MONROE COUNTY ROAD COMMISSION
REGULAR MEETING AGENDA
March 11, 2019 - 5:30 p.m.
1. CALL TO ORDER
2. ROLL CALL
3. PLEDGE OF ALLEGIANCE
4. OPENING PRAYER
5. APPROVAL OF REGULAR MEETING AGENDA
6. PUBLIC COMMENT
7. CONSENT AGENDA (with immediate effect)
1) Approval of Minutes- February 25, 2019 Regular Meeting Minutes
2) Approval of Journal Entry
No. 143 Vendor Checks #73809-73838 $ 194,145.33
Void Check#73663 $ 3,904.26
No. 170 Payroll Checks #64392-64409 & Advice #35688-25779 $ 285,564.54
Bank Service Charge – February 2019 $ 90.30
3) Township Contracts
Ash Township
Burns Newburg to Labo 2” stone lift
Carter Port Creek to Briarhill 2” stone lift
Indian Trails Sigler to Calkins 2” stone lift
Jones Sigler to Village limits 2” stone lift
Newburg Exeter to Burns Single chip seal
Newburg Briarhill to Railroad Base Stabilization/Dbl chip seal
Ready US24 to Berlin HMA Scratch/Single chip seal
Whipple Sweitzer to dead end 2” stone lift
2019 Various Local Roads – Mowing
Berlin Charter Township
Armstrong Sigler to dead end 2”stone lift
Armstrong Brandon to Labo 3”stone lift
Brandon Sigler to village limits 2”stone lift
Dauncy Armstrong to township line 2”stone lift
Dunsmore Plat Off Brandon Single chip seal
Haggerman Labo to Sigler 2”stone lift
Joanne/Birchwood Off Newport Single chip seal
Newport N. Dixie Hwy to Armstrong 2”stone lift
Swan Creek N. Dixie Hwy to N. Dixie Hwy Single chip seal
Swan Creek Newport to Labo Single chip seal
Swan View Trombley to dead end Single chip seal
Trombley Strong to Masserant Single chip seal
2019 Various Local Roads – Mowing
Dundee Township
Cake Petersburg to Davis 2”stone lift
Dennison Brewer to M50 Single chip seal
Dundee-Azalia Hatter to village limits Single chip seal
Gloff Dixon to railroad Single chip seal
Meanwell M50 to Ida West Single chip seal
Wilcox M50 to Day Single chip seal
2019 Various Local Roads – Mowing
2019 Various Local Roads – Excess Gradall
Monroe County Road Commission
Regular Meeting Agenda
March 11, 2019 – Page 2
LaSalle Township
Dunlap Stein to Yargerville Single chip seal
Hillcrest Orchard Sub off Stein btwn US24 and M125 Single chip seal
Rauch US24 to Minx Single chip seal
2019 Various Local Roads – Mowing
Summerfield Township
Albain Summerfield to city limits Single chip seal
Bentwood Wells to dead end Single chip seal
Forrest Teal to city limits Single chip seal
Lulu Summerfield to Teal Single chip seal
Morocco County Line to dead end 2”stone lift
Old Ida Center Wells to Ida Center Single chip seal
Railroad City limits to Summerfield Single chip seal
2019 Various Local Roads - Mowing
4) Mowing Contractors
Exeter Township D.K. Services
5) Approve the Resolution to enter into MDOT Contract No. 19-5082 (amendment to MDOT Contract
No. 18-5546) for microsurfacing along Summerfield Road from Smith Road northerly to Consear
Road, and authorize the Chairman and Vice Chairman to sign the contract on behalf of the Board.
6) Award the 2019 Microsurfacing contract to the low bidder Pavement Maintenance Systems,
LLC in the amount of $60,268.00 and authorize the Managing Director to sign all documents
on behalf of the Board.
7) Award the 2019 Various Uniform Traffic Control Devices (signs and sign materials) to all
responding bidders.
8) Award the South Stony Creek Road and Palmer Road Tree Removal contract to the low bidder
T & J Excavating and Tree Clearing, LLC in the amount of $41,445.00 and authorize the
Managing Director to sign all documents on behalf of the Board.
8. UNFINISHED BUSINESS
1) Continued discussion on MDOT State Trunkline Contract.
9. NEW BUSINESS
10. REPORT OF OFFICERS
11. PUBLIC COMMENT
12. COMMISSIONER’S COMMENT
13. ADJOURNMENT
MINUTES OF THE BOARD OF COUNTY ROAD COMMISSIONERS
MONROE, MICHIGAN
February 25, 2019
1. At a Regular Meeting of the Board of County Road Commissioners at their offices located at
840 S. Telegraph Road, Monroe, Michigan on Monday, February 25, 2019 the meeting was
called to order by Chairman Iacoangeli at 5:30 p.m.
2. Roll Call by Deputy Clerk as follows:
PRESENT EXCUSED
Dan Minton Jack Thayer
Charles A. Londo
Greg W. Stewart
Paul Iacoangeli
A quorum being present, the Board proceeded to transact business.
3. Commissioner Iacoangeli led the Pledge of Allegiance.
4. Commissioner Iacoangeli led the Opening Prayer.
5. Commissioner Minton moved, seconded by Commissioner Stewart to approve the February
25, 2019 regular meeting agenda as presented. Vote: Ayes: 4 Nays: 0 Excused: 1 Motion
carried.
6. Public Comment – None.
7. The following items were listed on the Consent Agenda: (with immediate effect)
1) Approval of Minutes- February 11, 2019 Regular Meeting Minutes
2) Approval of Journal Entry
No.105 Vendor Checks #73690-73768 $ 299,819.20
Void Check #71136 $ 340.34
Void Check #71161 $ 185.37
Void Check #71164 $ 87.89
Void Check #71169 $ 137.45
No. 117 Payroll Checks #64372-64391 & Advice #25597-25687 $ 312,374.21
No. 135 Vendor Checks #73769-73808 $ 202,743.29
3) Township Contracts –
Exeter Township
Colf Sumpter to 6900’ East (Davis Drain) Crush&Shape/2”HMA
Colf E of Davis Drain to Carleton West 1.5” HMA
Colf Capernall to Rawsonville 1.5” HMA
Doty Scofield to S. Stony Creek Zone Patch/Single Seal
Fay Carleton West to Martinsville 1.5” HMA
Finzel Kane to North of N. Stony Creek Crush&Shape/2.25” HMA
Heiss Steffas to township line Single chip seal
Scofield Sumpter to East end of pavement Single chip seal
Steffas S. Stony Creek to Heiss Zone Patch/Single seal
Timbers S. Stony Creek to Stout Zone Patch/Single seal
2019 Local Road Mowing – Various
2019 Local Mow/Mulch – Various
4) Pulled for further discussion.
5) Mowing Contractor
Exeter Township Exeter Township
Monroe County Road Commission
Regular Meeting Minutes
February 25, 2019 – Page 2
Commissioner Minton moved, seconded by Commissioner Stewart to approve the February
25, 2019 Consent Agenda as presented, except for Item #4 which was pulled for further
discussion. Vote: Ayes: 4 Nays: 0 Excused: 1 Motion carried.
Commissioner Londo also indicated there was a correction to the minutes on Page 11 under
his comments. Ms. U’Ran already made that correction.
Item removed for further discussion:
4) Approve the Retirement and Benefits Act Corrective Action Plan and authorize the
Managing Director to sign on behalf of the MCRC.
Commissioner Minton asked if this plan was part of the annual statement to the State, and
part of the normal business for the funding of the retiree health care. Mr. Pierce explained
this is the corrective action plan that was submitted which requires a 40% funding level by a
date certain, and they required a Resolution showing the Board accepts the plan we
submitted. Commissioner Minton asked if this was the plan the legislature adopted. Mr.
Pierce indicated yes.
Ms. Hawkins-Freelain added that there are two separate filling requirements, and this is
different than the annual filing form Commissioner Minton referenced which is due by the
end of March.
Commissioner Stewart indicated he was pleased that the Road Commission was doing pretty
good toward the goal set in this plan, and added the MCRC has come a long way.
Commissioner Minton moved, seconded by Commissioner Stewart to Approve the Retirement
and Benefits Act and Corrective Action Plan and Resolution, and authorize the Managing
Director to sign on behalf of the Board. Vote: Ayes: 4 Nays: 0 Excused: 1 Motion
carried.
8. Unfinished Business – None.
9. New Business – None.
10. Report of Officers –
Randy Pierce (Managing Director) – Mr. Pierce had nothing additional to report.
Commissioner Londo reviewed topics in the Managing Director communication and
inquired what was next for Labo Road issue.
Mr. Pierce explained this section of road is a local road, and therefore, by law, the
Road Commission can only contribution 50% to any fix or improvement. This section
of road is concrete, and there has been several discussions with Ash Township
several times. The staff will continue to work with Ash Township to see if there is
interest if the project could be extended to west of the I275 overpass.
Commissioner Londo asked if the road has no funding why was the estimate
prepared, and it mentioned in his report. Mr. Pierce explained he was asked to look
into how much it would cost to perform work on this section of road since the Road
Commission’s NE Salt Facility is located on Labo close to Telegraph. He added that
the Road Commission will continue to work with the township on possible fixes and
funding.
Monroe County Road Commission
Regular Meeting Minutes
February 25, 2019 – Page 3
David M. Leach (Superintendent of Maintenance) – Mr. Leach informed the Board that
his department continues to work on finalizing township contract packages for 2019.
They are working on contractor estimates and bid packages for asphalt and emulsion
going out in late March. He also let the Board know that the MCRC would be hosting
the SE Council quarterly Superintendent’s meeting on March 4th
.
Matthew Snell (County Highway Engineer) – Mr. Snell advised the Board that the
Oxcart Transportation Permit system would be launched Friday, March 1, 2019. This
should add an extra level of customer service allowing customers to use credit cards
because we will be integrated with other SE counties using the program so they can
apply for permits in multiple counties at one time.
Mr. Snell also indicated the MCRC would be hosting the quarterly SE Council meeting
at the Road Commission on Monday, May 6th
.
Commissioner Minton indicated he understands Lenawee and Washtenaw County is
using this and can do business in multiple counties at one time. Mr. Snell indicated
yes, and explained each company will have their own account and log on to get their
move permits through Adrian and Monroe and not have to contact each individual
Road Commission.
Commissioner Stewart asked if there was a timeline on the new maps. Mr. Snell
indicated he didn’t have a specific date but would follow up on it.
Dori Hawkins-Freelain (Director of Finance) – Ms. Hawkins-Freelain added that the
Corrective Action Plan requires the MCRC to be 40% funded by 2023, but that still
leaves a sizeable unfunded balance.
Philip Costello (General Counsel) – Mr. Costello had nothing additional to report.
11. Public Comment –
David Hoffman, County Commissioner, suggested the maintenance Supervisors check on the
roads where the winds have been blowing sand into ditches and drains which may affect
drainage when things start thawing.
12. Commissioners' Comments -
Commissioner Thayer was excused.
Commissioner Stewart had nothing additional to report.
Commissioner Londo had nothing additional to report.
Commissioner Minton had nothing additional to report.
Commissioner Iacoangeli had nothing additional to report.
13. Adjournment -
Chairman Iacoangeli stated if there are no objections, the meeting is adjourned at 5:44 p.m.
