STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above) Sr. No Tender No. Item /nature of work Mode of tender Dt. of publication of NIT Types of bidding ( single /two bid system ) Last date of receipt of tender Nos. of tenders received Nos. and name of parties qualified after technical evaluation Nos. & names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer evaluated L1 Contract No. & date. Name of contractor. Value of contract (In Crores /Lakhs) Scheduled date of completion of supplies. Actual date of start of work Actual date of completion Remarks/ Reason for delay if any, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 CE/C/I-JP Dy. CE/C/I-JP 1 Dy.CE/C/ GC/2012 /T-28 Residual earth work in bank, Cutting and lead bank utilizing cut spoils for widening/construction of BG formation including side drains, trolley refuses, cess wall etc. and other ancillary works between Sikar(Incl.)- Loharu (Incl.) stations of Sikar- Loharu section in connection with Jaipur- Sikar-Loharu & Sikar- Churu GC project. Open tender 11.7.12 Single Packet system 14.08.12 02 - - yes 19/NWR/Dy. CE/C-GC/JP /2012-13/JP- SIKR-CUR & SIKR-LHU dt. 21.12.12 M/s Bharwal Lal Bijarnia, Jaulsa Kua Road, Near Tagore B. Ed. College, Tegore Nagar, Kuchaman City, Distt. Nagour. 119.22 03.01.13 Ext. 31.08.15. 21.09.2012 31.8.15 Final bill under process. 2 Dy. CE /C/ GC/ NWR/ 2014/T- 51R Construction of 44 Nos. of Type –II quarters (8 Nos. at Nua Railway Station, 18 Nos. at Jhunjhunu Railway Station & 18 Nos. at Chirawa Railway Station) and other related works in connection with Gauge conversion of Sikar- Loharu section Open tender 23.3.15 Single Packet system 23.4.15 06 - - - 41/ NWR/Dy. CE/C-GC/JP /2014-15/JP- SIKR-CUR & SIKR-LHU dt. 23.10.15. M/s V. K. Construction Co., 2 D 37, Jawahar Nagar, Shri Ganganagar - 335001 926.07 30.04.17 Ext. 31.12.17 05.09.2015 31.12.17 Final bill under process. 3 NWR/SC /JP-RGS- CHURU/ CIVIL- 1011405 02 Dismantling of existing MG track, Laying and linking of Broad gauge main line, looplines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Zone-I (Km. 0.00 to Km. 48.70), including Sikar, Laxmangarh Sikar & Fatehpur shekhawati yards in Sikar -Churu section in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project. Open tender 28.8.15 Single Packet system 30.9.15 05 - - - 42/ NWR/Dy. CE/C-GC/JP /2014-15/JP- SIKR-CUR & SIKR-LHU dt. 26.12.15. M/s ISC Project Pvt. Ltd., “S-2,” The Meropole, Adjacent to INOX, Bund Garden Road, Pune – 411 001 948.07 08.5.2017 Ext. 31.10.17 12.11.15 31.10.17 Final bill under process.

Upload: others

Post on 20-Jan-2020

4 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1

CE/C/I-JP

Dy. CE/C/I-JP

1 Dy.CE/C/

GC/2012

/T-28

Residual earth work in

bank, Cutting and lead

bank utilizing cut spoils

for widening/construction

of BG formation including

side drains, trolley

refuses, cess wall etc. and

other ancillary works

between Sikar(Incl.)-

Loharu (Incl.) stations of

Sikar- Loharu section in

connection with Jaipur-

Sikar-Loharu & Sikar-

Churu GC project.

Open

tender

11.7.12 Single

Packet

system

14.08.12 02 - - yes 19/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

21.12.12

M/s Bharwal Lal

Bijarnia,

Jaulsa Kua Road, Near

Tagore B. Ed. College,

Tegore Nagar,

Kuchaman City, Distt.

Nagour.

119.22 03.01.13

Ext. 31.08.15.

21.09.2012 31.8.15 Final bill

under

process.

2 Dy. CE

/C/ GC/

NWR/

2014/T-

51R

Construction of 44 Nos. of

Type –II quarters (8 Nos.

at Nua Railway Station, 18

Nos. at Jhunjhunu Railway

Station & 18 Nos. at

Chirawa Railway Station)

and other related works in

connection with Gauge

conversion of Sikar-

Loharu section

Open

tender

23.3.15 Single

Packet

system

23.4.15 06 - - - 41/

NWR/Dy.

CE/C-GC/JP

/2014-15/JP-

SIKR-CUR &

SIKR-LHU dt.

23.10.15.

M/s V. K. Construction

Co.,

2 D 37, Jawahar Nagar,

Shri Ganganagar -

335001

926.07 30.04.17

Ext.

31.12.17

05.09.2015 31.12.17 Final bill

under

process.

3 NWR/SC

/JP-RGS-

CHURU/

CIVIL-

1011405

02

Dismantling of existing

MG track, Laying and

linking of Broad gauge

main line, looplines /

Sidings including points

and crossings in yards,

spreading of ballast,

tamping of track,

transportation of P. Way

materials and other

ancillary works in Zone-I

(Km. 0.00 to Km. 48.70),

including Sikar,

Laxmangarh Sikar &

Fatehpur shekhawati

yards in Sikar -Churu

section in connection with

Jaipur-Sikar- Loharu &

Sikar - Churu Gauge

conversion project.

Open

tender

28.8.15 Single

Packet

system

30.9.15 05 - - - 42/

NWR/Dy.

CE/C-GC/JP

/2014-15/JP-

SIKR-CUR &

SIKR-LHU dt.

26.12.15.

M/s ISC Project Pvt.

Ltd.,

“S-2,” The Meropole,

Adjacent to INOX, Bund

Garden Road, Pune –

411 001

948.07 08.5.2017

Ext. 31.10.17

12.11.15 31.10.17 Final bill

under

process.

Page 2: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2

4 NWR/SC

/JP-RGS-

CHURU/

CIVIL-

1011405

05

Dismantling of existing

MG track, Laying and

linking of Broad gauge

main line, loop lines /

Sidings including points

and crossings in yards,

spreading of ballast,

tamping of track,

transportation of P. Way

materials and other

ancillary works in Zone-II

(Km. 48.70 to Km. 90.46),

including Ramgarh

shekhawati, Bissau &

Churu yards in Sikar -

Churu section in

connection with Jaipur-

Sikar- Loharu & Sikar -

Churu Gauge conversion

project.

Open

tender

15.9.15 Single

Packet

system

19.10.15 02 - - - 45/

NWR/Dy.

CE/C-GC/JP

/2015-16/JP-

SIKR-CUR &

SIKR-LHU dt.

22.02.16.

M/s Bhanwar Lal

Bijarnia, Village -

Rajpura, Post- Prewari,

Teh- Nawa, Distt.-

Nagaur

808.49 11.5.2017

31.12.17

20.11.15 28.12.17 Final bill

under

process.

5 NWR/SC

/JP-RGS-

Churu/Ci

vil-

1011411

01

Earth work in filling and

cutting in bank for making

BG formation, supplying

and laying Blanketing

material on new

bank/diversion,

Construction of station

building, Platforms, trolley

refuses, ballast wall,

construction of Over Head

water Tank at Fatehpur

shekhawati &

Lachhmangarh sikar

stations, Fabrication &

erection of Platform

shelters /Small shelters

and other misc. works

from Sikar (incl.) to Churu

(incl.) in connection with

SIKR-CUR Gauge

Conversion.

Open

tender

10.8.15 Two bid

system

15.9.15 06 Yes NWR/S&C/C

A/ 151, dt.

15.02.2016.

M/s Prem Fabricators

Plot No. 426, Near Jyoti

Power,

B/H Steel Town, Moriya

Changodar,

Ahmedabad.

2472.03 10.06.17

Ext.

15.12.17

11.12.15 15.12.17 Final bill

under

process.

6 DY.

CE/C/GC

/NWR/2

015/T-55

Flash Butt Welding of

52Kg. / 60Kg. New/SH

rails at depot / site using

Mobile Flash Butt Welding

Plant in Jaipur –Sikar -

Churu section in

connection with Jaipur –

Sikar – Loharu & Sikar –

Churu GC project.

Open

tender

29.6.15 Single

Packet

system

20.08.15 03 - - - 46/

NWR/Dy.

CE/C-GC/JP

/2016-17/JP-

SIKR-CUR &

SIKR-LHU dt.

22.09.2016.

M/s Navketan Pvt. Ltd.,

1 A. J. C. Bose Road,

Kolkata – 700 020.

814.56 22.12.17

Ext. 30.6.18

25.5.2016 Work of

Sikar-

Churu

section

completed

and JP-CUR

work in

progress.

Page 3: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3

7 NWR/SC

/JP-SIKR-

CHURU/

Civil/101

3000100

3

Construction of Road

under Bridge / Limited

Height Sub-Way in lieu of

24 Nos. level crossing in

Sikar-Dundlod

Mukandgarh Section & 16

Nos. level crossing and 4

Nos. Balancing culverts in

Sikar – Laxmangarh Sikar

Section.

Open

tender

21.11.15 Two bid

system

23.12.15 06 01 M/s

Gurukrupa

Kalyan JV

2A,2nd

Floor,Navnat

h Soc-2, B/H,

Shradhadeep

Soc, Nr.

Sharda

School,

Singanpor-

Causway

Road, Surat-

395004.

Yes NWR/S&C/

CA/153, Dt.

15.6.2016

M/s AE-MHK (JV)

First Floor, Divine India

Building, Near R.T.O

Office, By Pass Road,

Post-Savgadh (Panpur),

Himmatnagar-383001

Dist. S.K. (Gujarat).

6363.98 22.3.2018 1.5.2016 Work in

progress.

8 NWR/SC

/JP-SIKR-

CHURU/

Civil/101

3000100

4

Construction of Road

under Bridge / Limited

Height Sub-Way in lieu of

33 Nos. level crossing and

4 Nos. of Bridges along

with 7 Nos Balancing

culverts in Laxmangarh

Sikar - Churu Section.

Open

tender

21.11.15 Two bid

system

23.12.15 03 - - Yes NWR/S&C/

CA/154, Dt.

23.6.2016

M/s Supreme - Modi

(JV) 9, Leela Mansion,

Raj Bhawan Road,

Civil Line - Jaipur

302006

5876.06 22.3.2018 24.3.16 Work in

progress.

9 NWR/SC

/JP-RGS-

Churu/Ci

vil-

1011418

06

Construction of 60 nos

staff quarters in Sikar-

Churu section,

Construction of running

room at CUR, construction

of PF & PF shelters &

extension of FOB, RCC OH

tank and other

miscellaneous Civil work

at Sikar, Civil works

related to L-xings and

related Electric works in

Sikar-Churu section and

other ancillary works in

connection with SIKR-CUR

Gauge Conversion project.

Open

tender

26.2.16 Two bid

system

30.3.16 04 01 M/s

Rajendra

Singh

Bhamboo

Infra Pvt.

Ltd. 108,

First Floor,

Neel kanth,

Neelkanth

Building ,

Gandhipath,

Vaishali

Nagar, Jaipur

yes NWR/S&C/

CA/159, Dt.

28.9.2016

M/s Gurukrupa

Enterprises,

2A,2nd Floor,Navnath

Soc-2

B/H, Shradhadeep Soc,

Nr. Sharda School,

Singanpor-Causway

Road, Surat

1948.67 15.9.2017

18.7.16 Work

terminated

on 6.6.17

Variation

under

process.

10 NWR/SC

/JP-RGS-

Churu/Ci

vil-

1011405

07

Providing in situ Glued

joints of G-3 (L) type as

per RDSO drawings for 60

kg & 52 kg rails with all

fittings etc complete in

Jaipur - Sikar - Churu

section in connection with

Jaipur - Sikar - Loharu &

Sikar - Churu Gauge

Conversion project.

Open

tender

18.5.16 Single

Packet

system

22.06.16 05 01 M/s

Diamond

Steel

Industries,

Plot No. 879,

Sector-16,

Faridabad

Yes 48/

NWR/Dy.

CE/C-GC/JP

/2016-17/JP-

SIKR-CUR &

SIKR-LHU dt.

11.01.2017.

M/s Creative Engineers,

F/189, Road No. 5,

Indraprastha Industrial

Area,

Kota

160.21 Lacks 14.3.2019 18.10.16 68% Work in

progress.

Page 4: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

4

DY. CE/C/II-JP

11 NWR/SC

/JP-RGS-

Churu/Ci

vil-

1011405

08

Welding of Rail Joints by

SKV process in Jaipur-

Sikar & Sikar-Churu

section in connection with

Jaipur-Sikar-Loharu and

Sikar-Churu Gauge

Conversion project.

Open

tender

10.6.16 Single

Packet

system

14.07.16 02 - - Yes 49/

NWR/Dy.

CE/C-GC/JP

/2016-17/JP-

SIKR-CUR &

SIKR-LHU dt.

11.01.2017.

M/s Oberoi Thermit

Pvt., Ltd. Plot No.3,

Sector 8B, IIE, Sidcul,

Haridwar -249403

349.73 Lacks 18.10.18 26.12.16 Work in

progress.

12 NWR/SC

/JP-RGS-

Churu/Ci

vil-

1011416

12

Balance / left over works

of Construction of 60 nos

staff quarters in Jaipur-

Sikar-Churu section,

Construction of running

room at Churu,

construction of PF & PF

shelters & extension of

FOB, RCC OH tank and

other miscellaneous Civil

work at Sikar, Civil works

related to L-xings works

in Sikar-Churu section

and other ancillary works

in connection with Jaipur-

SIKR-CUR Gauge

Conversion project.

