MONROE COUNTY ROAD COMMISSION REGULAR MEETING AGENDA March 11, 2019 - 5:30 p.m. 1. CALL TO ORDER 2. ROLL CALL 3. PLEDGE OF ALLEGIANCE 4. OPENING PRAYER 5. APPROVAL OF REGULAR MEETING AGENDA 6. PUBLIC COMMENT 7. CONSENT AGENDA (with immediate effect) 1) Approval of Minutes- February 25, 2019 Regular Meeting Minutes 2) Approval of Journal Entry No. 143 Vendor Checks #73809-73838 $ 194,145.33 Void Check#73663 $ 3,904.26 No. 170 Payroll Checks #64392-64409 & Advice #35688-25779 $ 285,564.54 Bank Service Charge – February 2019 $ 90.30 3) Township Contracts Ash Township Burns Newburg to Labo 2” stone lift Carter Port Creek to Briarhill 2” stone lift Indian Trails Sigler to Calkins 2” stone lift Jones Sigler to Village limits 2” stone lift Newburg Exeter to Burns Single chip seal Newburg Briarhill to Railroad Base Stabilization/Dbl chip seal Ready US24 to Berlin HMA Scratch/Single chip seal Whipple Sweitzer to dead end 2” stone lift 2019 Various Local Roads – Mowing Berlin Charter Township Armstrong Sigler to dead end 2”stone lift Armstrong Brandon to Labo 3”stone lift Brandon Sigler to village limits 2”stone lift Dauncy Armstrong to township line 2”stone lift Dunsmore Plat Off Brandon Single chip seal Haggerman Labo to Sigler 2”stone lift Joanne/Birchwood Off Newport Single chip seal Newport N. Dixie Hwy to Armstrong 2”stone lift Swan Creek N. Dixie Hwy to N. Dixie Hwy Single chip seal Swan Creek Newport to Labo Single chip seal Swan View Trombley to dead end Single chip seal Trombley Strong to Masserant Single chip seal 2019 Various Local Roads – Mowing Dundee Township Cake Petersburg to Davis 2”stone lift Dennison Brewer to M50 Single chip seal Dundee-Azalia Hatter to village limits Single chip seal Gloff Dixon to railroad Single chip seal Meanwell M50 to Ida West Single chip seal Wilcox M50 to Day Single chip seal 2019 Various Local Roads – Mowing 2019 Various Local Roads – Excess Gradall

Upload: others

Post on 14-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION

REGULAR MEETING AGENDA

March 11, 2019 - 5:30 p.m.

1. CALL TO ORDER

2. ROLL CALL

3. PLEDGE OF ALLEGIANCE

4. OPENING PRAYER

5. APPROVAL OF REGULAR MEETING AGENDA

6. PUBLIC COMMENT

7. CONSENT AGENDA (with immediate effect)

1) Approval of Minutes- February 25, 2019 Regular Meeting Minutes

2) Approval of Journal Entry

No. 143 Vendor Checks #73809-73838 $ 194,145.33

Void Check#73663 $ 3,904.26

No. 170 Payroll Checks #64392-64409 & Advice #35688-25779 $ 285,564.54

Bank Service Charge – February 2019 $ 90.30

3) Township Contracts

Ash Township

Burns Newburg to Labo 2” stone lift

Carter Port Creek to Briarhill 2” stone lift

Indian Trails Sigler to Calkins 2” stone lift

Jones Sigler to Village limits 2” stone lift

Newburg Exeter to Burns Single chip seal

Newburg Briarhill to Railroad Base Stabilization/Dbl chip seal

Ready US24 to Berlin HMA Scratch/Single chip seal

Whipple Sweitzer to dead end 2” stone lift

2019 Various Local Roads – Mowing

Berlin Charter Township

Armstrong Sigler to dead end 2”stone lift

Armstrong Brandon to Labo 3”stone lift

Brandon Sigler to village limits 2”stone lift

Dauncy Armstrong to township line 2”stone lift

Dunsmore Plat Off Brandon Single chip seal

Haggerman Labo to Sigler 2”stone lift

Joanne/Birchwood Off Newport Single chip seal

Newport N. Dixie Hwy to Armstrong 2”stone lift

Swan Creek N. Dixie Hwy to N. Dixie Hwy Single chip seal

Swan Creek Newport to Labo Single chip seal

Swan View Trombley to dead end Single chip seal

Trombley Strong to Masserant Single chip seal

2019 Various Local Roads – Mowing

Dundee Township

Cake Petersburg to Davis 2”stone lift

Dennison Brewer to M50 Single chip seal

Dundee-Azalia Hatter to village limits Single chip seal

Gloff Dixon to railroad Single chip seal

Meanwell M50 to Ida West Single chip seal

Wilcox M50 to Day Single chip seal

2019 Various Local Roads – Mowing

2019 Various Local Roads – Excess Gradall

Page 2: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Monroe County Road Commission

Regular Meeting Agenda

March 11, 2019 – Page 2

LaSalle Township

Dunlap Stein to Yargerville Single chip seal

Hillcrest Orchard Sub off Stein btwn US24 and M125 Single chip seal

Rauch US24 to Minx Single chip seal

2019 Various Local Roads – Mowing

Summerfield Township

Albain Summerfield to city limits Single chip seal

Bentwood Wells to dead end Single chip seal

Forrest Teal to city limits Single chip seal

Lulu Summerfield to Teal Single chip seal

Morocco County Line to dead end 2”stone lift

Old Ida Center Wells to Ida Center Single chip seal

Railroad City limits to Summerfield Single chip seal

2019 Various Local Roads - Mowing

4) Mowing Contractors

Exeter Township D.K. Services

5) Approve the Resolution to enter into MDOT Contract No. 19-5082 (amendment to MDOT Contract

No. 18-5546) for microsurfacing along Summerfield Road from Smith Road northerly to Consear

Road, and authorize the Chairman and Vice Chairman to sign the contract on behalf of the Board.

6) Award the 2019 Microsurfacing contract to the low bidder Pavement Maintenance Systems,

LLC in the amount of $60,268.00 and authorize the Managing Director to sign all documents

on behalf of the Board.

7) Award the 2019 Various Uniform Traffic Control Devices (signs and sign materials) to all

responding bidders.

8) Award the South Stony Creek Road and Palmer Road Tree Removal contract to the low bidder

T & J Excavating and Tree Clearing, LLC in the amount of $41,445.00 and authorize the

Managing Director to sign all documents on behalf of the Board.

8. UNFINISHED BUSINESS

1) Continued discussion on MDOT State Trunkline Contract.

9. NEW BUSINESS

10. REPORT OF OFFICERS

11. PUBLIC COMMENT

12. COMMISSIONER’S COMMENT

13. ADJOURNMENT

Page 3: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MINUTES OF THE BOARD OF COUNTY ROAD COMMISSIONERS

MONROE, MICHIGAN

February 25, 2019

1. At a Regular Meeting of the Board of County Road Commissioners at their offices located at

840 S. Telegraph Road, Monroe, Michigan on Monday, February 25, 2019 the meeting was

called to order by Chairman Iacoangeli at 5:30 p.m.

2. Roll Call by Deputy Clerk as follows:

PRESENT EXCUSED

Dan Minton Jack Thayer

Charles A. Londo

Greg W. Stewart

Paul Iacoangeli

A quorum being present, the Board proceeded to transact business.

3. Commissioner Iacoangeli led the Pledge of Allegiance.

4. Commissioner Iacoangeli led the Opening Prayer.

5. Commissioner Minton moved, seconded by Commissioner Stewart to approve the February

25, 2019 regular meeting agenda as presented. Vote: Ayes: 4 Nays: 0 Excused: 1 Motion

carried.

6. Public Comment – None.

7. The following items were listed on the Consent Agenda: (with immediate effect)

1) Approval of Minutes- February 11, 2019 Regular Meeting Minutes

2) Approval of Journal Entry

No.105 Vendor Checks #73690-73768 $ 299,819.20

Void Check #71136 $ 340.34

Void Check #71161 $ 185.37

Void Check #71164 $ 87.89

Void Check #71169 $ 137.45

No. 117 Payroll Checks #64372-64391 & Advice #25597-25687 $ 312,374.21

No. 135 Vendor Checks #73769-73808 $ 202,743.29

3) Township Contracts –

Exeter Township

Colf Sumpter to 6900’ East (Davis Drain) Crush&Shape/2”HMA

Colf E of Davis Drain to Carleton West 1.5” HMA

Colf Capernall to Rawsonville 1.5” HMA

Doty Scofield to S. Stony Creek Zone Patch/Single Seal

Fay Carleton West to Martinsville 1.5” HMA

Finzel Kane to North of N. Stony Creek Crush&Shape/2.25” HMA

Heiss Steffas to township line Single chip seal

Scofield Sumpter to East end of pavement Single chip seal

Steffas S. Stony Creek to Heiss Zone Patch/Single seal

Timbers S. Stony Creek to Stout Zone Patch/Single seal

2019 Local Road Mowing – Various

2019 Local Mow/Mulch – Various

4) Pulled for further discussion.

5) Mowing Contractor

Exeter Township Exeter Township

Page 4: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Monroe County Road Commission

Regular Meeting Minutes

February 25, 2019 – Page 2

Commissioner Minton moved, seconded by Commissioner Stewart to approve the February

25, 2019 Consent Agenda as presented, except for Item #4 which was pulled for further

discussion. Vote: Ayes: 4 Nays: 0 Excused: 1 Motion carried.

Commissioner Londo also indicated there was a correction to the minutes on Page 11 under

his comments. Ms. U’Ran already made that correction.

Item removed for further discussion:

4) Approve the Retirement and Benefits Act Corrective Action Plan and authorize the

Managing Director to sign on behalf of the MCRC.

Commissioner Minton asked if this plan was part of the annual statement to the State, and

part of the normal business for the funding of the retiree health care. Mr. Pierce explained

this is the corrective action plan that was submitted which requires a 40% funding level by a

date certain, and they required a Resolution showing the Board accepts the plan we

submitted. Commissioner Minton asked if this was the plan the legislature adopted. Mr.

Pierce indicated yes.

Ms. Hawkins-Freelain added that there are two separate filling requirements, and this is

different than the annual filing form Commissioner Minton referenced which is due by the

end of March.

Commissioner Stewart indicated he was pleased that the Road Commission was doing pretty

good toward the goal set in this plan, and added the MCRC has come a long way.

