monthly coal price report
TRANSCRIPT
7/30/2019 Monthly Coal Price Report
http://slidepdf.com/reader/full/monthly-coal-price-report 1/3
April 26, 2013
India imported around 125-130 mil-lion tons of coal in FY 2013
Increasing demand for coal in the country forced Indian
buyers to import more coal in 2012-2013 as domestic
supply did not match total demand.
During the FY 2013, nearly 127.25 MnT of coal has been
imported (i.e. April 2012 – March 2013), as per Indian
custom data against 105 million tons in 2011-2012
Coal demand for the year 2013-14 is estimated at 769.7
MnT and the total Indian coal production is estimated
to be 604.6 MnT (including captive). Thus, the esti-
mated gap of 165.14 MnT of coal will need to be met
through imports which is about 30% more compared to
current import.
Non-Coking Coal Market remains Stable
Prices for Indonesian material remain at same level due
to booked shipments till May. "Movement in prices (up
and down) will be seen after May as Indonesia is fulfill-
ing the supply orders till May end at same price level",
said an importer based in Mumbai.
Current price offers for RB1 (South Africa) is at $80/MT
(FoB Richards Bay ), whereas Indonesian 3800 GAR is at
$37 and 4200 GAR is at $43/MT respectively. Supramax
freight charge from Indonesia (South Kalimantan) re-
mains stable at $12/MT for ECI and $14.5/Mt for WCI.
Spot HCC prices remain downward Spot metallurgical coal prices in Asian market continues to
decline due to cautious Indian and Chinese buyers amid
good supply from Australia.
Low buying interest in the market is seen with small vol-
umes being purchased by the end users of the material, saidsources. "Demand is not impressive, but it’s moving slowly", said a source based in Singapore.
Current price for Premium Low Volume is at $148/MT (FoB Australia) converting to $166/MT CFR India. Whereas, HCC 64 mid
volume is at $132/MT FoB. Freight charge from Australia to India is at around $18/MT on panamax basis.
Global Non-Coking Coal Prices
Origin Destination Grade FOB Avg. CNF
Port Port (in kcal) GCV ($/MT) Freight ($/MT)
Indonesia ECI 3800 GAR 37 12.00 49.00
Indonesia WCI 4000 GAR 40 14.50 54.50Indonesia WCI 4200 GAR 43 14.50 57.50
South Africa ECI 6000 NAR 80 18.00 98.00WCI - West Coast India
ECI - East Coast India
0.00
0.00
0.39
0.55
0.00
0.60
0.00
0.08
0.30
0.22
2.37
1.13
0.49
0.26
0.65
0.03
0.58
0.46
0.21
3.49
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Mundra
KRISHNAPATNAM
PARADIP
VIZAG
DAHEJ
GOA
Kandla
JAIGARH
HALDIA
OTHERS
STEAM COKINGQtyin million tons
I N D I A N
P O R T S
Portwise Coal Imports- March'13
Global Coking Coal Index Prices
Particular (FOB Australia) in $/MT
24-Apr 2 Week 4 week
Platts Premium Low Vol 148.00 153.00 158.50
Platts HCC 64 Mid Vol 132.00 139.00 143.00
7/30/2019 Monthly Coal Price Report
http://slidepdf.com/reader/full/monthly-coal-price-report 2/3
April 26, 2013
Growing Imported Coal Market in India
Vesse Freig tLoad Discharge Cargo Current (USD/MT) Previous (USD/MT) Change
Port Port Qty (22-04-2013) (15-04-2013)
SUPRAMAX
Taboneo (Indonesia) Chennai 50,000 MT 11.30 11.20 0.1
Taboneo (Indonesia) Navalakhi 53,000 MT 13.60 13.60 0.0
Richards Bay (S.Africa) Kandla 53,000 MT 20.50 21.60 -1.1
Richards Bay (S.Africa) Chennai 50,000 MT 20.00 21.10 -1.1
Richards Bay (S.Africa) Paradip 53,000 MT 20.00 21.20 -1.2
PANAMAX
North Pulau Laut(Indonesia) Mundra 71,500 MT 9.80 9.60 0.2
North Pulau Laut(Indonesia) Goa 71,500 MT 10.00 9.90 0.1
North Pulau Laut(Indonesia) Dahej 68,000 MT 10.70 10.70 0.0Richards Bay (S.Africa) Paradip 68,000 MT 19.20 19.20 0.0
Richards Bay (S.Africa) Mundra 71,500 MT 16.50 16.50 0.0
Richards Bay (S.Africa) Goa 71,500 MT 16.60 16.70 -0.1
Richards Bay (S.Africa) Dahej 68,000 MT 18.10 18.20 -0.1
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
Q T Y ( i n m i l l i o n t o n s )
India's Coal Import
Coking Coal
Thermal Coal
Widening demand-supply gap is continuously encouraging im-ports in the country. At present, India ranks fourth in coal im-
ports and the major sources are Indonesia, Australia and South
Africa. Canada, Mozambique and USA. India’s coal production has increased from ~554 million tons (MnT) in 2011-12 to ~557 MnT in 2012-13 (an increase of 0.5%). On
the other hand, demand for coal has grown at CAGR (Compound Annual Growth Rate) of more than 7% in the last decade and has
reached around 696 MnT (2011-12) as against the production growth of ~5%. It is further anticipated that coal production will grow
at a CAGR of around 7-9% during 2013-14. According to the report of the Working Group of Coal and Lignite for the 12th Five Year
Plan, coal demand in India is projected to grow at a CAGR of 7.1% till 2016-17 and reach 980.5 MnT.