Open

tender

25.7.17 Two Packet

system

28.817 02 01 M/s AIEN

MEREN

ENTERPRISES

-DIMAPUR,

N. S.T.

Colony,

Circular

Road,

Dimapur

Yes Under

preparation

with HQ

M/S V. K.

CONSTRUCTION

COMPANY-

SRIGANGANAGAR, 2-D-

37, Jawahar Nagar,

Sriganganagar

2185.03 11.7.18 15.10.17 Work in

progress.

1 NWR/

S&C/FL

Shed/T/

1

Fabrication & erection of

structural steel covering

shed at Phulera.

Open

tender

5.9.2014 One bid

system

10.10.2014 2 2 - Yes NWR/S&C/FL

Shed/CA/01

dated

20.3.2015

M/s M.H. Khanusiya

Himmatnagar (Guj.)

7.17 Cr 17.12.14 1.1.2015 30.12.16 Work

completed.

2 NWR/

S&C/JP-

SIKR/T/

7

Supplying & stacking 65

mm gauge stone

ballast…. JP-SIKR

section.

Open

tender

2.9.2015 Two packet

system

14.10.2015 7 4 3 Yes Dy

CE/C/II/CA/N

WR/S&C/JP-

SIKR/T/7/01

Dated

17.3.2016

M/s MFL-Sidharth-

Parikshit Chandra

Das (JV) Gurgaon.

9.84 Cr. 1.12.15 1.1.2016 31.03.2018 Work in

progress.

3 NWR/

S&C/JP-

SIKR/T/

10

Construction of major &

Minor Bridges in C/w GC

of JP-SIKR section.

Open

tender

-

Two packet

system

18.8.2015

13 7 6 Yes, NWR/S&C/CA

/152 dated

25.2.2016

M/s Sona Builders,

Unjha (Guj.)

37.14 Cr. 17.11.15 1.12.15 31.05.2018 Work in

progress .

Page 5: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

5

Dy. CE/C/III-JP

4 NWR/

S&C/JP-

SIKR/T/

11

Earth work in

embankment cutting etc.

and construction

/alteration of service

building JP-SIKR section.

Open

tender

Two packet

system

25.8.2015

14 7 7 Yes NWR/S&C/CA

/150 dated

29.1.2016-

M/s Jandu

Construction

Company, Hisar.

34.18 Cr. 17.11.15 25.11.15 31.03.2018 Work in

progress .

5 NWR/

SC/JP-

RGS-

Churu/

Civil-

102141

001

Construction of LHS Sub

way (LHS)/RUB---LC (52

nos) between JP-SIKR

section.

Open

tender

Two packet

system

9.12.15 9 6 3 Yes NWR/S&C/CA

/151 dated

01.7.2016

M/s SGCCL-MMPL (JV)

Jaipur.

68.65

Cr.

23.3.16 1.4.16 22.3.18 Work in

progress .

6 NWR/

SC/JP-

RGS-

Churu/

Civil-

102140

801

Dismantling of existing of

MG track, Laying and

Linking of BG main line---

---Jaipur to Sikar GC

work

Open

tender

Two packet

system

- 8 5 3 Yes NWR/S&C/CA

/161 dated

19.10.2016

M/s KIEL-BLB (JV),

Jaipur

26.21 Cr 8.8.2016 8.8.2016 15.12.17 Work in

progress .

7 NWR/

SC/JP

/Civil-

102160

601R

Construction of PF,FOB PF

shelter ----JP Yard

remodeling & JP-SIKR GC.

Open

tender

Two packet

system

-26.7.2016 6 5 4 Yes NWR/SC/JP

/Civil-

102160601R/

01 date

11.11.2016

M/s Sanjeev Brothers

Jaipur

18.48 Cr 30.9.16 30.9.16 30.06.18 Work in

progress

1 NWR/S&

C/LHS/

RE-FL-

Madar/T/

1

Construction of road

under bridges / limited

height subways (35 Nos)

in Rewari–Phulera( RPC)

section

Open

tender

Two

packet

system

- Yes NWR/S&C/C

A/143 dated

08.7.2015

M/s S.B. Poonia Const.

Co. (JV), Hissar.

51.06 Crore. 28.4.17 5.5.2015 30.06.2018 Work in

progress.

2 NWR/

S&C/LHS

/RE-FL-

Madar/T/

2

Construction of road

under bridges / limited

height subways (32 Nos)

in Rewari – Phulera(

RPC) section

Open

tender

Two

packet

system

- Yes NWR/S&C/C

A/144 dated

16.7.2015

M/s S.B. Poonia Const.

Co. (JV), Hissar.

43.74 Crore. 28.4.17 10.5.15 30.06.2018 Work in

progress.

3 NWR/SC/

MD-FL-

RGS/Civil

-

1039980

1

Residual composite work

for Construction of 118

Nos Staff quarters

between RE-RGS-FL

section.

Open

tender

Two

packet

system

- Yes NWR/SC/MD

-FL-

RGS/Civil-

10399801/C

A/03 dated

21.11.2016

M/s Sammer Const.

Co. 15/65 West

Punjabi Bagh New

Delhi

11.41 Cr. 21.6.2017 28.6.16 30.06.2018 Work in

progress

Page 6: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

6

Dy. CE/C/IV-JP

4 Construction of Club

House at Jagatpura

Jaipur

Open

tender

Two

packet

system

- Yes NWR/S&C/C

A/168 dated

8.5.2017

M/s P.K.Jain Jaipur 19.00 Cr. 16.2.18 01.03.17 16.2.18 Work in

progress

1. Tender No.NWR/SC/JP/ Civil-102990301

RGS Detour in

connection with DFCCIL

work- Construction of

Viaduct (157x18.30m),

Major (5x18.30m &

3x18.30) and Minor

Bridges, earth work in

bank/cutting including

Blanketing material,

Track works for Broad

Gauge line, Supplying &

putting ballast in track,

Transportation of P.

Way materials and

other ancillary works in

Ringus- in connection

with RGS Detour.

Open

tender

6.3.2016 Two bid

system

12.4.2016 9 7 - Yes NWR/S&C/

CA/158

Dated

9.9.2016

M/s AT PLT MHK (JV)

First Floor, Divine

India Building, Nr.

RTO Office, By Pass

Road, Himatnagar-

383001, Dist- S.K.

(Gujrat)

108.92 Cr 23.6.18 20.7.16 23.6.18 Work in

progress.

Page 7: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7

CE/C/II-JP

Dy. CE/C/I-UDZ

1 UDZ-

HMT/

GC/EW/T/

4

Construction of Minor

bridges & earthwork

form Km. 207/0 to 250/0

in connection with UDZ-

HMT section GC Project .

Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/

CA/113 dtd.

21.10.11

M/s Rahee-Triveni

(J/V), Kolkatta

2286.41

07.02.13

30.11.13

31.07.14

31.03.15

31.12.15

30.06.16

30.12.16

31.07.17

31.01.18

23.08.11 Work in

Progress

2 UDZ-

HMT/

GC/MB/T-

13-R-1

Substructures of major

bridges from Udaipur to

Dungarpur.

Open 13.11.14 Two bid

system

17.12.14 05 02 Yes NWR/S&C/

CA/ 142 dtd.

30.06.15

M/s Murali Krishna

Const. Co, Hyderabad

6814.86 23.04.17

31.12.17

31.08.18

09.05.15 Work in

progress

3 UDZ-

HMT/

GC/EW/T-

20

Construction of Minor

bridges & earthwork from

Km. 121/0 to160/0 in c/w

UDZ-HMT section GC

Project

Open 08.05.15 Two bid

system

12.06.15 03 02 01 Yes NWR/S&C/

CA/ 145 dtd.

23.11.2015

M/S M.G. Contractors,

Pvt., Ltd., Panchkula

6402.75 13.03.17

30.06.17

31.12.17

30.04.18

28.09.15 Work in

Progress

4 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414062

7

Construction of station

buildings, S&T structures,

and ancillary works in

connection with UDZ-HMT

GC project

Open 05.04.16 Two bid

system

11.05.16 01 01 0 Yes NWR/S&C/

CA/ 162 dtd.

24.10.16

M/s Jainsons

Construction Co. JV,

Jodhpur

5933.53 01.02.18 14.09.16 Work in

Progress

5 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414042

6

Supply & stacking 50 mm

stone track ballast in UDZ-

HMT section

Open 06.0216 Two bid

system

16.03.16 04 02 02 Yes Dy.

CE/C/UDZ/C

A/34 dated

20.10.17

M/s Choyash Infra

Solution Joint Venture

Pvt., Ltd., Dungarpur

1345.41 30.06.18 10.09.16 Work in

Progress

6 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414112

9

Transportation of PSC

sleepers from sleeper

factory to site in UDZ-

HMT section

Open 05.06.16 Single

packet

19.07.16 04 04 04 No Dy.

CE/C/UDZ/C

A/35 dated

24.12.2016

M/s J.K Construction

Co., New Market

Nokha

267.84 24.04.17

25.12.17

25.04.18

19.04.17 Work in

Progress

7 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414012

8

Balance work of

construction, minor

bridges and earth work in

UDZ-HMT section.

Open 30.05.16 Two bid

system

05.07.16 02 02 0 Yes NWR/S&C/

CA/ 163 dtd.

08.12.1016

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

4526.41 30.08.18 15.09.16 Work in

Progress

8 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414012

4

Construction of minor

bridges and earth work in

cutting and filling

between Umra and Zawar

stations in connection

with UDZ-HMT GC Project

Open 02.06.16 Two bid

system

12.07.16 05 02 03 Yes NWR/S&C/

CA/ 164 dtd.

08.12.2016

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

6980.98 11.09.18 01.10.16 Work in

Progress

Page 8: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

8

9 NWR/SC/

Constructi

on/Civil-

20430001

030

Construction of 49 Nos.

Road Under Bridges and 8

Nos. Road Over Bridges in

UDZ-HMT section

Open 14.09.16 Two bid

system

18.10.16 04 03 01 Yes NWR/S&C/

CA/ 166 dtd.

14.03.2017

M/s Rachana - MI (JV),

Ahmedabad-(Gujarat).

6623.63 22.12.18 01.01.17 Work in

progress

10 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414033

4

Constriction of Super

structure of 32 Nos Major

bridge in UDZ-HMT

section

Open 04.12.16 Two bid

system

11.01.17 04 04 0 Yes NWR/S&C/

CA/ 167 dtd.

09.04.17

M/s Rachana - MI (JV),

Ahmedabad-(Gujarat).

5674.62 26.02.19 08.03.17 Work in

progress

11 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414053

3

Providing in situ Glued

joints of G-3 (L) type in

UDZ-HMT section

Open 20.10.16 Single

Packet

07.12.16 05 05 0 Yes Dy. CE/C/

UDZ/CA/41

dated

16.05.2017

M/s. Tirupati Metal

Fabricators, Faridabad

148.97 15.02.19 Work yet to

start

12 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414053

5

Supply of stone Ballast in

UDZ-HMT section

Open 21.12.20 Single

Packet

25.01.17 06 06 0 Yes Dy. CE/C/

UDZ/CA/26

dated

26.05.2017

M/s. B. B. Construction,

Khurja-Distt.

Bulandshahr

801.13 02.09.18 24.03.17 Work in

progress

13 NWR/SC/

UDZ-

HMT(GC)/

Civil-

20414053

8

Flash butt welding of Rails

in UDZ-HMT section

Open 31.12.16 Single

Packet

08.03.17 02 02 0 Yes Dy. CE/C/

UDZ/CA/49

dated

28.10.17

M/s ITC, Kanpur 648.34 30.11.18 --- Work in

progress

14 NWR/SC/

UDZ-HMT

(GC)/Civil-

20514053

9

Laying and linking of track

in UDZ-HMT section.

Open 31.12.16 Single

Packet

10.02.17 02 02 0 Yes Dy. CE/C/

UDZ/CA/40

dated

17.04.17

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

861.39 02.03.18 28.03.17 Work in

progress

15 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414083

9

Laying and linking of track

in UDZ-HMT section. from

Km 160 to Km 225 In UDZ-

HMT section

Open 29.12.16 Two packet 02.02.17 04 04 0 Yes - M/s BLB--SNCC JV, ,

Jodhpur (Raj)-342001

1128.55 02.04.19 16.05.17 Work in

progress

16 T.NO.UDZ

-HMT-GC-

MB-T-43-

R

Fabrication, transporting

assembling and erection

of superstructures

Open 19.07.17 Two packet 24.08.17 03 02 01 Yes - M/s Dynemic Engineers

Infratrack Pvt.,Ltd.,

Kota

1510.59 16.03.19 - Work in

progress

17 T.NO.UDZ

-HMT-GC-

BLDG/T-

44

Construction of staff

Quarters & SSE/C/P.Way

office in UDZ-HMt section

Open 09.06.17 Single 12.07.17 03 03 0 Yes Dy. CE/C/

UDZ/CA/46

dated

20.09.17

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

392.18 31.01.18

30.06.18

- Work in

progress

18 T.NO.UDZ

-HMT-GC-

Civil/T-47

Earth work and minor

bridges between UDZ-

Umra in UDZ-HMT section

Open 18.08.17 Single 20.09.17 02 02 0 Yes M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

890.55 10.06.18 - Work in

progress

Page 9: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

9

Dy. CE/C/II-UDZ

1. Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902

Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/cutting including blanketing material, construction strengthening, rebuilding, extension of Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl)

section in connection with Mavli Junction to Barisadri to Barisadri GC Project.

Open 19.02.16 Two bid

20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.2016

M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School,

Singanpore-Causway Road

Rs. 137.40 Cr

15.06.18 01.07.16 In progress.

