STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
CE/C/I-JP
Dy. CE/C/I-JP
1 Dy.CE/C/
GC/2012
/T-28
Residual earth work in
bank, Cutting and lead
bank utilizing cut spoils
for widening/construction
of BG formation including
side drains, trolley
refuses, cess wall etc. and
other ancillary works
between Sikar(Incl.)-
Loharu (Incl.) stations of
Sikar- Loharu section in
connection with Jaipur-
Sikar-Loharu & Sikar-
Churu GC project.
Open
tender
11.7.12 Single
Packet
system
14.08.12 02 - - yes 19/NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
21.12.12
M/s Bharwal Lal
Bijarnia,
Jaulsa Kua Road, Near
Tagore B. Ed. College,
Tegore Nagar,
Kuchaman City, Distt.
Nagour.
119.22 03.01.13
Ext. 31.08.15.
21.09.2012 31.8.15 Final bill
under
process.
2 Dy. CE
/C/ GC/
NWR/
2014/T-
51R
Construction of 44 Nos. of
Type –II quarters (8 Nos.
at Nua Railway Station, 18
Nos. at Jhunjhunu Railway
Station & 18 Nos. at
Chirawa Railway Station)
and other related works in
connection with Gauge
conversion of Sikar-
Loharu section
Open
tender
23.3.15 Single
Packet
system
23.4.15 06 - - - 41/
NWR/Dy.
CE/C-GC/JP
/2014-15/JP-
SIKR-CUR &
SIKR-LHU dt.
23.10.15.
M/s V. K. Construction
Co.,
2 D 37, Jawahar Nagar,
Shri Ganganagar -
335001
926.07 30.04.17
Ext.
31.12.17
05.09.2015 31.12.17 Final bill
under
process.
3 NWR/SC
/JP-RGS-
CHURU/
CIVIL-
1011405
02
Dismantling of existing
MG track, Laying and
linking of Broad gauge
main line, looplines /
Sidings including points
and crossings in yards,
spreading of ballast,
tamping of track,
transportation of P. Way
materials and other
ancillary works in Zone-I
(Km. 0.00 to Km. 48.70),
including Sikar,
Laxmangarh Sikar &
Fatehpur shekhawati
yards in Sikar -Churu
section in connection with
Jaipur-Sikar- Loharu &
Sikar - Churu Gauge
conversion project.
Open
tender
28.8.15 Single
Packet
system
30.9.15 05 - - - 42/
NWR/Dy.
CE/C-GC/JP
/2014-15/JP-
SIKR-CUR &
SIKR-LHU dt.
26.12.15.
M/s ISC Project Pvt.
Ltd.,
“S-2,” The Meropole,
Adjacent to INOX, Bund
Garden Road, Pune –
411 001
948.07 08.5.2017
Ext. 31.10.17
12.11.15 31.10.17 Final bill
under
process.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2
4 NWR/SC
/JP-RGS-
CHURU/
CIVIL-
1011405
05
Dismantling of existing
MG track, Laying and
linking of Broad gauge
main line, loop lines /
Sidings including points
and crossings in yards,
spreading of ballast,
tamping of track,
transportation of P. Way
materials and other
ancillary works in Zone-II
(Km. 48.70 to Km. 90.46),
including Ramgarh
shekhawati, Bissau &
Churu yards in Sikar -
Churu section in
connection with Jaipur-
Sikar- Loharu & Sikar -
Churu Gauge conversion
project.
Open
tender
15.9.15 Single
Packet
system
19.10.15 02 - - - 45/
NWR/Dy.
CE/C-GC/JP
/2015-16/JP-
SIKR-CUR &
SIKR-LHU dt.
22.02.16.
M/s Bhanwar Lal
Bijarnia, Village -
Rajpura, Post- Prewari,
Teh- Nawa, Distt.-
Nagaur
808.49 11.5.2017
31.12.17
20.11.15 28.12.17 Final bill
under
process.
5 NWR/SC
/JP-RGS-
Churu/Ci
vil-
1011411
01
Earth work in filling and
cutting in bank for making
BG formation, supplying
and laying Blanketing
material on new
bank/diversion,
Construction of station
building, Platforms, trolley
refuses, ballast wall,
construction of Over Head
water Tank at Fatehpur
shekhawati &
Lachhmangarh sikar
stations, Fabrication &
erection of Platform
shelters /Small shelters
and other misc. works
from Sikar (incl.) to Churu
(incl.) in connection with
SIKR-CUR Gauge
Conversion.
Open
tender
10.8.15 Two bid
system
15.9.15 06 Yes NWR/S&C/C
A/ 151, dt.
15.02.2016.
M/s Prem Fabricators
Plot No. 426, Near Jyoti
Power,
B/H Steel Town, Moriya
Changodar,
Ahmedabad.
2472.03 10.06.17
Ext.
15.12.17
11.12.15 15.12.17 Final bill
under
process.
6 DY.
CE/C/GC
/NWR/2
015/T-55
Flash Butt Welding of
52Kg. / 60Kg. New/SH
rails at depot / site using
Mobile Flash Butt Welding
Plant in Jaipur –Sikar -
Churu section in
connection with Jaipur –
Sikar – Loharu & Sikar –
Churu GC project.
Open
tender
29.6.15 Single
Packet
system
20.08.15 03 - - - 46/
NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR &
SIKR-LHU dt.
22.09.2016.
M/s Navketan Pvt. Ltd.,
1 A. J. C. Bose Road,
Kolkata – 700 020.
814.56 22.12.17
Ext. 30.6.18
25.5.2016 Work of
Sikar-
Churu
section
completed
and JP-CUR
work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3
7 NWR/SC
/JP-SIKR-
CHURU/
Civil/101
3000100
3
Construction of Road
under Bridge / Limited
Height Sub-Way in lieu of
24 Nos. level crossing in
Sikar-Dundlod
Mukandgarh Section & 16
Nos. level crossing and 4
Nos. Balancing culverts in
Sikar – Laxmangarh Sikar
Section.
Open
tender
21.11.15 Two bid
system
23.12.15 06 01 M/s
Gurukrupa
Kalyan JV
2A,2nd
Floor,Navnat
h Soc-2, B/H,
Shradhadeep
Soc, Nr.
Sharda
School,
Singanpor-
Causway
Road, Surat-
395004.
Yes NWR/S&C/
CA/153, Dt.
15.6.2016
M/s AE-MHK (JV)
First Floor, Divine India
Building, Near R.T.O
Office, By Pass Road,
Post-Savgadh (Panpur),
Himmatnagar-383001
Dist. S.K. (Gujarat).
6363.98 22.3.2018 1.5.2016 Work in
progress.
8 NWR/SC
/JP-SIKR-
CHURU/
Civil/101
3000100
4
Construction of Road
under Bridge / Limited
Height Sub-Way in lieu of
33 Nos. level crossing and
4 Nos. of Bridges along
with 7 Nos Balancing
culverts in Laxmangarh
Sikar - Churu Section.
Open
tender
21.11.15 Two bid
system
23.12.15 03 - - Yes NWR/S&C/
CA/154, Dt.
23.6.2016
M/s Supreme - Modi
(JV) 9, Leela Mansion,
Raj Bhawan Road,
Civil Line - Jaipur
302006
5876.06 22.3.2018 24.3.16 Work in
progress.
9 NWR/SC
/JP-RGS-
Churu/Ci
vil-
1011418
06
Construction of 60 nos
staff quarters in Sikar-
Churu section,
Construction of running
room at CUR, construction
of PF & PF shelters &
extension of FOB, RCC OH
tank and other
miscellaneous Civil work
at Sikar, Civil works
related to L-xings and
related Electric works in
Sikar-Churu section and
other ancillary works in
connection with SIKR-CUR
Gauge Conversion project.
Open
tender
26.2.16 Two bid
system
30.3.16 04 01 M/s
Rajendra
Singh
Bhamboo
Infra Pvt.
Ltd. 108,
First Floor,
Neel kanth,
Neelkanth
Building ,
Gandhipath,
Vaishali
Nagar, Jaipur
yes NWR/S&C/
CA/159, Dt.
28.9.2016
M/s Gurukrupa
Enterprises,
2A,2nd Floor,Navnath
Soc-2
B/H, Shradhadeep Soc,
Nr. Sharda School,
Singanpor-Causway
Road, Surat
1948.67 15.9.2017
18.7.16 Work
terminated
on 6.6.17
Variation
under
process.
10 NWR/SC
/JP-RGS-
Churu/Ci
vil-
1011405
07
Providing in situ Glued
joints of G-3 (L) type as
per RDSO drawings for 60
kg & 52 kg rails with all
fittings etc complete in
Jaipur - Sikar - Churu
section in connection with
Jaipur - Sikar - Loharu &
Sikar - Churu Gauge
Conversion project.
Open
tender
18.5.16 Single
Packet
system
22.06.16 05 01 M/s
Diamond
Steel
Industries,
Plot No. 879,
Sector-16,
Faridabad
Yes 48/
NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR &
SIKR-LHU dt.
11.01.2017.
M/s Creative Engineers,
F/189, Road No. 5,
Indraprastha Industrial
Area,
Kota
160.21 Lacks 14.3.2019 18.10.16 68% Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
DY. CE/C/II-JP
11 NWR/SC
/JP-RGS-
Churu/Ci
vil-
1011405
08
Welding of Rail Joints by
SKV process in Jaipur-
Sikar & Sikar-Churu
section in connection with
Jaipur-Sikar-Loharu and
Sikar-Churu Gauge
Conversion project.
Open
tender
10.6.16 Single
Packet
system
14.07.16 02 - - Yes 49/
NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR &
SIKR-LHU dt.
11.01.2017.
M/s Oberoi Thermit
Pvt., Ltd. Plot No.3,
Sector 8B, IIE, Sidcul,
Haridwar -249403
349.73 Lacks 18.10.18 26.12.16 Work in
progress.
12 NWR/SC
/JP-RGS-
Churu/Ci
vil-
1011416
12
Balance / left over works
of Construction of 60 nos
staff quarters in Jaipur-
Sikar-Churu section,
Construction of running
room at Churu,
construction of PF & PF
shelters & extension of
FOB, RCC OH tank and
other miscellaneous Civil
work at Sikar, Civil works
related to L-xings works
in Sikar-Churu section
and other ancillary works
in connection with Jaipur-
SIKR-CUR Gauge
Conversion project.
Open
tender
25.7.17 Two Packet
system
28.817 02 01 M/s AIEN
MEREN
ENTERPRISES
-DIMAPUR,
N. S.T.
Colony,
Circular
Road,
Dimapur
Yes Under
preparation
with HQ
M/S V. K.
CONSTRUCTION
COMPANY-
SRIGANGANAGAR, 2-D-
37, Jawahar Nagar,
Sriganganagar
2185.03 11.7.18 15.10.17 Work in
progress.
1 NWR/
S&C/FL
Shed/T/
1
Fabrication & erection of
structural steel covering
shed at Phulera.
Open
tender
5.9.2014 One bid
system
10.10.2014 2 2 - Yes NWR/S&C/FL
Shed/CA/01
dated
20.3.2015
M/s M.H. Khanusiya
Himmatnagar (Guj.)
7.17 Cr 17.12.14 1.1.2015 30.12.16 Work
completed.
2 NWR/
S&C/JP-
SIKR/T/
7
Supplying & stacking 65
mm gauge stone
ballast…. JP-SIKR
section.
Open
tender
2.9.2015 Two packet
system
14.10.2015 7 4 3 Yes Dy
CE/C/II/CA/N
WR/S&C/JP-
SIKR/T/7/01
Dated
17.3.2016
M/s MFL-Sidharth-
Parikshit Chandra
Das (JV) Gurgaon.
9.84 Cr. 1.12.15 1.1.2016 31.03.2018 Work in
progress.
3 NWR/
S&C/JP-
SIKR/T/
10
Construction of major &
Minor Bridges in C/w GC
of JP-SIKR section.
Open
tender
-
Two packet
system
18.8.2015
13 7 6 Yes, NWR/S&C/CA
/152 dated
25.2.2016
M/s Sona Builders,
Unjha (Guj.)
37.14 Cr. 17.11.15 1.12.15 31.05.2018 Work in
progress .
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5
Dy. CE/C/III-JP
4 NWR/
S&C/JP-
SIKR/T/
11
Earth work in
embankment cutting etc.
and construction
/alteration of service
building JP-SIKR section.
Open
tender
Two packet
system
25.8.2015
14 7 7 Yes NWR/S&C/CA
/150 dated
29.1.2016-
M/s Jandu
Construction
Company, Hisar.
34.18 Cr. 17.11.15 25.11.15 31.03.2018 Work in
progress .
5 NWR/
SC/JP-
RGS-
Churu/
Civil-
102141
001
Construction of LHS Sub
way (LHS)/RUB---LC (52
nos) between JP-SIKR
section.
