Page 1: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

MONTEREY PIPELINE & PIPE BRIDGE

CRAIG SMITH, PE - AECOM

LAWRENCE TAM, PE - AECOM

TIM O’HALLORAN, PE – CALIFORNIA AMERICAN WATER

Page 2: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

AGENDA

1. A little History

2. Monterey Area Water Providers

3. Monterey Peninsula Water Supply Project

4. Monterey Pipeline

5. Hwy 68 Pipe Bridge

6. Recognition

7. Questions

Page 3: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

A LITTLE HISTORY, 1 OF 2

• ~3300 years ago: Esselen tribal settlement in the region.

• 1600-1700s: European colonialists and missionaries arrive.

• 1921: San Clemente Dam

• 1949: Los Padres Dam

• 1966: California American Water is created.

• 1975: CPUC orders a moratorium on new water hookups on the Peninsula.

• 1979: Environmentalists and government officials focused on conservation and restoration of the Carmel River and its ecology.

• 1994: The U.S. Army closes down Fort Ord.

• 1995: SWRCB issues Order 95-10, requiring Cal Am to begin conservation, pursue a legal water source and ease pressure on the Carmel River.

Page 4: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

A LITTLE HISTORY, 2 OF 2

• 2010: Regional Water Project organized.

• 2012: Monterey Peninsula Water Supply Project (MPWSP) organized.

• 2015: San Clemente Dam removal complete.

• Sept. 2018: CPUC approves Cal Am’s plan to build a desalination plant.

• Nov. 2018: Measure J passes, directing the MPWMD to acquire control of the Cal Am-owned water system “if and when feasible.”

• Oct. 4, 2019: Pure Water Monterey wastewater recycling plant opens.

• March 2020: CCC is scheduled to vote on Cal Am’s permit.

• Dec. 31, 2021: The cease and desist deadline for Carmel River pumping.

Page 5: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CALIFORNIA AMERICAN WATER - MONTEREY

Page 6: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

MONTEREY AREA WATER PROVIDERS

Page 7: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

MONTEREY ONE WATER RECYCLED WATER

Page 8: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

SEASIDE GROUNDWATER BASIN AQUIFER STORAGE & RECOVERY (ASR)

Page 9: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

MONTEREY PENINSULA WATER SUPPLY PROJECT (MPWSP) OVERVIEW

Page 10: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

COMBINING NEW FACILITIES WITH EXISTING FACILITIES

Page 11: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CAW Desal Plant

Wastewater flows

MRWPCA WWTP

GWR ADVANCED TREATMENT

Growers

GWR ASR Injection

Wells

Seaside Groundwater

Basin

CAW Water Distribution System

CAW Seaside

Wells (non-ASR)

Seaside Monterey

Pacific Grove

Pebble Beach

Carmel Carmel Valley

CAW Carmel River Wells

CAW Water Distribution

System

Forest Lake Reservoirs

Crest Tank & 16” Pipeline

36” Transfer Pipeline

Monterey (ASR) Pump Station

MPWSP GWR ASR SYSTEM SCHEMATIC BASELINE SCHEMATIC

~560’ HGL

~435’ HGL

~305’ HGL

Existing PRV Set ~310’ HGL

42”

Sup

ply

Pip

eli

ne

Slant Well Intake System

Future 5-6

Existing Wells 1-4

CAW ASR Injection/Extraction

Carmel Valley Pump Station

Bri

ne

Pip

elin

e

MRWPCA Existing Outfall

Salinas Valley

Return

OUTFALL MIXING CAMBER

1

Page 12: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CAW Desal Plant

GWR ADVANCED TREATMENT

GWR ASR Injection

Wells

Seaside Groundwater

Basin

CAW Water Distribution System

CAW Seaside

Wells (non-ASR)

Seaside Monterey

Pacific Grove

Pebble Beach

Carmel Carmel Valley

CAW Water Distribution

System

Forest Lake Reservoirs

MPWSP GWR ASR SYSTEM SCHEMATIC INJECTION WITH MP&PS

~435’ HGL

~300’ HGL

Monterey (ASR) Pump Station

36” Transfer Pipeline

Future 5-6

Existing Wells 1-4

CAW ASR Injection/Extraction

42”

