buildete, with DSA c
w and modern
ool w and modern
ool – Landscaproject on sched
new instructpleted in Octob
chool – New Cantially comple
y School – Neww and modern
Site Acquisitiod to Athena Aca
ool – New Claslding and othe3, 2012.
nterim Classroalled and move
Conditioning oes Inc. comple
ool ‐ Interim Cmpleted the wo
y School – Portle was comple
ium Improvem
acing, new orn
d Tower Buildllation of the n
cial Sciences Bings occurred closeout in pro
nized buildings
nized buildings
pe and Sitewodule in the fall
tional spaces ber 2013.
lassroom Buildete and occupie
w Classroom Bunized buildings
on ademy.
ssroom Buildiner existing clas
ooms ed into for fall 2
of Existing Buildeted the instal
Classrooms ork on the relo
table Relocatiote and occupie
ments
namental fence
ing Improvemnew windows o
Building and Min July 2014.
ogress.
in fall 2013.
in fall 2013.
rk Improveme2013.
and modern
dings and Moded on August 1
uilding and Moin fall 2013.
ng and Modernssrooms occur
2011. DSA clos
dings llation of air c
ocated portable
on ed on August 8
e, signage and
ments on August 9, 20
Media Arts Buil Taisei has co
ents
ized buildings
dernization 11, 2014.
odernization
nization rred in Decem
seout received
conditioning u
es in August 20
8, 2011.
entry lighting w
013.
ding ompleted their
s in fall 2013
ber 2011. Stu
d November 19
units and cool
011.
Pa
were complete
r work, and co
3. The cafet
udents occupie
9, 2012.
roof coating
age | 4
ed for
ontract
torium
ed the
in the
ElementarInstallationclassrooms Palo Alto HThe fields w2011. Gunn HighThis facility Gunn HighThis facility Middle SchThese proj TechnologEquipmentyear. INACTIVE C Garland ElThe Boardelementar High SchooThe Boardclosed. Hoover EleThis projec ElementarThe projec
October 14Consent 4Renovation Consent 5Testing and October 28Consent 5 Consent 6
ry Classroom Imn of SmartBoas and libraries
High School – Mwere available
h School – Induy was available
h School – Aquy was available
hools Pre‐Desiects for pre‐de
gy t orders have
CAPITAL PROJ
ementary Sch of Education y schools.
ol Master Plan of Education
ementary Schoct has been put
ry Classroom Imct has been pla
4, 2014 4 – Approval n Project at Pa
– Authorizatid Inspection Se
8, 2014 – Approval of
– Authorizatio
mprovements ards and Lighin April 2011.
Multi‐use Fielde for play on Fe
ustrial Arts Adde for instructio
atic Center e for use in July
ign – Jordan, J.esign work hav
arrived and w
ECTS
ool Renovatiohas put new d
n (BOE) approv
ool – Pre‐Desigt on hold until
mprovements ced on hold pe
of Revised Clo Alto High Sc
on to Issue Aervices at Duve
Change Orders
on to Bid Corpo
– Installation htspeed sound
d ebruary 1, 201
dition & Renovn in January 20
y 2009, and ha
.L. Stanford anve been closed
were deployed
n development f
ved the maste
gn a growth plan
– Phase 1 Schending further
Board A
onceptual Deschool
Amendment Noeneck Element
s
oration Yard Pr
of Interactive d assist system
1, and final ch
vation 010. DSA close
s been closed
nd Terman .
to the variou
for Garland on
r plans for bo
is established
ools Barron Padiscussions w
Actions in Octo
sign, Budget,
o. 1 to Ninyo tary School
roject: Installat
Whiteboardsms were com
hange order ne
eout received o
out with DSA.
us campuses fo
n hold until a g
oth high schoo
d for the eleme
ark and El Carmith the BOE ab
ober
and DLM Ad
& Moore, Sp
tion of a Modu
and Sound Aspleted for all
egotiations com
on July 18, 201
or use during
growth plan is
ols, and these
entary schools.
melo bout elementar
ddendum No.
ecialty Consul
ular Building
Pa
ssist Systems elementary
mpleted on Ma
11.
the 2014/15 s
s established f
projects have
ry growth plan
21 for the L
ltants for Add
age | 5
school
arch 9,
school
for the
e been
nning.
Library
itional
A B C C / A B - C C / B A - B
Measure A FundGunn High School - High School Master Plan 172,390 166,328 138,714 80.5% 27,614 83.40% 6,062
Gunn High School 1 - Aquatic Center 4,865,425 4,862,530 4,862,530 99.9% 0 100.00% 2,895
Gunn High School 2 - I.A Building 5,082,402 5,065,128 5,065,128 99.7% 0 100.00% 17,274
Gunn High School 3 - AD2- close out 5,777 5,777 5,777 100.0% 0 100.00% 0
Gunn High School 4 - New classroom Buildings 25,035,201 24,758,488 24,758,488 98.9% 0 100.00% 276,713
Gunn High School 5 - Parking & Drop Off improvements 3,940,000 1,991,105 1,540,201 39.1% 450,904 77.35% 1,948,895
Gunn High School 6- New/Auxiliary Gymnasium 12,914,800 12,460,602 12,320,804 95.4% 139,798 98.88% 454,198
Gunn High School 7- A/C 2,600,000 2,092,366 2,092,366 80.5% 0 100.00% 507,634
Gunn High School 8 - MS & L-31 Buildings 2,120,839 1,707,527 1,428,534 67.4% 278,993 83.66% 413,312
Gunn High School 9 - Central building 19,374,242 1,236,865 79,515 0.4% 1,157,350 6.43% 18,137,377
Gunn High School - Reserved 0 0 0 0.0% 0 0.00% 0
Palo Alto High Schools - High School Master Plan 172,999 167,759 161,616 93.4% 6,143 96.34% 5,240
Palo Alto High School 1 - Stadium Field 5,090,000 4,749,887 4,749,887 93.3% 0 100.00% 340,113
Palo Alto High School 2 - Multi-Use Field (Multi-Fund) 2,609,680 2,609,680 2,609,680 100.0% 0 100.00% 0
Palo Alto high School 3 - New classroom & Media Art Building 38,415,003 36,274,946 35,948,757 93.6% 326,189 99.10% 2,140,057
Palo Alto High School 4 - New Theater 29,370,049 26,678,920 2,802,245 9.5% 23,876,675 10.50% 2,691,129
Palo Alto High School 5 - Haymarket and Tower Admin. Building 1,499,999 1,260,933 1,260,933 84.1% 0 100.00% 239,066
Palo Alto High School 6- Science Addition 5,532,204 977,826 582,458 10.5% 395,368 59.57% 4,554,378
Paly 7- indoor phusical ed and athletic facilities 350,000 181,327 176,475 50.4% 4,852 97.32% 168,673
Palo Alto High School - Reserved 18,474,443 0 0 0.0% 0 0.00% 18,474,443
Jordan Middle School -Program Management- MS Pre-Design 18,890 17,826 17,826 94.4% 0 100.00% 1,064
Jordan Middle Schools 1- Interim Classrooms 600,342 488,033 488,033 81.3% 0 100.00% 112,309
Jordan Middle School 2- Improvements 19,891,564 19,109,079 18,711,668 94.1% 397,411 97.92% 782,485
J.L.S Middle School - Program Management- MS Pre-Design 18,799 18,408 18,408 97.9% 0 100.00% 391
J.L.S Middle School 1 - Interim Classrooms 446,844 422,500 422,500 94.6% 0 100.00% 24,344
J.L.S Middle School 2- Improvements 17,184,699 15,503,856 15,399,140 89.6% 104,716 99.32% 1,680,843
Terman Middle School - Program Management- MS Pre-Design 18,799 18,423 18,423 98.0% 0 100.00% 376
Terman Middle School 1- Improvements 13,312,971 13,003,488 12,902,397 96.9% 101,091 99.22% 309,483
PAUSD Elementary Schools - Program Management- Elem. Growth Plan 145,000 98,480 92,290 63.6% 6,190 93.71% 46,520
Addison Elementary School 1-Phase I 21,267 21,267 21,267 100.0% 0 100.00% 0
Duveneck Elementary School 1-Phase I 9,778,358 9,531,799 8,861,468 90.6% 670,331 92.97% 246,559
Garland Elementary School 1- Phase I 22,178,544 280,113 280,113 1.3% 0 100.00% 21,898,431
Fairmeadow Elementary School 1- Phase I 7,796,550 7,501,746 7,486,534 96.0% 15,212 99.80% 294,804
Hoover Elementary School 1-Phase I 70,550 57,165 57,165 81.0% 0 100.00% 13,385
Ohlone Elementary School 1- Phase I 10,597,870 10,481,389 10,481,389 98.9% 0 100.00% 116,481
Elementary Schools 1 - Elementary Classroom Improvements 2,004,889 1,879,695 1,879,695 93.8% 0 100.00% 125,194
Elementary Schools - Reserved 37,585,253 0 0 0.0% 0 0.00% 37,585,253
PAUSD - Program Management 12,657,031 10,891,709 9,168,836 72.4% 1,722,873 84.18% 1,765,322
PAUSD - Technology 10,485,054 9,672,962 9,662,611 92.2% 10,351 99.89% 812,092
PAUSD - Technology -Reserved 3,422,312 0 0 0.0% 0 0.00% 3,422,312
PAUSD - Reserved 6,043,535 0 0 0.0% 0 0.00% 6,043,535
525 San Antonio -Property Acquisition 8,500,000 8,500,000 8,500,000 100.0% 0 100.00% 0
Transfer out to Planned Maintenance Fund* 17,758,557 17,758,557 17,758,557 100.0% 0 100.00% 0
Bond Issuance Cost 2,530,220 2,530,220 2,530,220 100.0% 0 100.00% 0
Measure A Fund Total 380,693,351 255,034,708 225,342,647 29,692,061 125,658,643
* Planned Maintenance Fund Total 4,083,911 1,103,677 751,640 18% 352,037 2,980,234
*$17,758,557 transfer from Measure A fund to Planned Maintenance fund was done during FY 2013-14 .The budget for Planned maintenance fund will be increased about $2 M every year in 9 years.