_________________________________
Cheryl A. U’Ran, Deputy Clerk
DATE: 02/27/2019
ACCOUNT NUMBER
MONROE COUNTY JOURNAL ENTRY
Fund Activity Account DESCRIPTION AND EXPLANATION OF ENTRY
201 00000 001000 Cash - County Road 201 44900 974500 Capital Outlay- County Road
To Cover Vendor Checks dated 02/28/2019
NUMBER: 143
AMOUNT Debit Credit
$194,145.33 $194,145.33
1----+-----+----1-:C::-::-h-e-=ck,.--s-#c-::-73809- 73838 -------------t---------t-------l l---+-----+----1-----------------!----------l--------------1---+----+----r-----------------t---·-······--------- -···----------------- ------------·-----------------
--------+------------·-+----1------------___;_----t------------+-------------l 201 00000 001000 Cash- County Road $3,904.26 201 44900 974500 Capital Outlay- County Road $3,904.26
Void Check # 73663 -----+--------------~----------------------------~4--------4--------l
1-----+----+----r---------------------------- ------- ----------------------------------------------·--- --------·--·---·-·---------------
$190,241.07 -----------------t----t-----f-=-------::-------,-:,---------o-:-----------·------------------------'-- ------·---------+-------1
From: County Road Account 1-----+----+----1------_.::_ ___________ t--------t-----····--·- ···········-------·---··---
#1 00-90015-2 To: County Road Vendor Account
#1 00-90020-5
Funds will be transferred internally at
______________ ··-··--------------------·--·-----------·- _________________ !Y.I_B& T by_~_b_e __ ~g~nty Treasurer ---+-~-----------+------------1 1---+-----+----l--------------------·-----·--·-·----·- ·--~----- -----·------
TOTAL $198,049.59 1 $198,049.59
PREPARED BY: Joy Bagnall
-- ··--····-··· ---t-----t-----------··-·-·--·---·-------- ---·-···--· -------------· ---- ·-·-·---------------
-----+----+-----1-------------------·---·----4--------+-------l
APPROVED BY:
ll..../" ( /
Date 02/27/2019 Monroe County Road Commission Page 1 of 1 Time 12:06:32 AP - Check Register jbagnall
------- Check ------- ------- Vendor ------- Check Number Date Number Name Amount
73809 02/28/2019 A00162 Aggregate Industries - Midwest 1,565.83 73810 02/28/2019 A00202 Applied Imaging 157.23 73811 02/28/2019 C00001 Auto Value Monroe 400.37 73812 02/28/2019 B00026 Buck & Knobby 179.94 73813 02/28/2019 C00214 Carleton Farms Landfill 193.02 73814 02/28/2019 C00257 CDW Government LLC 374.30 73815 02/28/2019 C00312 CHOP 44,900.00 73816 02/28/2019 D00102 Detroit Salt LLC 73,002.04 73817 02/28/2019 D00014 DTE Energy 7,500.22 73818 02/28/2019 F00087 Fremont Volvo Trucks 25.15 73819 02/28/2019 G00101 Great Lakes Engineering Group 10,650.00 73820 02/28/2019 H00136 Hoffman Brothers Upholsterers 150.00 73821 02/28/2019 K00064 Knight Technology Group, Inc. 5,665.00 73822 02/28/2019 L00065 Lowes Home Center, Inc 62.61 73823 02/28/2019 M00012 Mannik & Smith 4,587.50 73824 02/28/2019 M00013 Manpower Inc. 678.08 73825 02/28/2019 M00087 Michigan Cat 4,385.00 73826 02/28/2019 M00043 Michigan Gas Utilities 4,407.90 73827 02/28/2019 M00028 Monroe Bank & Trust 2,045.58 73828 02/28/2019 M00191 Monroe County Finance Dept 4,189.33 73829 02/28/2019 N00078 N etworkfleet, Inc 971.65 73830 02/28/2019 N00046 Northwest Consultants Inc 10,374.00 73831 02/28/2019 P00005 Peerless Supply Co 23.36 73832 02/28/2019 S00073 Shrader Tire & Oil 359.60 73833 02/28/2019 S00239 Staples Advantage 5.09 73834 02/28/2019 S00192 Sun Life Financial 4,114.50 73835 02/28/2019 T00133 T.D.C. Truck Sales, Inc. 8,010.00 73836 02/28/2019 T00018 Toledo Spring Service 4,565.98 73837 02/28/2019 U00036 UniFirst Corporation 283.02 73838 02/28/2019 W00009 Wayne County 319.03
Report Total 194,145.33
Date 02/27/2019 Monroe County Road Commission Page 1 Time 12:24:09 AP - Open Invoice by Fund jbagnall
Fund- 201
--------- Vendor -------· --------------------------- Invoice ------------------------- Gross Discount Net Payment Number Name Number Date Due Date Amount Amount Amount Status Type
D00102 Detroit Salt LLC 82004 02/19/2019 03/19/2019 9,769.86 9,769.86 Held Check
82172 02/20/2019 03/20/2019 19,817.89 19,817.89 Held Check
82300 02/21/2019 03/21/2019 12,289.49 12,289.49 Held Check
41,877.24 41,877.24
EOOOOI E.R. Zeiler Excavating, Inc. ESTI INDIANACRE 07/14/2018 08/14/2018 4,083.75 4,083.75 Held Check
EST2 INDIANACRE 07/28/2018 08/28/2018 2,299.01 2,299.01 Held Check
EST3 INDIANACRE 08/11/2018 09/11/2018 6,877.68 6,877.68 Held Check
EST4 INDIANACRE 09/12/2018 10/12/2018 16,150.96 16,150.96 Held Check
EST5 INDIANACRE 09/12/2018 10/12/2018 7,488.29 7,488.29 Held Check
EST6 INDIANACRE 01/30/2019 02/28/2019 3,600.31 3,600.31 Held Check
40,500.00 40,500.00
G00098 Geddis Paving & Exc., Inc. EST 1 MOHAWK 08/04/2018 09/04/2018 679.23 679.23 Held Check
EST2 MOHAWK 09/01/2018 10/01/2018 2,020.52 2,020.52 Held Separate Check
EST3MOHAWK 09/17/2018 10/17/2018 3,767.22 3,767.22 Held Check
EST4MOHAWK 10/09/2018 11/09/2018 14,015.87 14,015.87 Held Check
EST5MOHAWK 10/20/2018 11/20/2018 326.88 326.88 Held Check
EST6MOHAWK 12/05/2018 01/05/2019 792.31 792.31 Held Check
21,602.03 21,602.03
Fund Total for 201 103,979.27 103,979.27
~
Date 02/27/2019 Monroe County Road Commission Page 1 of 4 Time 11:35:08 AP - Payment Selection Register jbagnall
------ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount
Number Name Number Date Due Date Amount Amount Amount Amount Lost Comments
A00162 Aggregate Industries - Midwest 710108015 02/06/2019 03/06/2019 118.46 118.46 118.46 Stone
710111266 02/07/2019 03/07/2019 496.55 496.55 496.55 Stone
710111267 02/07/2019 03/07/2019 235.48 235.48 235.48 Stone
710111268 02/07/2019 03/07/2019 117.28 117.28 117.28 Stone
710111269 02/07/2019 03/07/2019 366.33 366.33 366.33 Stone
710111270 02/07/2019 03/07/2019 100.47 100.47 100.47 Stone
71018014 02/06/2019 03/06/2019 131.26 131.26 131.26 Stone
1,565.83 1,565.83 1,565.83
A00202 Applied Imaging 1281855 02/07/2019 03/07/2019 157.23 157.23 157.23 Copy Machines
C00001 Auto Value Monroe 227-1079863 02/21/2019 03/23/2019 400.37 400.37 400.37 Pts for equip/Small Tis shop
B00026 Buck & Knobby P41847 02/19/2019 03/19/2019 179.94 179.94 179.94 Small Tis - Road
C00214 Carleton Farms Landfill 3069-000020245 02/15/2019 03/15/2019 193.02 193.02 193.02 Disposal
C00257 CDW Government LLC RGM5786 02/26/2019 03/26/2019 374.30 374.30 374.30 Computer License
C00312 CHOP 10015 02/12/2019 03/12/2019 30,472.00 30,472.00 30,472.00 Tree Removal
10026 02/22/2019 03/22/2019 14,428.00 14,428.00 14,428.00 Tree Removal
44,900.00 44,900.00 44,900.00
D00102 Detroit Salt LLC 81131 02/11/2019 03/11/2019 15,346.15 15,346.15 15,346.15 Salt Inv
81132 02/11/2019 03/11/2019 9,921.28 9,921.28 9,921.28 Salt Inv
81552 02/14/2019 03/14/2019 12,815.86 12,815.86 12,815.86 Salt Inv
81733 02/15/2019 03/15/2019 12,665.40 12,665.40 12,665.40 Salt Inv
81734 02/15/2019 03/15/2019 22,253.35 22,253.35 22,253.35 Salt Inv
73,002.04 73,002.04 73,002.04
Date 02/27/2019 Monroe County Road Commission Page 2 of4 Time 11:35:08 AP - Payment Selection Register jbagnal1
------ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount
Number Name Number Date Due Date .Amount Amount Amount Amount Lost Comments
D00014 DTEEnergy FEB 100 65555 02/20/2019 03/15/2019 1,173.62 1,173.62 1,173.62 Electricity-Mtc
FEB 146 56037 02/20/2019 03/15/2019 2,422.34 2,422.34 2,422.34 Electricity-Monroe
JAN 10065555 RE 01/22/2019 02/15/2019 859.20 859.20 859.20 Reissue-Mtc
JAN 10065688 RE 01/18/2019 02!15/2019 901.19 901.19 901.19 Reissue-Summerfield
JAN 14656037 RE 01/22/2019 02/15/2019 1,883.30 1,883.30 1,883.30 Reissue-Monroe
JAN 14656136 RE 01/18/2019 02/15/2019 260.57 260.57 260.57 Reissue-Monroe Salt Shed
7,500.22 7,500.22 7,500.22
F00087 Fremont Volvo Trucks 433737 02/21/2019 03/21/2019 25.15 25.15 25.15 Pts for equip
G00101 Great Lakes Engineering Group 19-3026 02/07/2019 03/07/2019 10,650.00 10,650.00 10,650.00 Eng Svcs-Bridge Inspections
H00136 Hoffman Brothers Upholsterers EQ 1241 02/22/2019 03/22/2019 150.00 150.00 150.00 EquipMtc
K00064 Knight Technology Group, Inc. 12647 02/12/2019 03/12/2019 2,750.00 2,750.00 2,750.00 Computer Support-Mike Pouter
12665 02/26/2019 03/26/2019 2,915.00 2,915.00 2,915.00 Computer Supp-Mike Pouter
5,665.00 5,665.00 5,665.00
L00065 Lowes Home Center, Inc 02106 02/21/2019 03/21/2019 62.61 62.61 62.61 Small Tls-Road
M00012 Mannik & Smith 0077844 . 11/13/2018 12/13/2018 4,587.50 4,587.50 4,587.50 Eng Svcs-Vivian
M00013 Manpower Inc. 33624142 02/13/2019 03/13/2019 678.08 678.08 678.08 Temp Employee Svcs
M00087 Michigan Cat ER9533851 02/04/2019 03/04/2019 4,385.00 4,385.00 4,385.00 Rental Equip-Salt Loader
M00043 Michigan Gas Utilities 502709427-1 FEB 02/21/2019 03/21/2019 362.66 362.66 362.66 Heat-Sign Shop
503084002-1 FEB 02/21/2019 03/21/2019 1,387.64 1,387.64 1,387.64 Heat-Monroe
507812728-1 FEB 02/21/2019 03/21/2019 2,657.60 2,657.60 2,657.60 Heat-Mtc
Date o2J27!20I9 Monroe County Road Commission Page 3 of4 Time 11:35:08 AP - Payment Selection Register jbagnal1
------ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount
Number Name Number Date Due Date Amount Amount Amount Amount Lost Comments
4,407.90 4,407.90 4,407.90
M00028 Monroe Bank & Trust 2019 HSA BROWN 02/27/2019 03/27/2019 783.88 783.88 783.88 HSA-Employer Contribution
2019 HSA-MORGAN 02/22/2019 03/22/2019 277.74 277.74 277.74 HSA-Employer Contribution
2019HSAFUNCHION 02/27/2019 03/27/2019 983.96 983.96 983.96 HSA-Employer Deposit
2,045.58 2,045.58 2,045.58
M00191 Monroe County Finance Dept 3445-0NBASE/MTC 02/07/2019 03/07/2019 3,908.30 3,908.30 3,908.30 Computer Supp-Annual OnBase/License