Commissioner Minton moved, seconded by Commissioner Stewart to Approve the Retirement

and Benefits Act and Corrective Action Plan and Resolution, and authorize the Managing

Director to sign on behalf of the Board. Vote: Ayes: 4 Nays: 0 Excused: 1 Motion

carried.

8. Unfinished Business – None.

9. New Business – None.

10. Report of Officers –

Randy Pierce (Managing Director) – Mr. Pierce had nothing additional to report.

Commissioner Londo reviewed topics in the Managing Director communication and

inquired what was next for Labo Road issue.

Mr. Pierce explained this section of road is a local road, and therefore, by law, the

Road Commission can only contribution 50% to any fix or improvement. This section

of road is concrete, and there has been several discussions with Ash Township

several times. The staff will continue to work with Ash Township to see if there is

interest if the project could be extended to west of the I275 overpass.

Commissioner Londo asked if the road has no funding why was the estimate

prepared, and it mentioned in his report. Mr. Pierce explained he was asked to look

into how much it would cost to perform work on this section of road since the Road

Commission’s NE Salt Facility is located on Labo close to Telegraph. He added that

the Road Commission will continue to work with the township on possible fixes and

funding.

Page 5: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Monroe County Road Commission

Regular Meeting Minutes

February 25, 2019 – Page 3

David M. Leach (Superintendent of Maintenance) – Mr. Leach informed the Board that

his department continues to work on finalizing township contract packages for 2019.

They are working on contractor estimates and bid packages for asphalt and emulsion

going out in late March. He also let the Board know that the MCRC would be hosting

the SE Council quarterly Superintendent’s meeting on March 4th

.

Matthew Snell (County Highway Engineer) – Mr. Snell advised the Board that the

Oxcart Transportation Permit system would be launched Friday, March 1, 2019. This

should add an extra level of customer service allowing customers to use credit cards

because we will be integrated with other SE counties using the program so they can

apply for permits in multiple counties at one time.

Mr. Snell also indicated the MCRC would be hosting the quarterly SE Council meeting

at the Road Commission on Monday, May 6th

.

Commissioner Minton indicated he understands Lenawee and Washtenaw County is

using this and can do business in multiple counties at one time. Mr. Snell indicated

yes, and explained each company will have their own account and log on to get their

move permits through Adrian and Monroe and not have to contact each individual

Road Commission.

Commissioner Stewart asked if there was a timeline on the new maps. Mr. Snell

indicated he didn’t have a specific date but would follow up on it.

Dori Hawkins-Freelain (Director of Finance) – Ms. Hawkins-Freelain added that the

Corrective Action Plan requires the MCRC to be 40% funded by 2023, but that still

leaves a sizeable unfunded balance.

Philip Costello (General Counsel) – Mr. Costello had nothing additional to report.

11. Public Comment –

David Hoffman, County Commissioner, suggested the maintenance Supervisors check on the

roads where the winds have been blowing sand into ditches and drains which may affect

drainage when things start thawing.

12. Commissioners' Comments -

Commissioner Thayer was excused.

Commissioner Stewart had nothing additional to report.

Commissioner Londo had nothing additional to report.

Commissioner Minton had nothing additional to report.

Commissioner Iacoangeli had nothing additional to report.

13. Adjournment -

Chairman Iacoangeli stated if there are no objections, the meeting is adjourned at 5:44 p.m.

_________________________________

Cheryl A. U’Ran, Deputy Clerk

Page 6: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

DATE: 02/27/2019

ACCOUNT NUMBER

MONROE COUNTY JOURNAL ENTRY

Fund Activity Account DESCRIPTION AND EXPLANATION OF ENTRY

201 00000 001000 Cash - County Road 201 44900 974500 Capital Outlay- County Road

To Cover Vendor Checks dated 02/28/2019

NUMBER: 143

AMOUNT Debit Credit

$194,145.33 $194,145.33

1----+-----+----1-:C::-::-h-e-=ck,.--s-#c-::-73809- 73838 -------------t---------t-------l l---+-----+----1-----------------!----------l--------------1---+----+----r-----------------t---·-······--------- -···----------------- ------------·-----------------

--------+------------·-+----1------------___;_----t------------+-------------l 201 00000 001000 Cash- County Road $3,904.26 201 44900 974500 Capital Outlay- County Road $3,904.26

Void Check # 73663 -----+--------------~----------------------------~4--------4--------l

1-----+----+----r---------------------------- ------- ----------------------------------------------·--- --------·--·---·-·---------------

$190,241.07 -----------------t----t-----f-=-------::-------,-:,---------o-:-----------·------------------------'-- ------·---------+-------1

From: County Road Account 1-----+----+----1------_.::_ ___________ t--------t-----····--·- ···········-------·---··---

#1 00-90015-2 To: County Road Vendor Account

#1 00-90020-5

Funds will be transferred internally at

______________ ··-··--------------------·--·-----------·- _________________ !Y.I_B& T by_~_b_e __ ~g~nty Treasurer ---+-~-----------+------------1 1---+-----+----l--------------------·-----·--·-·----·- ·--~----- -----·------

TOTAL $198,049.59 1 $198,049.59

PREPARED BY: Joy Bagnall

-- ··--····-··· ---t-----t-----------··-·-·--·---·-------- ---·-···--· -------------· ---- ·-·-·---------------

-----+----+-----1-------------------·---·----4--------+-------l

APPROVED BY:

ll..../" ( /

Page 7: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Date 02/27/2019 Monroe County Road Commission Page 1 of 1 Time 12:06:32 AP - Check Register jbagnall

------- Check ------- ------- Vendor ------- Check Number Date Number Name Amount

73809 02/28/2019 A00162 Aggregate Industries - Midwest 1,565.83 73810 02/28/2019 A00202 Applied Imaging 157.23 73811 02/28/2019 C00001 Auto Value Monroe 400.37 73812 02/28/2019 B00026 Buck & Knobby 179.94 73813 02/28/2019 C00214 Carleton Farms Landfill 193.02 73814 02/28/2019 C00257 CDW Government LLC 374.30 73815 02/28/2019 C00312 CHOP 44,900.00 73816 02/28/2019 D00102 Detroit Salt LLC 73,002.04 73817 02/28/2019 D00014 DTE Energy 7,500.22 73818 02/28/2019 F00087 Fremont Volvo Trucks 25.15 73819 02/28/2019 G00101 Great Lakes Engineering Group 10,650.00 73820 02/28/2019 H00136 Hoffman Brothers Upholsterers 150.00 73821 02/28/2019 K00064 Knight Technology Group, Inc. 5,665.00 73822 02/28/2019 L00065 Lowes Home Center, Inc 62.61 73823 02/28/2019 M00012 Mannik & Smith 4,587.50 73824 02/28/2019 M00013 Manpower Inc. 678.08 73825 02/28/2019 M00087 Michigan Cat 4,385.00 73826 02/28/2019 M00043 Michigan Gas Utilities 4,407.90 73827 02/28/2019 M00028 Monroe Bank & Trust 2,045.58 73828 02/28/2019 M00191 Monroe County Finance Dept 4,189.33 73829 02/28/2019 N00078 N etworkfleet, Inc 971.65 73830 02/28/2019 N00046 Northwest Consultants Inc 10,374.00 73831 02/28/2019 P00005 Peerless Supply Co 23.36 73832 02/28/2019 S00073 Shrader Tire & Oil 359.60 73833 02/28/2019 S00239 Staples Advantage 5.09 73834 02/28/2019 S00192 Sun Life Financial 4,114.50 73835 02/28/2019 T00133 T.D.C. Truck Sales, Inc. 8,010.00 73836 02/28/2019 T00018 Toledo Spring Service 4,565.98 73837 02/28/2019 U00036 UniFirst Corporation 283.02 73838 02/28/2019 W00009 Wayne County 319.03

Report Total 194,145.33

Page 8: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Date 02/27/2019 Monroe County Road Commission Page 1 Time 12:24:09 AP - Open Invoice by Fund jbagnall

Fund- 201

--------- Vendor -------· --------------------------- Invoice ------------------------- Gross Discount Net Payment Number Name Number Date Due Date Amount Amount Amount Status Type

D00102 Detroit Salt LLC 82004 02/19/2019 03/19/2019 9,769.86 9,769.86 Held Check

82172 02/20/2019 03/20/2019 19,817.89 19,817.89 Held Check

82300 02/21/2019 03/21/2019 12,289.49 12,289.49 Held Check

41,877.24 41,877.24

EOOOOI E.R. Zeiler Excavating, Inc. ESTI INDIANACRE 07/14/2018 08/14/2018 4,083.75 4,083.75 Held Check

EST2 INDIANACRE 07/28/2018 08/28/2018 2,299.01 2,299.01 Held Check

EST3 INDIANACRE 08/11/2018 09/11/2018 6,877.68 6,877.68 Held Check

EST4 INDIANACRE 09/12/2018 10/12/2018 16,150.96 16,150.96 Held Check

EST5 INDIANACRE 09/12/2018 10/12/2018 7,488.29 7,488.29 Held Check

EST6 INDIANACRE 01/30/2019 02/28/2019 3,600.31 3,600.31 Held Check

40,500.00 40,500.00

G00098 Geddis Paving & Exc., Inc. EST 1 MOHAWK 08/04/2018 09/04/2018 679.23 679.23 Held Check

EST2 MOHAWK 09/01/2018 10/01/2018 2,020.52 2,020.52 Held Separate Check

EST3MOHAWK 09/17/2018 10/17/2018 3,767.22 3,767.22 Held Check

EST4MOHAWK 10/09/2018 11/09/2018 14,015.87 14,015.87 Held Check

EST5MOHAWK 10/20/2018 11/20/2018 326.88 326.88 Held Check

EST6MOHAWK 12/05/2018 01/05/2019 792.31 792.31 Held Check

21,602.03 21,602.03

Fund Total for 201 103,979.27 103,979.27

Page 9: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

~

Date 02/27/2019 Monroe County Road Commission Page 1 of 4 Time 11:35:08 AP - Payment Selection Register jbagnall

------ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount

Number Name Number Date Due Date Amount Amount Amount Amount Lost Comments

A00162 Aggregate Industries - Midwest 710108015 02/06/2019 03/06/2019 118.46 118.46 118.46 Stone