Prepared by: Business Services Department based on QSS accounting System
Budget Balance
CommittedBudgetSchool Name - Project NamePercent of
Budget Expended
Palo Alto Unified School District
Strong Schools Bond
10/31/2014
Percent of Expended
Contract Balance
Expenditures
Gunn H
Traffic Si
Phase I –
A. PROJE
The bMiranNovemDecem
B. BUDG
C. BOND D. PROJE
Mimco
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
High Schoo
ignal Replac
– Parking an
ECT STATUS
id opening forda is schedulmber 18, 201mber 2014.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
Miranda Ave. pamprovements wontract and wi
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
ement
d Drop‐off I
r thetraffic sigled for Novem4 and the ta
LE SUMMARY
T REFERENCE: 5
W:
arking and drowas delayed byll be re‐bid in N
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
mprovemen
nal replacemember 4, 2014. rget completi
5.5
p‐off project hy City of Palo ANovember.
$0 $3,940,000
$0 $3,940,000
$0 $0
$919,858 $2,919,840 $100,302
$3,940,000
39.1%
$121,380
$121,380
0.0% Directives vs.
nts
ent project at Board awardion is anticipa
has completedAlto permit cha
C
SAB
CB
SB
AB
S
A
B
A
N
S
*(
Arastradero ad is scheduled ated to occur
within budgetanges, so signa
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Authorize to Bid (2BOE Approval
Submit to DSA
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
* Anticipated Dates –( ) Denotes number o
and for r in
t. Completion oal work has bee
Close‐out/Oc
t (2)
n (2)
(2)
2)
t (1)
d
letion
– Subject to Change of Board of Education
Pa
of off‐site en deleted from
cupancy – August
March 31, 2009April 14, 2009
June 19, 2012 June 26, 2012
December 18, 2January 15, 201
June 11, 2013 June18, 2013
July 17, 2013
October 2, 2013
November 12, 2
November 19, 2
December 4, 20
August 15, 2014
n Readings
age | 6
m this
15, 2014
9
2012 13
3
2013
2013
013
4
Gunn H
Central B
A. PROJE
DLM cthat wstudenSeptemWellneprograreview
B. BUDG
C. BOND D. PROJE
D
is
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
High Schoo
Building Proj
ECT STATUS
continued desigwill house guidant activities spamber 2014, aness Center at Bam change to twed with the B
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
LM is working
anticipated in
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
l
ject
gn developmeance and counaces. DLM revid conducted aBalboa High Scthe schematic oard in Decem
LE SUMMARY
T REFERENCE: 5
W:
with staff on a
December 20
unds
ment y
ended
nt of the two‐sseling, new claiewed the plana site visit of thhool in San Fradesign approv
mber 2014.
5.5
a program chan
14.
$0 $19,374,242
$0 $19,374,242
$0 $0
$3,237,823 $15,936,419
$200,000 $19,374,242
0.4%
story building assrooms and ns with staff in e Health and ancisco. A al will be
nge to the 2nd f
C
SAB
CB
SBB
S
AB
A
B
A
N
S
*(
floor of this bu
Current Phase:
Schedule: Architect Contract BOE Approval
Conceptual DesignBOE Approval
Schematic Design (BOE ApprovalBOE Approval of Pr
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
* Anticipated Dates –) Denotes number of
uilding. Presen
Design Develo
(2)
(2)
(2)
rogram Change
2)
(1)
etion
– Subject to Change f Board of Education
Pa
tation to the B
opment
March 31, 2009April 14, 2009
February 25, 201March 11, 2014
June 3, 2014 June 17, 2014 December 9, 201
March 14, 2015*
June 7, 2015* June 21, 2015*
December 25, 20
February 26, 201
March 7, 2016*
March 18, 2016*
January, 2017*
n Readings
age | 7
Board
14
14*
*
015*
16*
*
Palo AltPerformi
A. PROJE
Alten poureof theconcre
commpaving
B. BUDG
C. BOND
D. PROJE
Co
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
to High Sching Arts Cen
ECT STATUS
Construction d concrete cure building paete for the
mence forming g the access ro
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction is
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
hool nter (PAC)
completed rorbs and guttersad, excavationbasement foo
walls, runningad in Novemb
LE SUMMARY
T REFERENCE: 4
W:
proceeding acc
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
ugh grading, as for the accessn, rebar placeotings is in p
g utilities throuer 2014.
4.11
cording to sche
$0 $29,370,049
$0 $29,370,049
$0 $0
$4,377,871 $24,845,000
$147,178 $29,370,049
9.5%
$2,184,400
$2,150,130
0.6% Directives vs.
and has formes road. Finish gement, and pprogress. Alte
ugh the buildin
edule and with
C
SAB
CB
SBB
S
A
AB
B
A
N
S
P
*(
ed and grading pouring en will
ng, and
hin budget.
Current Phase:
Schedule: Architect Contract BOE Approval
Conceptual DesignBOE Approval
Schematic Design (BOE ApprovalBOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –) Denotes number of
Construction
(2)
n (2)
(3)
2)
(1)
etion
cy
– Subject to Change f Board of Education
Pa
n
March 31, 2009April 14, 2009
June 1, 2010 June 22, 2010
June 14, 2011 December 13, 20January 17, 2012
March 28, 2013
January 16, 2014
January 14, 2014January 28, 2014
May 13, 2014
June 3, 2014
June 23, 2014
February 13, 201
June 1, 2016*
n Readings
age | 8
011 2
4
4 4
16*
Palo Alt
Science B
A. PROJE
The cafter cconstron cosubmi
B. BUDG
C. BOND D. PROJE
Dw
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
to High Sch
Building Add
ECT STATUS
onstruction scconstruction oraints and acceonstruction dttal to DSA pla
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
esign developmwill not begin un
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
hool
dition
chedule has bof the new gyess to the site.documents inanned for June
LE SUMMARY
T REFERENCE: 4
W:
ment will resumntil after comp
unds
ment y
ended
been adjustedmnasium, due DLM will resn January 202015.