3449-JAN 19 02/15/2019 03/15/2019 281.03 281.03 281.03 Phone-Monroe
4,189.33 4,189.33 4,189.33
N00078 Networkfleet, Inc osvooooo 1681828 02/01/2019 03/01/2019 971.65 971.65 971.65 GPS Mthly Data
N00046 Northwest Consultants Inc 0010845 01/31/2019 02/28/2019 6,950.00 6,950.00 6,950.00 Eng Svcs-Bridge Inspections
0010873 02/01/2019 03/01/2019 3,424.00 3,424.00 3,424.00 Eng Svcs-Exeter Rd
10,374.00 10,374.00 10,374.00
P00005 Peerless Supply Co 51600 02/13/2019 03/13/2019 9.46 9.46 9.46 BldgExp
51603 02/13/2019 03/13/2019 13.90 13.90 13.90 Pts for equip
23.36 23.36 23.36
S00073 Shrader Tire & Oil 387935-00 02/21/2019 03/21/2019 384.60 384.60 384.60 Oil Inv/Drum Deposit Return
389863-00 02/26/2019 03/26/2019 -25.00 -25.00 -25.00 See Inv 382067
359.60 359.60 359.60
S00239 Staples Advantage 3404850644 02/09/2019 03/09/2019 -2.48 -2.48 -2.48 Office Supp-See inv340251 0828
3405450265 02/16/2019 03/16/2019 7.57 7.57 7.57 Office Supp
5.09 5.09 5.09
Date 02/27/2019 Monroe County Road Commission Page4 of4 Time 11:35:08 AP - Payment Selection Register jbagnaU
__ ..; ___ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount
Number Name Number Date Due Date Amount Amount Amount Amount Lost Comments
800192 Sun Life Financial 041313 02/20/2019 03/20/2019 ~,114.50 4,114.50 4,114.50 Life Insurance/Health-Retired
T00133 T.D.C. Truck Sales, Inc. 122 02/22/2019 03/22/2019 8,010.00 8,010.00 8,010.00 Capital Equip-2002 Single Axle/Bucket Boom lift/Post Puller
T00018 Toledo Spring Service 101736 02/11/2019 03/11/2019 162.90 162.90 162.90 Pts for equip
101741 02/12/2019 03/12/2019 1,057.50 1,057.50 1,057.50 EquipMtc
101762 02/12/2019 03/12/2019 309.51 309.51 309.51 Pts for equip
101825 02/13/2019 03/13/2019 2,121.26 2)21.26 2,121.26 EquipMtc
102030 02/20/2019 03/20/2019 639.81 639.81 639.81 EquipMtc
102056 02/20/2019 03/20/2019 275.00 275.00 275.00 Pts for equip
4,565.98 4,565.98 4,565.98
U00036 UniFirst Corporation 150 0143326 02/13/2019 03/13/2019 119.76 119.76 119.76 Rental Uniforms
150 0144933 02/20/2019 03/20/2019 163.26 163.26 163.26 Rental Rugs/Uniforms
283.02 283.02 283.02
W00009 Wayne County 297822 02/07/2019 03/07/2019 319.03 319.03 319.03 SignalMtc
Report Totals 194,145.33 194,145.33 194,145.33
DATE: 03/06/2019
MONROE COUNTY JOURNAL ENTRY
ACCOUNT NUMBER Fund -~~-~!Y.!.!.Y.:. Account DESCRIPTION AND EXPLANATION OF ENTRY
···-··-------····------- ------------···-·-·····----------·-·····-·
201 00000 001000 Cash - County Road 201 44915 974500 Capital Outlay- Road Improvement
--------
To cover Payroll Ending 3/3/19 Check# 64392-64409 & Advice # 25688-25779
201 00000 001000 Cash - County Road 201 44915 974500 Capital Outlay - Road Improvement
Bank Service Charge- February 2019
$285,654.84
To record the transfer of funds from the County Road control account to the County Road Payroll Account
No. 100-900-214
Funds will be transferred ···-·-··-···---------
internally at MB& T by the County Treasurer.
-------········-····--------·-·······- ····-·-········----·········-····-···--- ····--·····-··
--------------------·-····-------------------------------TOTAL
PREPARED BY: Kimberly LaRocca
" { I
APPROVED BY: w~.~· {
L-/
NUMBER: 170
AMOUNT Debit Credit
--
$285,564.54 ________ $28~?64.54
--·-
~~-~~Q__ $90.30
··-·-···-··--···-·········--------- -----
r-·
···-··- ·······-------------------
$285,654.84 I $285,654.84
MONROE COUNTY ROAD COMMISSION
201JfTOWNSHIP ROAD IMPROVEMENT CONTRACT
'1
Township: Ash
Project#: 504 001190104
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agr~es to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Burns
Location: Newburg to lab~
Length: 3.52 Miles Road Class: Local -----Description of Work: 211 Stone Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 66,848 66,848
Total Probable Cost $ 66,848 $ 66,848 $ - . $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total· Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid
·amount, MCRC will advise the Township representative as soon as practical.. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payaph~ to the MCRc; within thirty (30) days.
Approve. by the Township Board on the ;l!J/11 day of ·MYIA-tl/':j]ji::·~ ~ . ---¥-+~~~-~-z/--=--Z-~_/!_CJ . _ii_ ~ <2j2o/t1 Supervisor Date Cler . Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 1MB. 7-DL Ci
Commissioner Date
MONROE COUNTY ROAD COMMISSION Township: Ash
504 001190102 201JfTOWNSH/P ROAD IMPROVEMENT CONTRACT
1 Project#: .
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Carter
Location: Port Creek to Bri~rhill
Length: 1.15 Miles Road Class: Local -----Description of Work: 211 Stone Lift
Work Probable Funding Source
Work Type Provider Cost Townshi'p MCRC Other Comment
Stoning Contractor 20,674 10,337 10,337
·Total Probable Cost $ 20,674 $ 10,337 $ 10,337 $ -
The Total Probable Cost along with the Township allocated portio11 of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practicaL An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progr:~ss billings payable to the MC~¢ wjthin thirty {30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _,.wf3.;w 19
Commissioner Date
MONROE COUNTY R.PAD COMMISSION
201srTOWNSHIP ROAD IMPROVEMENT CONTRACT 7 . Township: Ash
Project#: 504 001190105
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Indian Trails
Location: Sigler to Calkins
Length: 0.62 Miles Road Class: Local -----Description of Work: 2" Ston,e Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 11,396 11,396
Total Probable Cost $ 11,396 $ 11,396 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise th.e Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
;J!JJ~ r~brtu~U-J ~01 /
-----~~~t=he--IT'-..:::ow~ns:.....:hi;....:..p B-oa.....:rd:.....o-~-he_~_d_:_·~_;_9'f-V&_ ~d' ~ dj/O )!tj Supervisor Date ~ Date
Approved by the Board of County Road Commissioners on the ___ day of-.,.-----------' _201-8Q} () l7'
Commissioner Date
MONROE COUNTY ROAD COMMISSION Township: Ash
20U(,TOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 001190103 :
The~oard of County Road Commissioners of Monroe. County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be sched~led and the manner of
performance.
Road Name: Jones
Location: Sigler to Village limits
Length: 1.02 Miles ----- Road Class: Local -----Description of Work: 2" Stone Lift
..
Funding Source Work Probable
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 22,594 11,297 11,297
Total Probable Cost $ 22,594 $ 11,297 $ 11,297 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's. allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive mo.nthly progress .billings payable to th~ MCRC within thirty (30) days.
-~~....;,._,;__~--· 0 'li___;,_jl,_· --+-t: h_ Ytlt~k.f11 ,_ ~. d-r::;"'~ a .. cJ/));!_L 4 ~· .. Approved y the Township Board on the~' day of '-fCfj -1- ~.L~. // •
~A 2/ztl/1 Supervisor Date erk Date
Approved by the Board of County Road Commissioners on the ___ day of ________ _, .. ~ r;}_O J 9
Commissioner Date
MONROE COUNTY ROAD COMMISSION Township: Ash
20UfTOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 001190101
Th?Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951; as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Newburg
Location: Exeter to Burns
Length: Miles ----- Road Class: Local -----0.56
Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 17,040 8,520 8,520
Total Probable Cost $ 17,040 $ 8,520 $ 8,520 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. · Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require· prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
. -;oJh ~~ j . ;2oLr Approved the Township Board on theCX day of 'f-eAJYLLtlJ/1 , 2llill': ~-
Supervis!- ~~ · 2/~~C) . c!Jld4 ~a~po)!f Approved by the Board of County Road Commissioners on the ___ day of ________ _,~· ;)_D l '-j
Commissioner Date
MONROE COU TV OAD COMMISSION I
Township: Ash
489 001 190107 20ufTOWNSH 1
R AD IMPROVEMENT CONTRACT ·1 . Project#:
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name:
Location:
·Length:
Description of Work:
Work Type
Stoning Base Stabilization
Chip Sealing Shoulders
Construction Engineering Resurfacing
Newburg
Briarhill to Railroad
0.63 Miles -----Base Stabilization & Double Chip Seal
Work Probable
Provider Cost Township
Contractor 16,137 16,137 Contractor 76,770 76,770
MCRC 47,479 47,479 Contractor 21,850 21,850
MCRC 609 609
MCRC 4,243 4,243
Total Probable Cost $ 167,088 $ 167,088
Road Class: Local -----
Funding Source
MCRC Other Comment
HMA Drives
$ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress hilling:; payabJe to the .. MCRC within thirty (30) days.
Approved by the Board of County Road Commissioners on the ___ day of _________ , 2018-.J_Ol (.j .
Commissioner Date
MONROE COUNTY ROA Township: Ash
20~rOWNSHIP ROAD VEMENT CONTRACT Project#: 504 001190108
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951; as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of
performance.
Road Name:
location:
length:
Description of Work:
Work Type
Zone Patching
Chip Sealing
Ready
US-24 to Berlin
1.11 Miles
HMA Scratch and Single Chip Seal
Work Pro~able
Provider Cost Township
Contractor 44,550 44,550 MCRC 24,073 24,073
Total Probable Cost $ 68,623 $ 68,623
Road Class: local -----
· Funding Source
MCRC Other Comment
$ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road ·Improvement Contract Change Form.
The Township will receive mon.thly progress billings payable to the MCRC within thirty (30) days.