Open
tender
Two packet
system
9.12.15 9 6 3 Yes NWR/S&C/CA
/151 dated
01.7.2016
M/s SGCCL-MMPL (JV)
Jaipur.
68.65
Cr.
23.3.16 1.4.16 22.3.18 Work in
progress .
6 NWR/
SC/JP-
RGS-
Churu/
Civil-
102140
801
Dismantling of existing of
MG track, Laying and
Linking of BG main line---
---Jaipur to Sikar GC
work
Open
tender
Two packet
system
- 8 5 3 Yes NWR/S&C/CA
/161 dated
19.10.2016
M/s KIEL-BLB (JV),
Jaipur
26.21 Cr 8.8.2016 8.8.2016 15.12.17 Work in
progress .
7 NWR/
SC/JP
/Civil-
102160
601R
Construction of PF,FOB PF
shelter ----JP Yard
remodeling & JP-SIKR GC.
Open
tender
Two packet
system
-26.7.2016 6 5 4 Yes NWR/SC/JP
/Civil-
102160601R/
01 date
11.11.2016
M/s Sanjeev Brothers
Jaipur
18.48 Cr 30.9.16 30.9.16 30.06.18 Work in
progress
1 NWR/S&
C/LHS/
RE-FL-
Madar/T/
1
Construction of road
under bridges / limited
height subways (35 Nos)
in Rewari–Phulera( RPC)
section
Open
tender
Two
packet
system
- Yes NWR/S&C/C
A/143 dated
08.7.2015
M/s S.B. Poonia Const.
Co. (JV), Hissar.
51.06 Crore. 28.4.17 5.5.2015 30.06.2018 Work in
progress.
2 NWR/
S&C/LHS
/RE-FL-
Madar/T/
2
Construction of road
under bridges / limited
height subways (32 Nos)
in Rewari – Phulera(
RPC) section
Open
tender
Two
packet
system
- Yes NWR/S&C/C
A/144 dated
16.7.2015
M/s S.B. Poonia Const.
Co. (JV), Hissar.
43.74 Crore. 28.4.17 10.5.15 30.06.2018 Work in
progress.
3 NWR/SC/
MD-FL-
RGS/Civil
-
1039980
1
Residual composite work
for Construction of 118
Nos Staff quarters
between RE-RGS-FL
section.
Open
tender
Two
packet
system
- Yes NWR/SC/MD
-FL-
RGS/Civil-
10399801/C
A/03 dated
21.11.2016
M/s Sammer Const.
Co. 15/65 West
Punjabi Bagh New
Delhi
11.41 Cr. 21.6.2017 28.6.16 30.06.2018 Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
Dy. CE/C/IV-JP
4 Construction of Club
House at Jagatpura
Jaipur
Open
tender
Two
packet
system
- Yes NWR/S&C/C
A/168 dated
8.5.2017
M/s P.K.Jain Jaipur 19.00 Cr. 16.2.18 01.03.17 16.2.18 Work in
progress
1. Tender No.NWR/SC/JP/ Civil-102990301
RGS Detour in
connection with DFCCIL
work- Construction of
Viaduct (157x18.30m),
Major (5x18.30m &
3x18.30) and Minor
Bridges, earth work in
bank/cutting including
Blanketing material,
Track works for Broad
Gauge line, Supplying &
putting ballast in track,
Transportation of P.
Way materials and
other ancillary works in
Ringus- in connection
with RGS Detour.
Open
tender
6.3.2016 Two bid
system
12.4.2016 9 7 - Yes NWR/S&C/
CA/158
Dated
9.9.2016
M/s AT PLT MHK (JV)
First Floor, Divine
India Building, Nr.
RTO Office, By Pass
Road, Himatnagar-
383001, Dist- S.K.
(Gujrat)
108.92 Cr 23.6.18 20.7.16 23.6.18 Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
7
CE/C/II-JP
Dy. CE/C/I-UDZ
1 UDZ-
HMT/
GC/EW/T/
4
Construction of Minor
bridges & earthwork
form Km. 207/0 to 250/0
in connection with UDZ-
HMT section GC Project .
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-Triveni
(J/V), Kolkatta
2286.41
07.02.13
30.11.13
31.07.14
31.03.15
31.12.15
30.06.16
30.12.16
31.07.17
31.01.18
23.08.11 Work in
Progress
2 UDZ-
HMT/
GC/MB/T-
13-R-1
Substructures of major
bridges from Udaipur to
Dungarpur.
Open 13.11.14 Two bid
system
17.12.14 05 02 Yes NWR/S&C/
CA/ 142 dtd.
30.06.15
M/s Murali Krishna
Const. Co, Hyderabad
6814.86 23.04.17
31.12.17
31.08.18
09.05.15 Work in
progress
3 UDZ-
HMT/
GC/EW/T-
20
Construction of Minor
bridges & earthwork from
Km. 121/0 to160/0 in c/w
UDZ-HMT section GC
Project
Open 08.05.15 Two bid
system
12.06.15 03 02 01 Yes NWR/S&C/
CA/ 145 dtd.
23.11.2015
M/S M.G. Contractors,
Pvt., Ltd., Panchkula
6402.75 13.03.17
30.06.17
31.12.17
30.04.18
28.09.15 Work in
Progress
4 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414062
7
Construction of station
buildings, S&T structures,
and ancillary works in
connection with UDZ-HMT
GC project
Open 05.04.16 Two bid
system
11.05.16 01 01 0 Yes NWR/S&C/
CA/ 162 dtd.
24.10.16
M/s Jainsons
Construction Co. JV,
Jodhpur
5933.53 01.02.18 14.09.16 Work in
Progress
5 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414042
6
Supply & stacking 50 mm
stone track ballast in UDZ-
HMT section
Open 06.0216 Two bid
system
16.03.16 04 02 02 Yes Dy.
CE/C/UDZ/C
A/34 dated
20.10.17
M/s Choyash Infra
Solution Joint Venture
Pvt., Ltd., Dungarpur
1345.41 30.06.18 10.09.16 Work in
Progress
6 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414112
9
Transportation of PSC
sleepers from sleeper
factory to site in UDZ-
HMT section
Open 05.06.16 Single
packet
19.07.16 04 04 04 No Dy.
CE/C/UDZ/C
A/35 dated
24.12.2016
M/s J.K Construction
Co., New Market
Nokha
267.84 24.04.17
25.12.17
25.04.18
19.04.17 Work in
Progress
7 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414012
8
Balance work of
construction, minor
bridges and earth work in
UDZ-HMT section.
Open 30.05.16 Two bid
system
05.07.16 02 02 0 Yes NWR/S&C/
CA/ 163 dtd.
08.12.1016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
4526.41 30.08.18 15.09.16 Work in
Progress
8 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414012
4
Construction of minor
bridges and earth work in
cutting and filling
between Umra and Zawar
stations in connection
with UDZ-HMT GC Project
Open 02.06.16 Two bid
system
12.07.16 05 02 03 Yes NWR/S&C/
CA/ 164 dtd.
08.12.2016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
6980.98 11.09.18 01.10.16 Work in
Progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8
9 NWR/SC/
Constructi
on/Civil-
20430001
030
Construction of 49 Nos.
Road Under Bridges and 8
Nos. Road Over Bridges in
UDZ-HMT section
Open 14.09.16 Two bid
system
18.10.16 04 03 01 Yes NWR/S&C/
CA/ 166 dtd.
14.03.2017
M/s Rachana - MI (JV),
Ahmedabad-(Gujarat).
6623.63 22.12.18 01.01.17 Work in
progress
10 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414033
4
Constriction of Super
structure of 32 Nos Major
bridge in UDZ-HMT
section
Open 04.12.16 Two bid
system
11.01.17 04 04 0 Yes NWR/S&C/
CA/ 167 dtd.
09.04.17
M/s Rachana - MI (JV),
Ahmedabad-(Gujarat).
5674.62 26.02.19 08.03.17 Work in
progress
11 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414053
3
Providing in situ Glued
joints of G-3 (L) type in
UDZ-HMT section
Open 20.10.16 Single
Packet
07.12.16 05 05 0 Yes Dy. CE/C/
UDZ/CA/41
dated
16.05.2017
M/s. Tirupati Metal
Fabricators, Faridabad
148.97 15.02.19 Work yet to
start
12 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414053
5
Supply of stone Ballast in
UDZ-HMT section
Open 21.12.20 Single
Packet
25.01.17 06 06 0 Yes Dy. CE/C/
UDZ/CA/26
dated
26.05.2017
M/s. B. B. Construction,
Khurja-Distt.
Bulandshahr
801.13 02.09.18 24.03.17 Work in
progress
13 NWR/SC/
UDZ-
HMT(GC)/
Civil-
20414053
8
Flash butt welding of Rails
in UDZ-HMT section
Open 31.12.16 Single
Packet
08.03.17 02 02 0 Yes Dy. CE/C/
UDZ/CA/49
dated
28.10.17
M/s ITC, Kanpur 648.34 30.11.18 --- Work in
progress
14 NWR/SC/
UDZ-HMT
(GC)/Civil-
20514053
9
Laying and linking of track
in UDZ-HMT section.
Open 31.12.16 Single
Packet
10.02.17 02 02 0 Yes Dy. CE/C/
UDZ/CA/40
dated
17.04.17
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
861.39 02.03.18 28.03.17 Work in
progress
15 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414083
9
Laying and linking of track
in UDZ-HMT section. from
Km 160 to Km 225 In UDZ-
HMT section
Open 29.12.16 Two packet 02.02.17 04 04 0 Yes - M/s BLB--SNCC JV, ,
Jodhpur (Raj)-342001
1128.55 02.04.19 16.05.17 Work in
progress
16 T.NO.UDZ
-HMT-GC-
MB-T-43-
R
Fabrication, transporting
assembling and erection
of superstructures
Open 19.07.17 Two packet 24.08.17 03 02 01 Yes - M/s Dynemic Engineers
Infratrack Pvt.,Ltd.,
Kota
1510.59 16.03.19 - Work in
progress
17 T.NO.UDZ
-HMT-GC-
BLDG/T-
44
Construction of staff
Quarters & SSE/C/P.Way
office in UDZ-HMt section
Open 09.06.17 Single 12.07.17 03 03 0 Yes Dy. CE/C/
UDZ/CA/46
dated
20.09.17
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
392.18 31.01.18
30.06.18
- Work in
progress
18 T.NO.UDZ
-HMT-GC-
Civil/T-47
Earth work and minor
bridges between UDZ-
Umra in UDZ-HMT section
Open 18.08.17 Single 20.09.17 02 02 0 Yes M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
890.55 10.06.18 - Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
9
Dy. CE/C/II-UDZ
1. Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902
Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/cutting including blanketing material, construction strengthening, rebuilding, extension of Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl)
section in connection with Mavli Junction to Barisadri to Barisadri GC Project.
Open 19.02.16 Two bid
20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.2016
M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School,
Singanpore-Causway Road
Rs. 137.40 Cr
15.06.18 01.07.16 In progress.
Work terminated on 25.09.2017
2. T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R
Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project
Open 10.10.16 single bid
25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/MVJ-BI/GC/Welding/T-3R Dated 20.02.17
M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)
Rs.03.93 Cr
19.08.18 Yet to start
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10
Dy. CE/C/Dungarpur
1. Dy.CE/C/
UDZ/DNR
P-
RTM/FLS/
2011/T/1
Carrying out final
location of survey &
….other preliminary
activities in connection
with new BG line
between DNRP-RTM via
Banswara
Open 1/6/11 &
30/6/11
(NIT & First
corrig.)
Single 15-07-
2011
10 NA NA Yes NWR/S&C/
CA/114 Dt.
27-02-12
M/s S.M.Consultants,
Bhubneswar
4.99 Cr
Excl. 1st 0.60
Cr.
13/11/12
Extended
up to
31.12.2017
(Further
applied)
14/11/2011 -
Work in
progress
2. Dy.
CE/C/DN
RP/ RTM-
DNRP/EW
/ NL/T-8
E/W in cutting and
filling for formation &
all other ancillary works
etc. from Km. 0.00 to
Km. 17.00 between
Dungarpur-Nawa Gaon
station in c/with DNRP-
RTM New BG Rail Line
Project.
Open 23-01-2013 Two
Packet
06-03-
2013
15 5 10 Yes NWR/S&C/
CA/129
Dt. 31-10-
13
Accepted
on
10.07.13
M/s Nayak
Infrastructure Pvt.
Ltd., Guwahati
56.74 Cr.
Ex.SCA
8.05 Cr.
09-07-15
Further
extended
upto
09.07.2017.
Work closed
as on is
basis.
06-11-2013 - Project
freeze. PG
has been
released
final bill
under
process.
3. T. No.
Dy. CE/C/
DNRP/
RTM-
DNRP/MB
/NL/T/ 10
– Const. of minor
bridges, RUB & other
ancillary works etc.
from Km. 0.00 to 17.00
bet. Dungarpur to
Nawa Gaon stations in
c/with DNRP-RTM New
BG Rail Line Project.