4.1 ‐ 4.3
me in January pletion of the G
$0 $5,532,204
$0 $5,532,204
$0 $60,309 $842,825
$4,628,294 $776
$5,532,204
10.4%
to occur e to space ume work 015, with
for anticipatedGymnasium pro
C
SAB
CB
SB
S
AB
A
B
A
N
S
P
*(
d submittal to oject.
Current Phase:
Schedule: Architect Contract BOE Approval
Conceptual DesignBOE Approval
Schematic Design (BOE Approval
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –) Denotes number of
DSA in June 20
Design Devel
(2)
n (2)
(2)
2)
(1)
etion
cy
– Subject to Change f Board of Education
Pa
015. Construct
lopment
March 12, 2013March 19, 2013
March 12, 2013March 19, 2013
September 10, 2October 8, 2013
June 15, 2015*
February 2, 2016February 19, 201
March 15, 2016*
May 30, 2016*
June 15, 2016*
July 1, 2016*
August 1, 2017*
August 15, 2017
n Readings
age | 9
tion
2013
6* 16*
*
*
Palo Alt
Indoor P
A. PROJE
Jeremand cCompVance
B. BUDG
C. BOND D. PROJE
Vaea
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
to High Sch
E and Athlet
ECT STATUS
iah Tolbert Arcontinues to letion of a bide Brown in mid
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ance Brown Buarly November
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
hool
tic Facilities
rchitects receivaddress const set for pricing‐November 20
LE SUMMARY
T REFERENCE: 4
W:
uilders and Tolr, with a bid se
unds
ment y
ended
s
ved DSA sign‐otructability reg is anticipate014.
4.1 ‐ 4.3
bert Architectst scheduled to
$0 $350,000
$0 $350,000
$0 $0
$225,000 $125,000
$0 $350,000
50.4%
off in Septembview commend to be ready
s will be compo be ready for b
C
SAB
CB
SB
SR
A
L
A
N
S
P
*(
ber, nts. for
leting construcbidding in Nov
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSARe‐Submit to DSA
Approval by DSA
Lease Leaseback A
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –( ) Denotes number o
ctability and scember 2014.
Construction
t (2)
n (2)
(2)
Agreement
t (1)
d
letion
cy
– Subject to Change of Board of Education
Pag
cope clarificati
n Documents
N/A N/A
March 12, 2013March 19, 2013
September 10, 2October 8, 2013
December 4, 20January 27, 201
September 22, 2
January 13, 201
January 27, 201
January 30, 201
August 1, 2016*
August 15, 2016
n Readings
ge | 10
ons in
3 3
2013 3
013 14
2014
15*
15*
15*
*
6*
Palo Alt
Building
A. PROJE
DLM Septem
schemand wthe Fadesign2015 f
B. BUDG
C. BOND D. PROJE
Sc
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
to High Sch
500 Renova
ECT STATUS
presented thember 28, 2014
matic design. Dwill continue macilities Steerinn approval Decfor schematic d
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
chematic desig
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
hool
ation (Librar
e revised conc4 and receive
DLM has commeetings througng Committee fcember 2 2014design approva
LE SUMMARY
T REFERENCE: 4
W:
gn drawings are
unds
ment y
ended
y)
eptual design d approval on
menced schemgh November 2for their recom4. DLM anticipal.
4.8
e in progress.
$0 $9,350,000
$0 $9,350,000
$0 $0
$1,886,000 $7,344,000 $120,000
$9,350,000
0.0%
to the Board n October 14,
matic design w2014. DLM wilmmendation topates returning
C
SAB
CB
SB
S
AB
A
A
N
S
P
*(
of Education 2014 to proc
with stakeholdell review the po the BOE for sg to the BOE in
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –( ) Denotes number o
(BOE) on ceed with
er groups plans with schematic n January
Schematic De
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change of Board of Education
Pag
esign
N/A N/A
September 23, 2October 14, 201
January 13, 201January 27, 201
July 6, 2015*
March 8, 2016*March 22, 2016
February 27, 20
May 1, 2016*
May26, 2016*
July 1, 2017*
August 15, 2017
n Readings
ge | 11
2014 14
15* 15*
6*
016*
7*
Gunn HNew Clas
A. PROJE
The nstudenhave b
B. BUDG
C. BOND D. PROJE
Thstoc
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
High Schoossroom Buil
ECT STATUS
ew Math andnts on August been in use sin
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he World Langtudents on Febccupied with st
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
dings A & B
d English Build15, 2013. Woce February, 2
LE SUMMARY
T REFERENCE: 3
W:
uages buildingbruary 11, 2013taff and studen
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
ding was occurld Language B2013.
3.1, 3.3, 3.4
g move‐in occu3. The Math &nts on August
$0 $25,035,201
$0 $25,035,201
$24,948 $308,194
$3,789,909 $20,911,873
$277 $25,035,201
98.9%
$ 1,763,200
$ 126,231
9.3% Directives vs.
upied by staffBuilding classro
urred on Febru& English buildi15, 2013. The
f and ooms
ary 8, 2013, anng move‐in oce project was co
Current Phase: O
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Authorize to Bid (BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number o
nd was occupieccurred on Julyompleted with
Occupancy – Augus
ct (2)
n (2)
n (2)
(2)
ct (1)
d
pletion
cy
– Subject to Changeof Board of Educatio
Pag
ed with staff any 15, 2013, andhin budget.
st 15, 2013
March 31, 2009April 14, 2009
September 8, 2September 22,
January 12, 201January 26, 201
August 4, 2010 March 8, 2011March 22, 2011
May 27, 2011
July 13, 2011
July 22, 2011
August 24, 201
July 15, 2013
August 15, 2013
on Readings
ge | 12
nd d was
9
2009 2009
10 10
1
1
3
Gunn H
New Gym
A. PROJE
The nclassetenniscompl
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
High Schoo
mnasium
ECT STATUS
ew gymnasiums were held ins courts surfeted August 2
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he new gym w
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
m was occupin the new gymfacing and s7, 2013.
LE SUMMARY
T REFERENCE: 3
W:
as occupied on
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
ed on June 7m on August striping was
3.4, 3.5, 3.13
n June 7, 2013
$0 $12,914,800
$0 $12,914,800
$0 $19,706
$2,461,402 $10,400,737
$32,955 $12,914,800
95.3%
$834,700
$7,909
9.9% Directives vs.
7, 2013 and P15, 2013. Thinstalled an
.
SA
S
S
A
A
A
S
PE e d
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Authorize to Bid (BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Planned Occupanc
* Anticipated Dates ( ) Denotes number o
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change of Board of Educatio
Pag
– June 7, 2013
March 31, 2009April 14, 2009
September 8, 2September 22,
January 12, 201January 26, 201
August 4, 2010
March 8, 2011March 22, 2011
May 27, 2011
July 13, 2011
July 20, 2011
August 1, 2011
May 1, 2013
June 7, 2013
n Readings
ge | 13
9
009 2009
10 10
1
Gunn H
Existing G
A. PROJE
The mNovem
B. BUDG
C. BOND D. PROJE
Th
N
FundThis budg Chan
High Schoo
Gymnasium
ECT STATUS
modernized Bomber 4, 2013.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project was
ovember 12, 2
ding and Budget project is funded bget. See that proje
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
m Moderniza
ow gym was
LE SUMMARY
T REFERENCE: 3
W:
s completed on
2013.
by the New Gymnect budget for stat
ency
ency Balance
ngency Balance
ges onstruction Change
tion
occupied by t
3.4, 3.5, 3.13
n‐schedule and
asium project tus.
$99,800
$99,800
0.0% Directives vs.
the campus o
d within budge
on
et. Occupancy b
Current Phase: Cl
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Authorize to Bid (BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number
by the school o
ose‐out / Occupan
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
– Subject to Changeof Board of Educatio
Pag
occurred on
ncy – November 1
March 31, 2009April 14, 2009
September 8, 2September 22,
January 12, 201January 26, 201
August 4, 2010
February 12, 20February 26, 20
January 23, 201
April 2, 2013
April 9, 2013
May 31, 2013
October 28, 20
November 12, 2
e on Readings
ge | 14
12, 2013
9
2009 2009
10 10
013 013
13
13
2013
Gunn H
E and K (
A. PROJE
Studenthe fle2014.