710111266 02/07/2019 03/07/2019 496.55 496.55 496.55 Stone

710111267 02/07/2019 03/07/2019 235.48 235.48 235.48 Stone

710111268 02/07/2019 03/07/2019 117.28 117.28 117.28 Stone

710111269 02/07/2019 03/07/2019 366.33 366.33 366.33 Stone

710111270 02/07/2019 03/07/2019 100.47 100.47 100.47 Stone

71018014 02/06/2019 03/06/2019 131.26 131.26 131.26 Stone

1,565.83 1,565.83 1,565.83

A00202 Applied Imaging 1281855 02/07/2019 03/07/2019 157.23 157.23 157.23 Copy Machines

C00001 Auto Value Monroe 227-1079863 02/21/2019 03/23/2019 400.37 400.37 400.37 Pts for equip/Small Tis shop

B00026 Buck & Knobby P41847 02/19/2019 03/19/2019 179.94 179.94 179.94 Small Tis - Road

C00214 Carleton Farms Landfill 3069-000020245 02/15/2019 03/15/2019 193.02 193.02 193.02 Disposal

C00257 CDW Government LLC RGM5786 02/26/2019 03/26/2019 374.30 374.30 374.30 Computer License

C00312 CHOP 10015 02/12/2019 03/12/2019 30,472.00 30,472.00 30,472.00 Tree Removal

10026 02/22/2019 03/22/2019 14,428.00 14,428.00 14,428.00 Tree Removal

44,900.00 44,900.00 44,900.00

D00102 Detroit Salt LLC 81131 02/11/2019 03/11/2019 15,346.15 15,346.15 15,346.15 Salt Inv

81132 02/11/2019 03/11/2019 9,921.28 9,921.28 9,921.28 Salt Inv

81552 02/14/2019 03/14/2019 12,815.86 12,815.86 12,815.86 Salt Inv

81733 02/15/2019 03/15/2019 12,665.40 12,665.40 12,665.40 Salt Inv

81734 02/15/2019 03/15/2019 22,253.35 22,253.35 22,253.35 Salt Inv

73,002.04 73,002.04 73,002.04

Page 10: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Date 02/27/2019 Monroe County Road Commission Page 2 of4 Time 11:35:08 AP - Payment Selection Register jbagnal1

------ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount

Number Name Number Date Due Date .Amount Amount Amount Amount Lost Comments

D00014 DTEEnergy FEB 100 65555 02/20/2019 03/15/2019 1,173.62 1,173.62 1,173.62 Electricity-Mtc

FEB 146 56037 02/20/2019 03/15/2019 2,422.34 2,422.34 2,422.34 Electricity-Monroe

JAN 10065555 RE 01/22/2019 02/15/2019 859.20 859.20 859.20 Reissue-Mtc

JAN 10065688 RE 01/18/2019 02!15/2019 901.19 901.19 901.19 Reissue-Summerfield

JAN 14656037 RE 01/22/2019 02/15/2019 1,883.30 1,883.30 1,883.30 Reissue-Monroe

JAN 14656136 RE 01/18/2019 02/15/2019 260.57 260.57 260.57 Reissue-Monroe Salt Shed

7,500.22 7,500.22 7,500.22

F00087 Fremont Volvo Trucks 433737 02/21/2019 03/21/2019 25.15 25.15 25.15 Pts for equip

G00101 Great Lakes Engineering Group 19-3026 02/07/2019 03/07/2019 10,650.00 10,650.00 10,650.00 Eng Svcs-Bridge Inspections

H00136 Hoffman Brothers Upholsterers EQ 1241 02/22/2019 03/22/2019 150.00 150.00 150.00 EquipMtc

K00064 Knight Technology Group, Inc. 12647 02/12/2019 03/12/2019 2,750.00 2,750.00 2,750.00 Computer Support-Mike Pouter

12665 02/26/2019 03/26/2019 2,915.00 2,915.00 2,915.00 Computer Supp-Mike Pouter

5,665.00 5,665.00 5,665.00

L00065 Lowes Home Center, Inc 02106 02/21/2019 03/21/2019 62.61 62.61 62.61 Small Tls-Road

M00012 Mannik & Smith 0077844 . 11/13/2018 12/13/2018 4,587.50 4,587.50 4,587.50 Eng Svcs-Vivian

M00013 Manpower Inc. 33624142 02/13/2019 03/13/2019 678.08 678.08 678.08 Temp Employee Svcs

M00087 Michigan Cat ER9533851 02/04/2019 03/04/2019 4,385.00 4,385.00 4,385.00 Rental Equip-Salt Loader

M00043 Michigan Gas Utilities 502709427-1 FEB 02/21/2019 03/21/2019 362.66 362.66 362.66 Heat-Sign Shop

503084002-1 FEB 02/21/2019 03/21/2019 1,387.64 1,387.64 1,387.64 Heat-Monroe

507812728-1 FEB 02/21/2019 03/21/2019 2,657.60 2,657.60 2,657.60 Heat-Mtc

Page 11: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Date o2J27!20I9 Monroe County Road Commission Page 3 of4 Time 11:35:08 AP - Payment Selection Register jbagnal1

------ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount

Number Name Number Date Due Date Amount Amount Amount Amount Lost Comments

4,407.90 4,407.90 4,407.90

M00028 Monroe Bank & Trust 2019 HSA BROWN 02/27/2019 03/27/2019 783.88 783.88 783.88 HSA-Employer Contribution

2019 HSA-MORGAN 02/22/2019 03/22/2019 277.74 277.74 277.74 HSA-Employer Contribution

2019HSAFUNCHION 02/27/2019 03/27/2019 983.96 983.96 983.96 HSA-Employer Deposit

2,045.58 2,045.58 2,045.58

M00191 Monroe County Finance Dept 3445-0NBASE/MTC 02/07/2019 03/07/2019 3,908.30 3,908.30 3,908.30 Computer Supp-Annual OnBase/License

3449-JAN 19 02/15/2019 03/15/2019 281.03 281.03 281.03 Phone-Monroe

4,189.33 4,189.33 4,189.33

N00078 Networkfleet, Inc osvooooo 1681828 02/01/2019 03/01/2019 971.65 971.65 971.65 GPS Mthly Data

N00046 Northwest Consultants Inc 0010845 01/31/2019 02/28/2019 6,950.00 6,950.00 6,950.00 Eng Svcs-Bridge Inspections

0010873 02/01/2019 03/01/2019 3,424.00 3,424.00 3,424.00 Eng Svcs-Exeter Rd

10,374.00 10,374.00 10,374.00

P00005 Peerless Supply Co 51600 02/13/2019 03/13/2019 9.46 9.46 9.46 BldgExp

51603 02/13/2019 03/13/2019 13.90 13.90 13.90 Pts for equip

23.36 23.36 23.36

S00073 Shrader Tire & Oil 387935-00 02/21/2019 03/21/2019 384.60 384.60 384.60 Oil Inv/Drum Deposit Return

389863-00 02/26/2019 03/26/2019 -25.00 -25.00 -25.00 See Inv 382067

359.60 359.60 359.60

S00239 Staples Advantage 3404850644 02/09/2019 03/09/2019 -2.48 -2.48 -2.48 Office Supp-See inv340251 0828

3405450265 02/16/2019 03/16/2019 7.57 7.57 7.57 Office Supp

5.09 5.09 5.09

Page 12: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Date 02/27/2019 Monroe County Road Commission Page4 of4 Time 11:35:08 AP - Payment Selection Register jbagnaU

__ ..; ___ Vendor ------ -------------------------- Invoice -------------------- Gross Discount Net Pay Discount

Number Name Number Date Due Date Amount Amount Amount Amount Lost Comments

800192 Sun Life Financial 041313 02/20/2019 03/20/2019 ~,114.50 4,114.50 4,114.50 Life Insurance/Health-Retired

T00133 T.D.C. Truck Sales, Inc. 122 02/22/2019 03/22/2019 8,010.00 8,010.00 8,010.00 Capital Equip-2002 Single Axle/Bucket Boom lift/Post Puller

T00018 Toledo Spring Service 101736 02/11/2019 03/11/2019 162.90 162.90 162.90 Pts for equip

101741 02/12/2019 03/12/2019 1,057.50 1,057.50 1,057.50 EquipMtc

101762 02/12/2019 03/12/2019 309.51 309.51 309.51 Pts for equip

101825 02/13/2019 03/13/2019 2,121.26 2)21.26 2,121.26 EquipMtc

102030 02/20/2019 03/20/2019 639.81 639.81 639.81 EquipMtc

102056 02/20/2019 03/20/2019 275.00 275.00 275.00 Pts for equip

4,565.98 4,565.98 4,565.98

U00036 UniFirst Corporation 150 0143326 02/13/2019 03/13/2019 119.76 119.76 119.76 Rental Uniforms

150 0144933 02/20/2019 03/20/2019 163.26 163.26 163.26 Rental Rugs/Uniforms

283.02 283.02 283.02

W00009 Wayne County 297822 02/07/2019 03/07/2019 319.03 319.03 319.03 SignalMtc

Report Totals 194,145.33 194,145.33 194,145.33

Page 13: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

DATE: 03/06/2019

MONROE COUNTY JOURNAL ENTRY

ACCOUNT NUMBER Fund -~~-~!Y.!.!.Y.:. Account DESCRIPTION AND EXPLANATION OF ENTRY

···-··-------····------- ------------···-·-·····----------·-·····-·

201 00000 001000 Cash - County Road 201 44915 974500 Capital Outlay- Road Improvement

--------

To cover Payroll Ending 3/3/19 Check# 64392-64409 & Advice # 25688-25779

201 00000 001000 Cash - County Road 201 44915 974500 Capital Outlay - Road Improvement

Bank Service Charge- February 2019

$285,654.84

To record the transfer of funds from the County Road control account to the County Road Payroll Account

No. 100-900-214

Funds will be transferred ···-·-··-···---------

internally at MB& T by the County Treasurer.

-------········-····--------·-·······- ····-·-········----·········-····-···--- ····--·····-··

--------------------·-····-------------------------------TOTAL

PREPARED BY: Kimberly LaRocca

" { I

APPROVED BY: w~.~· {

L-/

NUMBER: 170

AMOUNT Debit Credit

--

$285,564.54 ________ $28~?64.54

--·-

~~-~~Q__ $90.30

··-·-···-··--···-·········--------- -----

r-·

···-··- ·······-------------------

$285,654.84 I $285,654.84

Page 14: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION

201JfTOWNSHIP ROAD IMPROVEMENT CONTRACT

'1

Township: Ash

Project#: 504 001190104

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agr~es to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Burns

Location: Newburg to lab~

Length: 3.52 Miles Road Class: Local -----Description of Work: 211 Stone Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 66,848 66,848

Total Probable Cost $ 66,848 $ 66,848 $ - . $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total· Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid

·amount, MCRC will advise the Township representative as soon as practical.. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payaph~ to the MCRc; within thirty (30) days.