A?:Y !?::!_. oard on the :2/;~ay of fbr/_,I_LA-vy , zoy(. 7' /)} , .
i:L_ ~ Lb-~/{t /!!:)uM .~ 2):2-c;/;y' ·Supervisor · · Date Clerk · Date
Approved by the Board of County Road _commissioners on the ___ day of ________ __,· .W1B.J-b L t'j
Commissioner Date
MONROE C \U ROAD COMMISSION Township: Ash
20~TOWN \ OAD IMPROVEMENT CONTRACT Project#: 504 001190106
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951; as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Whipple
Location: Sweitzer to Dead End
· Length: 0.21 Miles ----- Road Class: Local -----Description of Work: 211 Stone Lift
Work Probable Funding Source
·WorkType Provider Cost Township MGRC Other Comment
Stoning Contractor 3,908 3,908
Total Probable Cost $ 3,908 $ 3,908 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, .MCRC will advise the Township representative as ~oon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval usir.~g the Road Improvement Contract Change Form.
The Township will receive monthly progress billings p·ayable to the MCRC within thirty (30) days.
'J t)-fh ('-I J r {i!;f 1 Approve~ the Town. shil? Bo. ard on the? day of • ~.· VtL£1/',~= ~ '
{\ L ~2-/zc/fCt ·~-r-=-~Zk-~-__ c2-r--j;J-6_/;...:;;...,.....;9 Supervisor Date Cler / D~te
Approved by the Board of County Road Commissioners on the ___ day of _________ _,.~. c)_o L l
Commissioner Date
MONROECOUN
201g'TOWNSHIP
7
D COMMISSION
IMPROVEMENT CONTRACT
Township: Ash
Project#: 504 001195201
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Various
Location: to
Length: Miles Road Class: Local ----...,.-- -----Description of Work: First cutting (spring)- to center of ditch. Second cutting
(summer/fall)- both sides of the ditch
Work to be completed by Precision Irrigation
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Mowing Contractor 14,900 14,900
Total Probable Cost $ 14,900 $ 14,900 $ - $ -
The· Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agr~ed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A .contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receiv~ monthly progress hillihgs payable to ·the MCRC within thirty (30) days.
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2:(31'g, ZD l q _
Commissioner Date
\\i ~~ \\
M ~\ ~' ~\
MONROE C ~~ N~¥ ROAD COMMISSION Township: Berlin ' ~!
2019 TOWN JP J)OAD IMPROVEMENT CONTRACT Project#: 504 003 190309
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Armstrong
Location: Sigler to Dead End
Length: 0.14 Miles Road Class: Local ----- -----Description of Work: 211 Stone Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 3,810 3,810
Total Probable Cost $ 3,810 $ 3,810 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual con.tract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Supervisor Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _J 2019.
Commissioner Date
Township: Berlin
Project#: 489 003 19031.1
The Board of County Road co·mmissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Armstrong
Location: Brandon to labo
Length: 0.66 Miles Road Class: Local ----- -----Description of Work: 311 Stone Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 20,175 20,175
Total Probable Cost $ 20,175 $ 20,175 $ - $ -
The Total Probable Cost along with the. Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action frol"!1 either party, this contract will automatically·be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Approved by the Township Board on the~iflcJay of ~~rt '" ()
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of----------' 2019.
Commissioner Date
TV ROAD COMMISSION Township: Berlin
ROAD IMPROVEMENT CONTRACT Project#: 504 003 190310
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.
Road Name: Brandon
Location: Sigler to Village limits
Length: 1.13 Miles Road Class: Local ----- -----Description of Work: 211 Stone Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 24,226 24,226
Total Probable Cost $ 24,226 $ 24,226 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portfon of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Supervisor Date Date
Ap·proved by the Board of County Road Commissioners on the ___ day of ________ _, 2019.
Commissioner Date
MONROE COUNTY ~D COMMISSION Towns~ip: Berlin
2019 TOWNSHIP ROAD IMPROVEMENT CONTRACT · Project#: . 504 003 190308
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portfon of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Dauncy
Location: Armstrong to Township Line
Length: 1.07 Miles Road Class: Local -----Description of Work: 2" Stone Lift
Worl< Probable Funding Source
Worl< Type Provider Cost Township MCRC Other Comment
Stoning Contractor 19,379 10,658 8,721
Total Probable Cost $ 19,379 $ 10,658 $ 8,721 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRCwithin thirty (30} days.
• . rJ ~~ t c." 1_, ' Approved by the Township Board on the d5}VIday of Y~Uffi!f\4-
. 0 /)o~ 4~ ~/7G-/z
Supervisor Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
l\
II 11 'I
d II ·/ .
MONR , E , UNTY'ROAD COMMISSION Township: Berlin li I
2019 tjtJW. SHIP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190305 i i ~ ,!!
The Bo~-;:-d of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated porti~n of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Dunsmore Plat
Location: Off Brandon to
Length: 0.34 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing . MCRC 8,811 4,406 4AOS
Total Probable Cost $ 8,811 $ 4,406 $ 4,405 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the· Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
~,1
' !i MONROE C U :
1
Y ROAD COMMISSION · . Township: Berlin
2019 TOW HI J ROAD IMPROVEMENT CONTRACT Project#: 504 003 190316
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.
Road Name: Haggerman
Location: Labo to Sigler
Length: 0.99 Miles Road Class: Local -----Description of Work: 211 Stone Lift
Worl< Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 20,175 20,175
Total Probable Cost $ 20,175 $ 20,175 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from ei.ther party, this contract will awtomatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
J-~-1 a Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of ________ __~ 2019.
Commissioner Date
ROAD COMMISSION Township: Berlin
DAD IMPROVEMENT CONTRACT Project#: 504 003 190314
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. ~he Township agrees to pay its allocated portion of the actual cost of the work. 1he MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Joanne/Birchwood
Location: Off Newport to
Length: Road Class: Local -----Miles -----0.37
Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 12,423 12,423
Total Probable Cost $ 12,423 $ 12,423 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30} days.
Approved by the Township Board on the~Mday of N~(L).__f)vyl
Supervisor Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _~ 2019.
Commissioner Date
MONRO~~ NTY ROAD COMMISSION .
2019 roJ(s f' ROAD IMPROVEMENT CONTRACT
Township:
Project#:
Berlin
504 003 190315
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Newport
Location: N. Dixie Hwy to Armstrong
Length: 0.98 Miles Road Class: Local
Description of Work: 211 Stone Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 18,274 18,274
Total Probable Cost $ 18,274 $ 18,274 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
MONROEC Township: Berlin
2019 TOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190312
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Swan Creek
Location: N. Dixie Hwy to N. Dixie Hwy
Length: 1.07 Miles Road Class: Local -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider ·Cost Township MCRC Other Comment
Chip Sealing MCRC 23,997 23,997
Total Probable Cost $ 23,997 $ 23,997 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost Is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount an~ the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated· portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of----------' 2019.
Commissioner Date
MONROE C l,JTY ROAD COMMISSION Township: Berlin
2019 TOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190313
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. T~e Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Swan Creek
Location: Newport to labo
Length:. Miles ----- Road Class: Local -----1.09
Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 26,226 26,226
Total Probable Cost $ 26,226 $ 26,226 $ - $ -
The Total Probable Cost along with ~he Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township 1
S
allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township 1
S allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ -' 2019.
Commissioner Date·
MONROE ~U ROAD COMMISSION Township: Berlin ,
2019 TOWtHJ j ROAD IMPROVEMENT CONTRACT Project#: 504 003 190306
The Board of County Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Swan View
Location: Trombley to Dead End
Length: 0.39 Miles Road Class: Local -----Description. of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 9,752 4,876 4,876
Total Probable Cost $ 9,752 $ 4,876 $ 4,876 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof {which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceeq the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's ·allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _ __,... ______ ___, 2019.
Commissioner Date
I]
MONROFtOl NTY ROAD COMMISSION Township: Berlin
2019 T08i IP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190307
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. "fhe Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Trombley
Location: Strong to Masserant
Length: 0.75 Miles. Road Class: Local -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 18,215 9,108 9,107
Total Probable Cost $ 18,215 $ 9,108 $ 9,107 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
J-;t-(Q ~;}Of[ Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
11
MONROE tO tTY ROAD COMMISSION . Township: Berlin
2019 TO \Nsj;IP ROAD IMPROVEMENT CONTRACT Project#: 504 OOa 195203
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. ~he Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Various
Location:
Length: Miles Road Class: Local ----- -----Description of Work: Two cuttings to be from edge of road to center
(bottom of ditch). One cutting to be to the property line (fence row).
Work to be completed by D&D Wyse
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Mowing Contractor 18,500 18,500
Total Probable Cost $ 18,500 $ 18,500 $ - $ -
The Total Probable Cost along with th€ Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall npt exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
:i I
MONROE :,0 TV ROAD COMMISSION I I .
2019 TO S IP ROAD IMPROVEMENT CONTRACT
Township: Dundee
Project#: 504 004 190412
I The Board ounty Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Cake
Location: Petersburg to Davis
Length: 1.41 Miles Road Class: Local -----Description of Work: 2" Stone Lift
Work ·Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 28,962 28,962
Total Probable Cost $ 28,962 $ 28,962 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Approved by the Township Board on the C)& 'f'day·of
/\/) ~ [#4~.& 1J1 LtMJL t2--c2k ----11
1~ ,2019.
~)ry1, ~ .;2-C).{;-Ii Cle Date Supervisor Date
Approved by the Board of County Road Commissioners on the ___ day of _ _;__ _______ _, 2019.
Commissioner Date
MONROE COUN
2019 TOWNSHIP
AD COMMISSION
IMPROVEMENT CONTRACT
Township: Dundee
Project#: 504 004 190407
The Board of Cou oad Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Dennison
Location: Brewer to M-50
Length: 1.69 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 35,052 17,526 17,526
Total Probable Cost $ 35,052 $ 17,526 $ .17,526 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Approved by the Township Board on thec)2U ~ay of
~ ~-,JP-(9 ~ ,2019.
. . ~n?~'e2Gl6-!7 Cler · Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
Township: · Dundee
2019 TOWNSHIP ROAD IMPROV Project#: 504 004 190411
The Board of County Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Dundee-Azalia
Location: Hatter to Village Limits
Length: 1.24 Miles Road Class: Local -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 31,175 31,175
Total Probable Cost $ 31,175 $ 31,175 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof {which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Approved by the Tow~ship Board on the .;:(lj ~ay of ~~"' • 2019.
~at3flt /J-cZ~-!1. ~!II~· ,;;;~02~-19 Su rvisor Date C rk Date
Approved by the Board of County Road Commissioners on the ___ day of _________ __, 2019.
Commissioner Date
MONROE COUNTY R
2019 TOWNSHIP ROA ~ '
~ '
OM MISSION '
ROVEMENT CONTRACT
Township: Dundee
Project#: 504 004 190410
The Board of County Road Commissioners of Monroe County (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Gloff
Location: Dixon toRR
Length: 0.82 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 19,123 19,123
Total Probable Cost $ 19,123 $ 19,123 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Approved by the Township Board on the~ 'H-aav of ~~ • 2019.
~A® c2-o2b--!,9 ~lY/,~ ~~tP-J9 Sup rvisor Date erk Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
. MONROE C ROAD COMMISSION Township: Dundee
ROAD IMPROVEMENT CONTRACT Project#: 504 004 190409
The Board o ounty Road Commissioners of Monroe County (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.
Road Name: Meanwell
Location: M-50 to Ida West
Length: 2.73 Miles Road Class: Local ---'----
Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 65,613 65,613
Total Probable Cost $ 65,613 $ 65,613 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total .Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood s.hall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is
· provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Approved by the Township Board on thee2 (p ~ay of ~
fJJ:Ifdu1{§)J_ ~ -~ -;q Sup isor Date
12019,
~ /!1-~ d-0/t-)J Clerk Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
MONROE COU
2019TOWNSH I
OAD COMMISSION
AD IMPROVEMENT CONTRACT
Township: Dundee
Project#: . 504 004190408
The Board of ·C niy Road Commissioners of Monroe County (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.