B. BUDG
C. BOND D. PROJE
Co
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
High Schoo
(MS and L‐31
ECT STATUS
nts occupied Eex room in b
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
onstruction wa
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
1) Buildings
E and K buildiuilding E was
LE SUMMARY
T REFERENCE: 3
W:
as completed o
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
Renovation
ngs on Augustoccupied on
3.4, 3.5, 3.13
on schedule an
$0 $2,120,839
$0 $2,120,839
$0 $0
$428,000 $1,690,552
$2,287 $2,120,839
67.4%
$122,800
$114,946
1.0% Directives vs.
n
t 13, 2014, anSeptember 15
nd within budg
nd 5,
get. Occupancy
Current Phase:
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Authorize to Bid (BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number o
y took place on
Close‐out/Occup
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change of Board of Educatio
Pag
n August 13, 20
pancy – August 15,
March 31, 2009April 14, 2009
September 8, 2September 22,
June 11, 2013June 18, 2013
November 25, 2
March 25, 2014April 22, 2014
March 27, 2014
April 29, 2014
May 20, 2014
May 27, 2014
August 11, 2014
August 15, 2014
n Readings
ge | 15
014.
, 2014
9
009 2009
2013
4
4
4
4
Palo Alt
Athletic S
A. PROJE
The cfence,2013 f
B. BUDG
C. BOND D. PROJE
Thoc
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
to High Sch
Stadium Imp
ECT STATUS
oncessions bu signage and football season
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he ornamentalccupied Septem
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
hool
provements
uilding, track rentry lightingn.
LE SUMMARY
T REFERENCE: 4
W:
l fence was commber 10, 2012
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
s
re‐surfacing, ng were comple
4.13
mpleted on sch. The bleache
$0 $5,090,000
$0 $5,090,000
$882 $2,746
$818,716 $4,267,656
$0 $5,090,000
93.3%
$310,200
$225,587
2.3% Directives vs.
new ornamenteted for the F
hedule in Augur replacement
tal Fall
ust 2013. The work was com
Current Phase: C
Schedule: Architect ContraBOE Approval
Conceptual DesiBOE Approval
Schematic DesigBOE Approval
Submit to DSA
Authorize to BidBOE Approval
Approval by DSA
Bid Opening
Award of Contra
Notice to Procee
Substantial ComPlanned OccupaBleachersFence Completio* Anticipated Dates –( ) Denotes number of
concessions bumpleted on sch
Close‐out / Occup
act (2)
gn (2)
gn (2)
(2)
A
act (1)
ed
mpletion ‐ Concessincy ‐ Concessions
on– Subject to Change f Board of Education Rea
Pag
uilding was hedule in June
pancy – August 1, 2
January 26, 20February 9, 20
June 1, 2010June 22, 2010
February 22, 2March 8, 2011
April 4, 2011
June 28, 2011July 19, 2011
July 26, 2011
December 1, 2
December 13,
January 4, 201
ion August 31, 20 September 10
March 31, 201August 1, 2013
adings
ge | 16
2013.
2013
010 010
2011 1
2011
, 2011
12
012 0, 2012 13 3
Palo Alt
Haymark
A. PROJE
All Trwindo
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
to High Sch
ket and Tow
ECT STATUS
rusty Builders ows on August
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
hool
wer Building
completed t9, 2013, on sch
LE SUMMARY
T REFERENCE: 4
W:
mpleted on sch
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
Improveme
the installatiohedule and wit
4.1 ‐ 4.3
edule and with
$0 $1,500,000
$0 $1,500,000
$0 $62,844 $179,000
$1,258,159 $0
$1,500,000
84.1%
$39,200
$33,930
1.3% Directives vs.
nts
on of the nethin budget.
hin budget.
ew
Current Phase: C
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Authorize to Bid BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Procee
Substantial Comp
* Anticipated Dates( ) Denotes number
Close‐out / Occupa
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
s – Subject to Changer of Board of Educatio
Pag
ancy – August 9, 2
N/A N/A
N/A N/A
N/A N/A
May 25, 2012
April 24, 2012May 6, 2012
August 24, 201
January 17, 20
January 29, 20
February 21, 2
August 9, 2013
e on Readings
ge | 17
2013
12
13
13
013
3
Palo Alt
Classroo
A. PROJE
Move complcloseo
B. BUDG
C. BOND D. PROJE
Fu
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
to High Sch
m Building a
ECT STATUS
in and occupaeted their woout in progress
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
urniture install
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
hool
and Media A
ancy of both bork, and contra.
LE SUMMARY
T REFERENCE: 4
W:
ation and occu
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
Arts
buildings occuract closeout is
4.1 ‐ 4.3
upancy of the M
$0 $38,415,001
$0 $38,415,001
$18,448 $1,325,333 $7,261,915
$29,713,481 $95,826
$38,415,001
93.6%
$2,515,000
$85,252
9.7% Directives vs.
rred in July 20s nearly comp
Media Arts and
014. Taisei haslete, with DSA
d Math/Social
Current Phase:
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Authorize to Bid (BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number o
s A
Sciences build
Close‐out/ Oc
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change of Board of Educatio
Pag
dings complete
ccupancy – Augus
March 31, 2009April 14, 2009
September 8, 2September 22,
January 12, 201January 26, 201
August 4, 2010
March 8, 2011March 22, 2011
April 28, 2011
June 30, 2011
July 12, 2011
August 4, 2011
April 15, 2014
August 1, 2014
n Readings
ge | 18
ed.
t 1, 2014
9
009 2009
10 10
1
Jordan
A. PROJE
Studenstart o
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
Middle Sc
ECT STATUS
nts occupied aof school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project was
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
hool
all new and ml 2013.
LE SUMMARY
T REFERENCE: 2
W:
s completed on
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
modernized bu
2.1 – 2.3, 2.6 –
n schedule and
$0 $19,891,564
$0 $19,891,564
$6,111 $86,265
$3,723,370 $16,007,031
$68,787 $19,891,564
93.8%
$1,398,700
$847,769
4.0% Directives vs.
ildings for the
– 2.8, 2.10 – 2.1
d within budget
C
SAB
CB
SB
S
AB
A
B
A
N
S
P
*(
e
12, 6.3 – 6.5
t.
Current Phase: Clo
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –( ) Denotes number of
ose‐out / Occupan
t (2)
n (2)
(2)
2)
t (1)
etion
cy
– Subject to Change of Board of Education
Pag
ncy – August 15, 2
October 28, 200October 30, 200
June 23, 2009 September 8, 20
March 23, 2010April 27, 2010
December 21, 2
June 28, 2011 July 19, 2011
October 5, 2011
December 8, 20
December 13, 2
December 27, 2
August 1, 2013
August 15, 2013
n Readings
ge | 19
013
08 08
009
010
1
11
011
011
3
J.L. Stan A. PROJE
Studenstart o
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
nford Midd
ECT STATUS
nts occupied of school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
dle School
all new and ml 2013.
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
modernized b
2.1 – 2.3, 2.5 –
edule and with
$0 $17,184,699
$0 $17,184,699
$8,879 $144,790
$3,545,843 $13,485,187
$0 $17,184,699
89.5%
$1,057,800
$902,445
2.8% Directives vs.
uildings for th
– 2.8, 2.11 – 2.1
hin budget.
C
SAB
CB
SBB
S
AB
A
B
A
N
S
P
*(
he
12, 6.4, 6.5
Current Phase: Cl
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE ApprovalBOE Approval (Site
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates – Subj( ) Denotes number of Boa
ose‐out / Occupan
t (2)
n (2)
(3)
ework)
2)
t (1)
d
letion
cy
ject to Change ard of Education Readings
Pag
ncy – August 15, 2
October 28, 200October 30, 200
June 23, 2009 September 8, 20
June 1, 2010 June 22, 2010 September 28, 2
May 6, 2011
November 29, 2December 13, 2
January 24, 201
May 3, 2012
May 8, 2012
May 30, 2012
August 7, 2013
August 15, 2013
ge | 20
2013
08 08
009
2010
2011 2011
12
3
J.L. StanLandscap
A. PROJE
Scape
B. BUDG
C. BOND D. PROJE
Th
FundThis pproje Perce Chan
nford Middpe and Site I
ECT STATUS
s completed th
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding and Budget project is funded bect budget. See th
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
dle SchoolImprovemen
he project on s
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch
by the J.L. Stanfordhat project budget
ended
ency
ency Balance
ngency Balance
ges onstruction Change
nts
schedule in the
2.1 – 2.3, 2.5 –
edule and with
d Middle School for status.