Approve. by the Township Board on the ;l!J/11 day of ·MYIA-tl/':j]ji::·~ ~ . ---¥-+~~~-~-z/--=--Z-~_/!_CJ . _ii_ ~ <2j2o/t1 Supervisor Date Cler . Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 1MB. 7-DL Ci

Commissioner Date

Page 15: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION Township: Ash

504 001190102 201JfTOWNSH/P ROAD IMPROVEMENT CONTRACT

1 Project#: .

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Carter

Location: Port Creek to Bri~rhill

Length: 1.15 Miles Road Class: Local -----Description of Work: 211 Stone Lift

Work Probable Funding Source

Work Type Provider Cost Townshi'p MCRC Other Comment

Stoning Contractor 20,674 10,337 10,337

·Total Probable Cost $ 20,674 $ 10,337 $ 10,337 $ -

The Total Probable Cost along with the Township allocated portio11 of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practicaL An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progr:~ss billings payable to the MC~¢ wjthin thirty {30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _,.wf3.;w 19

Commissioner Date

Page 16: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY R.PAD COMMISSION

201srTOWNSHIP ROAD IMPROVEMENT CONTRACT 7 . Township: Ash

Project#: 504 001190105

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Indian Trails

Location: Sigler to Calkins

Length: 0.62 Miles Road Class: Local -----Description of Work: 2" Ston,e Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 11,396 11,396

Total Probable Cost $ 11,396 $ 11,396 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise th.e Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

;J!JJ~ r~brtu~U-J ~01 /

-----~~~t=he--IT'-..:::ow~ns:.....:hi;....:..p B-oa.....:rd:.....o-~-he_~_d_:_·~_;_9'f-V&_ ~d' ~ dj/O )!tj Supervisor Date ~ Date

Approved by the Board of County Road Commissioners on the ___ day of-.,.-----------' _201-8Q} () l7'

Commissioner Date

Page 17: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION Township: Ash

20U(,TOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 001190103 :

The~oard of County Road Commissioners of Monroe. County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be sched~led and the manner of

performance.

Road Name: Jones

Location: Sigler to Village limits

Length: 1.02 Miles ----- Road Class: Local -----Description of Work: 2" Stone Lift

..

Funding Source Work Probable

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 22,594 11,297 11,297

Total Probable Cost $ 22,594 $ 11,297 $ 11,297 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's. allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive mo.nthly progress .billings payable to th~ MCRC within thirty (30) days.

-~~....;,._,;__~--· 0 'li___;,_jl,_· --+-t: h_ Ytlt~k.f11 ,_ ~. d-r::;"'~ a .. cJ/));!_L 4 ~· .. Approved y the Township Board on the~' day of '-fCfj -1- ~.L~. // •

~A 2/ztl/1 Supervisor Date erk Date

Approved by the Board of County Road Commissioners on the ___ day of ________ _, .. ~ r;}_O J 9

Commissioner Date

Page 18: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION Township: Ash

20UfTOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 001190101

Th?Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951; as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Newburg

Location: Exeter to Burns

Length: Miles ----- Road Class: Local -----0.56

Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 17,040 8,520 8,520

Total Probable Cost $ 17,040 $ 8,520 $ 8,520 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. · Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require· prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

. -;oJh ~~ j . ;2oLr Approved the Township Board on theCX day of 'f-eAJYLLtlJ/1 , 2llill': ~-

Supervis!- ~~ · 2/~~C) . c!Jld4 ~a~po)!f Approved by the Board of County Road Commissioners on the ___ day of ________ _,~· ;)_D l '-j

Commissioner Date

Page 19: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COU TV OAD COMMISSION I

Township: Ash

489 001 190107 20ufTOWNSH 1

R AD IMPROVEMENT CONTRACT ·1 . Project#:

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name:

Location:

·Length:

Description of Work:

Work Type

Stoning Base Stabilization

Chip Sealing Shoulders

Construction Engineering Resurfacing

Newburg

Briarhill to Railroad

0.63 Miles -----Base Stabilization & Double Chip Seal

Work Probable

Provider Cost Township

Contractor 16,137 16,137 Contractor 76,770 76,770

MCRC 47,479 47,479 Contractor 21,850 21,850

MCRC 609 609

MCRC 4,243 4,243

Total Probable Cost $ 167,088 $ 167,088

Road Class: Local -----

Funding Source

MCRC Other Comment

HMA Drives

$ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress hilling:; payabJe to the .. MCRC within thirty (30) days.

Approved by the Board of County Road Commissioners on the ___ day of _________ , 2018-.J_Ol (.j .

Commissioner Date

Page 20: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROA Township: Ash

20~rOWNSHIP ROAD VEMENT CONTRACT Project#: 504 001190108

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951; as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of

performance.

Road Name:

location:

length:

Description of Work:

Work Type

Zone Patching

Chip Sealing

Ready

US-24 to Berlin

1.11 Miles

HMA Scratch and Single Chip Seal

Work Pro~able

Provider Cost Township

Contractor 44,550 44,550 MCRC 24,073 24,073

Total Probable Cost $ 68,623 $ 68,623

Road Class: local -----

· Funding Source

MCRC Other Comment

$ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road ·Improvement Contract Change Form.

The Township will receive mon.thly progress billings payable to the MCRC within thirty (30) days.

A?:Y !?::!_. oard on the :2/;~ay of fbr/_,I_LA-vy , zoy(. 7' /)} , .

i:L_ ~ Lb-~/{t /!!:)uM .~ 2):2-c;/;y' ·Supervisor · · Date Clerk · Date

Approved by the Board of County Road _commissioners on the ___ day of ________ __,· .W1B.J-b L t'j

Commissioner Date

Page 21: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE C \U ROAD COMMISSION Township: Ash

20~TOWN \ OAD IMPROVEMENT CONTRACT Project#: 504 001190106

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951; as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Whipple

Location: Sweitzer to Dead End

· Length: 0.21 Miles ----- Road Class: Local -----Description of Work: 211 Stone Lift

Work Probable Funding Source

·WorkType Provider Cost Township MGRC Other Comment

Stoning Contractor 3,908 3,908

Total Probable Cost $ 3,908 $ 3,908 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, .MCRC will advise the Township representative as ~oon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval usir.~g the Road Improvement Contract Change Form.

The Township will receive monthly progress billings p·ayable to the MCRC within thirty (30) days.

'J t)-fh ('-I J r {i!;f 1 Approve~ the Town. shil? Bo. ard on the? day of • ~.· VtL£1/',~= ~ '

{\ L ~2-/zc/fCt ·~-r-=-~Zk-~-__ c2-r--j;J-6_/;...:;;...,.....;9 Supervisor Date Cler / D~te

Approved by the Board of County Road Commissioners on the ___ day of _________ _,.~. c)_o L l

Commissioner Date

Page 22: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROECOUN

201g'TOWNSHIP

7

D COMMISSION

IMPROVEMENT CONTRACT

Township: Ash

Project#: 504 001195201

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Various

Location: to

Length: Miles Road Class: Local ----...,.-- -----Description of Work: First cutting (spring)- to center of ditch. Second cutting

(summer/fall)- both sides of the ditch

Work to be completed by Precision Irrigation

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Mowing Contractor 14,900 14,900

Total Probable Cost $ 14,900 $ 14,900 $ - $ -

The· Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agr~ed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A .contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receiv~ monthly progress hillihgs payable to ·the MCRC within thirty (30) days.

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2:(31'g, ZD l q _

Commissioner Date

Page 23: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

\\i ~~ \\

M ~\ ~' ~\

MONROE C ~~ N~¥ ROAD COMMISSION Township: Berlin ' ~!

2019 TOWN JP J)OAD IMPROVEMENT CONTRACT Project#: 504 003 190309

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Armstrong

Location: Sigler to Dead End

Length: 0.14 Miles Road Class: Local ----- -----Description of Work: 211 Stone Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 3,810 3,810

Total Probable Cost $ 3,810 $ 3,810 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual con.tract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Supervisor Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _J 2019.

Commissioner Date

Page 24: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Township: Berlin

Project#: 489 003 19031.1

The Board of County Road co·mmissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Armstrong

Location: Brandon to labo

Length: 0.66 Miles Road Class: Local ----- -----Description of Work: 311 Stone Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 20,175 20,175

Total Probable Cost $ 20,175 $ 20,175 $ - $ -

The Total Probable Cost along with the. Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action frol"!1 either party, this contract will automatically·be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Approved by the Township Board on the~iflcJay of ~~rt '" ()

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of----------' 2019.

Commissioner Date

Page 25: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

TV ROAD COMMISSION Township: Berlin

ROAD IMPROVEMENT CONTRACT Project#: 504 003 190310

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.

Road Name: Brandon

Location: Sigler to Village limits

Length: 1.13 Miles Road Class: Local ----- -----Description of Work: 211 Stone Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 24,226 24,226

Total Probable Cost $ 24,226 $ 24,226 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portfon of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Supervisor Date Date

Ap·proved by the Board of County Road Commissioners on the ___ day of ________ _, 2019.

Commissioner Date

Page 26: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ~D COMMISSION Towns~ip: Berlin

2019 TOWNSHIP ROAD IMPROVEMENT CONTRACT · Project#: . 504 003 190308

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portfon of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Dauncy

Location: Armstrong to Township Line

Length: 1.07 Miles Road Class: Local -----Description of Work: 2" Stone Lift

Worl< Probable Funding Source

Worl< Type Provider Cost Township MCRC Other Comment

Stoning Contractor 19,379 10,658 8,721

Total Probable Cost $ 19,379 $ 10,658 $ 8,721 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRCwithin thirty (30} days.

• . rJ ~~ t c." 1_, ' Approved by the Township Board on the d5}VIday of Y~Uffi!f\4-

. 0 /)o~ 4~ ~/7G-/z

Supervisor Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 27: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

l\

II 11 'I

d II ·/ .

MONR , E , UNTY'ROAD COMMISSION Township: Berlin li I

2019 tjtJW. SHIP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190305 i i ~ ,!!

The Bo~-;:-d of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated porti~n of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Dunsmore Plat

Location: Off Brandon to

Length: 0.34 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing . MCRC 8,811 4,406 4AOS

Total Probable Cost $ 8,811 $ 4,406 $ 4,405 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the· Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 28: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

~,1

' !i MONROE C U :

1

Y ROAD COMMISSION · . Township: Berlin

2019 TOW HI J ROAD IMPROVEMENT CONTRACT Project#: 504 003 190316

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.

