montague dpw (10.16.2017)...montague, ma montague department of public works october 16, 2017 gross...
TRANSCRIPT
Department Legend
Administration
Employee Facilities
Shops
Vehicle Canopy
Vehicle Maintenance
Vehicle Storage
Vehicle Wash Bay
14773 SF
123
VEHICLESTORAGE
4665 SF
124
VEHICLESTORAGECANOPY
15
5'-
6"
30' - 0"
5521
64
151
1625
3235
2155
1211
108
73
3340
413638
292
13
18
2030
53
42
195034
54
23
14
2726
24
22351 SF
121
FLUIDSTORAGE
ROOM
432 SF
107
STAFF /MEETING
ROOM
239 SF
111
PLUMBING / FIREPROTECTION ROOM
187 SF
108
ELECTRIC / ITROOM
72 SF
101
VESTIBULE
80 SF
102
WAITING AREA
521 SF
103
OFFICEADMINISTRATOR
/ WORKINGFOREPERSON'SWORKSTATION
152 SF
105
SUPPLY CLOSET
36 SF
109
JANITORCLOSET
51 SF
110
VESTIBULE
303 SF
104
SUPERINTENDENT'SOFFICE
521 SF
112
MEN'S LOCKER/ SHOWER /
TOILET ROOM
378 SF
113
WOMEN'S LOCKER /SHOWER / TOILET ROOM330 SF
106
CORRIDOR
1616 SF
114
SHARED GENERALWORKSHOP
427 SF
120
PARTSSTORAGE
128 SF
119
HYDRAULICHOSE
WORKSHOP
49 SF
118
TOILET
304 SF
117
MECHANIC'SOFFICE
2747 SF
116
VEHICLE /EQUIPMENT
MAINTENANCEBAYS
95' - 0"
KNOCK DOWN PAD
192 SF
115
SIGNSHOP
1013 SF
122
VEHICLE WASHBAY
UP
Weston & Sampson Engineers, Inc.100 Foxborough Boulevard Suite 250
Foxborough, MA 02035(508) 698-3034 (800) SAMPSON
www.westonandsampson.com
SCALE: AS NOTED
Project:
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2017
PROJECT TRUE
Issued For:
DPW FACILITY
MONTAGUE, MA
MONTAGUE DEPARTMENTOF PUBLIC WORKS
OCTOBER 16, 2017
FLOOR PLAN
A1.00
MMS
JA
JA
Project Number
Project Status
3/32" = 1'-0"1
GROUND FLOOR PLAN
ROOM SCHEDULE
ROOM
Department Area# NAME
Administration
101 VESTIBULE Administration 72 SF
102 WAITING AREA Administration 80 SF
103 OFFICE ADMINISTRATOR / WORKING FOREPERSON'S WORKSTATION Administration 521 SF
104 SUPERINTENDENT'S OFFICE Administration 303 SF
105 SUPPLY CLOSET Administration 152 SF
1128 SF
Employee Facilities
106 CORRIDOR Employee Facilities 330 SF
107 STAFF / MEETING ROOM Employee Facilities 432 SF
108 ELECTRIC / IT ROOM Employee Facilities 187 SF
109 JANITOR CLOSET Employee Facilities 36 SF
110 VESTIBULE Employee Facilities 51 SF
111 PLUMBING / FIRE PROTECTION ROOM Employee Facilities 239 SF
112 MEN'S LOCKER / SHOWER / TOILET ROOM Employee Facilities 521 SF
113 WOMEN'S LOCKER / SHOWER / TOILET ROOM Employee Facilities 378 SF
2173 SF
Shops
114 SHARED GENERAL WORKSHOP Shops 1616 SF
115 SIGN SHOP Shops 192 SF
1808 SF
Vehicle Maintenance
116 VEHICLE / EQUIPMENT MAINTENANCE BAYS Vehicle Maintenance 2747 SF
117 MECHANIC'S OFFICE Vehicle Maintenance 304 SF
118 TOILET Vehicle Maintenance 49 SF
119 HYDRAULIC HOSE WORKSHOP Vehicle Maintenance 128 SF