89.5%
$1,057,800
$902,445
2.8% Directives vs.
e fall 2013.
– 2.8, 2.11 – 2.1
hin budget.
C
SA
C
S
S
A
A
A
S
C
(
12, 6.4, 6.5
Current Phase: Cl
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE ApprovalBOE Approval (Sit
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Completion
* Anticipated Dates – Subj( ) Denotes number of Boa
ose‐out / Occupan
t (2)
n (2)
(3)
ework)
2)
t (1)
d
letion
ject to Change ard of Education Readings
Pag
ncy – August 16, 2
October 28, 200October 30, 200
June 23, 2009 September 8, 20
June 1, 2010 June 22, 2010 September 28, 2
May 6, 2011
November 29, 2December 13, 2
January 24, 201
May 3, 2013
May 8, 2013
May 23, 2013
August 16, 2013
August 16, 2013
ge | 21
2013
08 08
009
2010
2011 2011
12
3
3
Terman A. PROJE
Studenmodecafeto
B. BUDG
C. BOND D. PROJE
ThN
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
n Middle Sc
ECT STATUS
nts occupiedrnized buildingorium moderni
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project comovember 2013
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
chool
d the new gs for the starzation was com
LE SUMMARY
T REFERENCE: 2
W:
mpleted on sch3. The project
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
instructionalrt of school in mpleted in Oct
2.1 – 2.8, 2.11
edule in Augushas been com
$0 $13,312,971
$0 $13,312,971
$4,153 $75,747
$2,720,590 $10,507,733
$4,748 $13,312,971
96.9%
$929,900
$12,909
9.4% Directives vs.
spaces anfall 2013. Th
tober 2013.
– 2.12
st 2013, exceptpleted within b
nd he
t for the Cafetbudget.
Current Phase: C
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Authorize to Bid BOE Approval
Approval by DSA
Bid Opening
Award of Contrac
Notice to Procee
Substantial Comp
Planned Occupan
* Anticipated Dates( ) Denotes number
orium, which w
Close‐out / Occupa
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
s – Subject to Changer of Board of Educatio
Pag
was completed
ancy – November
October 28, 20October 30, 20
June 23, 2009September 8, 2
May 11, 2010May 25, 2010
December 21,
June 28, 2011July 19, 2011
September 1, 2
December 6, 2
December 13,
December 27,
October 31, 20
November 15,
e on Readings
ge | 22
d in
15, 2013
008 008
2009
2010
2011
011
2011
2011
013
2013
DuveneNew Clas
A. PROJE
The feremovcompl
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
eck Elemenssroom Buil
ECT STATUS
ence around thved on Septemete and occup
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project has
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
ntary Schodings and M
he sod for thember 19, 2014pied on August
LE SUMMARY
T REFERENCE: 1
W:
been complet
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
ool Modernizatio
e field area to 4. All buildin11, 2014.
1.1 – 1.2, 1.4 –
ed within budg
$0 $9,778,358
$0 $9,778,358
$20,313 $0
$2,098,650 $7,655,002
$4,393 $9,778,358
88.4%
$703 ,772
$435,376
3.8% Directives vs.
on
establish growngs were subs
– 1.10
get, and was o
wth was stantially
occupied on Au
Current Phase:
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number o
ugust 5, 2014.
Close‐out/O
ct (2)
n (2)
n (2)
(2)
ct (1)
d
pletion
cy
– Subject to Changeof Board of Educatio
Pag
Occupancy – Augus
April 27, 2010May 11, 2010
December 14, 2January 11, 201
June 14, 2011June 28, 2011
February 27, 20
December 10, 2
December 18 2January 15, 201
February 28, 20
March 12, 2013
March 25, 2013
July 31, 2014
August 5, 2014
on Readings
ge | 23
st 5, 2014
2010 11
012
2012
2012 13
013
3
3
FairmeaNew Clas
A. PROJE
Studenstart o
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
adow Elemssroom Buil
ECT STATUS
nts occupied aof school in fall
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he project com
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
mentary Scding and Mo
all new and ml 2013.
LE SUMMARY
T REFERENCE: 1
W:
mpleted on sch
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
chool odernization
modernized bu
1.1 – 1.2, 1.4 –
edule and with
$0 $7,796,550
$0 $7,796,550
$32,377 $98,962
$1,992,932 $5,671,159
$1,120 $7,796,550
96.0%
$642 ,300
$186,122
7.1% Directives vs.
n
uildings for the
– 1.10
hin budget.
C
ScAB
CB
ScB
S
AB
A
B
A
N
S
P
* ( )
e
Current Phase: Clos
chedule: Architect Contract BOE Approval
Conceptual Design BOE Approval
chematic Design (BOE Approval
ubmit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
ubstantial Comple
Planned Occupancy
Anticipated Dates –) Denotes number of
se‐out / Occupanc
(2)
(2)
(2)
)
(1)
etion
y
– Subject to Change f Board of Education
Pag
cy – August 15, 20
October 13, 2009October 27, 2009
March 23, 2010April 6, 2010
September 14, 2September 28, 2
April 18, 2011
October 11, 2011October 25, 2011
November 14, 20
December 5, 201
December 13, 20
January 3, 2012
August 5, 2013
August 15, 2013
Readings
ge | 24
013
9 9
010 010
1 1
011
11
011
Ohlone
New Clas A. PROJE
Move‐occurrbuildin
B. BUDG
C. BOND D. PROJE
O
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
Elementa
ssroom Buil
ECT STATUS
‐in to the newred in Decembng on January
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ccupancy occu
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
ary School
ding and Mo
w building and ber 2011. Stu3, 2012.
LE SUMMARY
T REFERENCE: 1
W:
urred on Janua
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
odernization
other existing udents occupie
1.1 – 1.2, 1.4 –
ry 3, 2012. Pro
$0 $10,597,870
$0 $10,597,870
$7,461 $49,049
$2,180,418 $8,360,942
$62,598 $10,597,870
98.9%
$748,400
$459,113
3.9% Directives vs.
n
classrooms ed the new
– 1.10
oject complete
C
SAB
CB
SB
S
AB
A
B
A
N
S
P
*(
ed on schedule
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Authorize to Bid (2BOE Approval
Approval by DSA
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –( ) Denotes number o
e and within bu
Occupancy –
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change of Board of Education
Pag
udget.
– January 3, 2012
September 30, 2October 14, 200
March 3, 2009March 17, 2009
June 2, 2009 June 23, 2009
November 24, 2
April 27, 2010 May 11, 2010
May 18, 2010
July 13, 2010
August 3, 2010
August 19, 2010
November 18, 2
January 3, 2012
n Readings
ge | 25
2008 08
9
2009
0
2011
2
Site Acq525 San A
A. PROJE
This si
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
quisition Antonio Rd
ECT STATUS
te has been le
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he site has bee
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
ased to Athena
LE SUMMARY
T REFERENCE: 1
W:
en leased to At
unds
ment y
ended
a Academy.
1.1 – 1.2, 1.4 –
thena Academy
$0 $8,500,000
$0 $8,500,000
$0 $0
$8,500,000 $0 $0
$8,500,000
100.0%
– 1.10
y.
Current Phase:
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number o
N/A
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change of Board of Educatio
Pag
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 26
Jordan A. PROJE
The po
B. BUDG
C. BOND D. PROJE
Th
M
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce *Bud
Middle Sc
ECT STATUS
ortables were
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
Move in occurre
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
dget previously exp
hools ‐ Int
installed and m
LE SUMMARY
T REFERENCE: 2
W:
mpleted ahead
ed on Septemb
unds
ment y
ended
pended
erim Class
moved into for
2.1, 6.4, 6.5
of schedule an
ber 30, 2011.
$0 $392,120 $208,222 $600,342
$0 $0
$180,286 $419,292
$764 $600,342
76.8%*
srooms
fall 2011. DSA
nd under budg
A closeout rece
get.