Open 10-09-2013 Two
Packet
23-10-
2013
8 6 2 Yes NWR/S&C/
CA/137 Dt.
30-06-
2014
accepted
on
04.04.2014
M/s Gannon Dunkerley & Co. Ltd., Ahmedabad
38.06 Crore 03-04-2016
Further
Extended
upto
31.03.18
14.11.2014 - Project
freeze.
Some work
to be
executed
to close
the work.
4 T. No.
UDZ-
HMT/GC/E
W/T-3R
UDZ-HMT GC PROJ.
Construction of Minor
bridges & earthwork
from Km. 270/0 to
320/0 in connection
with UDZ-HMT section
GC Project
Open 08.05.15 Two bid
system
12.06.15 06 01 05 Yes NWR/S&C/
CA/148
dated
12.01.2016
Accepted
on
20.10.15
M/s Royal Infra
Engineering Pvt. Ltd., Surat
2706.07
Lakhs
19.04.17
Extended
upto
31.03.2018
27.11.15 - Work in
Progress
5 NWR/SC/
UDZ-
HMT/GC/Ci
vil/204140
532
Flash Butt welding of
60 Kg/52 Kg. New / SH
Rails at Depot/ Site
using Mobile Flash Butt
Welding Plant in DNRP-
HMT Section.
Open Single
Packet
23.11.16 02 01 01 Yes Under
execution M/s Railtech
Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)
531.70 Lakhs 21.08.2018 Yet to be
commenced.
-- Work to be
started.
6 NWR/SC/
UDZ-
HMT/GC/Ci
vil/205140
541
Dismantling of existing
MG track, laying and
linking of BG ML, LL
etc. bet. Km. 270.00 to
Km. 320.00 in c/with
DNRP-HMT Section.
Open - Single 01.02.2017 04 Nos. 1 1 Yes Dy.
CE/C/DNRP
/CA/17 Dt.
27.06.2017
M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)
890.85 Lakhs 27.02.2018 05.04.2017 -- Work in
progress.
7. UDZ-HMT/
GC/
205140838
-R1
Transportation of all
types of free rails, P&C
etc. between DNRP-
HMT Section in c/w
UDZ-HMT GC Project.
Open
tender
01.05.2017 Single
Packet
12.06.2017 2 Nos. NA NA Yes Dy. CE/ C/
DNRP/CA/1
9 Dt.
15.10.2017
M/s Shree Nahar Construction Co., A-328, Shastri Nagar, Jodhpur (Rajasthan)
6.28 Crores 17.08.2018 31.08.2017 - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11
DY. CE/C/RTM
1 Dy.CE/C/BNSW/ DNRP-RTM/NL/T-9
Construction of Office Accommodation for Dy.CE/C/RTM & Officers Rest House at Ratlam in c/w Construction of New BG Line between DNRP-RTM via Banswara.
Open 23.10.13 Single 12.12.13 3 Nos. - - Yes Dy.CE/C/RTM/CA/02 dt.21.04.14
M/S Kirti Contractors & Engineers, 168, Samta Parisar, Ratlam (MP)
Rs. 124.14 Lacs
09.09.14 Extension given up 31.12.2016
11.03.2014 Work is in progress.
2 Dy.CE/C/RTM/ DNRP-RTM/NL/T-2
Construction of minor bridges ,Road under bridges (RUB) & other ancillary works from 142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project
Open 16.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015
M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema Acrcade,3rd Floor, Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006
Rs.42.89 Cr 17.12.2016 10.08.2015 Work is in progress.
3 Dy.CE/C/RTM/ DNRP-RTM/NL/T-3
Earth work in cutting and filling for formation as per BG standard profile, Construction of RCC box type bridges and all other ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc from Km.142.85 to 163.00 km between Chotti Sarwan & Shivgarh stations in connection with Ratlam - Dungarpur via Banswara New BG line project.
Open 26.03.15 Two bid 05.05.2015 06(six) 04(four) 02(two) Yes NWR/S&C/CA/147 dated 21.12.2015
MMS Infratech Pvt.Ltd.,New Anjar-370110(Gujarat)
Rs. 53.66 Cr. 06.09.2017 15.10.2015 Work is in progress.
8. UDZ-HMT/
GC/
205141142
Const. of duty huts,
road works at level
crossing, etc. in the
section of Dy.
CE/C/DNRP in c/with
UDZ-HMT GC Project.
Open
tender
14.08.2017 Single
Packet
18.09.2017 1 NA NA Yes Yet to be
executed. M/s R.K. Constructions, Village –Nawada, Sector-20, Greater Noida, Distt . Gautam Budh Nagar.
7.63 Crores 18.10.2017 Work started - Work in
progress.
9. NWR/SC/
UDZ-HMT/
GC/ Civil –
205140436
Supply & stacking of
stone track ballast etc.
bet. Km. 260 to Km.
320 etc. in c/with UDZ-
HMT GC Project.
Open
tender
08.12.2016 Two
packet
18.01.2017 4 4 - Yes Dy. CE/C/
DNRP/CA/1
8 dated
15.07.2017
M/s YSCC-YKS-HID
(JV), Vill. Mothala, Abu KRoad, Distt. Sirohi
10.87 Crores 17.10.2018 08.05.2017 - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12
4 Dy.CE/C/RTM/ DNRP-RTM/NL/
T-5
Earthwork in cutting and filling for formation as per B.G. standard profile and all other
ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc. from Km 163.00 to 184.600 & Ratlam connectivity between Chandra Berda & Ratlam stations in connection with Ratlam-Dungarpur via Banswara new BG line project.
Open 11.05.2015 Two bid 24.06.2015 05(Five) 02(two) 03(three) Yes NWR/S&C/CA/149 dated 29.01.2016
M/S Mehta Saiyyed(JV) 104, LIC Colony, Vaishali Nagar Ajmer(Raj) Pin
30 5001
Rs. 58.71 Cr. 05.11.2017 07.11.2015 Work is in progress.
CE/C/III-JP
Dy. CE/C/I-Ajmer
1
AII
/BN
GM
-RA
S/N
L/T
/11
R2
Laying and linking of Broad
gauge main line, loop lines
including points and
crossings in yards,
spreading of ballast,
tamping of track,
transportation of P-way
materials, construction of
station building & platform
and other ancillary works
between Bangurgram and
Ras stations in connection
with Bangurgram-Ras New
Broad Gauge Line Project.
Open 05.10.12 Single 09.11.12 1 Nos. - - Yes
Dy.
CE(C)/AII/BN
GM-
RAS/CA/85
dated
20/11/2013
M/s. Bhanwar Lal
Bijarnia, Village-
Rajpura, Tehsil-Nawa,
District-Nagaur (Raj.)
66
74
98
82
.09
17/09/2013,
28/02/2014,
31/05/2014,
30/09/2014,
31/01/2015,
31/05/2015,
30/10/2015 &
31/12/2015
02/09/13 -
Work
completed.
Final variation
under HQ
technical
check.
2
AII
/Co
nst
./D
FC
CIL
/T/3
-R2
Shifting of track between
Madar & Durai stations &
shifting MG yard at Marwar
Jn. i.c.w. DFC.
Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes
NWR/S&C/CA
/60 dated
26/12/2013
M/s. Ravi Infra build
Pvt. Ltd., 95, Hiran
Magri, Sector-11,
Udaipur
32
16
99
68
1.7
9
04/02/2015,
30/04/2016,
31/12/2016 &
30/06/2018
14/12/13 - Work re-
started.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13
3
AII
/Co
nst
./D
FC
CIL
/T/6
Construction of station
building & staff quarters in
c/w shifting of utilities for
DFCCIL.
Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes
NWR/S&C/CA
/61 dated
27/12/2013
M/s. Rama
Construction company,
H-240, Ashok Vihar
Phase-I New Delhi
41
17
03
68
6.3
4 05/03/2015,
31/12/2015,
30/06/2016,
31/12/2016,
30/06/2017 &
31/12/2017
15/09/13 - Work under
progress.
4
AII
/Co
nst
./LH
S/T
/3 Providing Limited Height
Subways in lieu of existing
Level Crossings between
Madar & Haripur stations
of Madar - Marwar Section
in connection with
elimination of existing level
crossing gates.
Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes
NWR/S&C/CA
/64 dated
20/02/2014
M/s. Lall Construction
Co. AA-105, Shalimar
Bagh, Delhi-110088
45
77
17
33
9.3
5
15/12/2015,
31/03/2017 &
31/10/2017
18/02/14 - Work under
progress.
5
AII
/Co
nst
./Lo
co/M
od
/T/7
Improvement to drainage
system in Loco Workshop
by the construction of drain
using mostly pre-cast RCC
units including launching.
Work also includes
construction of traverser
path and other ancillary
works in connection with
Modernisation of Loco
Workshop, Ajmer
Open 21/10/14 Two Bid 26/11/14 07 (Seven) 04 (Four)
1.0 JCC Infra
Projects Pvt.
Ltd., 761/30,
Aklank
House, Tikam
Ganj, Ajmer
(Raj.)
2.0 Bharat
Spun Pipe &
Construction
Company, 43,
Industrial
Area,
Jhotwara,
Jaipur-
302012
3.0 M/s. B. L.
Infra Projects
Pvt. Ltd., B-
8/6, Sector-3,
Rohini, New
Delhi -
110085.
4.0 M/s.
Satish & Amit
Infra
Structure
2/108, Royal
Green, Near
Sirsi Mod,
Post office
Sirsi, Jaipur.
Yes
NWR/S&C/
CA/70 dated
29/07/2015
Prem Fabricator's, 426,
Near Jyoti Power,
Behind Steel Town,
Moriya, Chandgodar,
Ahmedabad-382110
1326.88 Lakhs
04/02/2016,
30/06/2016,
30/08/2016,
31/10/2016 &
15/12/2016
17/02/15 -
Work
completed,
final variation
under HQ
account's
vetting.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
14
6
AII
/Co
nst
./C
&W
/Mo
d./
T/6
Improvement to drainage
system in C&W Workshop
by the construction of drain
using mostly pre-cast RCC
units including launching.
Work also includes
construction of traverser
path and other ancillary
works in connection with
Modernisation of C&W
Workshop, Ajmer
Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four)
1.0 Varaha
Infra Limited,
Umesh
Smriti-6,
Jalam Vilas
Scheme,
Poata B.
Road,
Jodhpur
(Raj.)-
342006. 2.0
Bharat Spun
Pipe &
Construction
Company, 43,
Industrial
Area,
Jhotwara,
Jaipur-
302012. 3.0
JCC Infra
Projects Pvt.
Ltd., 761/30,
Aklank
House, Tikam
Ganj, Ajmer
(Raj.) 4.0
M/s. Raj
Kumar Gupta
Contractors,
III-J/59,
Nehru Nagar,
Ghaziabad-
201001.
Yes
Dy.
CE(C)/AII/CA/
91 dated
30/07/2015
Prem Fabricator's, 426,
Near Jyoti Power,
Behind Steel Town,
Moriya, Chandgodar,
Ahmedabad-382110
948.74 Lakhs
21/01/2016,
31/12/2016,
30/06/2017 &
31/10/2017
04/02/15 - Work in
progress.
7
NW
R/S
C/A
II-B
NG
M/C
ivil
- 3
08
15
18
01
Earth work in bank/cutting
including Blanketing
material, Construction of
Major/Minor Bridges,
Construction of Quarters,
S&T structures &
Miscellaneous structures,
Dismantling of existing
Buildings, Platforms & Steel
structures etc., .... in
connection with Ajmer-
Bangurgram BG Doubling
project.
Open 02/03/16 Double
packet
12/04/201
6 06 (Six) 02 (Two)
M/s.
Rajendra
Singh
Bhamboo
Infra Pvt. Ltd.
108, First
Floor, Neel
Kanth
Building,
Gandhi Path,
Vaishali
Nagar, Jaipur
– 302021
and
M/s. Balajee-
Modi (JV), 9,
Leela
Mension, Raj
Bhawan
Road, Civil
Lines, Jaipur-
302006
Yes
NWR/S&C/CA
/74 dated
30/08/2016
M/s. Shivakriti-Shri
Mohangarh (JV), 7th
Floor, Ajmer Puliya,
Jaipur-302006
11337.76 Lakh 23/06/2018 20/07/16 - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
15
Jaipur-
302006
8
NW
R/S
C/B
an
gu
rgra
m-G
uri
ya
-Pa
tch
/Civ
il-3
08
15
18
01
Earth work in bank/cutting
including Blanketing
materials, Construction of
Major/Minor Bridges,
Construction of Quarters,
S&T structures &
Miscellaneous structures,
dismantling of existing
buildings, platforms & steel
structures etc., ... in
connection with
Bangurgram - Guriya BG
Doubling project.