Road Name: Wilcox
M-50 to Day Location:
length: 2.40 Miles
Description of Work: Single Chip Seal
Work Probable
Work Type Provider Cost
Chip Sealing MCRC 55,562
Total Probable Cost $ 55,562
Road Class: Local -----
Funding Source
Township MCRC Other Comment
36,671 18,891
$ 36,671 $ 18,891 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is. set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount
· and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress biJiings payable to the MCRC within thirty (30} days.
Approved by the Township Board on thecR{,. 'h" day of 1~ . 2019.
~ :J-;2/e -c:_q ~ !Yl~ .;2-r:}cR/9 Su Date Cler Date
Approved by the Board of County Road Commissioners on the ___ day of _________ -' 2019.
Commissioner Date
MONROE COUNTY ROAD COMMISSION Township: Dundee ;I
2019 TOWNSHIP ROAD IMPROVEMENT CONr: I
Project#: 504 004 195204
The Board of County Road Commissioners of Man-"" ·county (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Various
Lo·cation:
Length: Miles Road Class: Local ----- -----Description of Work: First cutting (spring) - One pass on both sides of road
Second Mowing- Two passes on both sides of road
Fence-:to-Fence- All roads west of US-23, South of M-50
Work to be completed by D&D Wyse
Work Probable ·Funding Source
Work Type Provider Cost Township MCRC Other Comment
Mowing Contractor 19,990 19,990
Total Probable Cost $ 19,990 $ 19,990 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require ·prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Approved by the To~wnship Board on the ;l(R 'f1<...l day of 1=~
Qjtuu.L¥1J c:<-~-;q Supervisor Date
12019, ·
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
I MONROE COUNTY ROAD cl; M 1/ ISSION
2019 TOWNSHIP ROAD IM I RO ,I EMENT CONTRACT ;I 'I
Township: Dundee
Project#: 000
The Board of County Road .. ' issioners of Monroe County (MCRC) and the Township,_ in accordance with Public Act 51 of 1951,_ as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Various
Location: to
Length: Miles Road Class: Local -----Description of Work: Excess Gradall
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Ditching MCRC 50,000 50,000
Total Probable Cost $ 50,000 $ . 50,000 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Approved by the Tow~ship Board on the d_{/1._ day of ±~
~ .Pj#/;1.. 12019,
~~.07~ Supervisor Date Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
ROAD COMMISSION Township: LaSalle
AD IMPROVEMENT CONTRACT Project#: 504 009 190904
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name:
location:
length:
Descrip.tion of Work:
Work Type
Chip Sealing
Dunlap
Stein to Yargerville
0.99 Miles
Single Chip Seal
Work Probable Provider Cost
MCRC 22,351
Total Probable Cost $ 22,351
Road Class: local -----
Funding Source
Township MCRC Other Comment
11,176 11,175
$ 11,176 $ 11,175 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
Date
Approved by the Board of County, Road Commissioners on the ___ day of ________ _, 2019.
Commissioner Date
r ~:~ . r ~I
MONROE COUNTY RO D ' MMISSION · ' )
2019 TOWNSHIP ROA IM~ ROVEMENT CONTRACT
Township:
Project#:
LaSalle
504 009 190904
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Hillcrest Orchard Sub
Location: Off Stein to Between US-24 & M-125
Length: 1.48 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 34,607 17,304 17,303
Total Probable Cost $ 34,607 $ 17,304 $ 17,303 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract ~id amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Approved by the Board of County Road Co~ missioners on the ___ day of _________ ,, 2019.
Commissioner Date
~ r
MONROE COUNT R D COMMISSION
2019 TOWNSHIP . 0 IMPROVEMENT CONTRACT
Township: LaSalle
Project#: 504 021192107
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shail be scheduled and the manner of performance.
Road Name: Rauch
Location: US-24 to Minx
Length: _1_.9_9 ____ Miles Road Class: Local -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 46,563 11,641 23,281 11,641
Total Probable Cost $ 46,563 $ 11,641 $ 23,281 $ 11,641
The Total Probable Cost along with the Township allocated portion of the Total Probable 'Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.
I c;til d f f ~(Lt &'1_( II :' ay o -:-. --=~-"'-!.....:~-~J.f--____l
2 2 & I 1(1 Date Date
Approved by the Board of County Road Commissioners on the ___ day of ________ ___, 2019.
Commissioner Date
COUNTY ROAD COMMISSION Township: LaSalle
, NSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 009 195209
The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Various
Location:
Length: 41.00 Miles Road Class: Local -----Description of Work: First cutting to be twenty (20) feet from edge of the road
to top of back bank (or whichever is less), Second cutting is to be twenty (20)
feet or to top of the back bank (or whichever is less)
Work to be completed by D;K. Services
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Mowing Contractor 10,250 10,250
Total Probable Cost $ 101250 $ 101250 $ - $ -
The Total Prob~ble Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of. the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township Will receive monthly progress billings payable to the MCRC within thirty (30} days.
Approved by the Township Board on the / 91:J. day of · Tf~·(U {i/ V f
-+-0..,.t.JJk~)1,:!4Luvt+--.:'-c/fl<---lf..lc,...£<..l:t~~>a~:Jl4<l..ol.{If~.k4:::...L..1- ____ ...:::;zz~lzi::.J..rrl.!...ja /c......t:l 1 I · ........ /
Supervisor Date ~..__..--./
Approved by the Board of County Road Commissioners on the ___ day of ________ _, 2019.
Commissioner Date
Date
MONROECOUN
2019 TOWNSHIP
The Board of Cou 1951, as amended, portion of the act performance.
Road Name:
Location:
Length:
Description of Work:
Work Type
Chip Sealing
COMMISSION Township:
Project#:
Summerfield
504 014 191408
Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of hat the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated of the work. · The MCRC shall determine when the work ·shall be scheduled and the manner of
Alba in
Summerfield to City Limits
2.01 Miles Road Class: Local -----Single Chip Seal
Work Probable Funding Source
Provider Cost Township MCRC Other Comment
MCRC 42,880 21,440 21,440
Total Probable Cost $ 42,880 $ 21A40 $ 21A40 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township1s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township1
S allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty (30} days.
the \Bfh day of ~.J J (\./L.vOJVj , 2019.
Cl Lf\ fi,
~4+-:.4~~,..G----~~-_21;___;;-Z__;__o_;a+- ~ 1 J .elM~ d::-2fo~ ~~ Date Clerk U Date
Approved by the Board.of County Road Commissioners on the ___ day of ______ ---'-__ _, 2019.
Commissioner Date
MONROE COU
2019TOWNS
OAD COMMISSION
~D IMPROVEMENT CONTRACT .
Township:
Project#:
Summerfield
504 014 191414
The Board of nty Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled aod the manner of performance.
Road Name: Bentwood
Location: Wells to Dead End
Length: 0.43 Miles Road Class: Local
Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 15,486 15,486 ~~~v~).\. l);,p,""
II
Total Probable Cost $ 15,486 $ 15,486 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is a~reed and understood shall not exceed 110% of the Township•s allocated portion of the Totat Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increas~ in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30} days.
Approved by the Board of County Road Commissioners on the ___ day of _________ _J 2019.
Commissioner Date
tl L MONROE ti:' TV ROAD COMMISSION Township: Summerfield
2019 TO!Il1i S , ~ROAD IMPROVEMENT CONTRACT Project#: 504 014 191409 u '
The Board or County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·Shall be scheduled and the manner of performance.
Road Name: Forrest
Location: Teal to City limits
Length: 0.52 Miles Road Class: Local ----- -----· Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provi.der Cost Township MCRC Other Comment
Chip Sealing MCRC 12,636 6,950 5,686
Total Probable Cost $ 12,636 $ 6,950 $ 5,686 $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form. ·
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
performance.
Road Name: Lulu
Location: Summerfield to Teal
Length: 1.39 Miles -----Description of Work: Single Chip Seal
Work Probable Work Type Provider Cost
Chip Sealing MCRC 32,890
Total Probable Cost $ 32,890
Township
32,890
$ 32,890
Township:·
Project#:
Road Class: Local -----
Funding Source
MCRC Other
$ - $ -
Summerfield
504 014 191410
Comment
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above._ Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form. '
TheTownship will receive monthly progress billings payable to the MCRC within thirty (30) days.
Date
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
])
~~' J 1 ~ MONRO /to
1 NTY ROAD COMMISSION Township: Summerfield
2019 T01~N /HIP ROAD IMPROVEMENT CONTRACT Project#: 504 014 191413 fl ~
The Bol ' of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the w·ork. The MCRC shall determine when the work· shall be scheduled and the manner of performance.
Road Name: Morocco
Location: County line to Dead End
Length: 4.77 Miles Road Class: Local -----Description of Work: 2" Stone Lift
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Stoning Contractor 83,564 83,564
Total Probable Cost $ 83,564 $ 83,564 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township 1
S
allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township1s allocated portion ·of the actual contract bid amount shall require' prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings ~ayable to the MCRC within thirty {30} days.
Approved by the Board of County Road Commissioners on the ___ day of _________ __, 2019.
Commissioner Date
MONROE CO ROAD COMMISSION Township: Summerfield I
2019 TOWNS r /P OAD IMPROVEMENT CONTRACT Project#: 504 014 191411 (
The Board of · "' ty Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as .amended, agree that the MCRC shall perform the work described hereinafter . .The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Old Ida Center
Location: Wells to Ida Center
Length: 0.18 Miles Road Class: Local --...,..----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 5,497 5,497
Total Probable Cost $ 5,497 $ 5,497 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Approved by the Board of County Road Commissioners on the ___ day of ___________ 2019.
Commissioner Date
Township:
Project#:
Summerfield
504 014 191412
The Board of 'v nty Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The Mc;:RC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Railroad
Location: City Limits to Summerfield
Length: 1.76 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Chip Sealing MCRC 38,316 38,316
Total Probable Cost $ 38,316 $ 38,316 $ - $ -
The Total Probable Cost along ·with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either·party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A cohtingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determi!1es that the actual contract ~ost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
MONROE COU~Q COMMISSION Township: Summerfield
2019 TOWNSHIP Rd~' PROVEMENT CONTRACT Project#: 504 014195214
The Board of County Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.
Road Name: Various
Location:
Length: Miles Road Class: Local ----- -----Description of Work: First Cutting -To center of ditch
Second Cutting -To center of ditch and back sides of ditch
Work to be completed by Precision Irrigation
Work Probable Funding Source
Work Type Provider Cost Township MCRC Other Comment
Mowing Contractor 18,400 18,400
Total Probable Cost $ 18,400 $ 18,400 $ - $ -
The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof {which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.
The Township will receive monthly progress billings payable to the MCRC within thirty {30} days.
Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.
Commissioner Date
MONROE COUNTY ROAD COMMISSION
RIGHT-OF-WAY CONTRACTS FOR
CONTRACTORS MOWING ON TOWNSHIP LOCAL ROADS
THIS AGREEMENT, made this __ day of , 2019, by and between the Board of County Road Commissioners of the County of Monroe, Michigan, a municipal corporation, hereinafter referred to as the Road Commission, and O.K. Services with offices at 13015 Dennison Rd., Milan, Ml 48160 734-439-8545, hereinafter referred to as the Contractor:
WITNESSETH:
That the Contractor has submitted the low bid for mowing in Exeter Township, in the amount of $245 per hour for up to $12,005 worth of work. The Contractor agrees to furnish all services, labor, tools, equipment, material, and transportation, and incidentals necessary to perform the entire work in accordance with the following documents which are incorporated herein by reference and are part of the contract.