Current Phase:
Schedule: Approval by DSA
Authorize to Bid (BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Occupancy
* Anticipated Dates ( ) Denotes number o
eived Novemb
Move‐in
2)
t (1)
d
pletion
– Subject to Change of Board of Educatio
Pag
er 19, 2012.
June 16, 2011
June 14, 2011June 28, 2011
July 14, 2011
July 20, 2011
July 27, 2011
September 20,
September 30,
n Readings
ge | 27
2011
2011
Gunn HAir Cond
A. PROJE
Best Ccondit
B. BUDG
C. BOND D. PROJE
Pr
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
High Schooitioning of E
ECT STATUS
Contracting Setioning units an
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject has been
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
l Existing Buil
ervices Inc. cond cool roof co
LE SUMMARY
T REFERENCE: 3
W:
n closed‐out.
unds
ment y
ended
dings
ompleted the oating in the su
3.7
$0 $2,600,000
$0 $2,600,000
$1,919 $0
$454,610 $2,120,580
$22,891 $2,600,000
80.9%
installation oummer 2011.
C
SAB
CB
SB
S
A
AB
B
A
N
S
*(
of air
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
* Anticipated Dates –( ) Denotes number o
Completed
t (2)
n (2)
(2)
2)
t (1)
etion
– Subject to Change of Board of Education
Pag
March 27, 2010April 6, 2010
N/A N/A
N/A N/A
October 20, 201
February 10, 20
February 22, 20March 8, 2011
March 28, 2011
April 8, 2011
April 11, 2011
August 8, 2011
n Readings
ge | 28
10
11
11
J.L. Stan A. PROJE
Coultereloca
B. BUDG
C. BOND D. PROJE
Pr
This JLS p
nford Midd
ECT STATUS
er Constructioted portables
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable relocaproject. Refer to
dle School
on completedin August 2011
LE SUMMARY
T REFERENCE: 2
W:
ted on schedul
tion project funo pg. 14
‐ Interim
the work o1.
2.1, 6.4, 6.5
e and is curren
ded by main
Classroom
on the
ntly in close‐ou
ms
ut.
Current Phase:
Schedule: Approval by DSAJordan Project
Authorize to Bid (BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number
Occupancy
(2)
ct (1)
d
pletion
ncy
s – Subject to Changeof Board of Educatio
Pag
‐ August 11, 2011
April 19, 2011June 16, 2011
May 10, 2011May 24, 2011
June 1, 2011
June 13, 2011
June 20, 2011
August 8, 2011
August 15, 201
e on Readings
ge | 29
1
FairmeaPortable
A. PROJE
Reloca
B. BUDG
C. BOND D. PROJE
Pr
This JLS p
adow Elem Relocation
ECT STATUS
ation of the po
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject complet
portable relocaproject. Refer to
mentary ScProject
ortable was com
LE SUMMARY
T REFERENCE: 6
W:
ted ahead of sc
tion project funo pg. 14
chool
mplete and occ
6.4
chedule on Aug
ded by main
cupied on Aug
gust 8, 2011.
ust 8, 2011.
Current Phase:
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number
Occupancy
ct (2)
gn (2)
n (2)
(2)
ct (1)
d
pletion
ncy
– Subject to Changeof Board of Educatio
Pag
‐ August 8, 2011
February 15, 20N/A
N/A N/A
N/A N/A
March 3, 2011
March 3, 2011
May 11, 2011May 24, 2011
June 14, 2011
June 14, 2011
June 20, 2011
August 1, 2011
August 8, 2011
e on Readings
ge | 30
011
ElemenInteractiInstallati
A. PROJE
Installsystemclassro
B. BUDG
C. BOND D. PROJE
A
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
ntary Classrve Whiteboion
ECT STATUS
ation of Smarms were comooms and libra
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
ll SmartBoards
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
room Imprards and So
rtBoards and Lmpleted for aaries in April 20
LE SUMMARY
T REFERENCE: 1
W:
s and Lightspee
unds
ment y
ended
rovementsound Assist S
Lightspeed souall elementar011.
1.5 – 1.7
ed sound syste
$0 $2,004,889
$0 $2,004,889
$0 $0
$275,488 $1,729,401
$0 $2,004,889
93.9%
s System
und assist ry school
ems installed.
C
SA
C
S
S
A
A
A
C
(
Current Phase: Co
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Completion
* Anticipated Dates – Su( ) Denotes number of B
omplete ‐ May 15,
t (2)
n (2)
(2)
2)
t (1)
d
ubject to Change Board of Education Readi
Pag
, 2011
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
November 9, 20November 23, 2
February 25, 20
March 8, 2011
March 9, 2011
May 15, 2011
ings
ge | 31
010 2010
011
Palo Alt Multi‐Us
A. PROJE
The fiechang
B. BUDG
C. BOND D. PROJE
Fi
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
to High Schse Field
ECT STATUS
elds were avaie order negoti
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
eld was open f
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
hool
lable for play oations comple
LE SUMMARY
T REFERENCE: 4
W:
for use on Feb
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
on February 1, ted on March
4.14
ruary 1, 2011.
$0 $2,609,680 $1,007,255 $3,616,935
$0 $1,506
$698,293 $2,916,682
$454 $3,616,935
100.0%
$269,300
$230,579
1.5% Directives vs.
2011, and fina9, 2011.
al
Current Phase:
Schedule: Architect ContraBOE Approval
Conceptual DesigBOE Approval
Schematic DesigBOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid BOE Approval
Bid Opening
Award of Contra
Notice to Procee
Substantial Com
Planned Occupa
* Anticipated Dates( ) Denotes number
Occupancy
ct (2)
gn (2)
n (2)
A
(2)
act (1)
ed
pletion
ncy
s – Subject to Changr of Board of Educati
Pag
y – February 1, 201
September 30October 14, 20
N/A N/A
November 18,December 09,
March 19, 200
September 30
February 24, 2March 17, 200
March 16, 201
April 7, 2010
June 1, 2010
January 31, 20
February 1, 20
e ion Readings
ge | 32
11
, 2008 008
, 2008 2008
09
, 2009
2009 09
10
011
011
Gunn H
Industria
A. PROJE
This fareceiv
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
High Schoo
al Arts Addit
ECT STATUS
acility was avaed on July 18,
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
he building occ
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
tion and Ren
ailable for ins2011.
LE SUMMARY
T REFERENCE: 3
W:
cupied as sche
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
novation
truction in Jan
3.1, 3.7, 3.11
duled, and the
$0 $5,082,402
$0 $5,082,402
$1,061 $88,985
$1,002,057 $3,990,300
$0 $5,082,402
99.3%
$349,000
$141,967
41.6% Directives vs.
nuary 2010. D
e project comp
C
ScAB
CB
ScB
Su
A
AB
B
A
N
Su
P
* ( )
DSA closeout
pleted within b
urrent Phase:
chedule: Architect Contract OE Approval
onceptual Design OE Approval
chematic Design (OE Approval
ubmit to DSA
Approval by DSA
Authorize to Bid (2OE Approval
id Opening
Award of Contract
Notice to Proceed
ubstantial Comple
lanned Occupancy
Anticipated Dates –) Denotes number of
udget.
Occupancy –
(2)
(2)
2)
)
(1)
etion
y
Subject to Change f Board of Education
Pag
January 4, 2010
N/A N/A
N/A N/A
N/A N/A
June 17, 2008 December 24, 20
October 14, 2008October 28, 2008
December 16, 20
December 24, 20
January 6, 2009
November 25, 20
January 4, 2010
Readings
ge | 33
008
8 8
008
008
009
Gunn HAquatic C
A. PROJE
This faout wi
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce Chan
High SchooCenter
ECT STATUS
acility was avaith DSA.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project com
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
nge Order Conting
Starting Continge
Remaining Contin
Percent of Chang(Change Orders + COriginal Contract)
l
ailable for use
LE SUMMARY
T REFERENCE: 3
W:
mpleted within
unds
ment y
ended
ency
ency Balance
ngency Balance
ges onstruction Change
in July 2009, a
3.12
budget.