Road Name: Haggerman

Location: Labo to Sigler

Length: 0.99 Miles Road Class: Local -----Description of Work: 211 Stone Lift

Worl< Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 20,175 20,175

Total Probable Cost $ 20,175 $ 20,175 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from ei.ther party, this contract will awtomatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

J-~-1 a Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of ________ __~ 2019.

Commissioner Date

Page 29: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

ROAD COMMISSION Township: Berlin

DAD IMPROVEMENT CONTRACT Project#: 504 003 190314

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. ~he Township agrees to pay its allocated portion of the actual cost of the work. 1he MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Joanne/Birchwood

Location: Off Newport to

Length: Road Class: Local -----Miles -----0.37

Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 12,423 12,423

Total Probable Cost $ 12,423 $ 12,423 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30} days.

Approved by the Township Board on the~Mday of N~(L).__f)vyl

Supervisor Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _~ 2019.

Commissioner Date

Page 30: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONRO~~ NTY ROAD COMMISSION .

2019 roJ(s f' ROAD IMPROVEMENT CONTRACT

Township:

Project#:

Berlin

504 003 190315

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Newport

Location: N. Dixie Hwy to Armstrong

Length: 0.98 Miles Road Class: Local

Description of Work: 211 Stone Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 18,274 18,274

Total Probable Cost $ 18,274 $ 18,274 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 31: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROEC Township: Berlin

2019 TOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190312

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Swan Creek

Location: N. Dixie Hwy to N. Dixie Hwy

Length: 1.07 Miles Road Class: Local -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider ·Cost Township MCRC Other Comment

Chip Sealing MCRC 23,997 23,997

Total Probable Cost $ 23,997 $ 23,997 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost Is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount an~ the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated· portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of----------' 2019.

Commissioner Date

Page 32: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE C l,JTY ROAD COMMISSION Township: Berlin

2019 TOWNSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190313

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. T~e Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Swan Creek

Location: Newport to labo

Length:. Miles ----- Road Class: Local -----1.09

Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 26,226 26,226

Total Probable Cost $ 26,226 $ 26,226 $ - $ -

The Total Probable Cost along with ~he Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township 1

S

allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township 1

S allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ -' 2019.

Commissioner Date·

Page 33: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE ~U ROAD COMMISSION Township: Berlin ,

2019 TOWtHJ j ROAD IMPROVEMENT CONTRACT Project#: 504 003 190306

The Board of County Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Swan View

Location: Trombley to Dead End

Length: 0.39 Miles Road Class: Local -----Description. of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 9,752 4,876 4,876

Total Probable Cost $ 9,752 $ 4,876 $ 4,876 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof {which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceeq the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's ·allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _ __,... ______ ___, 2019.

Commissioner Date

Page 34: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

I]

MONROFtOl NTY ROAD COMMISSION Township: Berlin

2019 T08i IP ROAD IMPROVEMENT CONTRACT Project#: 504 003 190307

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. "fhe Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Trombley

Location: Strong to Masserant

Length: 0.75 Miles. Road Class: Local -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 18,215 9,108 9,107

Total Probable Cost $ 18,215 $ 9,108 $ 9,107 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

J-;t-(Q ~;}Of[ Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 35: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

11

MONROE tO tTY ROAD COMMISSION . Township: Berlin

2019 TO \Nsj;IP ROAD IMPROVEMENT CONTRACT Project#: 504 OOa 195203

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. ~he Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Various

Location:

Length: Miles Road Class: Local ----- -----Description of Work: Two cuttings to be from edge of road to center

(bottom of ditch). One cutting to be to the property line (fence row).

Work to be completed by D&D Wyse

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Mowing Contractor 18,500 18,500

Total Probable Cost $ 18,500 $ 18,500 $ - $ -

The Total Probable Cost along with th€ Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall npt exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 36: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

:i I

MONROE :,0 TV ROAD COMMISSION I I .

2019 TO S IP ROAD IMPROVEMENT CONTRACT

Township: Dundee

Project#: 504 004 190412

I The Board ounty Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Cake

Location: Petersburg to Davis

Length: 1.41 Miles Road Class: Local -----Description of Work: 2" Stone Lift

Work ·Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 28,962 28,962

Total Probable Cost $ 28,962 $ 28,962 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Approved by the Township Board on the C)& 'f'day·of

/\/) ~ [#4~.& 1J1 LtMJL t2--c2k ----11

1~ ,2019.

~)ry1, ~ .;2-C).{;-Ii Cle Date Supervisor Date

Approved by the Board of County Road Commissioners on the ___ day of _ _;__ _______ _, 2019.

Commissioner Date

Page 37: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUN

2019 TOWNSHIP

AD COMMISSION

IMPROVEMENT CONTRACT

Township: Dundee

Project#: 504 004 190407

The Board of Cou oad Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Dennison

Location: Brewer to M-50

Length: 1.69 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 35,052 17,526 17,526

Total Probable Cost $ 35,052 $ 17,526 $ .17,526 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Approved by the Township Board on thec)2U ~ay of

~ ~-,JP-(9 ~ ,2019.

. . ~n?~'e2Gl6-!7 Cler · Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 38: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Township: · Dundee

2019 TOWNSHIP ROAD IMPROV Project#: 504 004 190411

The Board of County Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Dundee-Azalia

Location: Hatter to Village Limits

Length: 1.24 Miles Road Class: Local -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 31,175 31,175

Total Probable Cost $ 31,175 $ 31,175 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof {which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Approved by the Tow~ship Board on the .;:(lj ~ay of ~~"' • 2019.

~at3flt /J-cZ~-!1. ~!II~· ,;;;~02~-19 Su rvisor Date C rk Date

Approved by the Board of County Road Commissioners on the ___ day of _________ __, 2019.

Commissioner Date

Page 39: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY R

2019 TOWNSHIP ROA ~ '

~ '

OM MISSION '

ROVEMENT CONTRACT

Township: Dundee

Project#: 504 004 190410

The Board of County Road Commissioners of Monroe County (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Gloff

Location: Dixon toRR

Length: 0.82 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 19,123 19,123

Total Probable Cost $ 19,123 $ 19,123 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Approved by the Township Board on the~ 'H-aav of ~~ • 2019.

~A® c2-o2b--!,9 ~lY/,~ ~~tP-J9 Sup rvisor Date erk Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 40: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

. MONROE C ROAD COMMISSION Township: Dundee

ROAD IMPROVEMENT CONTRACT Project#: 504 004 190409

The Board o ounty Road Commissioners of Monroe County (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.

Road Name: Meanwell

Location: M-50 to Ida West

Length: 2.73 Miles Road Class: Local ---'----

Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 65,613 65,613

Total Probable Cost $ 65,613 $ 65,613 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total .Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood s.hall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is

· provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Approved by the Township Board on thee2 (p ~ay of ~

fJJ:Ifdu1{§)J_ ~ -~ -;q Sup isor Date

12019,

~ /!1-~ d-0/t-)J Clerk Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 41: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COU

2019TOWNSH I

OAD COMMISSION

AD IMPROVEMENT CONTRACT

Township: Dundee

Project#: . 504 004190408

The Board of ·C niy Road Commissioners of Monroe County (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·shall be scheduled and the manner of performance.

Road Name: Wilcox

M-50 to Day Location:

length: 2.40 Miles

Description of Work: Single Chip Seal

Work Probable

Work Type Provider Cost

Chip Sealing MCRC 55,562

Total Probable Cost $ 55,562

Road Class: Local -----

Funding Source

Township MCRC Other Comment

36,671 18,891

$ 36,671 $ 18,891 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is. set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount

· and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress biJiings payable to the MCRC within thirty (30} days.

Approved by the Township Board on thecR{,. 'h" day of 1~ . 2019.

~ :J-;2/e -c:_q ~ !Yl~ .;2-r:}cR/9 Su Date Cler Date

Approved by the Board of County Road Commissioners on the ___ day of _________ -' 2019.

Commissioner Date

Page 42: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION Township: Dundee ;I

2019 TOWNSHIP ROAD IMPROVEMENT CONr: I

Project#: 504 004 195204

The Board of County Road Commissioners of Man-"" ·county (MCRC} and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Various

Lo·cation:

Length: Miles Road Class: Local ----- -----Description of Work: First cutting (spring) - One pass on both sides of road

Second Mowing- Two passes on both sides of road

Fence-:to-Fence- All roads west of US-23, South of M-50

Work to be completed by D&D Wyse

Work Probable ·Funding Source

Work Type Provider Cost Township MCRC Other Comment

Mowing Contractor 19,990 19,990

Total Probable Cost $ 19,990 $ 19,990 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require ·prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Approved by the To~wnship Board on the ;l(R 'f1<...l day of 1=~

Qjtuu.L¥1J c:<-~-;q Supervisor Date

12019, ·

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 43: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

I MONROE COUNTY ROAD cl; M 1/ ISSION

2019 TOWNSHIP ROAD IM I RO ,I EMENT CONTRACT ;I 'I

Township: Dundee

Project#: 000

The Board of County Road .. ' issioners of Monroe County (MCRC) and the Township,_ in accordance with Public Act 51 of 1951,_ as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Various

Location: to

Length: Miles Road Class: Local -----Description of Work: Excess Gradall

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Ditching MCRC 50,000 50,000

Total Probable Cost $ 50,000 $ . 50,000 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Approved by the Tow~ship Board on the d_{/1._ day of ±~

~ .Pj#/;1.. 12019,

~~.07~ Supervisor Date Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 44: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

ROAD COMMISSION Township: LaSalle

AD IMPROVEMENT CONTRACT Project#: 504 009 190904

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name:

location:

length:

Descrip.tion of Work:

Work Type

Chip Sealing

Dunlap

Stein to Yargerville

0.99 Miles

Single Chip Seal

Work Probable Provider Cost

MCRC 22,351

Total Probable Cost $ 22,351

Road Class: local -----

Funding Source

Township MCRC Other Comment

11,176 11,175

$ 11,176 $ 11,175 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

Date

Approved by the Board of County, Road Commissioners on the ___ day of ________ _, 2019.

Commissioner Date

Page 45: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

r ~:~ . r ~I

MONROE COUNTY RO D ' MMISSION · ' )

2019 TOWNSHIP ROA IM~ ROVEMENT CONTRACT

Township:

Project#:

LaSalle

504 009 190904

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Hillcrest Orchard Sub

Location: Off Stein to Between US-24 & M-125

Length: 1.48 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 34,607 17,304 17,303

Total Probable Cost $ 34,607 $ 17,304 $ 17,303 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract ~id amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Approved by the Board of County Road Co~ missioners on the ___ day of _________ ,, 2019.