Year Supply Demand GAP
2006-07 430.8 463.9 33.1
2007-08 457 504.3 47.3
2008-09 490 546.1 56.1
2009-10 514.5 582.3 67.8
2010-11 536.1 624.8 88.7
2011-12 554 696 142
2012-13 (E) 580 772.8 192.8
2012-17 (XII Plan) 759.6 1,000-1,050 250-300
(Source: Working Group Report MOC, Govt. of India)
Demand-Supply Gap
7/30/2019 Monthly Coal Price Report
http://slidepdf.com/reader/full/monthly-coal-price-report 3/3
April 26, 2013
Raipur:#301, Jeevan Parisar,
Rajeev Nagar, Behind Crystal Ar-cade, Raipur (C.G) - 492 007,
IndiaTel: +91 771 2284888
Kolkata:5th Floor, Vishvakarma Building,
86,Topsia Road, South-WestBlock, Kolkata (W.B) - 700 046,
IndiaTel: +91 33 22852063
Our Contact Centers
This publication is for information purposes only. The information contained in this document has been compiledfrom sources believed to be reliable. SteelMint cannot be made liable for any loss no matter how it may arise. Therecipient of this report must make its own independent decisions regarding any product or items mentioned herein.
©SteelMint 2010-2013. All rights reserved. No part of this publication (text, data or graphics) may be reproduced,stored in corporate data retrieval systems or transmitted in any form without obtaining SteelMint's prior written
consent.
Vesse s expecte at Major Ports as on Apri 26,2013
Name of the Vessel ETA / Arrival Cargo Qty (MT) Receiver PORTVizag
MV.DORIC LIBERTY 41390 STEAM COAL 78750 - -
MV.STX GLOBAL 41392 COKING COAL 79892 - -
MV.MALAVIKA 41392 COKING COAL 44656 - -
MV.OCEAN LIBRA 41393 COKING COAL 79000 - -
MV.SPAR TAURUS 41394 STEAM COAL 53000 GANDHAR -
MV.STX CLOVER 41400 COKING COAL 79043 JAYASWAL NECO -
KRISHNAPATNAM
MV NAVIOUS STELLAR 26.04.13 S.COAL 161749 INDIA CEMENTS,BHATIA RICHARDS BAY
MV SILVER FREN 27.04.13 COAL - - -
MV NIGHT HWAK 27.04.13 S.COAL 55000 ARS METALS LTD INDONESIA
MV CAPE BRITANNIA 28.04.13 S.COAL 165000 INDIA,PARASHKTI,KCP,MADRAS CEMENTS RICHARDS BAY
MV GALVESTON 30.04.13 S.COAL 30000 RENUKA ENERGY. INDONESIA
SOUTHERN HARMONY 30.04.13 S.COAL 165000 ADANI INDONESIADHAMRA
M.V.CAPE PEONY 26.04.2013 S.COAL 150000 VISA -
M.V.HOUHENG3 27.04.2013 S.COAL 150000 STEMCORE
M.V.FRONTIER QUEEN 28.04.2013 C.COAL 150000 TATA STEEL LTD
M.V.AMIS WISDOM 3 03.05.2013 C.COAL 33000 TATA STEEL LTD
M.V.PRONOI R 04.05.2013 C.COAL 54973 BHUSHAN STEEL LTD
PARADIP
MV.ATLANTIC HORIZON 27.04.13 H.C.COAL 30000 SAIL
MV.SHROPSHIRE 29.04.13 S.COAL 55000 MMTC/KNOWLEDGE MUARA SABAK
MV.MEDI IMABARI 30.04.13 S.COAL 33000 MMTC/CEPL
MV.CONTI OPAL 01.05.13 S.COAL 33000 MMTC/CEPL
MV.TAN BINH 22 05.04.13 A.COAL 5999 IMFA CAMPHA PORT,.VIETNAM
HALDIA
MV. TRADE WILL 26.04.13 C.COAL 20000 MT SAIL NORFOLK
MV. NAVIOS KYPROS 26.04.13 PCI COAL 16000 MT SAIL AUSTRALIA
MV. ASTRA PERSUES 26.04.13 STEAM COAL 21700 MT MMTC LTD INDONESIA
MV. SHI ZI SHAN 26.04.13 C.COAL 20000 MT ENNORE COKE AUSTRALIA
MV. ANGLE STAR 29.04.13 C.COAL 30457 MT VITHOBA GLOBAL GLADSTONE