$0 $4,865,423
$0 $4,865,423
$0 $0
$647,169 $4,218,253
$0 $4,865,423
99.9%
$389,887
$195,148
49.9% Directives vs.
and has been
C
ScAB
CB
ScB
S
A
AB
B
A
N
S
P
* ( )
closed
Current Phase:
chedule: Architect Contract BOE Approval
Conceptual Design BOE Approval
chematic Design (BOE Approval
ubmit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
ubstantial Comple
Planned Occupancy
Anticipated Dates –) Denotes number of
Occupancy –
(2)
(2)
(2)
)
(1)
etion
y
– Subject to Change f Board of Education
Pag
June 15, 2009
N/A N/A
N/A N/A
N/A N/A
December 11, 20 April 24, 2008
April 8, 2008 April 22, 2008
May 28, 2008
June 4, 2008
December 6, 200
June 15, 2009
June 15, 2009
Readings
ge | 34
007
08
Middle Jordan, J
A. PROJE
AEDIS Boardprograprojectransf
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
School PreJ.L. Stanford
ECT STATUS
presented recof Education
am documentcts for pre‐deerred to the pr
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
e‐Design d and Terma
commended cofor approval os for the newsign work havrogram conting
LE SUMMARY
T REFERENCE: 2
W:
been complet
unds
ment y
ended
n
oncept plans foon Septemberw projects at ve been closegency on June
2.1 – 2.12
ted. Board app
$0 $56,488
$0 $56,488
$0 $0
$56,488 $0 $0
$56,488
96.8%
or each campur 8, which beceach campus.ed, and funds14, 2011.
proval received
C
SAB
CB
SB
S
A
AB
B
A
N
S
P
*(
us to the ame the . These s will be
d on Septembe
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design (BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comple
Planned Occupanc
* Anticipated Dates –) Denotes number of
er 8, 2009.
Complete
(2)
(2)
(2)
2)
(1)
etion
y
– Subject to Change f Board of Education
Pag
October 28, 200October 30, 200
June 23, 2009 September 8, 20
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 35
8 8
009
Techno
A. PROJE Equipmuse du
B. BUDG
C. BOND D. PROJE
Eq
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
logy Impro
ECT STATUS
ment orders hauring the 2014/
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
quipment has
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies & Computers racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
ovements
ave arrived and/15 school yea
LE SUMMARY
T REFERENCE: 1
W:
been installed
unds
ment y
ended
d were deployar.
1.5 – 1.7
for the 2014/1
$0 $10,485,054
$0 $10,485,054
$0 $6,850,644 $539,269
$3,095,142 $0
$10,485,054
92.2%
ed to the vario
15 school year
ous campuses f
r.
Current Phase:
Schedule: Architect ContracBOE Approval
Conceptual DesigBOE Approval
Schematic DesignBOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (BOE Approval
Bid Opening
Award of Contrac
Notice to Proceed
Substantial Comp
Planned Occupan
* Anticipated Dates ( ) Denotes number o
for
N/A
t (2)
n (2)
(2)
2)
t (1)
d
pletion
cy
– Subject to Change of Board of Educatio
Pag
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 36
GarlandCampus
A. PROJE
The Bohold uThe bJune 2at the
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
d ElementaModernizat
ECT STATUS
oard of Educatuntil a growth oard voted to2011. Discussioelementary sc
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
ary Schooltion
tion has put nplan is establis terminate theons with the Bchools are ongo
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment y
ended
ew developmeshed for the ele lease with SBoard on futureoing.
1.1, 1.4 – 1.10
on hold.
$0 $22,178,544
$0 $22,178,544
$0 $0
$3,915,789 $17,400,000
$862,755 $22,178,544
1.3%
ent for Garlandementary schoStratford Schooe plans for gro
C
SAB
CB
SB
S
A
AB
B
A
N
S
P
*(
d on ools. ol in owth
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Compl
Planned Occupanc
* Anticipated Dates –( ) Denotes number o
On Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
– Subject to Change of Board of Education
Pag
October 28, 200October 30, 200
February 10, 20February 24, 20
June 2, 2009 June 23, 2009
N/A N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 37
08 08
009 009
High Sc
Palo Alto
A. PROJE
The Bofor boclosedreserv
B. BUDG
C. BOND D. PROJE
M
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
hool Mast
o HS and Gu
ECT STATUS
oard of Educaoth high schod, with funds tve funds.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
Master planning
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
ter Plan
nn HS
tion (BOE) appools, and thetransferred to
LE SUMMARY
T REFERENCE: 3
W:
g effort comple
unds
ment y
ended
proved the mase projects ho the respectiv
3.1 – 3.14, 4.1
ete.
$0 $285,387
$0 $285,387
$0 $0
$285,387 $0 $0
$285,387
86.2%
aster plans have been ve campus
– 4.14
C
SA
G
G
G
(
Current Phase:
Schedule: Architect ContractBOE Approval
Initial Master PlanBOE Approval
Paly CEQA ApprovBOE Approval
Gunn Master PlanBOE Approval
Gunn CEQA ApproBOE Approval
Master Plan RevisPaly MP Revision AGunn MP Revision
* Anticipated Dates –( ) Denotes number o
Complete
t (2)
n Approval (2)
val (2)
n Update (2)
oval (2)
sion Approval (2) Approval (2) n Approval (2)
– Subject to Change of Board of Education
Pag
March 31, 2009April 14, 2009
September 8, 20September 22, 2
February 9, 201February 23, 20
March 23, 2010April 6, 2010
April 27, 2010 May 11, 2010
September 14, 2October 9, 2010October 12, 201
n Readings
ge | 38
9
009 2009
10 010
0
2010 0 10
HooverPre‐Desig
A. PROJE
This peleme
B. BUDG
C. BOND D. PROJE
Pr
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
Elementagn
ECT STATUS
roject has beeentary schools.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
roject is curren
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
ary School
n put on hold
LE SUMMARY
T REFERENCE: 1
W:
ntly on hold.
unds
ment y
ended
until a growth
1.1 – 1.2, 1.4 –
$0 $70,550
$0 $70,550
$0 $0
$70,550 $60 $0
$70,550
81.0%
h plan is establ
– 1.10
C
SAB
C
SB
S
A
AB
B
A
N
SP
*(
ished for the
Current Phase:
Schedule: Architect ContractBOE Approval
Conceptual Design
Schematic Design BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial ComplPlanned Occupanc
* Anticipated Dates –( ) Denotes number o
On Hold
t (2)
n (2)
(2)
2)
t (1)
d
letioncy
– Subject to Change of Board of Education
Pag
April 27, 2010 May 11, 2010
November 9, 20
N/A N/A
N/A
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
n Readings
ge | 39
010
Elemen A. PROJE
The pdiscusplanni
B. BUDG
C. BOND D. PROJE
Th
FundStateStronOtheTota BudgSalarSuppContConsSoft Tota Perce
ntary Classr
ECT STATUS
project has bessions with ting.
ET & SCHEDUL
D PROJECT LIST
ECT OVERVIEW
his project has
ding e Funds ng Schools Bond Fer Funding l
get ries and Benefits plies racts & Services struction & EquipmCosts Contingencyl
ent of Budget Expe
room Impr
een placed othe BOE abo
LE SUMMARY
T REFERENCE: 1
W:
been placed o
unds
ment y
ended
rovements
on hold pendout elementa
1.5 – 1.7
on hold.
$0 $2,004,889
$0 $2,004,889
$0 $0
$275,488 $1,729,401
$0 $2,004,889
93.9%
s
ing further ary growth
C
SA
C
S
S
A
A
A
S
(
Phase 1 Schools: Current Phase: O
Schedule: Architect ContractBOE Approval
Conceptual DesignBOE Approval
Schematic Design BOE Approval
Submit to DSA
Approval by DSA
Authorize to Bid (2BOE Approval
Bid Opening
Award of Contract
Notice to Proceed
Substantial Comp
Planned Occupanc
* Anticipated Dates – Su( ) Denotes number of B
Barron Park and En Hold
t (2)
n (2)
(2)
2)
t (1)
d
letion
cy
ubject to Change Board of Education Readi
Pag
El Carmelo
June 8, 2010 June 22, 2010
N/A N/A
November 9, 20December 7, 20
December 23, 2
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
ings
ge | 40
010 010
2010
OHS WEST:260388860.1 A-1
EXHIBIT A
PALO ALTO UNIFIED SCHOOL DISTRICT BOND PROJECT LIST
[Note: The order in which projects are listed is not an indication of priority for funding or completion. Not all listed projects will be completed at every site.] 1. ELEMENTARY SCHOOL PROJECTS
Addison Barron Park Briones Duveneck El Carmelo
Escondido Fairmeadow Garland Greendell Hays
Hoover Nixon Ohlone Palo Verde
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Acquire and install modular classrooms, as needed.