Sup

ply

Pip

eli

ne

Slant Well Intake System

Carmel Valley Pump Station

CAW Carmel River Wells

4

Crest Tank & 16” Pipeline

~560’ HGL

Existing PRV Set ~310’ HGL

Page 13: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CAW Desal Plant

GWR ADVANCED TREATMENT

GWR ASR Injection

Wells

Seaside Groundwater

Basin

CAW Water Distribution System

CAW Seaside

Wells (non-ASR)

Seaside Monterey

Pacific Grove

Pebble Beach

Carmel Carmel Valley

CAW Water Distribution

System

Forest Lake Reservoirs

MPWSP GWR ASR SYSTEM SCHEMATIC EXTRACTION WITH MP&PS

~435’ HGL

~300’ HGL

Monterey (ASR) Pump Station

36” Transfer Pipeline

Future 5-6

Existing Wells 1-4

CAW ASR Injection/Extraction

42”

Sup

ply

Pip

eli

ne

Slant Well Intake System

Carmel Valley Pump Station

CAW Carmel River Wells

5

Crest Tank & 16” Pipeline

~560’ HGL

Existing PRV Set ~310’ HGL

Page 14: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

MONTEREY PIPELINE

Page 15: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

AGENCY COORDINATION

Jurisdictional Agencies and Entities

• City of Pacific Grove

• City of Monterey

• Presidio of Monterey (US Army)

• Caltrans (3 crossings)

• City of Seaside

• Monterey Fairgrounds

• Division of Drinking Water

Page 16: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

PIPELINE CONSTRUCTION PREPARATIONS

Page 17: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

DUCTILE IRON PIPE

Features

• Extra Strength, 250 psi

• Restrained Joints

• Polyethylene Encasement

• NSF 61 Lining

• Supplemental Casing on Bridge

• American Made

• AVV Valves

• Isolation Valves

• Blow Off Drains

Page 18: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

PIPELINE CONSTRUCTION 1

Page 19: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

PIPELINE CONSTRUCTION 2

Page 20: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 PIPE BRIDGE

Page 21: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

EXISTING BRIDGE NORTH VIEW AT FAIRGROUNDS EXIT

Page 22: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

EXISTING BRIDGE SECTION

Page 23: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 SECTION VIEW

Page 24: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

SITE PLAN

Page 25: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CONCEPT 1: STEEL TRUSS

Page 26: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CONCEPT 2: PIPE ON CONCRETE GIRDER

Page 27: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CONCEPT 3: CONCRETE BATHTUB W/RAILS

Page 28: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

BRIDGE ARCHITECTURAL LIP

Page 29: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

BRIDGE ARCHITECTURAL LIP DETAILS

Bridge Deck

Sidewalk/Railing

Page 30: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

REVISION 3.1: ARCHITECTURAL LIP & RAIL BAR

Page 31: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

ARCHITECTURAL PROFILES

Lower Profile Higher Profile

Page 32: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

ARCHITECTURAL PROFILE DETAILS

Lower Profile Higher Profile

Page 33: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

REVISION 3.2 – FINAL DESIGN

Page 34: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

Bridge Security Gate

Page 35: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

EXISTING DECORATIVE BRIDGE WALL

Page 36: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

GEOLOGIC HAZARD MAP

Page 37: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

STRUCTURAL DETAIL 1

Page 38: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

STRUCTURAL DETAIL 2

Page 39: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

STRUCTURAL DETAIL 3

Page 40: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

CALTRANS ENGINEERING DRAWING EXAMPLE

Page 41: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

SEISMIC PIPE JOINTS

Page 42: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 PIPE BRIDGE CONSTRUCTION ABUTMENTS

Page 43: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 PIPE BRIDGE CONSTRUCTION CENTER PIER

Page 44: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 PIPE BRIDGE CONSTRUCTION BATHTUB GIRDER

Embedded video

Page 45: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 PIPE BRIDGE CONSTRUCTION PIPE & CASING

Page 46: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

HWY 68 PIPE BRIDGE CONSTRUCTION GATE & GRATING

Page 47: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

RECOGNITION

Page 48: Monterey Pipeline & Pipe Bridge - NorCal PUG...Pump Station 36” Transfer Pipeline Future 5 -6 Existing Wells 1 4 Injection/Extraction e Slant Well Intake System Carmel Valley Pump

THANK YOU

QUESTIONS?