MONTEREY PIPELINE & PIPE BRIDGE
CRAIG SMITH, PE - AECOM
LAWRENCE TAM, PE - AECOM
TIM O’HALLORAN, PE – CALIFORNIA AMERICAN WATER
AGENDA
1. A little History
2. Monterey Area Water Providers
3. Monterey Peninsula Water Supply Project
4. Monterey Pipeline
5. Hwy 68 Pipe Bridge
6. Recognition
7. Questions
A LITTLE HISTORY, 1 OF 2
• ~3300 years ago: Esselen tribal settlement in the region.
• 1600-1700s: European colonialists and missionaries arrive.
• 1921: San Clemente Dam
• 1949: Los Padres Dam
• 1966: California American Water is created.
• 1975: CPUC orders a moratorium on new water hookups on the Peninsula.
• 1979: Environmentalists and government officials focused on conservation and restoration of the Carmel River and its ecology.
• 1994: The U.S. Army closes down Fort Ord.
• 1995: SWRCB issues Order 95-10, requiring Cal Am to begin conservation, pursue a legal water source and ease pressure on the Carmel River.
A LITTLE HISTORY, 2 OF 2
• 2010: Regional Water Project organized.
• 2012: Monterey Peninsula Water Supply Project (MPWSP) organized.
• 2015: San Clemente Dam removal complete.
• Sept. 2018: CPUC approves Cal Am’s plan to build a desalination plant.
• Nov. 2018: Measure J passes, directing the MPWMD to acquire control of the Cal Am-owned water system “if and when feasible.”
• Oct. 4, 2019: Pure Water Monterey wastewater recycling plant opens.
• March 2020: CCC is scheduled to vote on Cal Am’s permit.
• Dec. 31, 2021: The cease and desist deadline for Carmel River pumping.
CALIFORNIA AMERICAN WATER - MONTEREY
MONTEREY AREA WATER PROVIDERS
MONTEREY ONE WATER RECYCLED WATER
SEASIDE GROUNDWATER BASIN AQUIFER STORAGE & RECOVERY (ASR)
MONTEREY PENINSULA WATER SUPPLY PROJECT (MPWSP) OVERVIEW
COMBINING NEW FACILITIES WITH EXISTING FACILITIES
CAW Desal Plant
Wastewater flows
MRWPCA WWTP
GWR ADVANCED TREATMENT
Growers
GWR ASR Injection
Wells
Seaside Groundwater
Basin
CAW Water Distribution System
CAW Seaside
Wells (non-ASR)
Seaside Monterey
Pacific Grove
Pebble Beach
Carmel Carmel Valley
CAW Carmel River Wells
CAW Water Distribution
System
Forest Lake Reservoirs
Crest Tank & 16” Pipeline
36” Transfer Pipeline
Monterey (ASR) Pump Station
MPWSP GWR ASR SYSTEM SCHEMATIC BASELINE SCHEMATIC
~560’ HGL
~435’ HGL
~305’ HGL
Existing PRV Set ~310’ HGL
42”
Sup
ply
Pip
eli
ne
Slant Well Intake System
Future 5-6
Existing Wells 1-4
CAW ASR Injection/Extraction
Carmel Valley Pump Station
Bri
ne
Pip
elin
e
MRWPCA Existing Outfall
Salinas Valley
Return
OUTFALL MIXING CAMBER
1
CAW Desal Plant
GWR ADVANCED TREATMENT
GWR ASR Injection
Wells
Seaside Groundwater
Basin
CAW Water Distribution System
CAW Seaside
Wells (non-ASR)
Seaside Monterey
Pacific Grove
Pebble Beach
Carmel Carmel Valley
CAW Water Distribution
System
Forest Lake Reservoirs
MPWSP GWR ASR SYSTEM SCHEMATIC INJECTION WITH MP&PS
~435’ HGL
~300’ HGL
Monterey (ASR) Pump Station
36” Transfer Pipeline
Future 5-6
Existing Wells 1-4
CAW ASR Injection/Extraction
42”
Sup
ply
Pip
eli
ne
Slant Well Intake System
Carmel Valley Pump Station
CAW Carmel River Wells
4
Crest Tank & 16” Pipeline
~560’ HGL
Existing PRV Set ~310’ HGL
CAW Desal Plant
GWR ADVANCED TREATMENT
GWR ASR Injection
Wells
Seaside Groundwater
Basin
CAW Water Distribution System
CAW Seaside
Wells (non-ASR)
Seaside Monterey
Pacific Grove
Pebble Beach
Carmel Carmel Valley
CAW Water Distribution
System
Forest Lake Reservoirs
MPWSP GWR ASR SYSTEM SCHEMATIC EXTRACTION WITH MP&PS
~435’ HGL
~300’ HGL
Monterey (ASR) Pump Station
36” Transfer Pipeline
Future 5-6
Existing Wells 1-4
CAW ASR Injection/Extraction
42”
Sup
ply
Pip
eli
ne
Slant Well Intake System
Carmel Valley Pump Station
CAW Carmel River Wells
5
Crest Tank & 16” Pipeline
~560’ HGL
Existing PRV Set ~310’ HGL
MONTEREY PIPELINE
AGENCY COORDINATION
Jurisdictional Agencies and Entities
• City of Pacific Grove
• City of Monterey
• Presidio of Monterey (US Army)
• Caltrans (3 crossings)
• City of Seaside
• Monterey Fairgrounds
• Division of Drinking Water
PIPELINE CONSTRUCTION PREPARATIONS
DUCTILE IRON PIPE
Features
• Extra Strength, 250 psi
• Restrained Joints
• Polyethylene Encasement
• NSF 61 Lining
• Supplemental Casing on Bridge
• American Made
• AVV Valves
• Isolation Valves
• Blow Off Drains
PIPELINE CONSTRUCTION 1
PIPELINE CONSTRUCTION 2
HWY 68 PIPE BRIDGE
EXISTING BRIDGE NORTH VIEW AT FAIRGROUNDS EXIT
EXISTING BRIDGE SECTION
HWY 68 SECTION VIEW
SITE PLAN
CONCEPT 1: STEEL TRUSS
CONCEPT 2: PIPE ON CONCRETE GIRDER
CONCEPT 3: CONCRETE BATHTUB W/RAILS
BRIDGE ARCHITECTURAL LIP
BRIDGE ARCHITECTURAL LIP DETAILS
Bridge Deck
Sidewalk/Railing
REVISION 3.1: ARCHITECTURAL LIP & RAIL BAR
ARCHITECTURAL PROFILES
Lower Profile Higher Profile
ARCHITECTURAL PROFILE DETAILS
Lower Profile Higher Profile
REVISION 3.2 – FINAL DESIGN
Bridge Security Gate
EXISTING DECORATIVE BRIDGE WALL
GEOLOGIC HAZARD MAP
STRUCTURAL DETAIL 1
STRUCTURAL DETAIL 2
STRUCTURAL DETAIL 3
CALTRANS ENGINEERING DRAWING EXAMPLE
SEISMIC PIPE JOINTS
HWY 68 PIPE BRIDGE CONSTRUCTION ABUTMENTS
HWY 68 PIPE BRIDGE CONSTRUCTION CENTER PIER
HWY 68 PIPE BRIDGE CONSTRUCTION BATHTUB GIRDER
Embedded video
HWY 68 PIPE BRIDGE CONSTRUCTION PIPE & CASING
HWY 68 PIPE BRIDGE CONSTRUCTION GATE & GRATING
RECOGNITION
THANK YOU
QUESTIONS?