Work terminated on 25.09.2017

2. T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R

Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project

Open 10.10.16 single bid

25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/MVJ-BI/GC/Welding/T-3R Dated 20.02.17

M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)

Rs.03.93 Cr

19.08.18 Yet to start

Page 10: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10

Dy. CE/C/Dungarpur

1. Dy.CE/C/

UDZ/DNR

P-

RTM/FLS/

2011/T/1

Carrying out final

location of survey &

….other preliminary

activities in connection

with new BG line

between DNRP-RTM via

Banswara

Open 1/6/11 &

30/6/11

(NIT & First

corrig.)

Single 15-07-

2011

10 NA NA Yes NWR/S&C/

CA/114 Dt.

27-02-12

M/s S.M.Consultants,

Bhubneswar

4.99 Cr

Excl. 1st 0.60

Cr.

13/11/12

Extended

up to

31.12.2017

(Further

applied)

14/11/2011 -

Work in

progress

2. Dy.

CE/C/DN

RP/ RTM-

DNRP/EW

/ NL/T-8

E/W in cutting and

filling for formation &

all other ancillary works

etc. from Km. 0.00 to

Km. 17.00 between

Dungarpur-Nawa Gaon

station in c/with DNRP-

RTM New BG Rail Line

Project.

Open 23-01-2013 Two

Packet

06-03-

2013

15 5 10 Yes NWR/S&C/

CA/129

Dt. 31-10-

13

Accepted

on

10.07.13

M/s Nayak

Infrastructure Pvt.

Ltd., Guwahati

56.74 Cr.

Ex.SCA

8.05 Cr.

09-07-15

Further

extended

upto

09.07.2017.

Work closed

as on is

basis.

06-11-2013 - Project

freeze. PG

has been

released

final bill

under

process.

3. T. No.

Dy. CE/C/

DNRP/

RTM-

DNRP/MB

/NL/T/ 10

– Const. of minor

bridges, RUB & other

ancillary works etc.

from Km. 0.00 to 17.00

bet. Dungarpur to

Nawa Gaon stations in

c/with DNRP-RTM New

BG Rail Line Project.

Open 10-09-2013 Two

Packet

23-10-

2013

8 6 2 Yes NWR/S&C/

CA/137 Dt.

30-06-

2014

accepted

on

04.04.2014

M/s Gannon Dunkerley & Co. Ltd., Ahmedabad

38.06 Crore 03-04-2016

Further

Extended

upto

31.03.18

14.11.2014 - Project

freeze.

Some work

to be

executed

to close

the work.

4 T. No.

UDZ-

HMT/GC/E

W/T-3R

UDZ-HMT GC PROJ.

Construction of Minor

bridges & earthwork

from Km. 270/0 to

320/0 in connection

with UDZ-HMT section

GC Project

Open 08.05.15 Two bid

system

12.06.15 06 01 05 Yes NWR/S&C/

CA/148

dated

12.01.2016

Accepted

on

20.10.15

M/s Royal Infra

Engineering Pvt. Ltd., Surat

2706.07

Lakhs

19.04.17

Extended

upto

31.03.2018

27.11.15 - Work in

Progress

5 NWR/SC/

UDZ-

HMT/GC/Ci

vil/204140

532

Flash Butt welding of

60 Kg/52 Kg. New / SH

Rails at Depot/ Site

using Mobile Flash Butt

Welding Plant in DNRP-

HMT Section.

Open Single

Packet

23.11.16 02 01 01 Yes Under

execution M/s Railtech

Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)

531.70 Lakhs 21.08.2018 Yet to be

commenced.

-- Work to be

started.

6 NWR/SC/

UDZ-

HMT/GC/Ci

vil/205140

541

Dismantling of existing

MG track, laying and

linking of BG ML, LL

etc. bet. Km. 270.00 to

Km. 320.00 in c/with

DNRP-HMT Section.

Open - Single 01.02.2017 04 Nos. 1 1 Yes Dy.

CE/C/DNRP

/CA/17 Dt.

27.06.2017

M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)

890.85 Lakhs 27.02.2018 05.04.2017 -- Work in

progress.

7. UDZ-HMT/

GC/

205140838

-R1

Transportation of all

types of free rails, P&C

etc. between DNRP-

HMT Section in c/w

UDZ-HMT GC Project.

Open

tender

01.05.2017 Single

Packet

12.06.2017 2 Nos. NA NA Yes Dy. CE/ C/

DNRP/CA/1

9 Dt.

15.10.2017

M/s Shree Nahar Construction Co., A-328, Shastri Nagar, Jodhpur (Rajasthan)

6.28 Crores 17.08.2018 31.08.2017 - Work in

progress.

Page 11: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11

DY. CE/C/RTM

1 Dy.CE/C/BNSW/ DNRP-RTM/NL/T-9

Construction of Office Accommodation for Dy.CE/C/RTM & Officers Rest House at Ratlam in c/w Construction of New BG Line between DNRP-RTM via Banswara.

Open 23.10.13 Single 12.12.13 3 Nos. - - Yes Dy.CE/C/RTM/CA/02 dt.21.04.14

M/S Kirti Contractors & Engineers, 168, Samta Parisar, Ratlam (MP)

Rs. 124.14 Lacs

09.09.14 Extension given up 31.12.2016

11.03.2014 Work is in progress.

2 Dy.CE/C/RTM/ DNRP-RTM/NL/T-2

Construction of minor bridges ,Road under bridges (RUB) & other ancillary works from 142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project

Open 16.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015

M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema Acrcade,3rd Floor, Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006

Rs.42.89 Cr 17.12.2016 10.08.2015 Work is in progress.

3 Dy.CE/C/RTM/ DNRP-RTM/NL/T-3

Earth work in cutting and filling for formation as per BG standard profile, Construction of RCC box type bridges and all other ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc from Km.142.85 to 163.00 km between Chotti Sarwan & Shivgarh stations in connection with Ratlam - Dungarpur via Banswara New BG line project.

Open 26.03.15 Two bid 05.05.2015 06(six) 04(four) 02(two) Yes NWR/S&C/CA/147 dated 21.12.2015

MMS Infratech Pvt.Ltd.,New Anjar-370110(Gujarat)

Rs. 53.66 Cr. 06.09.2017 15.10.2015 Work is in progress.

8. UDZ-HMT/

GC/

205141142

Const. of duty huts,

road works at level

crossing, etc. in the

section of Dy.

CE/C/DNRP in c/with

UDZ-HMT GC Project.

Open

tender

14.08.2017 Single

Packet

18.09.2017 1 NA NA Yes Yet to be

executed. M/s R.K. Constructions, Village –Nawada, Sector-20, Greater Noida, Distt . Gautam Budh Nagar.

7.63 Crores 18.10.2017 Work started - Work in

progress.

9. NWR/SC/

UDZ-HMT/

GC/ Civil –

205140436

Supply & stacking of

stone track ballast etc.

bet. Km. 260 to Km.

320 etc. in c/with UDZ-

HMT GC Project.

Open

tender

08.12.2016 Two

packet

18.01.2017 4 4 - Yes Dy. CE/C/

DNRP/CA/1

8 dated

15.07.2017

M/s YSCC-YKS-HID

(JV), Vill. Mothala, Abu KRoad, Distt. Sirohi

10.87 Crores 17.10.2018 08.05.2017 - Work in

progress.

Page 12: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12

4 Dy.CE/C/RTM/ DNRP-RTM/NL/

T-5

Earthwork in cutting and filling for formation as per B.G. standard profile and all other

ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc. from Km 163.00 to 184.600 & Ratlam connectivity between Chandra Berda & Ratlam stations in connection with Ratlam-Dungarpur via Banswara new BG line project.

Open 11.05.2015 Two bid 24.06.2015 05(Five) 02(two) 03(three) Yes NWR/S&C/CA/149 dated 29.01.2016

M/S Mehta Saiyyed(JV) 104, LIC Colony, Vaishali Nagar Ajmer(Raj) Pin

30 5001

Rs. 58.71 Cr. 05.11.2017 07.11.2015 Work is in progress.

CE/C/III-JP

Dy. CE/C/I-Ajmer

1

AII

/BN

GM

-RA

S/N

L/T

/11

R2

Laying and linking of Broad

gauge main line, loop lines

including points and

crossings in yards,

spreading of ballast,

tamping of track,

transportation of P-way

materials, construction of

station building & platform

and other ancillary works

between Bangurgram and

Ras stations in connection

with Bangurgram-Ras New

Broad Gauge Line Project.

Open 05.10.12 Single 09.11.12 1 Nos. - - Yes

Dy.

CE(C)/AII/BN

GM-

RAS/CA/85

dated

20/11/2013

M/s. Bhanwar Lal

Bijarnia, Village-

Rajpura, Tehsil-Nawa,

District-Nagaur (Raj.)

66

74

98

82

.09

17/09/2013,

28/02/2014,

31/05/2014,

30/09/2014,

31/01/2015,

31/05/2015,

30/10/2015 &

31/12/2015

02/09/13 -

Work

completed.

Final variation

under HQ

technical

check.

2

AII

/Co

nst

./D

FC

CIL

/T/3

-R2

Shifting of track between

Madar & Durai stations &

shifting MG yard at Marwar

Jn. i.c.w. DFC.

Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes

NWR/S&C/CA

/60 dated

26/12/2013

M/s. Ravi Infra build

Pvt. Ltd., 95, Hiran

Magri, Sector-11,

Udaipur

32

16

99

68

1.7

9

04/02/2015,

30/04/2016,

31/12/2016 &

30/06/2018

14/12/13 - Work re-

started.

Page 13: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13

3

AII

/Co

nst

./D

FC

CIL

/T/6

Construction of station

building & staff quarters in

c/w shifting of utilities for

DFCCIL.

Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes

NWR/S&C/CA

/61 dated

27/12/2013

M/s. Rama

Construction company,

H-240, Ashok Vihar

Phase-I New Delhi

41

17

03

68

6.3

4 05/03/2015,

31/12/2015,

30/06/2016,

31/12/2016,

30/06/2017 &

31/12/2017

15/09/13 - Work under

progress.

4

AII

/Co

nst

./LH

S/T

/3 Providing Limited Height

Subways in lieu of existing

Level Crossings between

Madar & Haripur stations

of Madar - Marwar Section

in connection with

elimination of existing level

crossing gates.

Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes

NWR/S&C/CA

/64 dated

20/02/2014

M/s. Lall Construction

Co. AA-105, Shalimar

Bagh, Delhi-110088

45

77

17

33

9.3

5

15/12/2015,

31/03/2017 &

31/10/2017

18/02/14 - Work under

progress.

5

AII

/Co

nst

./Lo

co/M

od

/T/7

Improvement to drainage

system in Loco Workshop

by the construction of drain

using mostly pre-cast RCC

units including launching.

Work also includes

construction of traverser

path and other ancillary

works in connection with

Modernisation of Loco

Workshop, Ajmer

Open 21/10/14 Two Bid 26/11/14 07 (Seven) 04 (Four)

1.0 JCC Infra

Projects Pvt.

Ltd., 761/30,

Aklank

House, Tikam

Ganj, Ajmer

(Raj.)

2.0 Bharat

Spun Pipe &

Construction

Company, 43,

Industrial

Area,

Jhotwara,

Jaipur-

302012

3.0 M/s. B. L.

Infra Projects

Pvt. Ltd., B-

8/6, Sector-3,

Rohini, New

Delhi -

110085.

4.0 M/s.

Satish & Amit

Infra

Structure

2/108, Royal

Green, Near

Sirsi Mod,

Post office

Sirsi, Jaipur.

Yes

NWR/S&C/

CA/70 dated

29/07/2015

Prem Fabricator's, 426,

Near Jyoti Power,

Behind Steel Town,

Moriya, Chandgodar,

Ahmedabad-382110

1326.88 Lakhs

04/02/2016,

30/06/2016,

30/08/2016,

31/10/2016 &

15/12/2016

17/02/15 -

Work

completed,

final variation

under HQ

account's

vetting.

Page 14: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

14

6

AII

/Co

nst

./C

&W

/Mo

d./

T/6

Improvement to drainage

system in C&W Workshop

by the construction of drain

using mostly pre-cast RCC

units including launching.

Work also includes

construction of traverser

path and other ancillary

works in connection with

Modernisation of C&W

Workshop, Ajmer

Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four)

1.0 Varaha

Infra Limited,

Umesh

Smriti-6,

Jalam Vilas

Scheme,

Poata B.

Road,

Jodhpur

(Raj.)-

342006. 2.0

Bharat Spun

Pipe &

Construction

Company, 43,

Industrial

Area,

Jhotwara,

Jaipur-

302012. 3.0

JCC Infra

Projects Pvt.

Ltd., 761/30,

Aklank

House, Tikam

Ganj, Ajmer

(Raj.) 4.0

M/s. Raj

Kumar Gupta

Contractors,

III-J/59,

Nehru Nagar,

Ghaziabad-

201001.

Yes

Dy.

CE(C)/AII/CA/

91 dated

30/07/2015

Prem Fabricator's, 426,

Near Jyoti Power,

Behind Steel Town,

Moriya, Chandgodar,

Ahmedabad-382110

948.74 Lakhs

21/01/2016,

31/12/2016,

30/06/2017 &

31/10/2017

04/02/15 - Work in

progress.

7

NW

R/S

C/A

II-B

NG

M/C

ivil

- 3

08

15

18

01

Earth work in bank/cutting

including Blanketing

material, Construction of

Major/Minor Bridges,

Construction of Quarters,

S&T structures &

Miscellaneous structures,

Dismantling of existing

Buildings, Platforms & Steel

structures etc., .... in

connection with Ajmer-

Bangurgram BG Doubling

project.