INSURANCE & PERMIT REQUIREMENTS:
The contractor shall secure and maintain such insurance as will protect self from claims under the Worker's Compensation Acts and from claims for bodily injury, death, or property damage, which may arise from the performance of services under this agreement, and shall also carry professional liability insurance. Limits of liability shall be as follows:
General Liability:
Bodily Injury
Property Damage
Automobile Liability:
Bodily Injury
Property Damage
Professional Liability:
Valuable Papers:
On Premises Off Premises
Each Person Each Occurrence Aggregate
Each Occurrence Aggregate
Each Person Each Occurrence
Each Occurrence Aggregate
$2,000,000 $2,000,000 $2,000,000
$2,000,000 $2,000,000
$2,000,000 $2,000,000
$2,000,000 $2,000,000
$ 500,000
$ 50,000 $ 5,000
Endorsements- All insurance policies and binders shall include the following endorsements, verbatim:
"ADDITIONAL INSURED: The BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF MONROE, the Monroe County Road Commission and its officers, agents, and employees."_
_"Provide Written notice ten (1 0) days prior to cancellation, expiration, termination or reduction in coverage for nonpayment of the premium and written notice thirty (30) days prior to cancellation, expiration, termination or reduction in coverage for all other reasons.
The C()ntractor will apply for a permit with the Monroe County Road Commission to work within the road right-of-way.
INDEMNIFY MONROE COUNTY ROAD COMMISSION
The contractor shall at all times exercise extreme care and shall assume any and all liability for property damage or bodily injury resulting from the above operation by his employees, agents, assigns, sub-contractors and anyone else acting under his control or direction; and will indemnify, hold harmless and defend the County Road Commission, its Commissioners and employees from any and all claims for property damage or bodily injury arising out of this Agreement (including 'but not limited to actual attorney fees, expert Witness fees, and court costs).
FINAL INSPECTION, ACCEPTANCE. AND PAYMENT
The Monroe County Road Commission will make a final inspection of all work included in the contract, and notify the contractor of defects to be remedied prior to final acceptance. Upon satisfactory completion of the work by the contractor, a final estimate will be prepared. Payment for all work completed ahd accepted, less previous payments, will be made within thirty (30) days of final acceptance.
DISPUTES
The Monroe County Road Commission's written decision on any question arising under the contract between the township and contractor shall be final and binding upon both the township and the contractor in the absence of fraud, bad faith, or abuse of discretion.
SPECIFICATIONS
Brush mowing - Mow/mulch everything from where township completed across to the far bank out to a minimum of 20'. Contractor will cut anything and up to 3" and smaller. Low hanging branches up to 3" to be cut back to tree trunk. Ditch work will be postponed if they have an excess of snow drifts & water level is too high.
Contractor must notify the Monroe County Road Commission, 24 hours prior to and within 24 hours of completion of each mowing cycle for each individual township.
Clearing of intersections, each cycle of mowing, requires clean up of the entire road right of way 1 00' in all directions from the intersection.
All local roads are to be mowed.
Contractor must communicate which of the township roads will receive cleanup on a yearly basis, prior to commencement.
No debris to be left in the roadway or shoulder portion of road.
All work must be inaccordance to Act 791, SB 303 of 1997 and Enrolled House Bill #5594, Section 326 which became effective on October 1, 1998 (see attached.)
Approved by the Contractor on the ___ day of _______ ...;.:7 2019.
c!J~~~ ~''7 Betsy ~itz~ Presi~ Date
Approved by the Board of County Road Commissioners on the of _____ ~ 2019.
Commissioner
MONROE COUNTY ROAD COMMISSION
RESOLUTION
BE IT RESOLVED that the Board of County Road Commissioners of Monroe County, Michigan enter into a contract with the Michigan Department of Transportation for:
Contract No. 19-5082; Control Section STU 58115; Job Number 133379CON; Project 1900(166); CFDA No. 20.205; Microsurfacing work along Summerfield Road from Smith Road northerly to Consear Road; including pavement marking work; and all together with necessary related work.
BE IT FURTHER RESOLVED that the Board or County Road Commissioners hereby approves the above-Cited contract and authorizes Commissioners Paul lacoangeli and Dan Minton to execute same on behalf of the Board of County Road Commissioners of Monroe County.
Moved by Commissioner _________________ and supported by
Commissioner the adoption of the above Resolution.
Vote: Yes
No
I hereby certify this to be a true copy of Board action dated ____________ ,2019
at Monroe County, Michigan.
Cheryl U'Ran, Deputy Clerk
BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF MONROE
Paul lacoangeli, Chairman Dan Minton, Vice Chairman Charles A. Londo, Member Greg W. Stewart, Member Jack Thayer, PE, Member
AMENDMENT TO CONTRACT 18-5546 DA
Control Section Job Number Project CFDANo.
Contract No.
STU 58115 133379CON 1900(166) 20.205 (Highway Research Planning & Construction) 19-5082
THIS AMENDATORY CONTRACT is made and entered into this date of ______ , by and between the MICHIGAN DEPARTMENT OF TRANSPORTATION, hereinafter referred to as the "DEPARTMENT"; and the BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF MONROE, MICHIGAN, hereinafter referred to as the "REQUESTING PARTY"; for the purpose of fixing- the rights and obligations of the parties in agreeing to this Amendment to CONTRACT #18-5546. · ·
WITNESSETH:
WHEREAS, the parties to the Amendment have heretofore, by a Contract dated January 22, 2019; hereinafter referred to as "CONTRACT 18-5546" provided for the construction and financing of that which is hereinafter referred to as the."PROJECT" and is described as follows:
Microsurfacing work along Summerfield Road from Smith Road northerly to Consear Road; including pavement marking wotk; and all together with necessary related work.
WHEREAS, the DEPARTMENT and the .REQUESTING PARTY having appropriate authority desire to amend CONTRACT 18-5546 to provide for the inclusion of federally participating construction engineering, construction materials testing, and inspection and the increase in the estimated PROJECT COST. ·
NOW, THEREFORE, it is hereby agreed by and between the parties hereto that:
1. Section 2 of CONTRACT 18-5546 is revised to read as follows:
2. The term uPROJECT COST", as herein used, is hereby defined as the cost of the physical construction necessary for the completidn of the PROJECT, including costs incurred by the DEPARTMENT and the REQUESTING PARTY for construction engineering, cqnstruction materials testing, and inspection and any other costs incurred by the DEPARTMENT as a result of this contract
2/4/87 amend.for 2/20/19 1
CONTRACTED WORK
Estimated Cost
EXHIBIT I REVISED
CONTROL SECTION JOB NUMBER PROJECT
ESTIMATED COST
CONSTRUCTION ENGINEERING, CONSTRUCTION MATERIALS TESTING, AND INSPECTION (REQUESTING PARTY) .
GRAND TOTAL
STU 58115 133379CON 1900(166)
COST PARTICIPATION
NO DEPOSIT
GRAND TOTAL ESTIMATED COST Less Federal Funds B.ALANCE (REQUESTING PARTY'S SHARE)
2/4/87 amend.for 2/20/19 ·5
February 20, 2019
$284,200
$ 42,600.
$326,800
$326,800 $267,500 $ 59,300.
Monroe County Road CommissionBid Comparison
Contract ID: 2019 MicroDescription: 0.81 miles of microsurfacing and pavement markings on North Dixie Highway from approximately 470 feet east of the northbound I-75 ramps to
Sandy Creek Road in Frenchtown Township, Monroe County (MCRC Project No. 459-007-190703)Location:
North Dixie HighwayProjects(s):
2019 Micro
Rank Bidder Total Bid % Over Low % Over Est.
0 ENGINEER'S ESTIMATE $66,882.50 10.97% 0.00%
1 (06439) Pavement Maintenance Systems, LLC $60,268.00 0.00% -9.88%
2 (07915) American Pavements, Inc. $78,170.50 29.70% 16.87%
3 (07091) Strawser Construction Inc. $99,002.50 64.27% 48.02%
4 (07942) Microsurfacing Contractors, LLC $138,275.00 129.43% 106.74%
Contract # 2019 Micro (North Dixie Highway)MERL: 2018.11.1
03/06/2019 7:44:18 AM
Page 1 of 3
(0) ENGINEER'S ESTIMATE(1) Pavement MaintenanceSystems, LLC (2) American Pavements, Inc.Line Pay Item Code Quantity Units
Description Bid Price Total Bid Price Total Bid Price Total0001 5047011 19,250 Syd $3.25 $62,562.50 $2.92 $56,210.00 $3.85 $74,112.50_ Micro-Surface, Std, Modified
0002 8110231 8,900 Ft $0.15 $1,335.00 $0.13 $1,157.00 $0.13 $1,157.00Pavt Mrkg, Waterborne, 4 inch, White
0003 8110232 10,700 Ft $0.15 $1,605.00 $0.13 $1,391.00 $0.13 $1,391.00Pavt Mrkg, Waterborne, 4 inch, Yellow
0004 8110343 170 Sft $4.00 $680.00 $5.00 $850.00 $5.00 $850.00Rem Spec Mrkg
0005 8110405 1 Ea $175.00 $175.00 $165.00 $165.00 $165.00 $165.00Pavt Mrkg, Polyurea, Lt Turn Arrow Sym
0006 8110410 2 Ea $175.00 $350.00 $165.00 $330.00 $165.00 $330.00Pavt Mrkg, Polyurea, Only
0007 8110412 1 Ea $175.00 $175.00 $165.00 $165.00 $165.00 $165.00Pavt Mrkg, Polyurea, Rt Turn Arrow Sym
Bid Totals: $66,882.50 $60,268.00 $78,170.50
Contract # 2019 Micro (North Dixie Highway)MERL: 2018.11.1
03/06/2019 7:44:18 AM
Page 2 of 3
(3) Strawser Construction Inc.(4) Microsurfacing Contractors,LLCLine Pay Item Code Quantity Units
Description Bid Price Total Bid Price Total Bid Price Total0001 5047011 19,250 Syd $4.90 $94,325.00 $6.70 $128,975.00 $0.00_ Micro-Surface, Std, Modified
0002 8110231 8,900 Ft $0.15 $1,335.00 $0.25 $2,225.00 $0.00Pavt Mrkg, Waterborne, 4 inch, White
0003 8110232 10,700 Ft $0.15 $1,605.00 $0.25 $2,675.00 $0.00Pavt Mrkg, Waterborne, 4 inch, Yellow
0004 8110343 170 Sft $5.75 $977.50 $20.00 $3,400.00 $0.00Rem Spec Mrkg
0005 8110405 1 Ea $190.00 $190.00 $250.00 $250.00 $0.00Pavt Mrkg, Polyurea, Lt Turn Arrow Sym
0006 8110410 2 Ea $190.00 $380.00 $250.00 $500.00 $0.00Pavt Mrkg, Polyurea, Only
0007 8110412 1 Ea $190.00 $190.00 $250.00 $250.00 $0.00Pavt Mrkg, Polyurea, Rt Turn Arrow Sym
Bid Totals: $99,002.50 $138,275.00
Contract # 2019 Micro (North Dixie Highway)MERL: 2018.11.1
03/06/2019 7:44:18 AM
Page 3 of 3
MONROE COUNTY
R 0 A D COMMISSION
840 S. Telegraph Rd: ·Monroe, Michigan ·48161 · (734) 240-5100 ·Fax: (734) 240-5101
MEMORANDUM
TO: Board of Road Commissioners
CC: Randy Pierce, Managing Director; Kyle Kinsey, Supervisor; Finance
FROM: ~~Christine Herron
RE: Uniform Traffic Control Devices Bid
DATE: Mar~h 6, 2019
On Tuesday, March 5, 2019.we held a bid opening for 201·9 Various Uniform Traffic Control Devices (signs and sign materials). ·
It is my recommendation to· award the bid to all the vendors that responded. . .
o Lightle Enterprises o MD Solutions o .Dornbos Sign, Inc. o Vulcan, Inc. o Osburn Associates, Inc. o Howard T. Moriarity
Bid tabulations are· attached for your review.