Commissioner Date

Page 46: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

~ r

MONROE COUNT R D COMMISSION

2019 TOWNSHIP . 0 IMPROVEMENT CONTRACT

Township: LaSalle

Project#: 504 021192107

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shail be scheduled and the manner of performance.

Road Name: Rauch

Location: US-24 to Minx

Length: _1_.9_9 ____ Miles Road Class: Local -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 46,563 11,641 23,281 11,641

Total Probable Cost $ 46,563 $ 11,641 $ 23,281 $ 11,641

The Total Probable Cost along with the Township allocated portion of the Total Probable 'Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township•s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30) days.

I c;til d f f ~(Lt &'1_( II :' ay o -:-. --=~-"'-!.....:~-~J.f--____l

2 2 & I 1(1 Date Date

Approved by the Board of County Road Commissioners on the ___ day of ________ ___, 2019.

Commissioner Date

Page 47: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

COUNTY ROAD COMMISSION Township: LaSalle

, NSHIP ROAD IMPROVEMENT CONTRACT Project#: 504 009 195209

The Board of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Various

Location:

Length: 41.00 Miles Road Class: Local -----Description of Work: First cutting to be twenty (20) feet from edge of the road

to top of back bank (or whichever is less), Second cutting is to be twenty (20)

feet or to top of the back bank (or whichever is less)

Work to be completed by D;K. Services

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Mowing Contractor 10,250 10,250

Total Probable Cost $ 101250 $ 101250 $ - $ -

The Total Prob~ble Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of. the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township Will receive monthly progress billings payable to the MCRC within thirty (30} days.

Approved by the Township Board on the / 91:J. day of · Tf~·(U {i/ V f

-+-0..,.t.JJk~)1,:!4Luvt+--.:'-c/fl<---lf..lc,...£<..l:t~~>a~:Jl4<l..ol.{If~.k4:::...L..1- ____ ...:::;zz~lzi::.J..rrl.!...ja /c......t:l 1 I · ........ /

Supervisor Date ~..__..--./

Approved by the Board of County Road Commissioners on the ___ day of ________ _, 2019.

Commissioner Date

Date

Page 48: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROECOUN

2019 TOWNSHIP

The Board of Cou 1951, as amended, portion of the act performance.

Road Name:

Location:

Length:

Description of Work:

Work Type

Chip Sealing

COMMISSION Township:

Project#:

Summerfield

504 014 191408

Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of hat the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated of the work. · The MCRC shall determine when the work ·shall be scheduled and the manner of

Alba in

Summerfield to City Limits

2.01 Miles Road Class: Local -----Single Chip Seal

Work Probable Funding Source

Provider Cost Township MCRC Other Comment

MCRC 42,880 21,440 21,440

Total Probable Cost $ 42,880 $ 21A40 $ 21A40 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township1s allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township1

S allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty (30} days.

the \Bfh day of ~.J J (\./L.vOJVj , 2019.

Cl Lf\ fi,

~4+-:.4~~,..G----~~-_21;___;;-Z__;__o_;a+- ~ 1 J .elM~ d::-2fo~ ~~ Date Clerk U Date

Approved by the Board.of County Road Commissioners on the ___ day of ______ ---'-__ _, 2019.

Commissioner Date

Page 49: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COU

2019TOWNS

OAD COMMISSION

~D IMPROVEMENT CONTRACT .

Township:

Project#:

Summerfield

504 014 191414

The Board of nty Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled aod the manner of performance.

Road Name: Bentwood

Location: Wells to Dead End

Length: 0.43 Miles Road Class: Local

Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 15,486 15,486 ~~~v~).\. l);,p,""

II

Total Probable Cost $ 15,486 $ 15,486 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is a~reed and understood shall not exceed 110% of the Township•s allocated portion of the Totat Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increas~ in project costs exceeding 110% of the Township•s allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30} days.

Approved by the Board of County Road Commissioners on the ___ day of _________ _J 2019.

Commissioner Date

Page 50: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

tl L MONROE ti:' TV ROAD COMMISSION Township: Summerfield

2019 TO!Il1i S , ~ROAD IMPROVEMENT CONTRACT Project#: 504 014 191409 u '

The Board or County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work ·Shall be scheduled and the manner of performance.

Road Name: Forrest

Location: Teal to City limits

Length: 0.52 Miles Road Class: Local ----- -----· Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provi.der Cost Township MCRC Other Comment

Chip Sealing MCRC 12,636 6,950 5,686

Total Probable Cost $ 12,636 $ 6,950 $ 5,686 $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form. ·

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 51: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

performance.

Road Name: Lulu

Location: Summerfield to Teal

Length: 1.39 Miles -----Description of Work: Single Chip Seal

Work Probable Work Type Provider Cost

Chip Sealing MCRC 32,890

Total Probable Cost $ 32,890

Township

32,890

$ 32,890

Township:·

Project#:

Road Class: Local -----

Funding Source

MCRC Other

$ - $ -

Summerfield

504 014 191410

Comment

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above._ Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form. '

TheTownship will receive monthly progress billings payable to the MCRC within thirty (30) days.

Date

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 52: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

])

~~' J 1 ~ MONRO /to

1 NTY ROAD COMMISSION Township: Summerfield

2019 T01~N /HIP ROAD IMPROVEMENT CONTRACT Project#: 504 014 191413 fl ~

The Bol ' of County Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the w·ork. The MCRC shall determine when the work· shall be scheduled and the manner of performance.

Road Name: Morocco

Location: County line to Dead End

Length: 4.77 Miles Road Class: Local -----Description of Work: 2" Stone Lift

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Stoning Contractor 83,564 83,564

Total Probable Cost $ 83,564 $ 83,564 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township 1

S

allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township1s allocated portion ·of the actual contract bid amount shall require' prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings ~ayable to the MCRC within thirty {30} days.

Approved by the Board of County Road Commissioners on the ___ day of _________ __, 2019.

Commissioner Date

Page 53: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE CO ROAD COMMISSION Township: Summerfield I

2019 TOWNS r /P OAD IMPROVEMENT CONTRACT Project#: 504 014 191411 (

The Board of · "' ty Road Commissioners of Monroe County (MCRC) and the Township, in accordance with Public Act 51 of 1951, as .amended, agree that the MCRC shall perform the work described hereinafter . .The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Old Ida Center

Location: Wells to Ida Center

Length: 0.18 Miles Road Class: Local --...,..----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 5,497 5,497

Total Probable Cost $ 5,497 $ 5,497 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Approved by the Board of County Road Commissioners on the ___ day of ___________ 2019.

Commissioner Date

Page 54: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Township:

Project#:

Summerfield

504 014 191412

The Board of 'v nty Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The Mc;:RC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Railroad

Location: City Limits to Summerfield

Length: 1.76 Miles Road Class: Local ----- -----Description of Work: Single Chip Seal

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Chip Sealing MCRC 38,316 38,316

Total Probable Cost $ 38,316 $ 38,316 $ - $ -

The Total Probable Cost along ·with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either·party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof (which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A cohtingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determi!1es that the actual contract ~ost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30) days.

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 55: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COU~Q COMMISSION Township: Summerfield

2019 TOWNSHIP Rd~' PROVEMENT CONTRACT Project#: 504 014195214

The Board of County Road Commissioners of Monroe County {MCRC) and the Township, in accordance with Public Act 51 of 1951, as amended, agree that the MCRC shall perform the work described hereinafter. The Township agrees to pay its allocated portion of the actual cost of the work. The MCRC shall determine when the work shall be scheduled and the manner of performance.

Road Name: Various

Location:

Length: Miles Road Class: Local ----- -----Description of Work: First Cutting -To center of ditch

Second Cutting -To center of ditch and back sides of ditch

Work to be completed by Precision Irrigation

Work Probable Funding Source

Work Type Provider Cost Township MCRC Other Comment

Mowing Contractor 18,400 18,400

Total Probable Cost $ 18,400 $ 18,400 $ - $ -

The Total Probable Cost along with the Township allocated portion of the Total Probable Cost is set forth above. Without requiring further action from either party, this contract will automatically be adjusted to reflect the actual contractor bid amount and the Township's actual allocated portion thereof {which it is agreed and understood shall not exceed 110% of the Township's allocated portion of the Total Probable Cost). A contingency amount of an additional 10% of the actual contract amount is provided for unforeseen or variable project costs. If MCRC determines that the actual contract cost will exceed the contract bid amount, MCRC will advise the Township representative as soon as practical. An increase in project costs exceeding 110% of the Township's allocated portion of the actual contract bid amount shall require prior Township approval using the Road Improvement Contract Change Form.

The Township will receive monthly progress billings payable to the MCRC within thirty {30} days.

Approved by the Board of County Road Commissioners on the ___ day of _________ _, 2019.

Commissioner Date

Page 56: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION

RIGHT-OF-WAY CONTRACTS FOR

CONTRACTORS MOWING ON TOWNSHIP LOCAL ROADS

THIS AGREEMENT, made this __ day of , 2019, by and between the Board of County Road Commissioners of the County of Monroe, Michigan, a municipal corporation, hereinafter referred to as the Road Commission, and O.K. Services with offices at 13015 Dennison Rd., Milan, Ml 48160 734-439-8545, hereinafter referred to as the Contractor:

WITNESSETH:

That the Contractor has submitted the low bid for mowing in Exeter Township, in the amount of $245 per hour for up to $12,005 worth of work. The Contractor agrees to furnish all services, labor, tools, equipment, material, and transportation, and incidentals necessary to perform the entire work in accordance with the following documents which are incorporated herein by reference and are part of the contract.

INSURANCE & PERMIT REQUIREMENTS:

The contractor shall secure and maintain such insurance as will protect self from claims under the Worker's Compensation Acts and from claims for bodily injury, death, or property damage, which may arise from the performance of services under this agreement, and shall also carry professional liability insurance. Limits of liability shall be as follows:

General Liability:

Bodily Injury

Property Damage

Automobile Liability:

Bodily Injury

Property Damage

Professional Liability:

Valuable Papers:

On Premises Off Premises

Each Person Each Occurrence Aggregate

Each Occurrence Aggregate

Each Person Each Occurrence

Each Occurrence Aggregate

$2,000,000 $2,000,000 $2,000,000

$2,000,000 $2,000,000

$2,000,000 $2,000,000

$2,000,000 $2,000,000

$ 500,000

$ 50,000 $ 5,000

Endorsements- All insurance policies and binders shall include the following endorsements, verbatim:

"ADDITIONAL INSURED: The BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF MONROE, the Monroe County Road Commission and its officers, agents, and employees."_

Page 57: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

_"Provide Written notice ten (1 0) days prior to cancellation, expiration, termination or reduction in coverage for nonpayment of the premium and written notice thirty (30) days prior to cancellation, expiration, termination or reduction in coverage for all other reasons.