Open 02/03/16 Double

packet

12/04/201

6 06 (Six) 02 (Two)

M/s.

Rajendra

Singh

Bhamboo

Infra Pvt. Ltd.

108, First

Floor, Neel

Kanth

Building,

Gandhi Path,

Vaishali

Nagar, Jaipur

– 302021

and

M/s. Balajee-

Modi (JV), 9,

Leela

Mension, Raj

Bhawan

Road, Civil

Lines, Jaipur-

302006

Yes

NWR/S&C/CA

/74 dated

30/08/2016

M/s. Shivakriti-Shri

Mohangarh (JV), 7th

Floor, Ajmer Puliya,

Jaipur-302006

11337.76 Lakh 23/06/2018 20/07/16 - Work in

progress.

Page 15: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

15

Jaipur-

302006

8

NW

R/S

C/B

an

gu

rgra

m-G

uri

ya

-Pa

tch

/Civ

il-3

08

15

18

01

Earth work in bank/cutting

including Blanketing

materials, Construction of

Major/Minor Bridges,

Construction of Quarters,

S&T structures &

Miscellaneous structures,

dismantling of existing

buildings, platforms & steel

structures etc., ... in

connection with

Bangurgram - Guriya BG

Doubling project.

Open 28/06/16 Double

packet

10/08/201

6 05 (Five) 01 (One)

VPRPL-RBIPL

"Guriya" (JV)

H-1, First

Floor Shivalik

Complex,

Near Gol

Building,

Sardarpura,

Jodhpur

(Rajasthan)

342001

Yes

NWR/S&C/CA

/76 dated

24/01/2017

M/s. H.S. Mehta Infra –

JCC Infra Projects (JV),

761/30, Aklank House,

Tikam Ganj Ajmer –

305001

16161.54 Lakh 10/11/2018 20/11/16 - Work in

progress.

9

NW

R/S

C/M

D-/

Civ

il-3

08

42

18

01

Providing pit line with or

without catwalk, washing

apron, overhead water

tank, extension of existing

bridges, extension of

existing shed, construction

of service buildings and

dismantling of existing

track, laying & linking of

new track & turnouts etc.

in Madar yard in

connection with shifting of

coach maintenance facility

from Ajmer to Madar

project

Open 29/04/16 Double

packet 28/06/16 7 (Seven) 2 (One)

M/s. Ali

Mohd. Abdul

Mazid, Near

Jama Masjid,

Mohalla

Vyaparian,

Bikaner-

334001

(Rajasthan)

Varindera

Construction

s Limited,

408-409,

Suneja

Tower-I,

District

Cenre,

Janakpuri,

New Delhi.

Yes

NWR/S&C/CA

/75 dated

29/09/2016

M/s. M. H. Khanusiya,

First Floor, Divine India

Building, Near RTO

office, By Pass Road,

Post-Savgadh, (Panpur)

Himmatnagar-383001

Dist.-S.K. (Gajarat)

2643.75 Lakh 06/09/2017 &

31/01/2018 15/09/16 -

Work in

progress.

Page 16: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

16

Dy. CE/C/II-Ajmer

1 AII/Const.

/LHS/T/2

Construction of Limited

Height Subway in lieu

of existing LC No. 58,

60, 61, 62, 64, 65, 66,

67, 68, 69, 71, 72 &

73(13 Nos) between

stations Marwar to Rani

of Marwar-Palanpur

Section in connection

with elimination of level

crossing gates.

Open 21.02.2013 Single 28.03.2013 01 Nos.

1st Lowest

M/s. Ravi

Infrabuild

Projects Pvt.

Ltd. Office

95, Hiran

Magri Sector-

11, Udaipur-

313002

(Raj.).

NIL Yes

NWR/S&C/CA/5

8 dated

18/11/2013

M/s. Ravi Infrabuild

Projects Pvt. Ltd.

Office 95, Hiran Magri

Sector-11, Udaipur-

313002 (Raj.).

1790.49 Lakhs

31/12/2014,

30/09/2015,

30/09/2016,

30/09/2016,

31/12/2016,

31/05/2017 &

30/11/2017

14/09/2013 - Work

Completed.

2

AII/GRI-

MJ/BGD/T

/1

Earthwork in

embankment for

cutting & filling,

Blanketing for bank,

Addition, alteration and

construction of S&T

structures, Pass.

Platform, Platform

Shelters, station

Building, staff Quarters,

water Huts, toilets,

Hand Pumps, FOBs,

TMC Rest house etc.

between Guriya–

Marwar Jn. stations

(both excl.) and Officer

Rest House at Mawar

Jn. Station in

connection with Guriya-

Marwar Jn. BG Patch

Doubling Project.

Open 30.08.12 Single 16.10.12 07 Nos.

1st Lowest

M/s. Braham

Prakash Modi,

74

Sudarshanpur

a, Industrial

Area,

Baisgodam,

Jaipur-06

NIL Yes

NWR/S&C/CA/5

1 dated

14/03/2013

M/s. Braham Prakash

Modi, 74

Sudarshanpura,

Industrial Area,

Baisgodam, Jaipur-06

3541.71 Lacs.

30/09/2014,

30/04/2015,

31/07/2015,

30/10/2015,

31/12/2015,

30/04/2016,

30/06/2016,

31/12/2016,

31/03/2017 &

30/06/2017

31/12/2012 30/06/17 Work

completed.

3

AII/GRI-

MJ/BGD/T

/2

Construction of

Important/Major

Bridges including

earthwork, blanketing

on the approaches

between stations

Guriya to Marwar

Junction with

Railway’s/Contractor’s

design & drawing in

connection with Guriya-

Marwar Junction BG

Patch Doubling Project.

Open 21.01.2013 Single 26.02.2013 06 Nos.

1st Lowest

M/s.PNC

Infratech

Ltd.-Jain

Construction

Company

(JV) 761/30,

Aklank

House, Near

Mal Godown,

Tikam Ganj,

Ajmer

NIL Yes

NWR/S&C/CA/6

2 dated

06/01/2014

M/s. PNC Infratech

Ltd.-Jain Construction

Company (JV) 761/30,

Aklank House, Near

Mal Godown, Tikam

Ganj, Ajmer

3240.43 Lakhs

28/01/2015,

31/12/2015,

30/09/2016,

31/12/2016,

15/02/2017 &

31/07/2017

06/12/2013 - Work

completed.

Page 17: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

17

4 AII/Const.

/FLS/T/1

Marking out of center

line, taking levels

including all details,

Carrying out Geotech

investigation, designing

of foundation and sub –

structures / super

structure of Minor /

Major bridges/LHS,

preparation of land

plans & proposal,

Preparation of L-section

& yard plans etc. &

submitting detailed

working drawings in

connection with

Bangurgram to Guriya

& Marwar to Rani

Doubling projects and

Various shifting of

utility works of DFCCIL

& LHS works between

Kishangarh & Palanpur

stations.

Open 17.09.2012 Single 09.11.2012 03 Nos.

2nd Lowest

M/s. S. M.

Consultants,

Plot No.-130,

S.M. Tower,

Mancheswar

Industrial

Estate,

Rasulgarh,

Bhubneshwar

(Odisha)

M/s. BPC

India, Nataraj

Bhawan,

P.O.Khamarch

andi, P.S.

Haripal, Dist.-

Hooghly, West

Bengal

Yes

NWR/S&C/CA/5

7 dated

07/11/2013

M/s. S. M.

Consultants, Plot No.-

130, S.M. Tower,

Mancheswar Industrial

Estate, Rasulgarh,

Bhubneshwar (Odisha)

183.38 Lakhs

06/07/2013,

30/11/2013,

31/03/2014,

31/10/2014,30/0

4/2015,

31/08/2015,

31/12/2015,

30/04/2016,

31/08/2016 &

30/04/2017

02/02/2013 - Work under

progress

5 AII/Const/

FBW/T/1

Flash butt Welding of

60/52 Kg.

New/SH,(72/90 UTS )

Rail joints by using

mobile flash butt

welding plant in

connection with various

sanctioned works of

Ajmer unit of

construction

organization.

Open 11.10.2012 Single 19.11.2012 01 No.

1st Lowest

M/s. The

India Thermit

Corpn. Ltd.,

84/22, Fazal

Ganj,

Kanpur-

208012.

NIL Yes

Dy.

CE(C)/AII/FBW/

CA/85 dated

21/10/2013

M/s. The India Thermit

Corpn. Ltd., 84/22,

Fazal Ganj, Kanpur-

208012

699.04 Lakhs

18/03/2015,

18/03/2016,

18/03/2017 &

18/03/2018

13/11/2013 - Work in

progress

6 AII/Const.

/LHS/T/4

Providing Limited

Height Subway (17

Nos.) in lieu of existing

level crossings between

Haripur & Marwar Jn.

stations of Ajmer -

Marwar Jn. section in

connection with

elimination of existing

level crossing gates.

Open 11.07.14 Two packet

system 13.08.2014 07 Nos.

1st Lowest

M/s. PNC

Infratech

Ltd.-JCC

Infraprojects

Pvt. Ltd. (JV)

761/30,

Aklank

House, Near

Mal Godown,

Tikam Ganj,

Ajmer

04 (Four) Yes

NWR/S&C/CA/6

8 Dt. 09-03-

2015

M/s. PNC Infratech

Ltd.-JCC Infraprojects

Pvt. Ltd. (JV) 761/30,

Aklank House, Near

Mal Godown, Tikam

Ganj, Ajmer

3529.60

Lakhs

18/05/2016 &

30/06/2017 11/09/2015 -

Work under

progress

Page 18: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

18

7 AII/Const.

/LHS/T/5

Providing Limited

Height Subways (19

Nos.) in lieu of existing

level crossings between

Rani & Keshavganj

stations of Marwar Jn. –

Palanpur section in

connection with

elimination of existing

level crossing gates.

Open 21.02.2013 Two packet

system 13.08.2014 04Nos.

1st Lowest

M/s. Ravi

Infrabuild

Projects Pvt.

Ltd. Office

95, Hiran

Magri Sector-

11, Udaipur-

313002

(Raj.).

03 (Three) Yes

NWR/S&C/CA/6

6 Dt. 27-02-

2015

M/s. Ravi Infrabuild

Projects Pvt. Ltd.

Office 95, Hiran Magri

Sector-11, Udaipur-

313002 (Raj.).

Rs.3908.17

Lacs

18/05/2016,

13/03/2017 &

31/12/2017

03/12/2014 - Work under

progress

8 AII/Const.

/LHS/T/6

Providing Limited

Height Subways in lieu

of existing level

crossings between

Swaroopganj &

Palanpur stations of

Marwar Jn. - Palanpur

section in connection

with elimination of

existing level crossing

gates.

Open 21.02.2013 Two packet

system 13.08.2014 04 Nos.

1st Lowest

M/s. Ravi

Infrabuild

Projects Pvt.

Ltd. Office

95, Hiran

Magri Sector-

11, Udaipur-

313002

(Raj.).

03 (Three) Yes

NWR/S&C/CA/6

7 dated

27/02/2015

M/s. Ravi Infrabuild

Projects Pvt. Ltd.

Office 95, Hiran Magri

Sector-11, Udaipur-

313002 (Raj.).

Rs.3873.36

Lacs.

18/05/2016,

31/03/2017 &

31/03/2018

18/12/2014 - Work under

progress

9

AII/GRI-

MJ/BGD/T

/6

Construction of Minor

Bridges including other

ancillary work between

station Guriya

(excluding) - Marwar

Jn. (excluding) in

connection with Guriya

- Marwar Junction BG

patch doubling project.

Open 07/07/2014 Two packet

system 13/08/2014 04 Nos. 1.0 (One)

1.0 M/s.

Ashish

Construction

Co.- SP

Infracon (JV)

211, Shivam

Complex, Opp.

Hetarth Party

Plot, Science

City Road,

Sola,

Ahmedabad -

380061.

Yes

NWR/S&C/CA/6

9 dated

09/03/2015.

M/s. JCC InfraProjects

Pvt. Ltd., 761/30,

"Aklank House", Tikam

Ganj, Ajmer (Raj.).

2169.63 Lakhs

29/02/2016,

30/06/2016,

31/12/2016,

31/07/2017 &

31/12/2017

01/03/2015 - Work under

progress.

10

AII/GRI-

MJ/BGD/T

/8-R

Dismantling of existing

BG track, laying and

linking of Broad gauge

main line, loop lines

including points and

crossings at various

yards, spreading of

ballast, tamping of

track, transportation of

P-Way materials and

other ancillary works

between Guriya –

Marwar Jn. Section in

connection with Guriya

- Marwar Jn. BG Patch

Doubling Project.

Open 28/07/2015 Single packet

system 31/08/2015 5 Nos. 1.0 (One)

1.0 JCC Infra

Projects Pvt.

Ltd., 761/30,

Aklank House,

Tikam Ganj,

Ajmer

No -

M/s. Jhawar Sales

Corporation, Rani

Bazar, Bikaner-

334001 (Raj.)

Rs. 976.32

Lakhs

28/05/2017 &

31/07/2017 - 30/06/17

Work

completed.

Page 19: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

19

11

AII/MJ-

RN/BGD/T

/1

Earth work in

bank/cutting including

Blanketing material,

Construction of

Important/Major/Minor

Bridges, Construction of

Quarters, S&T

structures &

Miscellaneous

structures on stations

and in section,

Dismantling of various

Buildings, Platforms &

Steel structures etc,

Track works for Broad

Gauge line, Supplying &

putting ballast in track,

Transportation of P.

Way materials and

other ancillary works in

Marwar Junction to Rani

section in connection

with Marwar Jn.-Rani

(both including) BG

Patch Doubling project.