&..v • ...., \...IIIIIVllll 1tcuttv vVIILIVt ucvivC~ DIU 1 ctU
March 5, 2019
.ROLL MATERIAL
MD Vulcan, Osburn H.T.
Material Lightle Solutions
* Dornbos Inc. Moriarity
3M Diamond Grade DG3 Reflective Sheeting - Standard Colors·-1014.89 N/B 969.45 906.00 897.00 N/B
Series 4000 - 24"x50yd
3M Diamond Grade DG3 Reflective Sheeting - Standard Colors -1268.62 N/B 1121.81 1132.50 1121.25 NIB
Series 4000 - 30"x50yd 3M Diamond Grade DG3 Reflective Sheeting - Standard. Colors -
1522.34 N/B 1454.18 1359.00 1345.50 N/B Series 4000·- 36"x50yd 3M Diamond Grade Florescent DG3 Reflective Sheeting - Standard
1053.19 N/B 990.15 942.00 912.00 NIB Colors - Series 4081 - 24"x50yd 3M Diamo.nd Grade Florescent DG3 Reflective Sheeting - Standard
1316.49 NIB 1237.69 1177.50 1140.00 N/B Colors - Series 4081 - 30"x50yd ·
3M Diamond Grade Florescent DG3 Reflective Sheeting - Standard 1579.79 N/B 1485.23 1413.00 1368.00 . N/B
Colors - Series 4081 - 36"x50yd 3M Diamond Grade Florescent Yellow/Green DG3.Reflective
1579.79 N/B. 1485.23 1413.00 13.68.00 N/B Sheeting - Standard Colors - Series 4083 - 36"x50yd
3M Scotchcal Graphic Film- Black- Series 3650-12- 30"x50yd 498.00 N/B . 463.50 585.00. 648.00/48" N/B
~M Scotchcai·Graphic Film- Black- Series 3650-12- 36"x50yq 511.26 N/B 556.20 702.00 486.00 N/B
3M Electrocut Film-Standard Colors - Series 1170 - 18"x50y~ 246.83 N/B 275.40 218.25 216.'00 N/B
3M Electrocut Film-Standard Colors- Series 1170- 24"x50yd 329.10 N/B 367.20 291.00 288.00 NIB
·3M Electrocut Film-Standard Colors - Series 1170 - 30"x50yd 411.38 N/B 459.00 363.75 360.00 N/B
3M Electrocut Film-Standard Colors - s·eries 1170 - 36"x50yd 493.65 N/B 550.80 436.50 432 .. 00 N/B
3M Protective Overlay Film ....:. Series 1150 - 30"x50yd '658.25 N/B 711.56/1160 585.00 577.50/1160 N/B
3M Protective Overlay Film ..:... Series 1150 - 36"x50yd 789.89 N/B 853.88/1160 702.00 693.00 N/B
TPM-5 Clear Transfer Tape- 6"x1 OOyd 50.00 N/B 54.00 21.00 46.50 N/B
TPM-5 Clear Transfer Tape- 9"x1 OOyd 75.00 N/B 81.00 31.50 69.75 N/B
TPM-5 Clear Transfer Tape- 24"x1 OOyd 200.00 N/8 216.00. 84.00 186.00 N/8
TPM-5 Clear Transfer Tape- 30"x1 bOyd 250.00 N/B 270.00 105.00 232.50 N/B - - - - - '---~
Page 1 of 7 MnnrnP. Cnuntv Rn~rl Cnmmi~~ion
Size
.18"x18"
30"x30"
36"x36"
36"x36"x36"
18"x6"
48"x9"
27"x18"
48"x30"
24"X30"
36"X12"
36"X48"
24"x10"
24"X24"
24"x24"
24"X36"
24"X30"
12"X6"
12"X12" 2 color
._..., ''-' 'JIIII'JIIII JltAIIIv '-JVIIL:IVI L.JvVJI.,.,c:;;:, UIU I au
March 5, 2019
PREFABRICATED REGULATORY AND MISC. REFLECTORIZED SIGN FACES 3M Diamond Grade DG3 Reflective Sheeting, Series 4000 on 0.80 flat aluminum
Example(s) MD Vulcan, Lightle
Soh:~tions * Dornbos
Inc.
ER-1 16.58 N/B 13.55 20.86
R1-1 45.40 N/B 36.69 39.25
R1-1 65.50 N/B 52.23 56.52
R1-2 33.30 N/B 27.09 28.98
R1-4 5.60 N/B 4.52 5.55
R15-1 44.22 N/B 60.04 77.39
R15-2P 2, R15-2P 3 24.87 N/B 25.35 29.2_1
R11-2 73.70 . N/B 60.20 67.30
R2-1, R12-1, R2-5A, R3-16, 36.85 N/B 30.10 33.65
R3- t6a, R3-17, R4-~, R8-8
R6-1 22.11·· N/B 18.06 20:19
R3-9b 88.44 N/B 72.24 80.76
ARROW (special see attachment) - 12.31 N/B 10.05 12.09
R5-2 'No Trucks' 29.70 N/B 24.08 26.92
R5-2 'No Thru Trucks' 29.70 N/B 24.08 26.92-
R10-6 44.22 N/B 36.12 40.38
R12-8 (special-see attachment) 36.85 N/B 40.10 33.65
R8-4 3.90 N/B 3.01 3.67
R3-8a 7.50 N/B 6.92 7.71 -- -
MnnmP. Cmmtv Rn::~rl Cnmmissinn
. ,-H.T.
Osburn· Moriarity
17.06 N/B
47.38 N/B
68.22 N/B
53.06 N/B J
I
5.69 N/B
22.74 N/B
25.58 .N/B
75.80 N/B
37.90 N/B
22.74 N/B
90.96 N/B
12.63 N/B
30.32 N/B
30.32 N/B
45.48 N/B
37.90. N/B
3.79 N/B
7.68 N/B
Page 2 of 7
-- ·- -····-···· lllo.AIII'\J '-'Vlll.IVI LJV.VIVVV LJIU IOU
March 5, 2019
-
24"X24". R3-8a 29.70 NIB 24.08 27.28 30.72 N/B
2 color
24"X18" R 1-1 0 pI R 14-1 22.11 NIB 18.06 20.19' 22.74 N/B
24"x18" R14~1 (special see attachment) 22.11 . N/B 28.06 20·.19 22.74 N/B -~·-·~ '-----·
PREFABRiCATED WARNING REFLECTORIZED SIGN FACES 3M Diamond Grade Florescent DG3 Reflective Sheeting, Series 4081 on 0.80 flat aluminum
Lightle MD Vulcan, Osburn H.T.
Size Example(s) Solutions
* Dornbos Inc. Moriarity .
12"x36" OM-3L, OM-3R 22.11 NIB 18.24 20.58 22.74 N/B
30"x30" W3-1 (text), W14-1, W14-2,
46.06 N/B 38.00 42.88 47.38 NIB W14-2a, W11-1, VV15-1
30"x30" W3-1 (symbol), W3-2(symbol),
50.50 N/B 44.05 49.64 47.38 N/B W3-3(symbol), W3-5(symbol)
W3-1 (text), W3-2(text), W3-3(text), W3-5(text), W1-1, VV1-2, VV1-3,·
36"x36" W1-4, W1-5, W2-1 I VV2-2, VV2-.3, 66.-33. N/B 54.72 61.74 68.22 . N/B VV3-4, VV1-8, VV8-3, VV11-10a, VV9-1 ,VV8-18
36"x36'~ VV3-1 (symbol), W3-2(symbol),
74.30 N/B 63.26 67.04 68.22 N/B W3-3(symbol), VV3-5(symbol)
48"x24" VV1-6, VV1-7 58.96 N/B 48.64 54.88 60.64 N/B
18"x24" VV1-8 22.11 N/B. 18.24 20.58 22.74 N/B
18"x18" VV13-1 16.58 N/B 13.68 16.39 17.06 N/B
24"x24" VV13-1 29.48 N/B 24.32 27.44 30.32 N/B
24"X12" VV4-:4p 14.74 N/B · 12.16 14.61 15.16 NIB
36" round VV10-1 66.33 N/B 53.36 60.28 68.22 NIB
48"X48"X3.6" VV14-3 44.50 N/B 36.48 51.56 60.64 N/B
-30"X30" Blank Warning -Yellow 46.06 NIB 38.00 42.88 47.38 N/B - - '····-·
Page 3 of 7 MnnroP. Cmmtv Rn::Jrl Cnmmi.s.sinn
-~ ·~ ~""'"'"" '''-""'"' '-Jv••t.•v• ._,c;vtvc;;:, utu 1 au
March 5, 2019
36"x3B" Blank Warning:. Yellow 66.~3 N/8 54.72 61.74
48"x48" Blank Warning - Orange 117.92 N/8 97.28 109.76 - - -- - - - - --·····-·--
RETROREFLECTIVITY STRIP FOR SIGN SUPPORTS 5 ft. length and must fit on a U-channel post on 0.80 flat aluminum
Materi'al MD Vulcan, Lightle * Dornbos
Solutions Inc. ·3M Diamond Grade Florescent DG3 Reflective
9.30 N/8 9.05 12.00 Sheeting Standard Colors Series .4081 3M Diamond Grade DG3 Reflective Sheeting -
9.21 N/B 8.96 11.95 Standard Colors Series 4092 3M Diamond Grade DG3 Reflective Sheeting -
9.21 N/8 8.96 11.95 Standard Colors - Series 4090
- -
PREFABRICATED REGULATORY AND MISC. REFLECTORIZED SIGN DECALS 3M_ Diamond Grade DG3_ Reflective Sheeting, Series 4092 & 4081
MD ·Vulcan, Size Example(s) Lightle
Solutions * Dornbos Inc. ..
30"x30" R1-1 24.75 N/8 21.25 21.13
36"x36" R1-1 35.64 N/8 30.60 30.42
30"x30" W3-1 29.88 N/8 27.75 31.81
36"x36" W3-1 43.80 N/B 39.79 45.81 ~ - - - - - - - ------
PREFABRICATED REGULATORY AND MISC. REFLECTORIZED SIGN FACES
68.22 N/8
121.28 N/8
H.T. Osburn
1_ Moriarity
8.69 N/B I
8.69 N/B
8.69 N/B
· Osburn H.T.- I
-r- Moriarity _ 1
20.88 N/B
30.06 N/8
20.88 N/8
30.06 N/B
3M Diamond Grade Flores.cent DG3 Reflective Sheeting, Series 4083- Fluorescent Yellow Green on 0.80 flat aluminum
Size Example(s) Lightle · · MD * Dornbos. Vulcan, Osburn · H.T.