Open 28/06/16 Double
packet
10/08/201
6 05 (Five) 01 (One)
VPRPL-RBIPL
"Guriya" (JV)
H-1, First
Floor Shivalik
Complex,
Near Gol
Building,
Sardarpura,
Jodhpur
(Rajasthan)
342001
Yes
NWR/S&C/CA
/76 dated
24/01/2017
M/s. H.S. Mehta Infra –
JCC Infra Projects (JV),
761/30, Aklank House,
Tikam Ganj Ajmer –
305001
16161.54 Lakh 10/11/2018 20/11/16 - Work in
progress.
9
NW
R/S
C/M
D-/
Civ
il-3
08
42
18
01
Providing pit line with or
without catwalk, washing
apron, overhead water
tank, extension of existing
bridges, extension of
existing shed, construction
of service buildings and
dismantling of existing
track, laying & linking of
new track & turnouts etc.
in Madar yard in
connection with shifting of
coach maintenance facility
from Ajmer to Madar
project
Open 29/04/16 Double
packet 28/06/16 7 (Seven) 2 (One)
M/s. Ali
Mohd. Abdul
Mazid, Near
Jama Masjid,
Mohalla
Vyaparian,
Bikaner-
334001
(Rajasthan)
Varindera
Construction
s Limited,
408-409,
Suneja
Tower-I,
District
Cenre,
Janakpuri,
New Delhi.
Yes
NWR/S&C/CA
/75 dated
29/09/2016
M/s. M. H. Khanusiya,
First Floor, Divine India
Building, Near RTO
office, By Pass Road,
Post-Savgadh, (Panpur)
Himmatnagar-383001
Dist.-S.K. (Gajarat)
2643.75 Lakh 06/09/2017 &
31/01/2018 15/09/16 -
Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16
Dy. CE/C/II-Ajmer
1 AII/Const.
/LHS/T/2
Construction of Limited
Height Subway in lieu
of existing LC No. 58,
60, 61, 62, 64, 65, 66,
67, 68, 69, 71, 72 &
73(13 Nos) between
stations Marwar to Rani
of Marwar-Palanpur
Section in connection
with elimination of level
crossing gates.
Open 21.02.2013 Single 28.03.2013 01 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
NIL Yes
NWR/S&C/CA/5
8 dated
18/11/2013
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
1790.49 Lakhs
31/12/2014,
30/09/2015,
30/09/2016,
30/09/2016,
31/12/2016,
31/05/2017 &
30/11/2017
14/09/2013 - Work
Completed.
2
AII/GRI-
MJ/BGD/T
/1
Earthwork in
embankment for
cutting & filling,
Blanketing for bank,
Addition, alteration and
construction of S&T
structures, Pass.
Platform, Platform
Shelters, station
Building, staff Quarters,
water Huts, toilets,
Hand Pumps, FOBs,
TMC Rest house etc.
between Guriya–
Marwar Jn. stations
(both excl.) and Officer
Rest House at Mawar
Jn. Station in
connection with Guriya-
Marwar Jn. BG Patch
Doubling Project.
Open 30.08.12 Single 16.10.12 07 Nos.
1st Lowest
M/s. Braham
Prakash Modi,
74
Sudarshanpur
a, Industrial
Area,
Baisgodam,
Jaipur-06
NIL Yes
NWR/S&C/CA/5
1 dated
14/03/2013
M/s. Braham Prakash
Modi, 74
Sudarshanpura,
Industrial Area,
Baisgodam, Jaipur-06
3541.71 Lacs.
30/09/2014,
30/04/2015,
31/07/2015,
30/10/2015,
31/12/2015,
30/04/2016,
30/06/2016,
31/12/2016,
31/03/2017 &
30/06/2017
31/12/2012 30/06/17 Work
completed.
3
AII/GRI-
MJ/BGD/T
/2
Construction of
Important/Major
Bridges including
earthwork, blanketing
on the approaches
between stations
Guriya to Marwar
Junction with
Railway’s/Contractor’s
design & drawing in
connection with Guriya-
Marwar Junction BG
Patch Doubling Project.
Open 21.01.2013 Single 26.02.2013 06 Nos.
1st Lowest
M/s.PNC
Infratech
Ltd.-Jain
Construction
Company
(JV) 761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
NIL Yes
NWR/S&C/CA/6
2 dated
06/01/2014
M/s. PNC Infratech
Ltd.-Jain Construction
Company (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3240.43 Lakhs
28/01/2015,
31/12/2015,
30/09/2016,
31/12/2016,
15/02/2017 &
31/07/2017
06/12/2013 - Work
completed.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
17
4 AII/Const.
/FLS/T/1
Marking out of center
line, taking levels
including all details,
Carrying out Geotech
investigation, designing
of foundation and sub –
structures / super
structure of Minor /
Major bridges/LHS,
preparation of land
plans & proposal,
Preparation of L-section
& yard plans etc. &
submitting detailed
working drawings in
connection with
Bangurgram to Guriya
& Marwar to Rani
Doubling projects and
Various shifting of
utility works of DFCCIL
& LHS works between
Kishangarh & Palanpur
stations.
Open 17.09.2012 Single 09.11.2012 03 Nos.
2nd Lowest
M/s. S. M.
Consultants,
Plot No.-130,
S.M. Tower,
Mancheswar
Industrial
Estate,
Rasulgarh,
Bhubneshwar
(Odisha)
M/s. BPC
India, Nataraj
Bhawan,
P.O.Khamarch
andi, P.S.
Haripal, Dist.-
Hooghly, West
Bengal
Yes
NWR/S&C/CA/5
7 dated
07/11/2013
M/s. S. M.
Consultants, Plot No.-
130, S.M. Tower,
Mancheswar Industrial
Estate, Rasulgarh,
Bhubneshwar (Odisha)
183.38 Lakhs
06/07/2013,
30/11/2013,
31/03/2014,
31/10/2014,30/0
4/2015,
31/08/2015,
31/12/2015,
30/04/2016,
31/08/2016 &
30/04/2017
02/02/2013 - Work under
progress
5 AII/Const/
FBW/T/1
Flash butt Welding of
60/52 Kg.
New/SH,(72/90 UTS )
Rail joints by using
mobile flash butt
welding plant in
connection with various
sanctioned works of
Ajmer unit of
construction
organization.
Open 11.10.2012 Single 19.11.2012 01 No.
1st Lowest
M/s. The
India Thermit
Corpn. Ltd.,
84/22, Fazal
Ganj,
Kanpur-
208012.
NIL Yes
Dy.
CE(C)/AII/FBW/
CA/85 dated
21/10/2013
M/s. The India Thermit
Corpn. Ltd., 84/22,
Fazal Ganj, Kanpur-
208012
699.04 Lakhs
18/03/2015,
18/03/2016,
18/03/2017 &
18/03/2018
13/11/2013 - Work in
progress
6 AII/Const.
/LHS/T/4
Providing Limited
Height Subway (17
Nos.) in lieu of existing
level crossings between
Haripur & Marwar Jn.
stations of Ajmer -
Marwar Jn. section in
connection with
elimination of existing
level crossing gates.
Open 11.07.14 Two packet
system 13.08.2014 07 Nos.
1st Lowest
M/s. PNC
Infratech
Ltd.-JCC
Infraprojects
Pvt. Ltd. (JV)
761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
04 (Four) Yes
NWR/S&C/CA/6
8 Dt. 09-03-
2015
M/s. PNC Infratech
Ltd.-JCC Infraprojects
Pvt. Ltd. (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3529.60
Lakhs
18/05/2016 &
30/06/2017 11/09/2015 -
Work under
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
18
7 AII/Const.
/LHS/T/5
Providing Limited
Height Subways (19
Nos.) in lieu of existing
level crossings between
Rani & Keshavganj
stations of Marwar Jn. –
Palanpur section in
connection with
elimination of existing
level crossing gates.
Open 21.02.2013 Two packet
system 13.08.2014 04Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
6 Dt. 27-02-
2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3908.17
Lacs
18/05/2016,
13/03/2017 &
31/12/2017
03/12/2014 - Work under
progress
8 AII/Const.
/LHS/T/6
Providing Limited
Height Subways in lieu
of existing level
crossings between
Swaroopganj &
Palanpur stations of
Marwar Jn. - Palanpur
section in connection
with elimination of
existing level crossing
gates.
Open 21.02.2013 Two packet
system 13.08.2014 04 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
7 dated
27/02/2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3873.36
Lacs.
18/05/2016,
31/03/2017 &
31/03/2018
18/12/2014 - Work under
progress
9
AII/GRI-
MJ/BGD/T
/6
Construction of Minor
Bridges including other
ancillary work between
station Guriya
(excluding) - Marwar
Jn. (excluding) in
connection with Guriya
- Marwar Junction BG
patch doubling project.
Open 07/07/2014 Two packet
system 13/08/2014 04 Nos. 1.0 (One)
1.0 M/s.
Ashish
Construction
Co.- SP
Infracon (JV)
211, Shivam
Complex, Opp.
Hetarth Party
Plot, Science
City Road,
Sola,
Ahmedabad -
380061.
Yes
NWR/S&C/CA/6
9 dated
09/03/2015.
M/s. JCC InfraProjects
Pvt. Ltd., 761/30,
"Aklank House", Tikam
Ganj, Ajmer (Raj.).
2169.63 Lakhs
29/02/2016,
30/06/2016,
31/12/2016,
31/07/2017 &
31/12/2017
01/03/2015 - Work under
progress.
10
AII/GRI-
MJ/BGD/T
/8-R
Dismantling of existing
BG track, laying and
linking of Broad gauge
main line, loop lines
including points and
crossings at various
yards, spreading of
ballast, tamping of
track, transportation of
P-Way materials and
other ancillary works
between Guriya –
Marwar Jn. Section in
connection with Guriya
- Marwar Jn. BG Patch
Doubling Project.
Open 28/07/2015 Single packet
system 31/08/2015 5 Nos. 1.0 (One)
1.0 JCC Infra
Projects Pvt.
Ltd., 761/30,
Aklank House,
Tikam Ganj,
Ajmer
No -
M/s. Jhawar Sales
Corporation, Rani
Bazar, Bikaner-
334001 (Raj.)
Rs. 976.32
Lakhs
28/05/2017 &
31/07/2017 - 30/06/17
Work
completed.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
11
AII/MJ-
RN/BGD/T
/1
Earth work in
bank/cutting including
Blanketing material,
Construction of
Important/Major/Minor
Bridges, Construction of
Quarters, S&T
structures &
Miscellaneous
structures on stations
and in section,
Dismantling of various
Buildings, Platforms &
Steel structures etc,
Track works for Broad
Gauge line, Supplying &
putting ballast in track,
Transportation of P.
Way materials and
other ancillary works in
Marwar Junction to Rani
section in connection
with Marwar Jn.-Rani
(both including) BG
Patch Doubling project.
Open 09/08/2015 Two packet
system 06/10/2015 13 Nos. 7.0 (Seven)
1.0 M/s.
Gawar –
Lakhlan (JV)
402, Diamond
Tower, Purani
Chungi, Ajmer
Road,
Jaipur2.0 M/s.
Kalindee –
Paras JV, 2nd
Floor Building
No. 9 A, Cyber
City, DLF
Phase – III,
Gurgaon –
1220023.0
M/s. Ravi - HG
(JV) 95, Hiran
Magri, Sector-
11, Udaipur –
3130024.0
M/s. Gannon
Dunkerley &
Co. Ltd. 301-
303, Prerna
Arcade, Opp.
Doctor House,
Near parimal
Crossing, C.G.
Road,
Ahmedabad-
3800065.0
M/s. VRC – SIL
(JV), 16, Opp.
Metro Pillar
No. 190,
Paschim Vihar
Extension,
Rohtak Road,
Delhi
1100636.0
M/s. BPL-BCPL
(JV) Ekta
House, Nr.
Shripath
Apartment,
Jalaram-II,
University
Road, Rajkot –
360007
Yes
NWR/S&C/CA/7
1 dated
22/02/2016
M/s. VPRPL – RBIPL
(JV) H-1, first Floor
Shivalik Complex,
Near Gol Building,
Sardarpura, Jodhpur
(Raj.) – 342001
15262.94 Lakh 29/12/2017 25/02/2016 - Work under
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20
12
NWR/SC/
Guriya-
Marwar/Ci
vil-
30915110
9
Miscellaneous works
between Guriya to
Marwar Jn. doubling
project.
Open 20/09/2016 Single packet
system 24/10/2016 04 Nos. 04 (Four) NIL Yes
Dy.CE(C)/AII/C
onst./GRI-
MJ/CA/4 dated
30/03/2017
M/s K.B. Enterprises,
2, Matra Chhaya,
Opp. Chambal Power
House, Hawa Sarak,
Jaipur-302006
Rs.814.54
Lakhs
20/05/2017 &
19/08/2017 03/12/2016 -
Work under
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
21
CE/C/IV-JP
Dy. CE/C/I-Jodhpur
11.. TT..NNoo.. JJUU//
CCOONNSSTT//
1155//22001111--1122
AAcccceepptteedd
oonn––
1177..0099..1122
WWoorrkk ooff rreemmooddeelliinngg ooff
JJUU yyaarrdd iinncclluuddiinngg aallll
wwoorrkk rreellaatteedd ttoo PP..
wwaayy,, AATT wweellddiinngg
OOppeenn 2255..0033..1122 SSiinnggllee 2266..0044..1122 0044 SShh..GGiirrddhhaarrii
RRaamm SS//oo SShh..