Open 09/08/2015 Two packet

system 06/10/2015 13 Nos. 7.0 (Seven)

1.0 M/s.

Gawar –

Lakhlan (JV)

402, Diamond

Tower, Purani

Chungi, Ajmer

Road,

Jaipur2.0 M/s.

Kalindee –

Paras JV, 2nd

Floor Building

No. 9 A, Cyber

City, DLF

Phase – III,

Gurgaon –

1220023.0

M/s. Ravi - HG

(JV) 95, Hiran

Magri, Sector-

11, Udaipur –

3130024.0

M/s. Gannon

Dunkerley &

Co. Ltd. 301-

303, Prerna

Arcade, Opp.

Doctor House,

Near parimal

Crossing, C.G.

Road,

Ahmedabad-

3800065.0

M/s. VRC – SIL

(JV), 16, Opp.

Metro Pillar

No. 190,

Paschim Vihar

Extension,

Rohtak Road,

Delhi

1100636.0

M/s. BPL-BCPL

(JV) Ekta

House, Nr.

Shripath

Apartment,

Jalaram-II,

University

Road, Rajkot –

360007

Yes

NWR/S&C/CA/7

1 dated

22/02/2016

M/s. VPRPL – RBIPL

(JV) H-1, first Floor

Shivalik Complex,

Near Gol Building,

Sardarpura, Jodhpur

(Raj.) – 342001

15262.94 Lakh 29/12/2017 25/02/2016 - Work under

progress.

Page 20: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

20

12

NWR/SC/

Guriya-

Marwar/Ci

vil-

30915110

9

Miscellaneous works

between Guriya to

Marwar Jn. doubling

project.

Open 20/09/2016 Single packet

system 24/10/2016 04 Nos. 04 (Four) NIL Yes

Dy.CE(C)/AII/C

onst./GRI-

MJ/CA/4 dated

30/03/2017

M/s K.B. Enterprises,

2, Matra Chhaya,

Opp. Chambal Power

House, Hawa Sarak,

Jaipur-302006

Rs.814.54

Lakhs

20/05/2017 &

19/08/2017 03/12/2016 -

Work under

progress.

Page 21: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

21

CE/C/IV-JP

Dy. CE/C/I-Jodhpur

11.. TT..NNoo.. JJUU//

CCOONNSSTT//

1155//22001111--1122

AAcccceepptteedd

oonn––

1177..0099..1122

WWoorrkk ooff rreemmooddeelliinngg ooff

JJUU yyaarrdd iinncclluuddiinngg aallll

wwoorrkk rreellaatteedd ttoo PP..

wwaayy,, AATT wweellddiinngg

OOppeenn 2255..0033..1122 SSiinnggllee 2266..0044..1122 0044 SShh..GGiirrddhhaarrii

RRaamm SS//oo SShh..

SSaajjjjaann RRaamm,,

JJooddhhppuurr

MM//ss PP..CC..

SShhaarrmmaa,,

NNooiiddaa ((UU..PP..))

LL--11 DDyy..CCEE//CC//

JJUU//0033//22001122--

1133,, ddttdd..

1133..1122..1122

SShh..GGiirrddhhaarrii RRaamm SS//oo

SShh.. SSaajjjjaann RRaamm,,

JJOODDHHPPUURR

113322..0022 1166..0066..1133

3311..1100..1133

3300..0044..1144

3311..1122..1144

2288..0022..1155

2200..0033..1155

3311..1122..1155

3311..1122..1166

1155..0099..1166

1111..1111..1122 WWoorrkk

pphhyyssiiccaallllyy

ccoommpplleetteedd &&

ffiinnaall bbiillll

ppaasssseedd..

--

22.. JJUU//CCoonnsstt..//

TT--1188//1133--1144//

RROOBB//CC--

2211//NNAACC

CCoonnssttrruuccttiioonn ooff

ccoommpplleettee RROOBB ((22 llaannee))

iinnccll..aapppprrooaacchheess iinn lliieeuu

ooff eexxiissttiinngg LLCC NNoo..CC--2211

oonn MMTTDD--FFLL sseecc aatt NNAACC

ssttaattiioonn

OOppeenn

tteennddeerr

0088..1111..1133 TTwwoo ppaacckkeett

ssyysstteemm

1133..1122..1133 0099 NNooss.. 0066 NNooss..

11.. VViisshhnnuu

PPrraakkaasshh RR

PPuunnggaalliiaa

22.. RRaacchhaannaa

CCoonnsstt.. CCoo..

33.. PPrraavveeeenn

GGuullaattii IInnffrraa--

ssttrruuccttuurreess

PPvvtt.. LLttdd..

44.. SSoonnaa

BBuuiillddeerrss,,

55.. RRaakkeesshh

CCoonnsstt.. CCoo..

66.. MM//ss JJaaiinn

CCoonnsstt.. CCoo..

0033 NNooss..

11.. SShhrreeee

GGaauuttaamm

CCoonnssttrruuccttiioo

nn CCoo.. LLttdd..,,

22.. MM//ss MMaaaann

RRaannaa ((JJVV)),,

33.. MM//ss

DDRRAA--BBSSPP

CCoonnssttrruuccttiioo

nn ((JJVV)),,

LL--11

NNWWRR//SS&&CC//CCAA

--6655,, ddttdd..

2200..1100..22001144

MM//ss VViisshhnnuu PPrraakkaasshh RR

PPuunngglliiaa LLiimmiitteedd,, HH--11

FFiirrsstt FFlloooorr SShhiivvaalliikk

CCoommpplleexx,, NNeeaarr GGooll

BBuuiillddiinngg,, SSaarrddaarrppuurraa,,

JJooddhhppuurr

1188..8888 CCrr.. 0033..0077..1166

3300..0099..1166

1155..1122..1166

1155..0011..1177

3311..0011..1177

0088..0077..1144 WWoorrkk

ccoommpplleetteedd

&& RROOBB

ccoommmmiissssiioonn

eedd bbyy

HHoonn’’bbllee

MMooSSRR oonn

1100..0022..1177

FFiinnaall bbiillll

ppaasssseedd oonn

2211..0088..1177

33.. TT..NNoo.. JJUU//

CCoonnsstt..//

TT--0066RR//

22001144--

1155//LLHHSS

RRUUBBss iinn lliieeuu ooff LLCCss,, iinn

sseeccttiioonn ooff MMTTDD--BBKKNN

((0044 NNooss..)),, MMTTDD BByyee

PPaassss ((0011 NNoo..)) && MMTTDD--

FFLL ((0011 NNoo..)) oonn JJUU

ddiivviissiioonn

OOppeenn

TTeennddeerr

0055..1111..1144 SSiinnggllee

TTeennddeerr

0099..1122..1144 0044 NNooss.. MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

CC--117711 KKaannttaa

KKhhaattuurriiaa

CCoolloonnyy,,

BBiikkaanneerr

-- LL--11 DDyy..CCEE//CC//

JJUU//1133//22001144--

1155//LLHHSS,, ddttdd..

1188..0044..22001155..

MM//ss SShhrreeee KKaarrnnii

TTrraaddeerrss,,

CC--117711 KKaannttaa KKhhaattuurriiaa

CCoolloonnyy,,

BBiikkaanneerr

662244..1155 llaaccss.. 2277..0044..1166

3311..0088..1166

1177..0044..1155 WWoorrkk

ccoommpplleetteedd

FFiinnaall bbiillll

ppaasssseedd oonn

0099..0099..1177

44.. JJUU//CCoonnsstt..//TT--

2222//1144--

1155//SSttdd..IIIIRR//

MMTTDD--BBKKNN

AAllll CCiivviill && PP..WWaayy wwoorrkk

cc//wwiitthh SSttdd--IIII wwoorrkk iinn

MMTTDD--BBKKNN && RRKKBB--PPLLCC

sseecc

OOppeenn

TTeennddeerr

2211..1111..1144 SSiinnggllee

TTeennddeerr

2233..1122..1144 0022 NNooss.. MM//ss BBhhaannwwaarr

LLaall BBiijjaarrnniiaa,,

VViillllaaggee--

RRaajjppuurraa,, PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,,

DDiisstttt.. NNaaggoouurr

((RRaajjaasstthhaann))

MM//ss JJaaii MMaattaa

DDee EEnneerrggyy

SSyysstteemm,,

LLaaxxmmaannggaarrhh

ssiikkaarr

LL--11 DDyy..CCEE//CC//

JJUU//1144//22001155--

1166//SSttdd--IIIIRR,,

ddttdd..

1111..0066..1155..

MM//ss BBhhaannwwaarr LLaall

BBiijjaarrnniiaa,,

VViillllaaggee--RRaajjppuurraa,, PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,, DDiisstttt..

NNaaggoouurr

((RRaajjaasstthhaann))

771155..8800 llaaccss.. 0033..1100..1166

3311..0033..1177

3311..0088..1177

3311..0033..1188

1100..0044..1155 WWoorrkk iinn

pprrooggrreessss

WWoorrkk

ddeellaayyeedd dduuee

ttoo nnoonn--

rreecceeiivviinngg ooff

CCRRSS ssaannccttiioonn

55.. JJUU//CCoonnsstt..//77

44--WW--

2266//22001155--

1166//SSttdd..IIIIRR//

RRKKBB--PPLLCC

SSuuppppllyyiinngg aanndd

ssttaacckkiinngg ooff 2200880000 ccuumm

SSttoonnee bbaallllaasstt ffoorr

SSttdd..IIIIRR wwoorrkk iinn RRKKBB--

PPLLCC sseeccttiioonn

OOppeenn

TTeennddeerr

0055..0066..1155 SSiinnggllee

TTeennddeerr

1100..0077..1155 0044 NNooss.. MM//ss JJ..KK..

CCoonnsstt..CCoo..

NNookkhhaa,,

•• AA..KK.. GGuuppttaa

&& CCoo..,, ,,

DDEELLHHII

•• MM//ss

HHaannuummaann

CCoonnssttrruuccttiioo

nn CCoo..,,

NNookkhhaa

•• MM//ss SShhrreeee

SShhyyaamm

EEnnggiinneeeerriinn

gg CCoo,,

LL--11 DDyy..CCEE//CC//

JJUU//1199// 22001155--

1166//SSttdd..IIIIRR//

RRKKBB--PPLLCC,,

ddttdd..

3300..0011..1166

MM//ss JJ..KK.. CCoonnssttrruuccttiioonn

CCoo..,,

NNeeww MMaarrkkeett,, NNookkhhaa,,

DDiissttrriicctt –– BBiikkaanneerr

114422..8844 llaaccss.. 1100..0055..1166

3311..0077..1166

1155..1111..1166

..0099..22001155 1188..0077..1177 WWoorrkk

ccoommpplleetteedd &&

ffiinnaall bbiillll

aawwaaiitteedd dduuee

ttoo nnoonn

ddeeppoossiittiioonn ooff

mmiinniinngg NNOOCC..

Page 22: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

22

CChhuurruu

66.. JJUU//CCoonnsstt..//

TT--2277//22001155--

1166//SSttdd..IIIIRR//

RRKKBB--PPLLCC

AAllll CCiivviill && PP..WWaayy wwoorrkk

cc//wwiitthh SSttdd--IIII wwoorrkk iinn

RRKKBB--PPLLCC sseecc

OOppeenn

TTeennddeerr

1111..0066..1155 SSiinnggllee 1155..0077..1155 0011 NNoo.. MM//ss BBhhaannwwaarr

LLaall BBiijjaarrnniiaa,,

VViillllaaggee--

RRaajjppuurraa,, PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,,

DDiisstttt.. NNaaggoouurr

((RRaajjaasstthhaann))

-- LL--11 DDyy..CCEE//CC//

JJUU//1188// 22001155--

1166//SSttdd..IIIIRR,,

ddttdd..

0066..0011..1166

MM//ss BBhhaannwwaarr LLaall

BBiijjaarrnniiaa,,

VViillllaaggee--RRaajjppuurraa,, PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,, DDiisstttt..

NNaaggoouurr

((RRaajjaasstthhaann))

667799..8844 llaaccss.. 1155..0033..1177

0088//22001177

3311..0033..1188

1188..0099..1155 WWoorrkk iinn

pprrooggrreessss

WWoorrkk

ddeellaayyeedd dduuee

ttoo nnoonn--

rreecceeiivviinngg ooff

CCRRSS

ssaannccttiioonn..

77.. JJUU//CCoonnsstt..//TT--

2255//22001155--

1166//SSttdd IIIIRR

PPrroovviiddiinngg ““IINN SSIITTUU””

GGlluueedd IInnssuullaatteedd JJooiinnttss

ooff GG--33 ((LL)) ttyyppee ffoorr 5522

kkgg//6600 kkgg rraaiillss iinn cc//ww

SSttddIIIIRR wwoorrkk iinn MMTTDD--

BBKKNN && RRKKBB--PPLLCC

sseeccttiioonn..

OOppeenn

TTeennddeerr

0055..0066..1155 SSiinnggllee 1100..0077..1155 0033 MM//ss TTiirruuppaattii

MMeettaall

FFaabbrriiccaattoorrss,,

11443333 SSeeccttoorr

1166,,

FFaarriiddaabbaadd--

112211000022

((HHaarryyaannaa))

•• DDyynnaammiicc

EEnnggiinneeeerrssKK

oottaa..

•• CCrreeaattiivvee

EEnnggiinneeeerrss

KKoottaa --

LL--11 DDyy..CCEE//CC//

JJUU//1177// 22001155--

1166//SSttdd..IIIIRR,,

ddttdd.. 0066..0011--

22001166

MM//ss TTiirruuppaattii MMeettaall

FFaabbrriiccaattoorrss,,

11443333 SSeeccttoorr 1166,,

FFaarriiddaabbaadd--112211000022

((HHaarryyaannaa))

332200..0011 llaaccss.. 3311..0033..1188 1177..1122..1155 WWoorrkk iinn

pprrooggrreessss

WWoorrkk

ddeellaayyeedd dduuee

ttoo nnoonn--

rreecceeiivviinngg ooff

CCRRSS

ssaannccttiioonn..