·--Solutions Inc. Moriarity
36"X36" S1-1,·S2-1 65.70 N/8 53.36. 57.84 69.21 N/8
pentagon
36"X36" . S3-1, W11-2 66.33 N/B 54.72 62.04 69.21 N/B
24"X12" W16~7p, W16-9p 14.74 N/B 12.16 14.61 15.38 N/B -
Mnnri1P. Cmmtv Rn;,c:l Cnmmissinn
i
Page 4 of 7
24"X8" S4-3
36"X36" S4-5
2 color
Size Example(s)
12"x6" R~ctangle
12'x18" Rectangle
18"x6" Rectangle
18"x12" Rectangle
18"x24" Rectangle
24"x6" _Rectangle.
24"x10" Rectangle ·
24"x12" Rectangle
24"x18" Rectangle
24"x30" Rectangle
24"x36~' Rectangle
30"x6" Rectangle
60"x30" Rectangle
36"x6" Rectangle
36"x12" Rectangle
36"x18" Rectangle
36"x30" · Rectangle
48"x12" Rectangle
48"x24" Rectangle
48"x30" Rectangle ·.
MnnroP. Cntmtv Rn::lrl Cnmmissinn
_...., ''"' "''"'....,'"' 11'-"•••"-' '-JVJJLJVJ uc:;vrvc;;:, UIU !c::tU
March 5, 2019 ·
9.88 N/8 8.09
66.70 N/8 '63.26
ALUMINUM SIGN BLANKS On 0.80 flat aluminum
Lightle MD * Dornbos
Solutions
1.70 1.90 . 1.49
5.03 4.2~ 4.46
2.60 2.15 2.23
5.03 4.29 4.46
10.05 8.58 8.91
3.35 2.86 2.97
5.60 4.77 4.96.
6.70 5.72 5.94
10.05 8.58 8.91
16.75 14.30 14.85
20.10 17.16 17.82
4.20 4.09 3.71
41.88. 35.75 37.13
5.03 4.29 4.46
. 10.05 8.58 8.91
15.08 12.87 13.37
25.13 21.45 22.28
13.40 11.44 11.88
26.80 8.58 23.76
33.50 28.60 29.70
9.83 10.25 N/8
72.56 70.11 N/8
Vulcan, Osburn H.T.
Inc. Mor~arity
1.60 1.48 N/8
4.58 . 4.43 N/8
2.37 2.21 N/8
4.39 . 4.43 N/8
8.93 8.85 · N/8
3.04 2.95 N/8
5 .. 01 . 4.92 N/8
5.98 5.90 N/8
8.93 8.85 N/8
·14.59 14.75 N/8
17.62 17.70 N/8 -I
I 3.75 N/8 I
3.69
. 36.88 36.88 N/8
4.61 4.43 N/8
8.98 8.85 N/8
13.37 13.28 N/8
22.22 22.13 N/8
11.83 1-1.80 N/8
23.4.1 23.60 NIB
29.27 29.50 N/8
Page 5 of 7
12"x12" Square
18"x18" Square
24"x24" Square
30"x30" Square
36"x36" Square
48"x48" Square '--- - --- -·· ·······--
Si~e
24"x9"
30"x9"
36"x9"
42"x9"
24"x12" ·
30"x12" .
36"x12"
42"x12" '------~-~-----
.......... I." ..._,.....,. 1\.1 '\JI L..l'""' v IVVV L-'JU IO.U
March 5, 2019
3.35 2.86 2.97 3.09
7.54 6.44 6.68 6.77
13.40 11.44· 11.88 11.79'
20.94 17.88 18.56 18.41
30.15 . 25'.7 4 26.73 26.55
53.60 45.76 . 47.52 46.76 -
PREFABRICATED REFLECTORIZED STREET SIGNS 3M ·Diamond Grade DG3 Reflective Sheeting, Series 4090
Whi~e Sheeting/One Side Only on 0.80 flat aluminum
Lightle MD * Dornbos . Vulcan, Solutions Inc.
10.32 12.78 9.56 8.65
12.90 15.98 11.98 13.44
15.48 19.17 14.33 16.09
18.06 22.37 16.75 18.80
13.76 17.04 12.74 •14.30
17.20 21.30 15.93 17.88
. 20.64 25.56 19.11 21.45
24.08 . 29.82 22.30 25.03
SU.PPL Y OF GREEN BAKED ENAMEL 3#/ft. U-CHANNEL SIGN POSTS
2.95
6.64
11.80
18.44
26.55
47.20
Osburn
11.54
14.42
17.30
20:1.5
15.38
19.23
23.07 .
26.92 '--
Size Price Per Post I Price Per Bundle Lightle *MD * Dornbos. Vulcan, Osburn Of 50 Solutions ' Inc.
11' 23.87/1083.50 20.90/1045.00 25.90/1295:00 N/B N/B
12' 26.04/1182.00 22.80/1140.00 28.24/1412.00 NIB N/B
14' 30.38/1379.00 26.60/1330.00 32.96/1648.00 N/B ·N/B
15' 32.55/1477.50 28.50/1425.00 35.32/1766.00 N/B N/B
16' 34.72/1576.00 30.40/1520.00 40.84/2042.00 NIB N/B -- - --
MonrnP. Countv Ro:;:Hi Commission
N/B
N/B
. N/B
N/B
N/B ·
N/B
H.T . Moriaritv N/B
N/B
N/B
N/B
N/B
N/B
N/B
N/B
.H.T. Moriaritv
N/B
N/B J
N/B
N/B.
N/B
Page 6 of 7.
- ~ ~--- ..... • • -...• ••'-' '-'......,• 11.1 "-'1 L...J'-' v IV'-'V LJIU I O.U
. March 5, 2019
MISCELLANEOUS
Material Vulcan, H.T. I
Lightle *MD Solutions * Dornbos Inc.
Osburn Moriaritv 1
Unistrut- 1 %" Square x 3' long- 12 gauge NIB "15.00 11.96 N/B N/B N/B
Unistrut- 1 %" Square x 4' long- 12 gauge N/B 20.00 15.63 NIB N/B N/B
24"x24" Adopt A Road Sign -see attac~ed 31.00 N/B 28.03 32.99 30.76 N/B
Plastic Barricade Board - Blank- Type 3 Panel 32.50. N/B 58:58 N/B N/B 50.00 (left, Bi Directional, Right, Closure
Type Ill Barricade- see attached 180.00 N/B 255.00 N/B N/B 180.00
*MD Solutions- U Channel Posts 10,000 lbs minimum order or freight is additional.. ·
*Dornbos -Signs sold in quantities of 6 or more of the same legend. Minimum order of $1 ,500 for prepaid freight. U Channel Posts sold in bundles of 50. Minimum post order quantity 200/can mix and match. . ·
Page 7 of 7 MnnrnP. r.nuntv Rn~rl r.nmmi~~inn
Monroe County Road CommissionBid Comparison
Contract ID: 459-006-190615Description: 5.51 miles of tree and stump removals on South Stony Creek Road from Palmer Road to Sumpter Road (MCRC Project No. 459-006-190615)
and on Palmer Road from Oakville Waltz Road to South Stony Creek Road (MCRC Project No. 459-010-199065) in Exeter and LondonTownships, Monroe County, Michigan
Location:South Stony Creek Road Palmer Road
Projects(s):459-006-190615
Rank Bidder Total Bid % Over Low % Over Est.
0 ENGINEER'S ESTIMATE $51,650.00 24.62% 0.00%
1 (_00010) T & J Excavating and Tree Clearing, LLC $41,445.00 0.00% -19.75%
2 (06505) CHOP $48,750.00 17.62% -5.61%
3 (_00014) Pro Line Tree Clearance, Inc. $50,495.00 21.83% -2.23%
4 (05685) Treeworks, Inc. $69,100.00 66.72% 33.78%
5 (04456) Owen Tree Service, Inc. $86,465.00 108.62% 67.40%
Contract # 459-006-190615 (South Stony Creek Road Palmer Road)MERL: 2018.11.1
03/06/2019 11:46:01 AM
Page 1 of 3
459-010-191002
(0) ENGINEER'S ESTIMATE(1) T & J Excavating and TreeClearing, LLC (2) CHOPLine Pay Item Code Quantity Units
Description Bid Price Total Bid Price Total Bid Price Total0001 2010001 1.25 Acre $8,000.00 $10,000.00 $4,650.00 $5,812.50 $5,500.00 $6,875.00Clearing
0002 2020002 23 Ea $700.00 $16,100.00 $400.00 $9,200.00 $800.00 $18,400.00Tree, Rem, 19 inch to 36 inch
0003 2020003 7 Ea $1,300.00 $9,100.00 $2,000.00 $14,000.00 $1,650.00 $11,550.00Tree, Rem, 37 inch or Larger
0004 2020004 26 Ea $200.00 $5,200.00 $150.00 $3,900.00 $185.00 $4,810.00Tree, Rem, 6 inch to 18 inch
0005 2020006 11 Ea $200.00 $2,200.00 $90.00 $990.00 $185.00 $2,035.00Stump, Rem, 19 inch to 36 inch
0006 2020007 5 Ea $350.00 $1,750.00 $92.50 $462.50 $225.00 $1,125.00Stump, Rem, 37 inch or Larger
0007 2020008 4 Ea $100.00 $400.00 $45.00 $180.00 $100.00 $400.00Stump, Rem, 6 inch to 18 inch
0008 2027050 3 Ea $300.00 $900.00 $300.00 $900.00 $185.00 $555.00_ Tree Trimming
0009 8127051 1 LSUM $6,000.00 $6,000.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00_ Maintaining Traffic
Bid Totals: $51,650.00 $41,445.00 $48,750.00
Contract # 459-006-190615 (South Stony Creek Road Palmer Road)MERL: 2018.11.1
03/06/2019 11:46:01 AM
Page 2 of 3
(3) Pro Line Tree Clearance,Inc. (4) Treeworks, Inc. (5) Owen Tree Service, Inc.Line Pay Item Code Quantity Units
Description Bid Price Total Bid Price Total Bid Price Total0001 2010001 1.25 Acre $6,600.00 $8,250.00 $15,000.00 $18,750.00 $11,500.00 $14,375.00Clearing
0002 2020002 23 Ea $990.00 $22,770.00 $700.00 $16,100.00 $925.00 $21,275.00Tree, Rem, 19 inch to 36 inch
0003 2020003 7 Ea $1,320.00 $9,240.00 $1,300.00 $9,100.00 $1,425.00 $9,975.00Tree, Rem, 37 inch or Larger
0004 2020004 26 Ea $130.00 $3,380.00 $275.00 $7,150.00 $315.00 $8,190.00Tree, Rem, 6 inch to 18 inch
0005 2020006 11 Ea $145.00 $1,595.00 $250.00 $2,750.00 $515.00 $5,665.00Stump, Rem, 19 inch to 36 inch
0006 2020007 5 Ea $300.00 $1,500.00 $400.00 $2,000.00 $750.00 $3,750.00Stump, Rem, 37 inch or Larger
0007 2020008 4 Ea $100.00 $400.00 $125.00 $500.00 $240.00 $960.00Stump, Rem, 6 inch to 18 inch
0008 2027050 3 Ea $120.00 $360.00 $250.00 $750.00 $425.00 $1,275.00_ Tree Trimming
0009 8127051 1 LSUM $3,000.00 $3,000.00 $12,000.00 $12,000.00 $21,000.00 $21,000.00_ Maintaining Traffic
Bid Totals: $50,495.00 $69,100.00 $86,465.00
Contract # 459-006-190615 (South Stony Creek Road Palmer Road)MERL: 2018.11.1
03/06/2019 11:46:01 AM
Page 3 of 3