120 PARTS STORAGE Vehicle Maintenance 427 SF
121 FLUID STORAGE ROOM Vehicle Maintenance 351 SF
4006 SF
Vehicle Storage
123 VEHICLE STORAGE Vehicle Storage 14773 SF
14773 SF
Vehicle Wash Bay
122 VEHICLE WASH BAY Vehicle Wash Bay 1013 SF
1013 SF
Subtotal 24900 SF
Vehicle Canopy
124 VEHICLE STORAGE CANOPY Vehicle Canopy 4665 SF
4665 SF
Subtotal 4665 SF
Department Legend
Vehicle Storage
3585 SF
201
MEZZANINE
OPEN TO BELOW
DN
Weston & Sampson Engineers, Inc.100 Foxborough Boulevard Suite 250
Foxborough, MA 02035(508) 698-3034 (800) SAMPSON
www.westonandsampson.com
SCALE: AS NOTED
Project:
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2017
PROJECT TRUE
Issued For:
DPW FACILITY
MONTAGUE, MA
MONTAGUE DEPARTMENTOF PUBLIC WORKS
OCTOBER 16, 2017
OVERALLMEZZANINEFLOOR PLAN
A1.01
MMS
JJA
JJA
Project Number
Project Status
3/32" = 1'-0"1
MEZZANINE FLOOR PLAN
MEZZANINE SCHEDULE
ROOM
Department Area# NAME
Vehicle Storage
201 MEZZANINE Vehicle Storage 3585 SF
3585 SF
Subtotal 3585 SF
Building Area Legend
ADMINISTRATION
EMPLOYEE FACILITIES
SHOPS
VEHICLE CANOPY
VEHICLE MAINTENANCE
VEHICLE STORAGE
VEHICLE WASH BAY
4821 SF
VEHICLE CANOPY
14773 SF
VEHICLE STORAGE
1185 SF
ADMINISTRATION
2432 SF
EMPLOYEEFACILITIES
1834 SF
SHOPS
4219 SF
VEHICLEMAINTENANCE
1060 SF
VEHICLE WASH BAY
Weston & Sampson Engineers, Inc.100 Foxborough Boulevard Suite 250
Foxborough, MA 02035(508) 698-3034 (800) SAMPSON
www.westonandsampson.com
SCALE: AS NOTED
Project:
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2017
PROJECT TRUE
Issued For:
DPW FACILITY
MONTAGUE, MA
MONTAGUE DEPARTMENTOF PUBLIC WORKS
OCTOBER 16, 2017
GROSS BUILDINGAREA
A1.02
MMS
JJA
JJA
Project Number
Project Status
3/32" = 1'-0"1
FLOOR PLAN - GROSS BUILDING AREA
GROSS AREA
DEPARTMENT GROSS AREA
ADMINISTRATION 1185 SF
EMPLOYEE FACILITIES 2432 SF
SHOPS 1834 SF
VEHICLE CANOPY 4821 SF
VEHICLE MAINTENANCE 4219 SF
VEHICLE STORAGE 14773 SF
VEHICLE WASH BAY 1060 SF
Grand total 30323 SF
FUTURE FUEL ISLAND
KNOCK DOWN PAD
FUTURE SALT SHED40' X 80'
(CHAPTER 90 FUNDING)
TURNERS FALLS ROAD
VEHICLE MAINTENANCE
VEHICLE WASH BAY
SHOPS
EMPLOYEE FACILITIES
ADMINISTRATION
VEHICLE STORAGE VEHICLE CANOPY
Weston & Sampson Engineers, Inc.100 Foxborough Boulevard Suite 250
Foxborough, MA 02035(508) 698-3034 (800) SAMPSON
www.westonandsampson.com
SCALE: AS NOTED
Project:
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2017
PROJECT TRUE
Issued For:
DPW FACILITY
MONTAGUE, MA
MONTAGUE DEPARTMENTOF PUBLIC WORKS
OCTOBER 16, 2017
OVERALL SITEPLAN
A1.03
MMS
JJA
JJA
Project Number
Project Status
1" = 30'-0"1
OVERALL SITE PLAN
SCALE: 1" = 30'-0"