SSaajjjjaann RRaamm,,
JJooddhhppuurr
MM//ss PP..CC..
SShhaarrmmaa,,
NNooiiddaa ((UU..PP..))
LL--11 DDyy..CCEE//CC//
JJUU//0033//22001122--
1133,, ddttdd..
1133..1122..1122
SShh..GGiirrddhhaarrii RRaamm SS//oo
SShh.. SSaajjjjaann RRaamm,,
JJOODDHHPPUURR
113322..0022 1166..0066..1133
3311..1100..1133
3300..0044..1144
3311..1122..1144
2288..0022..1155
2200..0033..1155
3311..1122..1155
3311..1122..1166
1155..0099..1166
1111..1111..1122 WWoorrkk
pphhyyssiiccaallllyy
ccoommpplleetteedd &&
ffiinnaall bbiillll
ppaasssseedd..
--
22.. JJUU//CCoonnsstt..//
TT--1188//1133--1144//
RROOBB//CC--
2211//NNAACC
CCoonnssttrruuccttiioonn ooff
ccoommpplleettee RROOBB ((22 llaannee))
iinnccll..aapppprrooaacchheess iinn lliieeuu
ooff eexxiissttiinngg LLCC NNoo..CC--2211
oonn MMTTDD--FFLL sseecc aatt NNAACC
ssttaattiioonn
OOppeenn
tteennddeerr
0088..1111..1133 TTwwoo ppaacckkeett
ssyysstteemm
1133..1122..1133 0099 NNooss.. 0066 NNooss..
11.. VViisshhnnuu
PPrraakkaasshh RR
PPuunnggaalliiaa
22.. RRaacchhaannaa
CCoonnsstt.. CCoo..
33.. PPrraavveeeenn
GGuullaattii IInnffrraa--
ssttrruuccttuurreess
PPvvtt.. LLttdd..
44.. SSoonnaa
BBuuiillddeerrss,,
55.. RRaakkeesshh
CCoonnsstt.. CCoo..
66.. MM//ss JJaaiinn
CCoonnsstt.. CCoo..
0033 NNooss..
11.. SShhrreeee
GGaauuttaamm
CCoonnssttrruuccttiioo
nn CCoo.. LLttdd..,,
22.. MM//ss MMaaaann
RRaannaa ((JJVV)),,
33.. MM//ss
DDRRAA--BBSSPP
CCoonnssttrruuccttiioo
nn ((JJVV)),,
LL--11
NNWWRR//SS&&CC//CCAA
--6655,, ddttdd..
2200..1100..22001144
MM//ss VViisshhnnuu PPrraakkaasshh RR
PPuunngglliiaa LLiimmiitteedd,, HH--11
FFiirrsstt FFlloooorr SShhiivvaalliikk
CCoommpplleexx,, NNeeaarr GGooll
BBuuiillddiinngg,, SSaarrddaarrppuurraa,,
JJooddhhppuurr
1188..8888 CCrr.. 0033..0077..1166
3300..0099..1166
1155..1122..1166
1155..0011..1177
3311..0011..1177
0088..0077..1144 WWoorrkk
ccoommpplleetteedd
&& RROOBB
ccoommmmiissssiioonn
eedd bbyy
HHoonn’’bbllee
MMooSSRR oonn
1100..0022..1177
FFiinnaall bbiillll
ppaasssseedd oonn
2211..0088..1177
33.. TT..NNoo.. JJUU//
CCoonnsstt..//
TT--0066RR//
22001144--
1155//LLHHSS
RRUUBBss iinn lliieeuu ooff LLCCss,, iinn
sseeccttiioonn ooff MMTTDD--BBKKNN
((0044 NNooss..)),, MMTTDD BByyee
PPaassss ((0011 NNoo..)) && MMTTDD--
FFLL ((0011 NNoo..)) oonn JJUU
ddiivviissiioonn
OOppeenn
TTeennddeerr
0055..1111..1144 SSiinnggllee
TTeennddeerr
0099..1122..1144 0044 NNooss.. MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
CC--117711 KKaannttaa
KKhhaattuurriiaa
CCoolloonnyy,,
BBiikkaanneerr
-- LL--11 DDyy..CCEE//CC//
JJUU//1133//22001144--
1155//LLHHSS,, ddttdd..
1188..0044..22001155..
MM//ss SShhrreeee KKaarrnnii
TTrraaddeerrss,,
CC--117711 KKaannttaa KKhhaattuurriiaa
CCoolloonnyy,,
BBiikkaanneerr
662244..1155 llaaccss.. 2277..0044..1166
3311..0088..1166
1177..0044..1155 WWoorrkk
ccoommpplleetteedd
FFiinnaall bbiillll
ppaasssseedd oonn
0099..0099..1177
44.. JJUU//CCoonnsstt..//TT--
2222//1144--
1155//SSttdd..IIIIRR//
MMTTDD--BBKKNN
AAllll CCiivviill && PP..WWaayy wwoorrkk
cc//wwiitthh SSttdd--IIII wwoorrkk iinn
MMTTDD--BBKKNN && RRKKBB--PPLLCC
sseecc
OOppeenn
TTeennddeerr
2211..1111..1144 SSiinnggllee
TTeennddeerr
2233..1122..1144 0022 NNooss.. MM//ss BBhhaannwwaarr
LLaall BBiijjaarrnniiaa,,
VViillllaaggee--
RRaajjppuurraa,, PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,,
DDiisstttt.. NNaaggoouurr
((RRaajjaasstthhaann))
MM//ss JJaaii MMaattaa
DDee EEnneerrggyy
SSyysstteemm,,
LLaaxxmmaannggaarrhh
ssiikkaarr
LL--11 DDyy..CCEE//CC//
JJUU//1144//22001155--
1166//SSttdd--IIIIRR,,
ddttdd..
1111..0066..1155..
MM//ss BBhhaannwwaarr LLaall
BBiijjaarrnniiaa,,
VViillllaaggee--RRaajjppuurraa,, PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,, DDiisstttt..
NNaaggoouurr
((RRaajjaasstthhaann))
771155..8800 llaaccss.. 0033..1100..1166
3311..0033..1177
3311..0088..1177
3311..0033..1188
1100..0044..1155 WWoorrkk iinn
pprrooggrreessss
WWoorrkk
ddeellaayyeedd dduuee
ttoo nnoonn--
rreecceeiivviinngg ooff
CCRRSS ssaannccttiioonn
55.. JJUU//CCoonnsstt..//77
44--WW--
2266//22001155--
1166//SSttdd..IIIIRR//
RRKKBB--PPLLCC
SSuuppppllyyiinngg aanndd
ssttaacckkiinngg ooff 2200880000 ccuumm
SSttoonnee bbaallllaasstt ffoorr
SSttdd..IIIIRR wwoorrkk iinn RRKKBB--
PPLLCC sseeccttiioonn
OOppeenn
TTeennddeerr
0055..0066..1155 SSiinnggllee
TTeennddeerr
1100..0077..1155 0044 NNooss.. MM//ss JJ..KK..
CCoonnsstt..CCoo..
NNookkhhaa,,
•• AA..KK.. GGuuppttaa
&& CCoo..,, ,,
DDEELLHHII
•• MM//ss
HHaannuummaann
CCoonnssttrruuccttiioo
nn CCoo..,,
NNookkhhaa
•• MM//ss SShhrreeee
SShhyyaamm
EEnnggiinneeeerriinn
gg CCoo,,
LL--11 DDyy..CCEE//CC//
JJUU//1199// 22001155--
1166//SSttdd..IIIIRR//
RRKKBB--PPLLCC,,
ddttdd..
3300..0011..1166
MM//ss JJ..KK.. CCoonnssttrruuccttiioonn
CCoo..,,
NNeeww MMaarrkkeett,, NNookkhhaa,,
DDiissttrriicctt –– BBiikkaanneerr
114422..8844 llaaccss.. 1100..0055..1166
3311..0077..1166
1155..1111..1166
..0099..22001155 1188..0077..1177 WWoorrkk
ccoommpplleetteedd &&
ffiinnaall bbiillll
aawwaaiitteedd dduuee
ttoo nnoonn
ddeeppoossiittiioonn ooff
mmiinniinngg NNOOCC..
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
22
CChhuurruu
66.. JJUU//CCoonnsstt..//
TT--2277//22001155--
1166//SSttdd..IIIIRR//
RRKKBB--PPLLCC
AAllll CCiivviill && PP..WWaayy wwoorrkk
cc//wwiitthh SSttdd--IIII wwoorrkk iinn
RRKKBB--PPLLCC sseecc
OOppeenn
TTeennddeerr
1111..0066..1155 SSiinnggllee 1155..0077..1155 0011 NNoo.. MM//ss BBhhaannwwaarr
LLaall BBiijjaarrnniiaa,,
VViillllaaggee--
RRaajjppuurraa,, PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,,
DDiisstttt.. NNaaggoouurr
((RRaajjaasstthhaann))
-- LL--11 DDyy..CCEE//CC//
JJUU//1188// 22001155--
1166//SSttdd..IIIIRR,,
ddttdd..
0066..0011..1166
MM//ss BBhhaannwwaarr LLaall
BBiijjaarrnniiaa,,
VViillllaaggee--RRaajjppuurraa,, PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,, DDiisstttt..
NNaaggoouurr
((RRaajjaasstthhaann))
667799..8844 llaaccss.. 1155..0033..1177
0088//22001177
3311..0033..1188
1188..0099..1155 WWoorrkk iinn
pprrooggrreessss
WWoorrkk
ddeellaayyeedd dduuee
ttoo nnoonn--
rreecceeiivviinngg ooff
CCRRSS
ssaannccttiioonn..
77.. JJUU//CCoonnsstt..//TT--
2255//22001155--
1166//SSttdd IIIIRR
PPrroovviiddiinngg ““IINN SSIITTUU””
GGlluueedd IInnssuullaatteedd JJooiinnttss
ooff GG--33 ((LL)) ttyyppee ffoorr 5522
kkgg//6600 kkgg rraaiillss iinn cc//ww
SSttddIIIIRR wwoorrkk iinn MMTTDD--
BBKKNN && RRKKBB--PPLLCC
sseeccttiioonn..
OOppeenn
TTeennddeerr
0055..0066..1155 SSiinnggllee 1100..0077..1155 0033 MM//ss TTiirruuppaattii
MMeettaall
FFaabbrriiccaattoorrss,,
11443333 SSeeccttoorr
1166,,
FFaarriiddaabbaadd--
112211000022
((HHaarryyaannaa))
•• DDyynnaammiicc
EEnnggiinneeeerrssKK
oottaa..
•• CCrreeaattiivvee
EEnnggiinneeeerrss
KKoottaa --
LL--11 DDyy..CCEE//CC//
JJUU//1177// 22001155--
1166//SSttdd..IIIIRR,,
ddttdd.. 0066..0011--
22001166
MM//ss TTiirruuppaattii MMeettaall
FFaabbrriiccaattoorrss,,
11443333 SSeeccttoorr 1166,,
FFaarriiddaabbaadd--112211000022
((HHaarryyaannaa))
332200..0011 llaaccss.. 3311..0033..1188 1177..1122..1155 WWoorrkk iinn
pprrooggrreessss
WWoorrkk
ddeellaayyeedd dduuee
ttoo nnoonn--
rreecceeiivviinngg ooff
CCRRSS
ssaannccttiioonn..
88.. NNWWRR//SSCC//MMTT
DD--
DDEEMMUU//CCiivviill--
331100116611880011
CCoonnssttrruuccttiioonn ooff aallll
CCiivviill WWoorrkkss aanndd aallll
aalllliieedd wwoorrkk ffoorr DDEEMMUU
mmaaiinntteennaannccee ffaacciilliittiieess
aatt MMeerrttaa RRooaadd
OOppeenn
tteennddeerr
3311..0077..1155 SSiinnggllee 0044..0099..1155 0088 ((EEiigghhtt)) •• MM//ss KKaalluu
RRaamm
CCoonnttrraaccttoorr
JJooddhhppuurr
((JJVV))
•• MM//ss
SSppaacceecchheemm
KKeerraarraamm
AAmmiitt ((JJVV))
JJooddhhppuurr..
•• MM//ss PPMMPP
IInnffrraatteecchh
PPvvtt LLttdd SSoollee
AADDII..
•• MM//ss BBhhaarraatt
SSuunn PPiippee &&
CCoonnsstt.. CCoo..
JJaaiippuurr..
•• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
HHiimmmmaatt
nnaaggaarr
•• MM//ss SShhrreeee
HHaarrsshhaa
CCoonnsstt
SSaannjjeeeevv
BBrrootthheerrss
((JJVV)) JJaaiippuurr
•• MM//ss TT..SS..RR..
MMaannuusshhrreeee
((JJVV))
HHyyddeerraabbaadd
LL--11 NNWWRR//SS&&CC//
CCAA--6688,, ddaatteedd
0055..0011..22001166
MM//ss PPrreemm FFaabbrriiccaattoorrss,,
MMoorriiyyaa,, CChhaannggooddaarr,,
AAhhmmeeddaabbaadd
1166..4477 CCrr.. 0066..0066..1177
3300..1100..1177
3311..0011..1188
1111..1122..1155 WWoorrkk iiss iinn
pprrooggrreessss
DDOOCC
eexxtteennddeedd
wwiitthh ttookkeenn
ppeennaallttyy..
99.. NNWWRR//SSCC//RRKK
BB--JJSSMM//CCiivviill--
33110033000000110000
44
LLNN--MMJJ sseecc.. --RRUUBBss iinn
lliieeuu ooff LLCCss ((1122 NNooss
LLCCss uunnddeerr PPiinnkk BBooookk
iitteemm NNoo.. 9933 ooff 22001155--
1166))
OOppeenn
tteennddeerr
0099..1122..1155 SSiinnggllee 1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss
RRaacchhaannaa--
SSNNCCCC JJVV
•• MM//ss JJaayy
JJaawwaann
CCoonnsstt.. CCoo
•• MM//ss SSaattiisshh
KKeerraa RRaamm
AAmmiitt
•• MM//ss
MMoohhaannllaall
MMaannaaggaannllaall
KKaakkrreecchhaa
•• MM//ss JJCCCC
IInnffrraa
•• MM//ss MM..HH..
KKhhaannuussiiyyaa
•• MM//ss RRaammaa
KKiisshhaann
•• MM//ss
RRaacchhaannaa--
SSNNCCCC JJVV
•• MM//ss JJaayy
JJaawwaann
CCoonnsstt.. CCoo
•• MM//ss SSaattiisshh
KKeerraa RRaamm
AAmmiitt
•• MM//ss
MMoohhaannllaall
MMaannaaggaannllaall
KKaakkrreecchhaa
•• MM//ss JJCCCC
IInnffrraa
•• MM//ss RRaammaa
KKiisshhaann
LL--11 DDyy..CCEE//CC//
JJUU//2233// 22001166--
1177//LLHHSS// LLNN--
MMJJ,, ddttdd..
1122..0077..1166
MM//ss MM..HH..KKhhaannuussiiyyaa,,
HHiimmaannttnnaaggaarr--338833000011
DDiisstt-- SS..KK..((GGuujjrraatt))
1122..7711 CCrr.. 0011..1111..1177
3311..0033..1188
1122..0055..1166 WWoorrkk iiss iinn
pprrooggrreessss
1100.. NNWWRR//SSCC//JJUU//
CCiivviill ––
33110033000000110000
PPPPRR--BBAARRAA sseecc-- RRUUBBss
iinn lliieeuu ooff LLCCss ((2222 NNooss..
LLCCss uunnddeerr PPiinnkk BBooookk
OOppeenn
tteennddeerr
0099..1122..1155 TTwwoo ppaacckkeett
ssyysstteemm
1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss RRaakkeesshh
CCoonnssttrruuccttiioo
nn CCoo.. JJVV
RRaajjkkoott
LL--11 NNWWRR//SS&&CC//CCAA
//7722//22001166--
1177//LLHHSS,, ddttdd
MM//ss SShhrreeee KKaarrnnii
TTrraaddeerrss,, BBiikkaanneerr
((RRaajjaasstthhaann)) 333344000011
2211..1199 CCrr.. 0011..1111..1177 1166..0055..1166 WWoorrkk
ccoommpplleetteedd
FFiinnaall bbiillll
ppaasssseedd
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
23
55 iitteemm NNoo.. 110033 ooff 22001155--
1166))
•• MM//ss RRaakkeesshh
CCoonnssttrruuccttiioo
nn CCoo.. JJVV
RRaajjkkoott
•• MM//ss DDRRAAIIPPLL
–– XXTTPPLL JJ..VV..
AAhhmmeeddaabbaadd
•• MM//ss
RRaacchhaannaa ––
BBhhaannwwaarr LLaall
BBiijjaarrnniiaa JJVV
NNaaggoouurr
•• MM//ss JJCCCC
IInnffrraapprroojjeecctt
ss PPrriivvaattee
LLiimmiitteedd,,
AAjjmmeerr
•• MM//ss MMHHKK
RRPPPPLL ((JJVV))
HHiimmaattnnaaggaarr
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttiioo
nn CCoommppaannyy
((JJVV)) HHiissaarr
•• MM//ss
DDRRAAIIPPLL ––
XXTTPPLL JJ..VV..
AAhhmmeeddaabbaa
dd
•• MM//ss
RRaacchhaannaa ––
BBhhaannwwaarr
LLaall BBiijjaarrnniiaa
JJVV NNaaggoouurr
•• MM//ss JJCCCC
IInnffrraapprroojjeecc
ttss PPrriivvaattee
LLiimmiitteedd,,
AAjjmmeerr
•• MM//ss MMHHKK
RRPPPPLL ((JJVV))
HHiimmaattnnaaggaa
rr
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttiioo
nn CCoommppaannyy
((JJVV)) HHiissaarr
0066..0077..1166
1111.. NNWWRR//SSCC//MMTT
DD--
BBKKNN//CCIIVVIILL--
33110033000000110000
22--RR
MMTTDD--BBKKNN sseeccttiioonn--
RRUUBB iinn lliieeuu ooff LLCCss,, ((1166
NNooss.. ooff LLCCss uunnddeerr PPiinnkk
BBooookk iitteemm NNoo.. 9977 &&
110044 ooff 22001166--1177))
OOppeenn
tteennddeerr
1177..0077..1166 TTwwoo ppaacckkeett
ssyysstteemm
1199..0088..1166 0044 ((FFoouurr)) •• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
HHiimmaattnnaaggaa
rr
•• MM//ss JJMMEESS ––
MMGGCC ((JJVV))
VV..PP..OO.. ––
NNaarrooddaarraa
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttiioo
nn CCoo.. ((JJVV)),,
HHiissaarr
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss JJMMEESS
–– MMGGCC
((JJVV))
VV..PP..OO.. ––
NNaarrooddaarraa
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttii
oonn CCoo..
((JJVV)),, HHiissaarr
LL--11 NNWWRR//SS&&CC//CCAA
// 7777 ddaatteedd
1155..0022..22001177
MM//ss MM..HH.. KKhhaannuussiiyyaa,,
HHiimmaattnnaaggaarr
11882233..4455 0066..0055..1188 1100..0011..1177 WWoorrkk iinn
pprrooggrreessss
1122.. NWR/SC/RK
B-JSM/Civil-
3103000100
3-R
RRKKBB--JJSSMM sseeccttiioonn-- RRUUBB
iinn lliieeuu ooff LLCCss,, (20 Nos.
LCs under Pink Book
item No. 98 & 108 of
2016-17).
OOppeenn
tteennddeerr
0033..0088..1166 TTwwoo ppaacckkeett
ssyysstteemm
0066..0099..1166 0044 ((FFoouurr)) •• MM//ss
RRaacchhaannaa ––
SSNNCCCC JJVV,,
JJooddhhppuurr..
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
SSuunnsshhiinnee
IInnffrraassttuucctthh
eerr ((JJVV)),,
HHiimmaattnnaaggaa
rr
•• MM//ss SSBB ––
JJaaggttaajjii
((JJVV)),, NNeeww
DDeellhhii ––
111100001188
••
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyyaa
,, SSuunnsshhiinnee
IInnffrraassttuucctt
hheerr ((JJVV)),,
HHiimmaattnnaaggaa
rr
•• MM//ss SSBB ––
JJaaggttaajjii
((JJVV)),, NNeeww
DDeellhhii ––
111100001188
LL--11 NNWWRR//SS&&CC//CCAA
// 7788 ddaatteedd
0055..0066..22001177
MM//ss RRaacchhaannaa –– SSNNCCCC
JJVV,, JJooddhhppuurr
22116622..3344 1133..0066..1188 1155..0011..1177 WWoorrkk iinn
pprrooggrreessss
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
24
1133.. 4103000010
06
NNWWRR//SSCC//RRUUBB//CCiivviill--
441100330000000011000066 ––
BBaarrmmeerr--MMuunnaabbaaoo
sseeccttiioonn -- RRooaadd uunnddeerr
bbrriiddggeess iinn lliieeuu ooff LLeevveell
CCrroossssiinnggss ((0077 NNoo.. LLCCss
uunnddeerr PPBB iitteemm NNoo..110000
ooff 22001166--1177))
OOppeenn
tteennddeerr
0066..1111..22001166 SSiinnggllee 0088..1122..1166 0044 ((FFoouurr)) •• MM//ss JJaaggttaajjii
IInnffrraassttrruucctt
uurree,, JJGG--
IIIIII//7733--AA,,
VViikkaassppuurrii,,
NNeeww DDeellhhii
111100001188
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyyaa
,,
HHiimmaattnnaaggaa
rr
•• MM//ss
BBhhaannwwaarrllaa
ll VViillll--
RRaajjppuurraa,,
PPoosstt
PPrreewwaarrii,,
DDiisstttt..
NNaaggoouurr
LL--11 DDyy..CCEE//CC//JJUU//
2255//22001177--1188//
LLHHSS// BBMMEE--
MMBBFF,, ddttdd..
1111..0088..22001177
MM//ss JJaaggttaajjii
IInnffrraassttrruuccttuurree,, JJGG--
IIIIII//7733--AA,, VViikkaassppuurrii,,
NNeeww DDeellhhii 111100001188
887755..7777 0022--0099--1188 -- -- NNOOCC ffrroomm
aarrmmyy iiss ssttiillll
aawwaaiitteedd..
1144.. NWR/SC/RU
B/Civil-
4103000100
7
NWR/SC/RUB/Civil-
41030001007
samdari-BBaarrmmeerr
sseeccttiioonn -- RRooaadd uunnddeerr
bbrriiddggeess iinn lliieeuu ooff LLeevveell
CCrroossssiinnggss ((1133 NNoo.. LLCCss
uunnddeerr PPBB iitteemm NNoo.. 7733
ooff 22001166--1177 && 0044 NNoo..
LLCCss uunnddeerr PPBB iitteemm NNoo..
110000 ooff 22001166--1177))
OOppeenn
tteennddeerr
0066..1111..22001166 TTwwoo ppaacckkeett
ssyysstteemm
0088..1122..1166 0044 •• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
HHiimmaattnnaaggaa
rr
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss JJMMEESS ––
MMGGCC ((JJVV))
VV..PP..OO.. ––
NNaarrooddaarraa
•• MM//SS
RRaammaakkiisshhaa
nn AAsshhookk
kkuummaarr ((JJVV))
220055,,
SSaarrddaarrppuurraa
JJUU..
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
••
LL--11 NWR/S&C/C
A/ 79 dated
19.07.2017
MM//SS RRaammaa kkiisshhaann
AAsshhookk kkuummaarr ((JJVV)) 220055,,
SSaarrddaarrppuurraa JJUU..
22224411..3333 0066..1100..1188 1100//22001177 WWoorrkk iinn
pprrooggrreessss
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
25
1155.. NWR/SC/RO
B/Civil-
4103000090
86
NWR/SC/ROB/Civil-
410300009086
construction of
complete ROB
including Approaches
in lieu of existing LC
No. C- 56 at JM: 77/2-
3 and C- 109 at KM:
145/9 – 146/0 on
SMR-BLDI section
OOppeenn
tteennddeerr
TTwwoo ppaacckkeett
ssyysstteemm
1100..0033..1177 0088 •• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
HHiimmaattnnaaggaa
rr
•• MM//ss
RRaacchhaannaa
AAnnkklleesshhwwaarr
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• LLaall CCoonnsstt..
CCoommppaannyy
•• MM//SS SSoonnaa
BBuuiillddeerrss--
RRCC PPaatteell JJVV
MMeehhssaannaa
•• RRaavvii iinnffrraa
bbuuiilldd
pprroojjeeccttss
PPvvtt.. LLttdd..
UUddaaiippuurr
•• RRaaddhhee
aassssoocciiaatteess
MMeehhssaannaa
•• VVPPRRPPLL--
RRBBIIPPLL
SSaammddaarrii JJVV
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss
RRaacchhaannaa
AAnnkklleesshhwwaa
rr
•• VVPPRRPPLL--
RRBBIIPPLL
SSaammddaarrii
JJVV
•• RRaaddhhee
aassssoocciiaatteess
MMeehhssaannaa
LL--11 - •• MM//SS SSoonnaa BBuuiillddeerrss--
RRCC PPaatteell JJVV
MMeehhssaannaa
33669999..1144 0044..0077..1199 -- -- WWoorrkk iinn
pprrooggrreessss
1166.. NWR/SC/RU
B/Civil-
4103000100
9
Merta Road - Bikaner
section - Road under
bridges in lieu of LC
(21 Nos. LCs under
Pink Book item No.