4. Expand libraries to accommodate enrollment growth.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.
8. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.
9. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.
10. Modernization/replacement of administration/multipurpose/library space.
Numbers Added
A-2 OHS WEST:260388860.1
2. MIDDLE SCHOOL PROJECTS
David Starr Jordan Jane Lathrop Stanford Terman
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.
2. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.
3. Construct extra school-wide storage space.
4. Expand classrooms and classroom wings, library and administration spaces.
5. Improve or provide new security systems, including alarms, lighting, locks, monitoring systems, fencing, etc.
6. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.
7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.
8. Renovate gymnasium, including new gym floors, doors, windows, bleachers and athletic equipment; upgrade building infrastructure, including power and water distribution.
9. Renovate swimming pool and pool deck; new filtration system; new storage and restrooms; upgrade pool equipment.
10. Replace and/or improve play fields, including drainage and irrigation, install water meters; replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic equipment.
11. Repair/Replace and/or improve concrete walkways and asphalt; canopies; parking lot and driveways.
12. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.
A-3 OHS WEST:260388860.1
3. GUNN HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.
2. Demolish old library building.
3. Replace temporary classrooms with permanent classrooms.
4. Construct additional restrooms.
5. Construct second gymnasium.
6. Construct new soccer field.
7. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.
8. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.
9. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.
10. Improve or provide new security systems, including alarms, lighting, locks, monitoring systems, fencing, etc.
11. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.
12. Replace swimming pool with new 35-meter pool, pool equipment and support structures, pool decking, bleachers, storage, restrooms, showers, associated equipment.
13. Renovate gymnasium; interior renovation including gymnasium floors and bleachers; replace athletic equipment.
14. Modernize football stadium, including new bathrooms and concession stands.
A-4 OHS WEST:260388860.1
4. PALO ALTO HIGH SCHOOL PROJECTS
1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.
2. Replace temporary classrooms with permanent classrooms.
3. Construct additional restrooms.
4. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.
5. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.
6. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.
7. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.
8. Library modernization and building interior improvements, including infrastructure and major building system upgrades.
9. Renovation or replacement of the Tower Building to accommodate administration, classroom and program support space.
10. Renovate Main Gymnasium and second gymnasium, including seismic upgrades; accessibility improvements; construction of new restrooms; install new roofing; replace doors and windows; replace gymnasium floors and athletic equipment, bleachers and renovation of interior. Renovation or replacement of weight training facility.
11. Construct new theater building.
12. Renovate and improve soccer field, including new retaining wall and bleachers; new fencing and storage.
13. Modernize football stadium, including replace bleachers; new bathrooms and concession stands.
14. Replace and/or improve play fields, including drainage and irrigation, install water meters; replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic equipment.
A-5 OHS WEST:260388860.1
5. OTHER DISTRICT-WIDE PROJECTS
Furnishing and equipping of existing and newly constructed, modernized or rehabilitated classrooms and facilities on an ongoing basis, including to replace worn, broken, or out-of-date furniture and equipment for all classrooms, athletic facilities and other facilities, as needed.
1. Replace existing or acquire new computers, technology and related equipment on an ongoing basis.
2. Establish a planned maintenance fund to address maintenance work expected to be needed to all District facilities on an ongoing basis (other than as may be necessary for current maintenance, operation or repairs), in order to implement the District’s comprehensive facilities maintenance plan.
3. Acquisition of any of the facilities on the Bond Project List through temporary lease or lease-purchase arrangements, or execute purchase option under a lease for any of these authorized facilities.
4. If and as opportunities become available, and to the extent the Board of Education determines that bond funds are available for the purpose, acquisition of land and other interests in real property for future school buildings and other District facilities, and construction of such facilities, and rehabilitation/renovation of District-owned buildings and sites not otherwise listed.
5. Repair, upgrade, modify, expand, refinish, replace and construct site improvements, including off-street parking areas, pickup/dropoff, signage, paths, sidewalks and walkways, canopies, hard courts (student play areas), athletic play fields, landscaping, irrigation, permanent athletic field equipment and facilities (including nets, basketball standards, goals and goalposts, backstops), field lighting, etc.
6. ADDITIONAL NECESSARY AND INCIDENTAL PROJECTS
1. Remove, dispose of, and otherwise remediate hazardous materials, including asbestos, lead, etc., where necessary.
2. Address unforeseen conditions revealed by construction/modernization (including plumbing or gas line breaks, dry rot, seismic, structural, etc.).
3. Other improvements required to comply with existing building codes, including the Field Act, and access requirements of the Americans with Disabilities Act (ADA).
4. Site preparation/restoration in connection with new construction, renovation or remodeling, or installation or removal of relocatable classrooms, including ingress and egress, demolition of existing structures, removing, replacing, or installing irrigation and drainage, utility lines (such as gas lines, water lines, electrical lines, sewer lines, and communication lines), trees and landscaping, relocating fire access roads, traffic lights and mitigation, and acquiring any necessary easements, licenses, or rights of way to the property.
5. Rental or construction of storage facilities and other space on an interim basis, as needed to accommodate construction materials, equipment, and personnel, and interim classrooms (including relocatables) for students and school functions or other storage for classroom materials displaced during construction.
A-6 OHS WEST:260388860.1
7. RENOVATION/MODERNIZATION (DEFINED)
For purposes of the Bond Project List, renovation and modernization projects are intended to restore the building systems and infrastructure, weather protections, finishes, and technology, or reallocate and reorganize space, to a condition that will provide a sustainable, functional educational and administrative environment for future years, comparable to new construction.
Renovation projects may include, but are not limited to nor necessarily encompass, all of the following, depending upon the age, condition and needs of each particular school facility:
1. upgrade electrical, communication, fire alarm, and similar building systems as well as main power service and distribution, which may include active and passive solar power and heating system acquisition, installation and construction
2. Replace, repair or upgrade plumbing, piping and drainage systems, including water supply, meters, water heating, and wastewater systems, plumbing fixtures and sinks, etc., within buildings and sites and to connect with city supply and drainage systems
3. Replace or modify aging heating, ventilation and air cooling systems with energy-efficient heating and air cooling systems (HVAC), including installing energy management systems (EMS);
4. Replace, modify, upgrade interior lighting and exterior safety/security lighting systems and fixtures, as necessary;
5. Repair, modify and construct structural elements of the existing structure as necessary;
6. Replace or repair aging roofs with similar materials or District standard materials;
7. Replace, repair, install and construct, as necessary, interior walls, floor and ceiling finishes, doors, door locks, windows, cabinets and casework, and equipment attached to wall surfaces (including white boards, marker boards, tack boards, television mounts, scoreboards, fire extinguishers, kitchen cabinets/equipment, etc.);
8. Upgrade, modify and construct restroom facilities;
9. Comply, as necessary, with Americans with Disabilities Act (ADA) and Title 24 requirements;
10. Refinish the exterior finishes of the school (including stucco, wood and metal trims, wood siding, paint, etc.); replace doors and windows
11. Modify, expand, separate, convert and construct school support areas; staff work and lunch areas; and educational areas to provide adequate, functional environments;
12. Modify, replace and construct functional components of altered or replaced building components (including rainwater leaders, fascias, mansards, etc.);
For any project involving renovation, modernization, remodeling or rehabilitation of a building or the major portion of a building, the District may proceed with new replacement construction instead (including any necessary demolition), if the Board of Education determines that replacement and new construction is more practical than rehabilitation and renovation, considering the building’s age, condition, expected remaining life, comparative cost, and other relevant factors.