88.. NNWWRR//SSCC//MMTT

DD--

DDEEMMUU//CCiivviill--

331100116611880011

CCoonnssttrruuccttiioonn ooff aallll

CCiivviill WWoorrkkss aanndd aallll

aalllliieedd wwoorrkk ffoorr DDEEMMUU

mmaaiinntteennaannccee ffaacciilliittiieess

aatt MMeerrttaa RRooaadd

OOppeenn

tteennddeerr

3311..0077..1155 SSiinnggllee 0044..0099..1155 0088 ((EEiigghhtt)) •• MM//ss KKaalluu

RRaamm

CCoonnttrraaccttoorr

JJooddhhppuurr

((JJVV))

•• MM//ss

SSppaacceecchheemm

KKeerraarraamm

AAmmiitt ((JJVV))

JJooddhhppuurr..

•• MM//ss PPMMPP

IInnffrraatteecchh

PPvvtt LLttdd SSoollee

AADDII..

•• MM//ss BBhhaarraatt

SSuunn PPiippee &&

CCoonnsstt.. CCoo..

JJaaiippuurr..

•• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

HHiimmmmaatt

nnaaggaarr

•• MM//ss SShhrreeee

HHaarrsshhaa

CCoonnsstt

SSaannjjeeeevv

BBrrootthheerrss

((JJVV)) JJaaiippuurr

•• MM//ss TT..SS..RR..

MMaannuusshhrreeee

((JJVV))

HHyyddeerraabbaadd

LL--11 NNWWRR//SS&&CC//

CCAA--6688,, ddaatteedd

0055..0011..22001166

MM//ss PPrreemm FFaabbrriiccaattoorrss,,

MMoorriiyyaa,, CChhaannggooddaarr,,

AAhhmmeeddaabbaadd

1166..4477 CCrr.. 0066..0066..1177

3300..1100..1177

3311..0011..1188

1111..1122..1155 WWoorrkk iiss iinn

pprrooggrreessss

DDOOCC

eexxtteennddeedd

wwiitthh ttookkeenn

ppeennaallttyy..

99.. NNWWRR//SSCC//RRKK

BB--JJSSMM//CCiivviill--

33110033000000110000

44

LLNN--MMJJ sseecc.. --RRUUBBss iinn

lliieeuu ooff LLCCss ((1122 NNooss

LLCCss uunnddeerr PPiinnkk BBooookk

iitteemm NNoo.. 9933 ooff 22001155--

1166))

OOppeenn

tteennddeerr

0099..1122..1155 SSiinnggllee 1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss

RRaacchhaannaa--

SSNNCCCC JJVV

•• MM//ss JJaayy

JJaawwaann

CCoonnsstt.. CCoo

•• MM//ss SSaattiisshh

KKeerraa RRaamm

AAmmiitt

•• MM//ss

MMoohhaannllaall

MMaannaaggaannllaall

KKaakkrreecchhaa

•• MM//ss JJCCCC

IInnffrraa

•• MM//ss MM..HH..

KKhhaannuussiiyyaa

•• MM//ss RRaammaa

KKiisshhaann

•• MM//ss

RRaacchhaannaa--

SSNNCCCC JJVV

•• MM//ss JJaayy

JJaawwaann

CCoonnsstt.. CCoo

•• MM//ss SSaattiisshh

KKeerraa RRaamm

AAmmiitt

•• MM//ss

MMoohhaannllaall

MMaannaaggaannllaall

KKaakkrreecchhaa

•• MM//ss JJCCCC

IInnffrraa

•• MM//ss RRaammaa

KKiisshhaann

LL--11 DDyy..CCEE//CC//

JJUU//2233// 22001166--

1177//LLHHSS// LLNN--

MMJJ,, ddttdd..

1122..0077..1166

MM//ss MM..HH..KKhhaannuussiiyyaa,,

HHiimmaannttnnaaggaarr--338833000011

DDiisstt-- SS..KK..((GGuujjrraatt))

1122..7711 CCrr.. 0011..1111..1177

3311..0033..1188

1122..0055..1166 WWoorrkk iiss iinn

pprrooggrreessss

1100.. NNWWRR//SSCC//JJUU//

CCiivviill ––

33110033000000110000

PPPPRR--BBAARRAA sseecc-- RRUUBBss

iinn lliieeuu ooff LLCCss ((2222 NNooss..

LLCCss uunnddeerr PPiinnkk BBooookk

OOppeenn

tteennddeerr

0099..1122..1155 TTwwoo ppaacckkeett

ssyysstteemm

1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss RRaakkeesshh

CCoonnssttrruuccttiioo

nn CCoo.. JJVV

RRaajjkkoott

LL--11 NNWWRR//SS&&CC//CCAA

//7722//22001166--

1177//LLHHSS,, ddttdd

MM//ss SShhrreeee KKaarrnnii

TTrraaddeerrss,, BBiikkaanneerr

((RRaajjaasstthhaann)) 333344000011

2211..1199 CCrr.. 0011..1111..1177 1166..0055..1166 WWoorrkk

ccoommpplleetteedd

FFiinnaall bbiillll

ppaasssseedd

Page 23: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

23

55 iitteemm NNoo.. 110033 ooff 22001155--

1166))

•• MM//ss RRaakkeesshh

CCoonnssttrruuccttiioo

nn CCoo.. JJVV

RRaajjkkoott

•• MM//ss DDRRAAIIPPLL

–– XXTTPPLL JJ..VV..

AAhhmmeeddaabbaadd

•• MM//ss

RRaacchhaannaa ––

BBhhaannwwaarr LLaall

BBiijjaarrnniiaa JJVV

NNaaggoouurr

•• MM//ss JJCCCC

IInnffrraapprroojjeecctt

ss PPrriivvaattee

LLiimmiitteedd,,

AAjjmmeerr

•• MM//ss MMHHKK

RRPPPPLL ((JJVV))

HHiimmaattnnaaggaarr

•• MM//ss PPCCCC ––

HHaarriittaa

CCoonnssttrruuccttiioo

nn CCoommppaannyy

((JJVV)) HHiissaarr

•• MM//ss

DDRRAAIIPPLL ––

XXTTPPLL JJ..VV..

AAhhmmeeddaabbaa

dd

•• MM//ss

RRaacchhaannaa ––

BBhhaannwwaarr

LLaall BBiijjaarrnniiaa

JJVV NNaaggoouurr

•• MM//ss JJCCCC

IInnffrraapprroojjeecc

ttss PPrriivvaattee

LLiimmiitteedd,,

AAjjmmeerr

•• MM//ss MMHHKK

RRPPPPLL ((JJVV))

HHiimmaattnnaaggaa

rr

•• MM//ss PPCCCC ––

HHaarriittaa

CCoonnssttrruuccttiioo

nn CCoommppaannyy

((JJVV)) HHiissaarr

0066..0077..1166

1111.. NNWWRR//SSCC//MMTT

DD--

BBKKNN//CCIIVVIILL--

33110033000000110000

22--RR

MMTTDD--BBKKNN sseeccttiioonn--

RRUUBB iinn lliieeuu ooff LLCCss,, ((1166

NNooss.. ooff LLCCss uunnddeerr PPiinnkk

BBooookk iitteemm NNoo.. 9977 &&

110044 ooff 22001166--1177))

OOppeenn

tteennddeerr

1177..0077..1166 TTwwoo ppaacckkeett

ssyysstteemm

1199..0088..1166 0044 ((FFoouurr)) •• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

HHiimmaattnnaaggaa

rr

•• MM//ss JJMMEESS ––

MMGGCC ((JJVV))

VV..PP..OO.. ––

NNaarrooddaarraa

•• MM//ss PPCCCC ––

HHaarriittaa

CCoonnssttrruuccttiioo

nn CCoo.. ((JJVV)),,

HHiissaarr

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss JJMMEESS

–– MMGGCC

((JJVV))

VV..PP..OO.. ––

NNaarrooddaarraa

•• MM//ss PPCCCC ––

HHaarriittaa

CCoonnssttrruuccttii

oonn CCoo..

((JJVV)),, HHiissaarr

LL--11 NNWWRR//SS&&CC//CCAA

// 7777 ddaatteedd

1155..0022..22001177

MM//ss MM..HH.. KKhhaannuussiiyyaa,,

HHiimmaattnnaaggaarr

11882233..4455 0066..0055..1188 1100..0011..1177 WWoorrkk iinn

pprrooggrreessss

1122.. NWR/SC/RK

B-JSM/Civil-

3103000100

3-R

RRKKBB--JJSSMM sseeccttiioonn-- RRUUBB

iinn lliieeuu ooff LLCCss,, (20 Nos.

LCs under Pink Book

item No. 98 & 108 of

2016-17).

OOppeenn

tteennddeerr

0033..0088..1166 TTwwoo ppaacckkeett

ssyysstteemm

0066..0099..1166 0044 ((FFoouurr)) •• MM//ss

RRaacchhaannaa ––

SSNNCCCC JJVV,,

JJooddhhppuurr..

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

SSuunnsshhiinnee

IInnffrraassttuucctthh

eerr ((JJVV)),,

HHiimmaattnnaaggaa

rr

•• MM//ss SSBB ––

JJaaggttaajjii

((JJVV)),, NNeeww

DDeellhhii ––

111100001188

••

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyyaa

,, SSuunnsshhiinnee

IInnffrraassttuucctt

hheerr ((JJVV)),,

HHiimmaattnnaaggaa

rr

•• MM//ss SSBB ––

JJaaggttaajjii

((JJVV)),, NNeeww

DDeellhhii ––

111100001188

LL--11 NNWWRR//SS&&CC//CCAA

// 7788 ddaatteedd

0055..0066..22001177

MM//ss RRaacchhaannaa –– SSNNCCCC

JJVV,, JJooddhhppuurr

22116622..3344 1133..0066..1188 1155..0011..1177 WWoorrkk iinn

pprrooggrreessss

Page 24: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

24

1133.. 4103000010

06

NNWWRR//SSCC//RRUUBB//CCiivviill--

441100330000000011000066 ––

BBaarrmmeerr--MMuunnaabbaaoo

sseeccttiioonn -- RRooaadd uunnddeerr

bbrriiddggeess iinn lliieeuu ooff LLeevveell

CCrroossssiinnggss ((0077 NNoo.. LLCCss

uunnddeerr PPBB iitteemm NNoo..110000

ooff 22001166--1177))

OOppeenn

tteennddeerr

0066..1111..22001166 SSiinnggllee 0088..1122..1166 0044 ((FFoouurr)) •• MM//ss JJaaggttaajjii

IInnffrraassttrruucctt

uurree,, JJGG--

IIIIII//7733--AA,,

VViikkaassppuurrii,,

NNeeww DDeellhhii

111100001188

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyyaa

,,

HHiimmaattnnaaggaa

rr

•• MM//ss

BBhhaannwwaarrllaa

ll VViillll--

RRaajjppuurraa,,

PPoosstt

PPrreewwaarrii,,

DDiisstttt..

NNaaggoouurr

LL--11 DDyy..CCEE//CC//JJUU//

2255//22001177--1188//

LLHHSS// BBMMEE--

MMBBFF,, ddttdd..

1111..0088..22001177

MM//ss JJaaggttaajjii

IInnffrraassttrruuccttuurree,, JJGG--

IIIIII//7733--AA,, VViikkaassppuurrii,,

NNeeww DDeellhhii 111100001188

887755..7777 0022--0099--1188 -- -- NNOOCC ffrroomm

aarrmmyy iiss ssttiillll

aawwaaiitteedd..

1144.. NWR/SC/RU

B/Civil-

4103000100

7

NWR/SC/RUB/Civil-

41030001007

samdari-BBaarrmmeerr

sseeccttiioonn -- RRooaadd uunnddeerr

bbrriiddggeess iinn lliieeuu ooff LLeevveell

CCrroossssiinnggss ((1133 NNoo.. LLCCss

uunnddeerr PPBB iitteemm NNoo.. 7733

ooff 22001166--1177 && 0044 NNoo..

LLCCss uunnddeerr PPBB iitteemm NNoo..

110000 ooff 22001166--1177))

OOppeenn

tteennddeerr

0066..1111..22001166 TTwwoo ppaacckkeett

ssyysstteemm

0088..1122..1166 0044 •• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

HHiimmaattnnaaggaa

rr

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss JJMMEESS ––

MMGGCC ((JJVV))

VV..PP..OO.. ––

NNaarrooddaarraa

•• MM//SS

RRaammaakkiisshhaa

nn AAsshhookk

kkuummaarr ((JJVV))

220055,,

SSaarrddaarrppuurraa

JJUU..

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

••

LL--11 NWR/S&C/C

A/ 79 dated

19.07.2017

MM//SS RRaammaa kkiisshhaann

AAsshhookk kkuummaarr ((JJVV)) 220055,,

SSaarrddaarrppuurraa JJUU..

22224411..3333 0066..1100..1188 1100//22001177 WWoorrkk iinn

pprrooggrreessss

Page 25: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

25

1155.. NWR/SC/RO

B/Civil-

4103000090

86

NWR/SC/ROB/Civil-

410300009086

construction of

complete ROB

including Approaches

in lieu of existing LC

No. C- 56 at JM: 77/2-

3 and C- 109 at KM:

145/9 – 146/0 on

SMR-BLDI section

OOppeenn

tteennddeerr

TTwwoo ppaacckkeett

ssyysstteemm

1100..0033..1177 0088 •• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

HHiimmaattnnaaggaa

rr

•• MM//ss

RRaacchhaannaa

AAnnkklleesshhwwaarr

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• LLaall CCoonnsstt..