The C()ntractor will apply for a permit with the Monroe County Road Commission to work within the road right-of-way.

INDEMNIFY MONROE COUNTY ROAD COMMISSION

The contractor shall at all times exercise extreme care and shall assume any and all liability for property damage or bodily injury resulting from the above operation by his employees, agents, assigns, sub-contractors and anyone else acting under his control or direction; and will indemnify, hold harmless and defend the County Road Commission, its Commissioners and employees from any and all claims for property damage or bodily injury arising out of this Agreement (including 'but not limited to actual attorney fees, expert Witness fees, and court costs).

FINAL INSPECTION, ACCEPTANCE. AND PAYMENT

The Monroe County Road Commission will make a final inspection of all work included in the contract, and notify the contractor of defects to be remedied prior to final acceptance. Upon satisfactory completion of the work by the contractor, a final estimate will be prepared. Payment for all work completed ahd accepted, less previous payments, will be made within thirty (30) days of final acceptance.

DISPUTES

The Monroe County Road Commission's written decision on any question arising under the contract between the township and contractor shall be final and binding upon both the township and the contractor in the absence of fraud, bad faith, or abuse of discretion.

SPECIFICATIONS

Brush mowing - Mow/mulch everything from where township completed across to the far bank out to a minimum of 20'. Contractor will cut anything and up to 3" and smaller. Low hanging branches up to 3" to be cut back to tree trunk. Ditch work will be postponed if they have an excess of snow drifts & water level is too high.

Contractor must notify the Monroe County Road Commission, 24 hours prior to and within 24 hours of completion of each mowing cycle for each individual township.

Clearing of intersections, each cycle of mowing, requires clean up of the entire road right of way 1 00' in all directions from the intersection.

All local roads are to be mowed.

Contractor must communicate which of the township roads will receive cleanup on a yearly basis, prior to commencement.

No debris to be left in the roadway or shoulder portion of road.

All work must be inaccordance to Act 791, SB 303 of 1997 and Enrolled House Bill #5594, Section 326 which became effective on October 1, 1998 (see attached.)

Approved by the Contractor on the ___ day of _______ ...;.:7 2019.

c!J~~~ ~''7 Betsy ~itz~ Presi~ Date

Page 58: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Approved by the Board of County Road Commissioners on the of _____ ~ 2019.

Commissioner

Page 59: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY ROAD COMMISSION

RESOLUTION

BE IT RESOLVED that the Board of County Road Commissioners of Monroe County, Michigan enter into a contract with the Michigan Department of Transportation for:

Contract No. 19-5082; Control Section STU 58115; Job Number 133379CON; Project 1900(166); CFDA No. 20.205; Microsurfacing work along Summerfield Road from Smith Road northerly to Consear Road; including pavement marking work; and all together with necessary related work.

BE IT FURTHER RESOLVED that the Board or County Road Commissioners hereby approves the above-Cited contract and authorizes Commissioners Paul lacoangeli and Dan Minton to execute same on behalf of the Board of County Road Commissioners of Monroe County.

Moved by Commissioner _________________ and supported by

Commissioner the adoption of the above Resolution.

Vote: Yes

No

I hereby certify this to be a true copy of Board action dated ____________ ,2019

at Monroe County, Michigan.

Cheryl U'Ran, Deputy Clerk

BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF MONROE

Paul lacoangeli, Chairman Dan Minton, Vice Chairman Charles A. Londo, Member Greg W. Stewart, Member Jack Thayer, PE, Member

Page 60: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

AMENDMENT TO CONTRACT 18-5546 DA

Control Section Job Number Project CFDANo.

Contract No.

STU 58115 133379CON 1900(166) 20.205 (Highway Research Planning & Construction) 19-5082

THIS AMENDATORY CONTRACT is made and entered into this date of ______ , by and between the MICHIGAN DEPARTMENT OF TRANSPORTATION, hereinafter referred to as the "DEPARTMENT"; and the BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF MONROE, MICHIGAN, hereinafter referred to as the "REQUESTING PARTY"; for the purpose of fixing- the rights and obligations of the parties in agreeing to this Amendment to CONTRACT #18-5546. · ·

WITNESSETH:

WHEREAS, the parties to the Amendment have heretofore, by a Contract dated January 22, 2019; hereinafter referred to as "CONTRACT 18-5546" provided for the construction and financing of that which is hereinafter referred to as the."PROJECT" and is described as follows:

Microsurfacing work along Summerfield Road from Smith Road northerly to Consear Road; including pavement marking wotk; and all together with necessary related work.

WHEREAS, the DEPARTMENT and the .REQUESTING PARTY having appropriate authority desire to amend CONTRACT 18-5546 to provide for the inclusion of federally participating construction engineering, construction materials testing, and inspection and the increase in the estimated PROJECT COST. ·

NOW, THEREFORE, it is hereby agreed by and between the parties hereto that:

1. Section 2 of CONTRACT 18-5546 is revised to read as follows:

2. The term uPROJECT COST", as herein used, is hereby defined as the cost of the physical construction necessary for the completidn of the PROJECT, including costs incurred by the DEPARTMENT and the REQUESTING PARTY for construction engineering, cqnstruction materials testing, and inspection and any other costs incurred by the DEPARTMENT as a result of this contract

2/4/87 amend.for 2/20/19 1

Page 61: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

CONTRACTED WORK

Estimated Cost

EXHIBIT I REVISED

CONTROL SECTION JOB NUMBER PROJECT

ESTIMATED COST

CONSTRUCTION ENGINEERING, CONSTRUCTION MATERIALS TESTING, AND INSPECTION (REQUESTING PARTY) .

GRAND TOTAL

STU 58115 133379CON 1900(166)

COST PARTICIPATION

NO DEPOSIT

GRAND TOTAL ESTIMATED COST Less Federal Funds B.ALANCE (REQUESTING PARTY'S SHARE)

2/4/87 amend.for 2/20/19 ·5

February 20, 2019

$284,200

$ 42,600.

$326,800

$326,800 $267,500 $ 59,300.

Page 62: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission
Page 63: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Monroe County Road CommissionBid Comparison

Contract ID: 2019 MicroDescription: 0.81 miles of microsurfacing and pavement markings on North Dixie Highway from approximately 470 feet east of the northbound I-75 ramps to

Sandy Creek Road in Frenchtown Township, Monroe County (MCRC Project No. 459-007-190703)Location:

North Dixie HighwayProjects(s):

2019 Micro

Rank Bidder Total Bid % Over Low % Over Est.

0 ENGINEER'S ESTIMATE $66,882.50 10.97% 0.00%

1 (06439) Pavement Maintenance Systems, LLC $60,268.00 0.00% -9.88%

2 (07915) American Pavements, Inc. $78,170.50 29.70% 16.87%

3 (07091) Strawser Construction Inc. $99,002.50 64.27% 48.02%

4 (07942) Microsurfacing Contractors, LLC $138,275.00 129.43% 106.74%

Contract # 2019 Micro (North Dixie Highway)MERL: 2018.11.1

03/06/2019 7:44:18 AM

Page 1 of 3

Page 64: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

(0) ENGINEER'S ESTIMATE(1) Pavement MaintenanceSystems, LLC (2) American Pavements, Inc.Line Pay Item Code Quantity Units

Description Bid Price Total Bid Price Total Bid Price Total0001 5047011 19,250 Syd $3.25 $62,562.50 $2.92 $56,210.00 $3.85 $74,112.50_ Micro-Surface, Std, Modified

0002 8110231 8,900 Ft $0.15 $1,335.00 $0.13 $1,157.00 $0.13 $1,157.00Pavt Mrkg, Waterborne, 4 inch, White

0003 8110232 10,700 Ft $0.15 $1,605.00 $0.13 $1,391.00 $0.13 $1,391.00Pavt Mrkg, Waterborne, 4 inch, Yellow

0004 8110343 170 Sft $4.00 $680.00 $5.00 $850.00 $5.00 $850.00Rem Spec Mrkg

0005 8110405 1 Ea $175.00 $175.00 $165.00 $165.00 $165.00 $165.00Pavt Mrkg, Polyurea, Lt Turn Arrow Sym

0006 8110410 2 Ea $175.00 $350.00 $165.00 $330.00 $165.00 $330.00Pavt Mrkg, Polyurea, Only

0007 8110412 1 Ea $175.00 $175.00 $165.00 $165.00 $165.00 $165.00Pavt Mrkg, Polyurea, Rt Turn Arrow Sym

Bid Totals: $66,882.50 $60,268.00 $78,170.50

Contract # 2019 Micro (North Dixie Highway)MERL: 2018.11.1

03/06/2019 7:44:18 AM

Page 2 of 3

Page 65: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

(3) Strawser Construction Inc.(4) Microsurfacing Contractors,LLCLine Pay Item Code Quantity Units

Description Bid Price Total Bid Price Total Bid Price Total0001 5047011 19,250 Syd $4.90 $94,325.00 $6.70 $128,975.00 $0.00_ Micro-Surface, Std, Modified

0002 8110231 8,900 Ft $0.15 $1,335.00 $0.25 $2,225.00 $0.00Pavt Mrkg, Waterborne, 4 inch, White

0003 8110232 10,700 Ft $0.15 $1,605.00 $0.25 $2,675.00 $0.00Pavt Mrkg, Waterborne, 4 inch, Yellow

0004 8110343 170 Sft $5.75 $977.50 $20.00 $3,400.00 $0.00Rem Spec Mrkg

0005 8110405 1 Ea $190.00 $190.00 $250.00 $250.00 $0.00Pavt Mrkg, Polyurea, Lt Turn Arrow Sym

0006 8110410 2 Ea $190.00 $380.00 $250.00 $500.00 $0.00Pavt Mrkg, Polyurea, Only

0007 8110412 1 Ea $190.00 $190.00 $250.00 $250.00 $0.00Pavt Mrkg, Polyurea, Rt Turn Arrow Sym

Bid Totals: $99,002.50 $138,275.00

Contract # 2019 Micro (North Dixie Highway)MERL: 2018.11.1

03/06/2019 7:44:18 AM

Page 3 of 3

Page 66: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

MONROE COUNTY

R 0 A D COMMISSION

840 S. Telegraph Rd: ·Monroe, Michigan ·48161 · (734) 240-5100 ·Fax: (734) 240-5101

MEMORANDUM

TO: Board of Road Commissioners

CC: Randy Pierce, Managing Director; Kyle Kinsey, Supervisor; Finance

FROM: ~~Christine Herron

RE: Uniform Traffic Control Devices Bid

DATE: Mar~h 6, 2019

On Tuesday, March 5, 2019.we held a bid opening for 201·9 Various Uniform Traffic Control Devices (signs and sign materials). ·

It is my recommendation to· award the bid to all the vendors that responded. . .

o Lightle Enterprises o MD Solutions o .Dornbos Sign, Inc. o Vulcan, Inc. o Osburn Associates, Inc. o Howard T. Moriarity

Bid tabulations are· attached for your review.