106 of 2017-18 & 02
Nos LCs under Pink
book item No.113 of
2017-18 )
OOppeenn
tteennddeerr
0044..0088..1177 TTwwoo ppaacckkeett
ssyysstteemm
1111..0099..1177 0033 MM//ss RRaacchhaannaa
CCoonnssttrruuccttiioonn
CCoommppaannyy,, AATT
&& PPOO
MMaakkttuuppuurr,,
TTaa.. UUnnjjhhaa,,
MMeehhssaannaa
((GGuujjrraatt))..
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss PPrraaggaatt
CCoonnsstt.. CCoo..
NNeeww DDeellhhii
LL--11 - MM//ss RRaacchhaannaa
CCoonnssttrruuccttiioonn
CCoommppaannyy,, AATT && PPOO
MMaakkttuuppuurr,, TTaa.. UUnnjjhhaa,,
MMeehhssaannaa ((GGuujjrraatt))..
55222255..2266 10.11.19 Work
awarded on
11.12.17
1177.. NWR/SC/RU
B/Civil-
4103000101
1
DNA-MTD & RTGH-
DNA section - Road
under bridges in lieu
of LC (20 Nos. LCs
under Pink Book item
No. 122 of 2017-18,
01 No LC under Pink
book item No. 112 of
2017-18 )
OOppeenn
tteennddeerr
0044..0088..1177 TTwwoo ppaacckkeett
ssyysstteemm
1111..0099..1177 0033 MM//ss RRaacchhaannaa
CCoonnssttrruuccttiioonn
CCoommppaannyy,, AATT
&& PPOO
MMaakkttuuppuurr,,
TTaa.. UUnnjjhhaa,,
MMeehhssaannaa
((GGuujjrraatt))..
•• MMeehhttaa
CCoonnsstt.. CCoo
KKaarrnnaall
•• MM//ss PPrraaggaatt
CCoonnsstt.. CCoo..
NNeeww DDeellhhii
LL--11 - MM//ss RRaacchhaannaa
CCoonnssttrruuccttiioonn
CCoommppaannyy,, AATT && PPOO
MMaakkttuuppuurr,, TTaa.. UUnnjjhhaa,,
MMeehhssaannaa ((GGuujjrraatt))..
55330066..0077 10.11.19 Work
awarded on
11.12.17
1188.. NWR/SC/RU
B/Civil-
4103000101
0
MTD-JU, PPR-BARA
section - RUB in lieu of
LC (19 Nos. LCs under
P B item No. 112 of
2017-18, 01 No LC
under Pb item No. 117
of 2017-18 )
OOppeenn
tteennddeerr
0044..0088..1177 TTwwoo ppaacckkeett
ssyysstteemm
1111..0099..1177 0022 MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
MM//ss PPrraaggaatt
CCoonnsstt.. CCoo..
NNeeww DDeellhhii
LL--11 - MM//ss SShhrreeee KKaarrnnii
TTrraaddeerrss,, BBiikkaanneerr ..
44993399..7744 0022..0011..2200 Work
awarded on
03.01.18
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
26
Dy. CE/C/II-JU
1 NWR/SC/
Thaiyat/
Civil-
31011180
2
Construction of all Civil
work & all other misc.
works between THM– Sanu
new BG line project (56.250
kms.).
Open
temder
11.09.15 Two packet
17.11.15 07 M/s SCC JV
PMP
Infratech, A-
Block, A-104,
Ganesh
Meridian,
Ahmedabad
4 Nos
M/s DRD MI JV
M/s Bhaniyana
Const. JV
M/S Apex
Termic PVT (JV)
M/S Ravi-HG
(JV)
L-1 NWR/SC
/CA/73 dt.
17.08.16
M/s SCC JV PMP
Infratech, A-Block, A-
104, Ganesh Meridian,
Ahmedabad
11733.94 Lakhs 22.03.18 27.04.16 Work in
progress
2 NWR/SC/
Thiyat/
Civil-
31911060
4
Work of modification of
existing rooms for office
set up at Jaisalmer under
Dy.CE(C)-II/ Jodhpur’s unit
Open
tender
04.03.16 Single 12.04.16 02 M/s B.S.
Constructions
, New Delhi-
110092
01
M/s
S.D.Builders
Jaisalmer
L-1
Dy.CE/C/
JU/CA/02,
dtd.
25.08.16
M/s B.S. Constructions,
New Delhi-110092
105.50 Lakhs 2266..0022..1177
3300..0099..1177
3300..1111..1177
3311..1122..1177
08.07.16 Work in
progress,
-
3 NWR/SC/
Thiyat/
Civil-
31911050
7-R
Providing “IN SITU” Glued
Insulated Joint in c/w.
Thaiyat Hamira–Sanu new
BG line project & Marwar
Jn.-Rani section in MJ-Rani
BG Patch Doubling project
Open
tender
27.12.16 Singal 02.02.17 5 M/s Creative
Engineers, F-
189, Road No.
5, Indraprasth
lnd Area, Kota
(Raj.) 324005
1.M/sDynamic
Engineers
2 M/s Kushal
Engineering
3 .M/s Tirupati
Metal
Fabricators
4. M/s Diamond
Steel Ind.
L-1 Dy.CE/C/
JU/CA04/
dtd.
18.08.17
M/s Creative Engineers,
F-189, Road No. 5,
Indraprasth lnd Area,
Kota (Raj.) 324005
173.15 Lakhs 30.05.19 - - -
4 NWR/SC/
FL-DNA/
Civil-
41015200
1
Construction of Doubling
work between Phulera –
Degana (108.75 Kms.) on
Phulera-Degana Railway
line.
EPC 13.12.16 EPC 02.08.17 5 M/s Punj
Lloyd Limited,
Plot No.78,
Institutional
Area,
Sector-32,
Gurgaon
PIN-122003
Haryana
1. M/s IRCON
International
Limited,
2. Jaiprakash
Associates
Limited,
NOIDA
3. Larsen &
Toubro Limited
MUMBAI
4. AFCONS
Infrastructure
Limited
MUMBAI
L-1 NWR/S7C/
CA/80
dt.28.8.17
M/s Punj Lloyd Limited,
Plot No.78, Institutional
Area,
Sector-32, Gurgaon
PIN-122003 Haryana
477.50
Cr.
13.03.20 26.9.17
( Appointed
date)
Work
awarded on
09.08.2017.
Survey work
under
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27
Dy. CE/C/BKN
1 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR
Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
Yes 173-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat
Rs 534.82 lakhs
01.06.12 05.01.12 30.06.16 Contract terminated.on 10.06.2016. Final variation in process.
2 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh -
Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project
Open tender
20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
Yes 178-NWR/Dy CE/C-I/BKN Dt 18.08.2012
M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003
Rs 531.61 lakhs
25.12.12 24.05.12 05.06.17 Final variation under process.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
28
3 Const/BKN/09(R)/2011-12/BKN-
SDLP-RTGH-SRDR Dt 13.01.2012.
Construction and modification of station buildings, platform, platform shelter level
crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
20.01.12 single 28.03.12 04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 177-NWR/Dy CE/C-II/BKN Dt
07.08.12.
M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)
Rs 647.31 lakhs
03.03.13 06.07.12 31.07.16 Final bill passed on 16.10.2017
4 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012
Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project
Open tender
26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012
M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur
Rs137.94 lakhs
28.12.12 07.09.12 31.03.14 Contract terminated. Final variation in process.
5 Tender No. NWR/SC/Sadulpur-Bikaner/Civil-412140107 Dated 29.10.2015
Earthwork in cutting and filling, Construction of minor Bridges/ Road under Bridges, Limited Height Subway in lieu of LC No 8, toe wall, pitching, Rooms for S & T structure at takeoff point and other ancillary works from takeoff point on Ratangarh- Bikaner section to Km 1/500, in Ratangarh to Sardarshahar section in connection with Ratangarh- Sardarshahar gauge conversion project
Open tender
02.11.15 Two packet
04.12.15 07 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 31/NWR/Dy CE/C/BKN/2015-16 Dated 31.03.2016
M/S BPL-MCPL (JV), A/9, Kumud Apartment, Near Amco Bank, Off. C.G.Road, Navrangpura, Ahmedabad-380009
Rs 1084.47 lakhs
01.11.16 25.02.16 15.08.17 Final bill under technical check.
6 Tender No. NWR/SC/BNW/Civi
l-412161111 dated 02.01.16
Earthwork in embankment, construction of minor bridge & S & T
structure, supplying of stone ballast and linking of track and other ancillary works in connection with “Provision of Bhiwani Bye Pass Railway line.
Open tender
06.01.16 single 10.02.16 05 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 32/NWR/Dy CE/C/BKN/2016-17
Dated 30.08.2016
M/S Shree Shyam Engineering Co.,29, Poonia Colony, Churu (Rajasthan)
Rs 136.08 lakhs
01.11.16 02.05.16 30.09.17 31.01.18
work is in progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
29
7 Tender No. NWR/SC/EI at
BNW, STD & LGH/2016-17/Civil-412160503 dated 05.07.2016
Providing in Situ Glued Insulated Joints of G-3 (L) type for 52 kg/60 kg rails as per RDSO
drawing No. T-671/T-2572 and confirming to the specfication as per instructions contained in Manual for Glued insulated rails joints in connection with EI works at Bhiwani and Satrod and RRI work at Lalgarh and at any other location in the jursidiction of Bikaner Construction unit.
Open tender
08.07.16 single 10.08.16 04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes PG yet to be submitted.
M/S Tirupati Metal Fabricators, 1433, Sector -16, Faridabad
(Haryana)-121002
Rs 102.58 lakhs
23.04.17 24.09.16 23.03.18 work is in progress.
8 Tender No. NWR/SC/Sadulpur-Bikaner/ 2016-17/ Civil - 4121401
02 dated 22.07.2016
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc. and other miscellaneous works between
Ratangarh Junction cabin km 0.00 at km 329/6-7 on Ratangarh – Bikaner section) to Sardarshahar (including) km 46/750 in connection with Ratangarh- Sardarshahar gauge conversion project.
Open tender
24.07.16 single 29.08.16 04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes PG yet to be submitted.
M/S Gurukrupa Enterprises, 2A,2nd Floor, Navnath Soc.2,B/H, Shradhadeep Soc.,Sharda School Road , Singanpor-Causway
Road, Surat-395004
Rs 784.49 lakhs
27.03.17 15.10.16 15.11.17 15.01.18
work is in progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
30
CE/C/HQ-JP
Dy. CE/C/DO
1
DO
/GG
C/N
L/1
8
Construction of Broad
Gauge Formation & Minor
Bridges from Chainage
41000.00 to 45000.00
between Dausa and Lalsot in
connection with Dausa-
Gangapur City New Broad
Gauge line project.
Op
en
te
nd
er
Single packet
system
14
/11
/20
07
Yes NWR/S&C/CA/9
7 dated
03/03/2008
M/s Atlanta-
ARSS (JV)
Bhubneshwa
r (Orissa)
17.95 Crore 30/07/09
extended
upto
30/06/2014
14/03/08 - Work short
closed vide
HQ’s letter
dated
18/06/2014.
Final
measuremen
ts under
process
2
DO
/GG
C/N
L/2
1
Construction of BG
formation and Minor Bridge
from chanaige 45000 to
60000 bet. Lalsot and
Gangapur City in connection
with DO-GGC New B G line
Project
O
pe
n t
en
de
r
24
/09
/20
07
Single Packet
system
02
/11
/20
07
3 Yes NWR/S&C/CA/9
5 dated
18/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
8.41
Crores
20/03/09
Extended
upto
30/06/15
15/03/08 - Contract has
been short
closed. Final
bill under
process
3
DO
/GG
C/N
L/2
2
Construction of BG
formation and Minor Bridge
from chanaige 60000to
75000 bet. Lalsot and
Gangapur City in connection
with DO-GGC New B G line
Project
Op
en
te
nd
er
24
/09
/20
07
Single Packet
system
02
/11
/20
07
3 Yes Dy.
CE/C/I/JP/CA/17
dated
29/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
6.71 Crores 10/03/09
Extended
upto
30/06/2014
10/03/08 - Final bill has
been
submitted to
Account..