CCoommppaannyy

•• MM//SS SSoonnaa

BBuuiillddeerrss--

RRCC PPaatteell JJVV

MMeehhssaannaa

•• RRaavvii iinnffrraa

bbuuiilldd

pprroojjeeccttss

PPvvtt.. LLttdd..

UUddaaiippuurr

•• RRaaddhhee

aassssoocciiaatteess

MMeehhssaannaa

•• VVPPRRPPLL--

RRBBIIPPLL

SSaammddaarrii JJVV

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss

RRaacchhaannaa

AAnnkklleesshhwwaa

rr

•• VVPPRRPPLL--

RRBBIIPPLL

SSaammddaarrii

JJVV

•• RRaaddhhee

aassssoocciiaatteess

MMeehhssaannaa

LL--11 - •• MM//SS SSoonnaa BBuuiillddeerrss--

RRCC PPaatteell JJVV

MMeehhssaannaa

33669999..1144 0044..0077..1199 -- -- WWoorrkk iinn

pprrooggrreessss

1166.. NWR/SC/RU

B/Civil-

4103000100

9

Merta Road - Bikaner

section - Road under

bridges in lieu of LC

(21 Nos. LCs under

Pink Book item No.

106 of 2017-18 & 02

Nos LCs under Pink

book item No.113 of

2017-18 )

OOppeenn

tteennddeerr

0044..0088..1177 TTwwoo ppaacckkeett

ssyysstteemm

1111..0099..1177 0033 MM//ss RRaacchhaannaa

CCoonnssttrruuccttiioonn

CCoommppaannyy,, AATT

&& PPOO

MMaakkttuuppuurr,,

TTaa.. UUnnjjhhaa,,

MMeehhssaannaa

((GGuujjrraatt))..

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss PPrraaggaatt

CCoonnsstt.. CCoo..

NNeeww DDeellhhii

LL--11 - MM//ss RRaacchhaannaa

CCoonnssttrruuccttiioonn

CCoommppaannyy,, AATT && PPOO

MMaakkttuuppuurr,, TTaa.. UUnnjjhhaa,,

MMeehhssaannaa ((GGuujjrraatt))..

55222255..2266 10.11.19 Work

awarded on

11.12.17

1177.. NWR/SC/RU

B/Civil-

4103000101

1

DNA-MTD & RTGH-

DNA section - Road

under bridges in lieu

of LC (20 Nos. LCs

under Pink Book item

No. 122 of 2017-18,

01 No LC under Pink

book item No. 112 of

2017-18 )

OOppeenn

tteennddeerr

0044..0088..1177 TTwwoo ppaacckkeett

ssyysstteemm

1111..0099..1177 0033 MM//ss RRaacchhaannaa

CCoonnssttrruuccttiioonn

CCoommppaannyy,, AATT

&& PPOO

MMaakkttuuppuurr,,

TTaa.. UUnnjjhhaa,,

MMeehhssaannaa

((GGuujjrraatt))..

•• MMeehhttaa

CCoonnsstt.. CCoo

KKaarrnnaall

•• MM//ss PPrraaggaatt

CCoonnsstt.. CCoo..

NNeeww DDeellhhii

LL--11 - MM//ss RRaacchhaannaa

CCoonnssttrruuccttiioonn

CCoommppaannyy,, AATT && PPOO

MMaakkttuuppuurr,, TTaa.. UUnnjjhhaa,,

MMeehhssaannaa ((GGuujjrraatt))..

55330066..0077 10.11.19 Work

awarded on

11.12.17

1188.. NWR/SC/RU

B/Civil-

4103000101

0

MTD-JU, PPR-BARA

section - RUB in lieu of

LC (19 Nos. LCs under

P B item No. 112 of

2017-18, 01 No LC

under Pb item No. 117

of 2017-18 )

OOppeenn

tteennddeerr

0044..0088..1177 TTwwoo ppaacckkeett

ssyysstteemm

1111..0099..1177 0022 MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

MM//ss PPrraaggaatt

CCoonnsstt.. CCoo..

NNeeww DDeellhhii

LL--11 - MM//ss SShhrreeee KKaarrnnii

TTrraaddeerrss,, BBiikkaanneerr ..

44993399..7744 0022..0011..2200 Work

awarded on

03.01.18

Page 26: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

26

Dy. CE/C/II-JU

1 NWR/SC/

Thaiyat/

Civil-

31011180

2

Construction of all Civil

work & all other misc.

works between THM– Sanu

new BG line project (56.250

kms.).

Open

temder

11.09.15 Two packet

17.11.15 07 M/s SCC JV

PMP

Infratech, A-

Block, A-104,

Ganesh

Meridian,

Ahmedabad

4 Nos

M/s DRD MI JV

M/s Bhaniyana

Const. JV

M/S Apex

Termic PVT (JV)

M/S Ravi-HG

(JV)

L-1 NWR/SC

/CA/73 dt.

17.08.16

M/s SCC JV PMP

Infratech, A-Block, A-

104, Ganesh Meridian,

Ahmedabad

11733.94 Lakhs 22.03.18 27.04.16 Work in

progress

2 NWR/SC/

Thiyat/

Civil-

31911060

4

Work of modification of

existing rooms for office

set up at Jaisalmer under

Dy.CE(C)-II/ Jodhpur’s unit

Open

tender

04.03.16 Single 12.04.16 02 M/s B.S.

Constructions

, New Delhi-

110092

01

M/s

S.D.Builders

Jaisalmer

L-1

Dy.CE/C/

JU/CA/02,

dtd.

25.08.16

M/s B.S. Constructions,

New Delhi-110092

105.50 Lakhs 2266..0022..1177

3300..0099..1177

3300..1111..1177

3311..1122..1177

08.07.16 Work in

progress,

-

3 NWR/SC/

Thiyat/

Civil-

31911050

7-R

Providing “IN SITU” Glued

Insulated Joint in c/w.

Thaiyat Hamira–Sanu new

BG line project & Marwar

Jn.-Rani section in MJ-Rani

BG Patch Doubling project

Open

tender

27.12.16 Singal 02.02.17 5 M/s Creative

Engineers, F-

189, Road No.

5, Indraprasth

lnd Area, Kota

(Raj.) 324005

1.M/sDynamic

Engineers

2 M/s Kushal

Engineering

3 .M/s Tirupati

Metal

Fabricators

4. M/s Diamond

Steel Ind.

L-1 Dy.CE/C/

JU/CA04/

dtd.

18.08.17

M/s Creative Engineers,

F-189, Road No. 5,

Indraprasth lnd Area,

Kota (Raj.) 324005

173.15 Lakhs 30.05.19 - - -

4 NWR/SC/

FL-DNA/

Civil-

41015200

1

Construction of Doubling

work between Phulera –

Degana (108.75 Kms.) on

Phulera-Degana Railway

line.

EPC 13.12.16 EPC 02.08.17 5 M/s Punj

Lloyd Limited,

Plot No.78,

Institutional

Area,

Sector-32,

Gurgaon

PIN-122003

Haryana

1. M/s IRCON

International

Limited,

2. Jaiprakash

Associates

Limited,

NOIDA

3. Larsen &

Toubro Limited

MUMBAI

4. AFCONS

Infrastructure

Limited

MUMBAI

L-1 NWR/S7C/

CA/80

dt.28.8.17

M/s Punj Lloyd Limited,

Plot No.78, Institutional

Area,

Sector-32, Gurgaon

PIN-122003 Haryana

477.50

Cr.

13.03.20 26.9.17

( Appointed

date)

Work

awarded on

09.08.2017.

Survey work

under

progress.

Page 27: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

27

Dy. CE/C/BKN

1 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR

Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

Yes 173-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat

Rs 534.82 lakhs

01.06.12 05.01.12 30.06.16 Contract terminated.on 10.06.2016. Final variation in process.

2 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh -

Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project

Open tender

20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

Yes 178-NWR/Dy CE/C-I/BKN Dt 18.08.2012

M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003

Rs 531.61 lakhs

25.12.12 24.05.12 05.06.17 Final variation under process.

Page 28: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

28

3 Const/BKN/09(R)/2011-12/BKN-

SDLP-RTGH-SRDR Dt 13.01.2012.

Construction and modification of station buildings, platform, platform shelter level

crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

20.01.12 single 28.03.12 04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 177-NWR/Dy CE/C-II/BKN Dt

07.08.12.

M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)

Rs 647.31 lakhs

03.03.13 06.07.12 31.07.16 Final bill passed on 16.10.2017

4 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012

Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project

Open tender

26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012

M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur

Rs137.94 lakhs

28.12.12 07.09.12 31.03.14 Contract terminated. Final variation in process.

5 Tender No. NWR/SC/Sadulpur-Bikaner/Civil-412140107 Dated 29.10.2015

Earthwork in cutting and filling, Construction of minor Bridges/ Road under Bridges, Limited Height Subway in lieu of LC No 8, toe wall, pitching, Rooms for S & T structure at takeoff point and other ancillary works from takeoff point on Ratangarh- Bikaner section to Km 1/500, in Ratangarh to Sardarshahar section in connection with Ratangarh- Sardarshahar gauge conversion project

Open tender

02.11.15 Two packet

04.12.15 07 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 31/NWR/Dy CE/C/BKN/2015-16 Dated 31.03.2016

M/S BPL-MCPL (JV), A/9, Kumud Apartment, Near Amco Bank, Off. C.G.Road, Navrangpura, Ahmedabad-380009

Rs 1084.47 lakhs

01.11.16 25.02.16 15.08.17 Final bill under technical check.

6 Tender No. NWR/SC/BNW/Civi

l-412161111 dated 02.01.16

Earthwork in embankment, construction of minor bridge & S & T

structure, supplying of stone ballast and linking of track and other ancillary works in connection with “Provision of Bhiwani Bye Pass Railway line.

Open tender

06.01.16 single 10.02.16 05 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 32/NWR/Dy CE/C/BKN/2016-17

Dated 30.08.2016

M/S Shree Shyam Engineering Co.,29, Poonia Colony, Churu (Rajasthan)

Rs 136.08 lakhs

01.11.16 02.05.16 30.09.17 31.01.18

work is in progress.

Page 29: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

29

7 Tender No. NWR/SC/EI at

BNW, STD & LGH/2016-17/Civil-412160503 dated 05.07.2016

Providing in Situ Glued Insulated Joints of G-3 (L) type for 52 kg/60 kg rails as per RDSO

drawing No. T-671/T-2572 and confirming to the specfication as per instructions contained in Manual for Glued insulated rails joints in connection with EI works at Bhiwani and Satrod and RRI work at Lalgarh and at any other location in the jursidiction of Bikaner Construction unit.

Open tender

08.07.16 single 10.08.16 04 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes PG yet to be submitted.

M/S Tirupati Metal Fabricators, 1433, Sector -16, Faridabad

(Haryana)-121002

Rs 102.58 lakhs

23.04.17 24.09.16 23.03.18 work is in progress.

8 Tender No. NWR/SC/Sadulpur-Bikaner/ 2016-17/ Civil - 4121401

02 dated 22.07.2016

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc. and other miscellaneous works between

Ratangarh Junction cabin km 0.00 at km 329/6-7 on Ratangarh – Bikaner section) to Sardarshahar (including) km 46/750 in connection with Ratangarh- Sardarshahar gauge conversion project.

Open tender

24.07.16 single 29.08.16 04 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes PG yet to be submitted.

M/S Gurukrupa Enterprises, 2A,2nd Floor, Navnath Soc.2,B/H, Shradhadeep Soc.,Sharda School Road , Singanpor-Causway

Road, Surat-395004

Rs 784.49 lakhs

27.03.17 15.10.16 15.11.17 15.01.18

work is in progress.

Page 30: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

30

CE/C/HQ-JP

Dy. CE/C/DO

1

DO

/GG

C/N

L/1

8

Construction of Broad

Gauge Formation & Minor

Bridges from Chainage

41000.00 to 45000.00

between Dausa and Lalsot in

connection with Dausa-

Gangapur City New Broad

Gauge line project.

Op

en

te

nd

er

Single packet

system

14

/11

/20

07

Yes NWR/S&C/CA/9

7 dated

03/03/2008

M/s Atlanta-

ARSS (JV)

Bhubneshwa

r (Orissa)

17.95 Crore 30/07/09

extended

upto

30/06/2014

14/03/08 - Work short

closed vide

HQ’s letter

dated

18/06/2014.

Final

measuremen

ts under

process

2

DO

/GG

C/N

L/2

1

Construction of BG

formation and Minor Bridge

from chanaige 45000 to

60000 bet. Lalsot and

Gangapur City in connection

with DO-GGC New B G line

Project

O

pe

n t

en

de

r

24

/09

/20

07

Single Packet

system

02

/11

/20

07

3 Yes NWR/S&C/CA/9

5 dated

18/02/2008

M/s. ARSS

Infrastructur

e Projects

Limited,

Bhubaneshw

ar

8.41

Crores

20/03/09

Extended

upto

30/06/15

15/03/08 - Contract has

been short

closed. Final

bill under

process

3

DO

/GG

C/N

L/2

2

Construction of BG

formation and Minor Bridge

from chanaige 60000to

75000 bet. Lalsot and

Gangapur City in connection

with DO-GGC New B G line

Project

Op

en

te

nd

er

24

/09

/20

07

Single Packet

system

02

/11

/20

07

3 Yes Dy.

CE/C/I/JP/CA/17

dated

29/02/2008

M/s. ARSS

Infrastructur

e Projects

Limited,

Bhubaneshw

ar

6.71 Crores 10/03/09

Extended

upto

30/06/2014

10/03/08 - Final bill has

been

submitted to

Account..

4

DO

/GG

C/N

L/3

1

Construction of ROBs across

Railway track at chainage

37034,83925 & 37925 and

drainage over pass at

chainage 36960 & 37520

between salempura to

Udaikalan station

inconnection with Dausa-

Gangapurcity new BG line

project Op

en

te

nd

er

Single packet

system

16

/02

/20

10

11 - - Yes NWR/S&C/CA/1

05 dated

22/11/2010

M/s Shree

Ram Kripa

Construction

Jaipur

13.44 Crore 29/02/2012.

Extended up

to

30/04/2016

- - Final

variation is

under finance

vetting.

Page 31: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

31

5

DO

/GG

C/N

L/3

0

Construction of single line

13 standard straight

alignment tunnel in soil and

rock including cut and cover

portion between chainage

38/720 to 40/840 including

side drain and other

approaches of tunnel

between Didwana- Lalsot

Railway station in

connection with Dausa-

Gangapurcity new BG line

project. Op

en

te

nd

er

Single packet

system

27

/07

/20

09

12 - - Yes NWR/S&C/CA/1

06 dated

29/12/10

M/s Valecha-

Transtonelstr

oey (J/V)

Mumbai

53.02 Crore 27/09/2012.

Extended

upto

31/12/2015

- - Work

terminated

on

07/07/2015.

Final bill is

under

technical

check..

6

DO

/GG

C/N

L/4

0

Laying and linking of BG

track and transportation of

P.Way material, PSC

sleepers etc between

Dausa- Deedwana section in

connection with Dausa-

Gangapurcity new BG line

project. Op

en

te

nd

er

28

/03

/20

11

Single packet

system

18

/05

/20

11

6 - - Yes

Dy.CE/C/DO/CA/

56 dated

18/10/11

M/s Goel

Brothers Rail

Infra Pvt.

Ltd., Bareilly.

5.66 Crore 01/08/2012.

Extended

upto

31/10/2014

13/09/11 Work short

closed.

7

DO

/GG

C/N

L/1

0(R

&

C)R

Construction of broad gauge

formation from chainage

15000 to 28000 in

connection with Dausa

Gangapurcity new line

project(Risk & cost tender).

Op

en

te

nd

er

Single packet

system

11

/01

/20

13

2

- - Yes Dy.CE/C/DO/CA/

68 dated

16/04/13

M/s MCD

Pvt. Ltd., &

Aastha

Construction

Co.(JV),

Jaipur

3.30 Crore 05/07/13

Extended

upto

15/10/2014

08/04/2013 - Completed.

Final

measuremen

ts under

process.

8

DO

/GG

C/N

L/6

0R

Construction of minor

bridges from chainage 00 to

30000 between Dausa-

Lalsot in connection with

Dausa- Gangapurcity new

BG line project

op

en

te

nd

er

Single packet

system

20

/11

/20

13

3 - - yes Dy.CE/C/DO/CA/

74 dated

14/03/2014

M/s Shree

Ram Kripa

Construction

s, Jaipur

Rs.4.74 Crore 10/06/2014

Extended

upto

31/12/2015

26/12/2014 Final bill

passed

9

DO

/GG

C/N

L/5

3

Construction of 3 nos Low

Over Pass at LC No. 4, 26 &

27 on Dausa- Gangapurcity

secton

Op

en

te

nd

er

Two packet

system

06

/09

/13

4 - - Yes NWR/S&C/CA/1

36 dated

03/06/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.10.44 Crore 08/04/15

extended

upto

31/12/2017

further

extension

under

process

- - Work in

progress.

Page 32: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

32

10

DO

/GG

C/N

L/5

6 Construction of Road Over

Bridge at LC No. 5B on

Dausa- Gangapurcity

section

Op

en

te

nd

er

Two packet

system

06

/09

/13

6 - - Yes NWR/S&C/CA/1

34 dated

16/05/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.13.43 Crore 12/07/15

extended

upto

30/05/17

- - Final bill

passed.

11

DO

/GG

C/N

L/5

7

Construction of Road Over

Bridge at LC No. 24B on

Dausa- Gangapurcity

section

Op

en

te

nd

er

Two packet

system

06

/09

/13

4 - - Yes NWR/S&C/CA/1

35 dated

19/05/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.13.75 Crore 09/07/15

Extended

upto

30/09/18

- - Agreement

executed.

Work held up

for want of

funds and

approval of

MoRTH

12

AW

R-B

KI/

Do

ub

lin

g/T

/2

Earthwork in bank/cutting

including blanketing

material, construction of

major/minor bridges

including drop/curtain

walls, LHS, construction

S&T structures, platform

walls, PF shelters, FOB,

water huts, Staff quarters

etc. supply of stone ballast

and dismantling of existing

BG track, laying and linking

of Broad gauge main line,

loop lines including points

and crossings of various

yards spreading of ballast,

tamping of track

transportation of P. Way

material and other ancillary

works between Alwar-

Bandikui section in

connection with AWR-BKI

Doubling project.

Op

en

Two packet

system

21

/03

/20

16

8 6 2 Yes

NWR/S&C/CA/1

57 dated

05/09/2016

M/s NG

Project Ltd.-

M/s. Deem

Construction

Co. Pvt. Ltd

(JV), Jaipur

Rs.118.24

Crore 17/05/18 - -

Work in

progress.

Page 33: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

33

13

NW

R/S

C/D

O-

GG

C/C

IVIL

/51

41

10

46

8

Supplying and stacking

machine crushed stone

ballast in stacks as per

Railway’s specifications

between Dausa &

Gangapurcity stations in

connection with Dausa-

Gangapurcity new line

project o

pe

n

Two packet

system

31

/08

/16

2 - 2 Yes

Dy.

CE/C/DOCA/81

dated

23/12/2016

M/s J.K.

Construction

Co., Nokha,

Distt Bikaner

Rs.14.33 Crore 06/04/18 - - Work in

progress

14

NW

R/S

C/D

O-G

GC

/CIV

IL/5

14

11

18

04

Construction of balance

work of single line BG

standard straight

alignment tunnel in soil

and rock including cut &

cover portion, side

drains, protection works

on approaches of tunnel

and other ancillary

works from chainage

38600 to 40900 between

Didwana & Lalsot

Railway stations in

connection with Dausa-

Gangapurcity new BG

line project

Op

en

Two Packet

system

20

/06

/20

16

5 3 2 Yes

NWR/S&C/CA.

165 dated

01/02/17

M/s TCL-

UTM JV,

Gurgoan

Rs.54.46 Crore 22/03/18 - - Work in

progress

15

NW

R/S

C/L

HS

/CIV

IL/5

14

30

00

10

01

Construction of kimited

Height sub-way (08 nos)

in lieu of level crossings

in Dausa- Gangapurcity

new line section in

connection with

elimination of level

crossings

Op

en

Two Packet

system

07

/09

/20

16

8 5 3 Yes

Dy. CE/

C/DO/CA/86

dated 10/03/17

M/s JMES-

KDC-JPIS(JV),

Beawar,

Ajmer

Rs.10.00 Crore 04/02/18 - - Work in

progress

Page 34: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

34

16

NW

R/S

C/D

O-G

GC

/CIV

IL/5

14

11

02

01

Misc. balance works like

finishing work of

quarters, station

buildings, platforms and

construction of LHS

providing platform

covering, cess repairing,

circulating area etc.

between Dausa &

Deedwana stations in

connection with Dausa-

Gangapurcity new line

project

Op

en

Two Packet

System

13

/10

/20

16

7 5 2 Yes

Dy. CE/

C/DO/CA/83

dated 28/01/17

M/s. MCDPL-

Sunrise Infra

Project (JV),

Ajmer Road,

Jaipur

Rs.9.70 Crore

15/05/17

Extended up

to 31/12/17

further

extension

under

process

- - Work in

progress

17

NW

R/S

C/A

lwa

r-

Ba

nd

iku

i/C

ivil

/51

41

50

80

3-R

Flash butt welding of

60/ 53kg New/SH

(72/90UTS) Rail joints

by using mobile flash

butt welding plant in

connection with Alwar-

Bandikui and Dausa-

Gangapurcity new line

project.

Op

en

te

nd

er

Two packet

system

28

/10

/20

16

1 1 0 Yes

Dy. CE/

C/DO/CA/85

dated 06/03/17

M/s Railtech

Infraventure

Pvt. Ltd.

Allahabad

Rs.11.15 Crore 15/05/18 - - Work in

progress

18

NW

R/S

C/D

O-G

GC

/CIV

IL/5

14

11

08

69

-R Balance work of laying

& linking of Broad

Gauge main line loop

lines including points &

crossings in yards,

spreading of ballast,

tamping of track

transportation of P-Way

material and other

ancillary works between

Dausa- Gangapurcity

new line project

Op

en

Single packet

system

23

/11

/20

16

- - - Yes

Dy. CE/

C/DO/CA/84

dated 17/02/17

M/s P.C.

Sharma,

Noida.

Rs.3.93 Crore

05/06/17

Extended

upto

31/10/17

- -

Work

completed.

Final

measuremen

ts under

process

Page 35: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

35

19

NW

R/S

C/D

O-G

GC

/CIV

IL/5

14

11

01

70

Balance earthwork and

blanketing work

including side drain,

trolley refuges pitching

diversion road etc. from

chainage 67400 to

92670 between Piplai

village and

Gangapurcity in

connection with Dausa-

Gangapurcity new line

project

Op

en

Two packet

system

17

/04

/20

17

2 1 1 Yes

M/s. KB-Shiv

Om (JV), New

Delhi.

Rs.13.60 Crore 20/06/18 - - Work in

progress

20

NW

R/S

C/R

E-J

P/C

ivil

/51

43

00

90

5 Construction of ROB at

LC No. 69 on RE-JP

section

Op

en

Single packet

system

09

/10

/20

17

- - - Yes

M/s Punia

Construction

Co., Hisar.

Rs.8.34 Crore 22/11/18 - - Agreement is

progress

21

NW

R/S

C/B

KI-

AW

R/C

ivil

/51

43

01

00

4 Construction of Limited

Height Subway in lieu

of existing level crossing

between Alwar-

Bandikui station of

Jaipur- Rewari section in

connection with

elimination of level

crossings (20 nos)

Op

en

Two packet

system

30

/08

/20

17

4 4 0 Yes

Sanjeev-

Bharat (JV),

Jaipur

Rs.29.84 Crore 29/04/19 - -

Agreement is

under

process.

Page 36: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

36

22

NW

R/S

C/D

O-G

GC

/Civ

il/5

14

11

08

73

Laying and linking of

Broad gauge main line,

loop lines including

points and crossings in

yard, spreading of

ballast, tamping of track

transportation of P-ay

materials and other

ancillary works between

Didwana &

Gangapurcity stations

and at Baniyana &

Arnya Kala Salempura

stations in connection

with Dausa-

Gangapurcity new line

project.

Op

en

Two Packet

system

11

/10

/20

17

3 1 2 Yes

M/s Laxyo

Energy

Limited,

Ratlam

Rs.14.67 Crore 27/03/19 - -

Agreement is

under

process.

23

NW

R/S

C/D

O-G

GC

/Civ

il/5

14

11

01

74

Balance earthwork and

blanketing work

including side drains,

trolley refuges, pitching,

toe wall etc. from

chainage 36000 to

45000 between Didwana

and Lalsot stations in

connection with Dausa-

Gangapurcity new line

project.

Op

en

Two Packet

system

25

/10

/20

17

5 3 2 Yes

M/s Varaha

Infra Limited,

Jodhpur

Rs.34.03 Crore 26/03/19 - -

Agreement is

under

process

24

NW

R/S

C/D

O-G

GC

/Civ

il/5

14

11

02

77

Balance work of minor

bridges, Road Under

Bridge, like PSC slabs,

bed blocks, returns,toe

wall, pitching, drop &

curtain wall, height

gauge, road work etc.

and construction of

Limited Height Subway

between Didwana to

Gangapurcity stations in

connection with Dausa-

Gangapurcity new Line

Project

Op

en

Two Packet

System

27

/10

/20

17

2 1 1 Yes

M/s. Lall

Construction

Co. Delhi

Rs.46.41 Crore 26/06/19 - -

Agreement is

under

process

Page 37: Monthly CVC January 2018 Rs. 1 Crore abovenwr.indianrailways.gov.in/uploads/files/1518590297177... · 2018-05-01 · Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

37

For CAO/C/JP

25

NW

R/S

C/D

O-G

GC

/Civ

il/5

14

11

01

75

Balance earthwork and

blanketing work

including side drains,

trolley refuges, pitching,

toe wall etc. from

chainage 45000 to

67400 between Lalsot

and stations

Op

en

Two Packet

system

27

/10

/20

17

3 1 2 Yes

M/s

Meenesh

Contractor &

Developers

Pvt. Ltd.,

Jaipur

Rs.10.35 Crore 19/12/18 - -

Agreement is

under

process.

NW

R/S

C/D

O-G

GC

/Civ

il/5

14

11

06

76

Miscellaneous works

like construction of

station buildings,

providing FOB, platform

covering, circulating

area, balance work of

platforms etc. from

Lalsot to Gangapurcity

in connection with

Dausa-Gangapurcity

New Line Project.

Op

en

Two Packet

system

27

/10

/20

17

6 3 3 Yes

M/s MCDPL-

Surnrise Infra

(JV), Jaipur

Rs.17.95 Crore 19/03/19 - -

Agreement is

under

process.