4
DO
/GG
C/N
L/3
1
Construction of ROBs across
Railway track at chainage
37034,83925 & 37925 and
drainage over pass at
chainage 36960 & 37520
between salempura to
Udaikalan station
inconnection with Dausa-
Gangapurcity new BG line
project Op
en
te
nd
er
Single packet
system
16
/02
/20
10
11 - - Yes NWR/S&C/CA/1
05 dated
22/11/2010
M/s Shree
Ram Kripa
Construction
Jaipur
13.44 Crore 29/02/2012.
Extended up
to
30/04/2016
- - Final
variation is
under finance
vetting.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31
5
DO
/GG
C/N
L/3
0
Construction of single line
13 standard straight
alignment tunnel in soil and
rock including cut and cover
portion between chainage
38/720 to 40/840 including
side drain and other
approaches of tunnel
between Didwana- Lalsot
Railway station in
connection with Dausa-
Gangapurcity new BG line
project. Op
en
te
nd
er
Single packet
system
27
/07
/20
09
12 - - Yes NWR/S&C/CA/1
06 dated
29/12/10
M/s Valecha-
Transtonelstr
oey (J/V)
Mumbai
53.02 Crore 27/09/2012.
Extended
upto
31/12/2015
- - Work
terminated
on
07/07/2015.
Final bill is
under
technical
check..
6
DO
/GG
C/N
L/4
0
Laying and linking of BG
track and transportation of
P.Way material, PSC
sleepers etc between
Dausa- Deedwana section in
connection with Dausa-
Gangapurcity new BG line
project. Op
en
te
nd
er
28
/03
/20
11
Single packet
system
18
/05
/20
11
6 - - Yes
Dy.CE/C/DO/CA/
56 dated
18/10/11
M/s Goel
Brothers Rail
Infra Pvt.
Ltd., Bareilly.
5.66 Crore 01/08/2012.
Extended
upto
31/10/2014
13/09/11 Work short
closed.
7
DO
/GG
C/N
L/1
0(R
&
C)R
Construction of broad gauge
formation from chainage
15000 to 28000 in
connection with Dausa
Gangapurcity new line
project(Risk & cost tender).
Op
en
te
nd
er
Single packet
system
11
/01
/20
13
2
- - Yes Dy.CE/C/DO/CA/
68 dated
16/04/13
M/s MCD
Pvt. Ltd., &
Aastha
Construction
Co.(JV),
Jaipur
3.30 Crore 05/07/13
Extended
upto
15/10/2014
08/04/2013 - Completed.
Final
measuremen
ts under
process.
8
DO
/GG
C/N
L/6
0R
Construction of minor
bridges from chainage 00 to
30000 between Dausa-
Lalsot in connection with
Dausa- Gangapurcity new
BG line project
op
en
te
nd
er
Single packet
system
20
/11
/20
13
3 - - yes Dy.CE/C/DO/CA/
74 dated
14/03/2014
M/s Shree
Ram Kripa
Construction
s, Jaipur
Rs.4.74 Crore 10/06/2014
Extended
upto
31/12/2015
26/12/2014 Final bill
passed
9
DO
/GG
C/N
L/5
3
Construction of 3 nos Low
Over Pass at LC No. 4, 26 &
27 on Dausa- Gangapurcity
secton
Op
en
te
nd
er
Two packet
system
06
/09
/13
4 - - Yes NWR/S&C/CA/1
36 dated
03/06/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.10.44 Crore 08/04/15
extended
upto
31/12/2017
further
extension
under
process
- - Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
32
10
DO
/GG
C/N
L/5
6 Construction of Road Over
Bridge at LC No. 5B on
Dausa- Gangapurcity
section
Op
en
te
nd
er
Two packet
system
06
/09
/13
6 - - Yes NWR/S&C/CA/1
34 dated
16/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.43 Crore 12/07/15
extended
upto
30/05/17
- - Final bill
passed.
11
DO
/GG
C/N
L/5
7
Construction of Road Over
Bridge at LC No. 24B on
Dausa- Gangapurcity
section
Op
en
te
nd
er
Two packet
system
06
/09
/13
4 - - Yes NWR/S&C/CA/1
35 dated
19/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.75 Crore 09/07/15
Extended
upto
30/09/18
- - Agreement
executed.
Work held up
for want of
funds and
approval of
MoRTH
12
AW
R-B
KI/
Do
ub
lin
g/T
/2
Earthwork in bank/cutting
including blanketing
material, construction of
major/minor bridges
including drop/curtain
walls, LHS, construction
S&T structures, platform
walls, PF shelters, FOB,
water huts, Staff quarters
etc. supply of stone ballast
and dismantling of existing
BG track, laying and linking
of Broad gauge main line,
loop lines including points
and crossings of various
yards spreading of ballast,
tamping of track
transportation of P. Way
material and other ancillary
works between Alwar-
Bandikui section in
connection with AWR-BKI
Doubling project.
Op
en
Two packet
system
21
/03
/20
16
8 6 2 Yes
NWR/S&C/CA/1
57 dated
05/09/2016
M/s NG
Project Ltd.-
M/s. Deem
Construction
Co. Pvt. Ltd
(JV), Jaipur
Rs.118.24
Crore 17/05/18 - -
Work in
progress.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33
13
NW
R/S
C/D
O-
GG
C/C
IVIL
/51
41
10
46
8
Supplying and stacking
machine crushed stone
ballast in stacks as per
Railway’s specifications
between Dausa &
Gangapurcity stations in
connection with Dausa-
Gangapurcity new line
project o
pe
n
Two packet
system
31
/08
/16
2 - 2 Yes
Dy.
CE/C/DOCA/81
dated
23/12/2016
M/s J.K.
Construction
Co., Nokha,
Distt Bikaner
Rs.14.33 Crore 06/04/18 - - Work in
progress
14
NW
R/S
C/D
O-G
GC
/CIV
IL/5
14
11
18
04
Construction of balance
work of single line BG
standard straight
alignment tunnel in soil
and rock including cut &
cover portion, side
drains, protection works
on approaches of tunnel
and other ancillary
works from chainage
38600 to 40900 between
Didwana & Lalsot
Railway stations in
connection with Dausa-
Gangapurcity new BG
line project
Op
en
Two Packet
system
20
/06
/20
16
5 3 2 Yes
NWR/S&C/CA.
165 dated
01/02/17
M/s TCL-
UTM JV,
Gurgoan
Rs.54.46 Crore 22/03/18 - - Work in
progress
15
NW
R/S
C/L
HS
/CIV
IL/5
14
30
00
10
01
Construction of kimited
Height sub-way (08 nos)
in lieu of level crossings
in Dausa- Gangapurcity
new line section in
connection with
elimination of level
crossings
Op
en
Two Packet
system
07
/09
/20
16
8 5 3 Yes
Dy. CE/
C/DO/CA/86
dated 10/03/17
M/s JMES-
KDC-JPIS(JV),
Beawar,
Ajmer
Rs.10.00 Crore 04/02/18 - - Work in
progress
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
34
16
NW
R/S
C/D
O-G
GC
/CIV
IL/5
14
11
02
01
Misc. balance works like
finishing work of
quarters, station
buildings, platforms and
construction of LHS
providing platform
covering, cess repairing,
circulating area etc.
between Dausa &
Deedwana stations in
connection with Dausa-
Gangapurcity new line
project
Op
en
Two Packet
System
13
/10
/20
16
7 5 2 Yes
Dy. CE/
C/DO/CA/83
dated 28/01/17
M/s. MCDPL-
Sunrise Infra
Project (JV),
Ajmer Road,
Jaipur
Rs.9.70 Crore
15/05/17
Extended up
to 31/12/17
further
extension
under
process
- - Work in
progress
17
NW
R/S
C/A
lwa
r-
Ba
nd
iku
i/C
ivil
/51
41
50
80
3-R
Flash butt welding of
60/ 53kg New/SH
(72/90UTS) Rail joints
by using mobile flash
butt welding plant in
connection with Alwar-
Bandikui and Dausa-
Gangapurcity new line
project.
Op
en
te
nd
er
Two packet
system
28
/10
/20
16
1 1 0 Yes
Dy. CE/
C/DO/CA/85
dated 06/03/17
M/s Railtech
Infraventure
Pvt. Ltd.
Allahabad
Rs.11.15 Crore 15/05/18 - - Work in
progress
18
NW
R/S
C/D
O-G
GC
/CIV
IL/5
14
11
08
69
-R Balance work of laying
& linking of Broad
Gauge main line loop
lines including points &
crossings in yards,
spreading of ballast,
tamping of track
transportation of P-Way
material and other
ancillary works between
Dausa- Gangapurcity
new line project
Op
en
Single packet
system
23
/11
/20
16
- - - Yes
Dy. CE/
C/DO/CA/84
dated 17/02/17
M/s P.C.
Sharma,
Noida.
Rs.3.93 Crore
05/06/17
Extended
upto
31/10/17
- -
Work
completed.
Final
measuremen
ts under
process
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
35
19
NW
R/S
C/D
O-G
GC
/CIV
IL/5
14
11
01
70
Balance earthwork and
blanketing work
including side drain,
trolley refuges pitching
diversion road etc. from
chainage 67400 to
92670 between Piplai
village and
Gangapurcity in
connection with Dausa-
Gangapurcity new line
project
Op
en
Two packet
system
17
/04
/20
17
2 1 1 Yes
M/s. KB-Shiv
Om (JV), New
Delhi.
Rs.13.60 Crore 20/06/18 - - Work in
progress
20
NW
R/S
C/R
E-J
P/C
ivil
/51
43
00
90
5 Construction of ROB at
LC No. 69 on RE-JP
section
Op
en
Single packet
system
09
/10
/20
17
- - - Yes
M/s Punia
Construction
Co., Hisar.
Rs.8.34 Crore 22/11/18 - - Agreement is
progress
21
NW
R/S
C/B
KI-
AW
R/C
ivil
/51
43
01
00
4 Construction of Limited
Height Subway in lieu
of existing level crossing
between Alwar-
Bandikui station of
Jaipur- Rewari section in
connection with
elimination of level
crossings (20 nos)
Op
en
Two packet
system
30
/08
/20
17
4 4 0 Yes
Sanjeev-
Bharat (JV),
Jaipur
Rs.29.84 Crore 29/04/19 - -
Agreement is
under
process.
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
36
22
NW
R/S
C/D
O-G
GC
/Civ
il/5
14
11
08
73
Laying and linking of
Broad gauge main line,
loop lines including
points and crossings in
yard, spreading of
ballast, tamping of track
transportation of P-ay
materials and other
ancillary works between
Didwana &
Gangapurcity stations
and at Baniyana &
Arnya Kala Salempura
stations in connection
with Dausa-
Gangapurcity new line
project.
Op
en
Two Packet
system
11
/10
/20
17
3 1 2 Yes
M/s Laxyo
Energy
Limited,
Ratlam
Rs.14.67 Crore 27/03/19 - -
Agreement is
under
process.
23
NW
R/S
C/D
O-G
GC
/Civ
il/5
14
11
01
74
Balance earthwork and
blanketing work
including side drains,
trolley refuges, pitching,
toe wall etc. from
chainage 36000 to
45000 between Didwana
and Lalsot stations in
connection with Dausa-
Gangapurcity new line
project.
Op
en
Two Packet
system
25
/10
/20
17
5 3 2 Yes
M/s Varaha
Infra Limited,
Jodhpur
Rs.34.03 Crore 26/03/19 - -
Agreement is
under
process
24
NW
R/S
C/D
O-G
GC
/Civ
il/5
14
11
02
77
Balance work of minor
bridges, Road Under
Bridge, like PSC slabs,
bed blocks, returns,toe
wall, pitching, drop &
curtain wall, height
gauge, road work etc.
and construction of
Limited Height Subway
between Didwana to
Gangapurcity stations in
connection with Dausa-
Gangapurcity new Line
Project
Op
en
Two Packet
System
27
/10
/20
17
2 1 1 Yes
M/s. Lall
Construction
Co. Delhi
Rs.46.41 Crore 26/06/19 - -
Agreement is
under
process
STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF JANUARY, 2018 (Rs. 1 Crore above)
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
37
For CAO/C/JP
25
NW
R/S
C/D
O-G
GC
/Civ
il/5
14
11
01
75
Balance earthwork and
blanketing work
including side drains,
trolley refuges, pitching,
toe wall etc. from
chainage 45000 to
67400 between Lalsot
and stations
Op
en
Two Packet
system
27
/10
/20
17
3 1 2 Yes
M/s
Meenesh
Contractor &
Developers
Pvt. Ltd.,
Jaipur
Rs.10.35 Crore 19/12/18 - -
Agreement is
under
process.
NW
R/S
C/D
O-G
GC
/Civ
il/5
14
11
06
76
Miscellaneous works
like construction of
station buildings,
providing FOB, platform
covering, circulating
area, balance work of
platforms etc. from
Lalsot to Gangapurcity
in connection with
Dausa-Gangapurcity
New Line Project.
Op
en
Two Packet
system
27
/10
/20
17
6 3 3 Yes
M/s MCDPL-
Surnrise Infra
(JV), Jaipur
Rs.17.95 Crore 19/03/19 - -
Agreement is
under
process.