Page 67: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

&..v • ...., \...IIIIIVllll 1tcuttv vVIILIVt ucvivC~ DIU 1 ctU

March 5, 2019

.ROLL MATERIAL

MD Vulcan, Osburn H.T.

Material Lightle Solutions

* Dornbos Inc. Moriarity

3M Diamond Grade DG3 Reflective Sheeting - Standard Colors·-1014.89 N/B 969.45 906.00 897.00 N/B

Series 4000 - 24"x50yd

3M Diamond Grade DG3 Reflective Sheeting - Standard Colors -1268.62 N/B 1121.81 1132.50 1121.25 NIB

Series 4000 - 30"x50yd 3M Diamond Grade DG3 Reflective Sheeting - Standard. Colors -

1522.34 N/B 1454.18 1359.00 1345.50 N/B Series 4000·- 36"x50yd 3M Diamond Grade Florescent DG3 Reflective Sheeting - Standard

1053.19 N/B 990.15 942.00 912.00 NIB Colors - Series 4081 - 24"x50yd 3M Diamo.nd Grade Florescent DG3 Reflective Sheeting - Standard

1316.49 NIB 1237.69 1177.50 1140.00 N/B Colors - Series 4081 - 30"x50yd ·

3M Diamond Grade Florescent DG3 Reflective Sheeting - Standard 1579.79 N/B 1485.23 1413.00 1368.00 . N/B

Colors - Series 4081 - 36"x50yd 3M Diamond Grade Florescent Yellow/Green DG3.Reflective

1579.79 N/B. 1485.23 1413.00 13.68.00 N/B Sheeting - Standard Colors - Series 4083 - 36"x50yd

3M Scotchcal Graphic Film- Black- Series 3650-12- 30"x50yd 498.00 N/B . 463.50 585.00. 648.00/48" N/B

~M Scotchcai·Graphic Film- Black- Series 3650-12- 36"x50yq 511.26 N/B 556.20 702.00 486.00 N/B

3M Electrocut Film-Standard Colors - Series 1170 - 18"x50y~ 246.83 N/B 275.40 218.25 216.'00 N/B

3M Electrocut Film-Standard Colors- Series 1170- 24"x50yd 329.10 N/B 367.20 291.00 288.00 NIB

·3M Electrocut Film-Standard Colors - Series 1170 - 30"x50yd 411.38 N/B 459.00 363.75 360.00 N/B

3M Electrocut Film-Standard Colors - s·eries 1170 - 36"x50yd 493.65 N/B 550.80 436.50 432 .. 00 N/B

3M Protective Overlay Film ....:. Series 1150 - 30"x50yd '658.25 N/B 711.56/1160 585.00 577.50/1160 N/B

3M Protective Overlay Film ..:... Series 1150 - 36"x50yd 789.89 N/B 853.88/1160 702.00 693.00 N/B

TPM-5 Clear Transfer Tape- 6"x1 OOyd 50.00 N/B 54.00 21.00 46.50 N/B

TPM-5 Clear Transfer Tape- 9"x1 OOyd 75.00 N/B 81.00 31.50 69.75 N/B

TPM-5 Clear Transfer Tape- 24"x1 OOyd 200.00 N/8 216.00. 84.00 186.00 N/8

TPM-5 Clear Transfer Tape- 30"x1 bOyd 250.00 N/B 270.00 105.00 232.50 N/B - - - - - '---~

Page 1 of 7 MnnrnP. Cnuntv Rn~rl Cnmmi~~ion

Page 68: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Size

.18"x18"

30"x30"

36"x36"

36"x36"x36"

18"x6"

48"x9"

27"x18"

48"x30"

24"X30"

36"X12"

36"X48"

24"x10"

24"X24"

24"x24"

24"X36"

24"X30"

12"X6"

12"X12" 2 color

._..., ''-' 'JIIII'JIIII JltAIIIv '-JVIIL:IVI L.JvVJI.,.,c:;;:, UIU I au

March 5, 2019

PREFABRICATED REGULATORY AND MISC. REFLECTORIZED SIGN FACES 3M Diamond Grade DG3 Reflective Sheeting, Series 4000 on 0.80 flat aluminum

Example(s) MD Vulcan, Lightle

Soh:~tions * Dornbos

Inc.

ER-1 16.58 N/B 13.55 20.86

R1-1 45.40 N/B 36.69 39.25

R1-1 65.50 N/B 52.23 56.52

R1-2 33.30 N/B 27.09 28.98

R1-4 5.60 N/B 4.52 5.55

R15-1 44.22 N/B 60.04 77.39

R15-2P 2, R15-2P 3 24.87 N/B 25.35 29.2_1

R11-2 73.70 . N/B 60.20 67.30

R2-1, R12-1, R2-5A, R3-16, 36.85 N/B 30.10 33.65

R3- t6a, R3-17, R4-~, R8-8

R6-1 22.11·· N/B 18.06 20:19

R3-9b 88.44 N/B 72.24 80.76

ARROW (special see attachment) - 12.31 N/B 10.05 12.09

R5-2 'No Trucks' 29.70 N/B 24.08 26.92

R5-2 'No Thru Trucks' 29.70 N/B 24.08 26.92-

R10-6 44.22 N/B 36.12 40.38

R12-8 (special-see attachment) 36.85 N/B 40.10 33.65

R8-4 3.90 N/B 3.01 3.67

R3-8a 7.50 N/B 6.92 7.71 -- -

MnnmP. Cmmtv Rn::~rl Cnmmissinn

. ,-H.T.

Osburn· Moriarity

17.06 N/B

47.38 N/B

68.22 N/B

53.06 N/B J

I

5.69 N/B

22.74 N/B

25.58 .N/B

75.80 N/B

37.90 N/B

22.74 N/B

90.96 N/B

12.63 N/B

30.32 N/B

30.32 N/B

45.48 N/B

37.90. N/B

3.79 N/B

7.68 N/B

Page 2 of 7

Page 69: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

-- ·- -····-···· lllo.AIII'\J '-'Vlll.IVI LJV.VIVVV LJIU IOU

March 5, 2019

-

24"X24". R3-8a 29.70 NIB 24.08 27.28 30.72 N/B

2 color

24"X18" R 1-1 0 pI R 14-1 22.11 NIB 18.06 20.19' 22.74 N/B

24"x18" R14~1 (special see attachment) 22.11 . N/B 28.06 20·.19 22.74 N/B -~·-·~ '-----·

PREFABRiCATED WARNING REFLECTORIZED SIGN FACES 3M Diamond Grade Florescent DG3 Reflective Sheeting, Series 4081 on 0.80 flat aluminum

Lightle MD Vulcan, Osburn H.T.

Size Example(s) Solutions

* Dornbos Inc. Moriarity .

12"x36" OM-3L, OM-3R 22.11 NIB 18.24 20.58 22.74 N/B

30"x30" W3-1 (text), W14-1, W14-2,

46.06 N/B 38.00 42.88 47.38 NIB W14-2a, W11-1, VV15-1

30"x30" W3-1 (symbol), W3-2(symbol),

50.50 N/B 44.05 49.64 47.38 N/B W3-3(symbol), W3-5(symbol)

W3-1 (text), W3-2(text), W3-3(text), W3-5(text), W1-1, VV1-2, VV1-3,·

36"x36" W1-4, W1-5, W2-1 I VV2-2, VV2-.3, 66.-33. N/B 54.72 61.74 68.22 . N/B VV3-4, VV1-8, VV8-3, VV11-10a, VV9-1 ,VV8-18

36"x36'~ VV3-1 (symbol), W3-2(symbol),

74.30 N/B 63.26 67.04 68.22 N/B W3-3(symbol), VV3-5(symbol)

48"x24" VV1-6, VV1-7 58.96 N/B 48.64 54.88 60.64 N/B

18"x24" VV1-8 22.11 N/B. 18.24 20.58 22.74 N/B

18"x18" VV13-1 16.58 N/B 13.68 16.39 17.06 N/B

24"x24" VV13-1 29.48 N/B 24.32 27.44 30.32 N/B

24"X12" VV4-:4p 14.74 N/B · 12.16 14.61 15.16 NIB

36" round VV10-1 66.33 N/B 53.36 60.28 68.22 NIB

48"X48"X3.6" VV14-3 44.50 N/B 36.48 51.56 60.64 N/B

-30"X30" Blank Warning -Yellow 46.06 NIB 38.00 42.88 47.38 N/B - - '····-·

Page 3 of 7 MnnroP. Cmmtv Rn::Jrl Cnmmi.s.sinn

Page 70: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

-~ ·~ ~""'"'"" '''-""'"' '-Jv••t.•v• ._,c;vtvc;;:, utu 1 au

March 5, 2019

36"x3B" Blank Warning:. Yellow 66.~3 N/8 54.72 61.74

48"x48" Blank Warning - Orange 117.92 N/8 97.28 109.76 - - -- - - - - --·····-·--

RETROREFLECTIVITY STRIP FOR SIGN SUPPORTS 5 ft. length and must fit on a U-channel post on 0.80 flat aluminum

Materi'al MD Vulcan, Lightle * Dornbos

Solutions Inc. ·3M Diamond Grade Florescent DG3 Reflective

9.30 N/8 9.05 12.00 Sheeting Standard Colors Series .4081 3M Diamond Grade DG3 Reflective Sheeting -

9.21 N/B 8.96 11.95 Standard Colors Series 4092 3M Diamond Grade DG3 Reflective Sheeting -

9.21 N/8 8.96 11.95 Standard Colors - Series 4090

- -

PREFABRICATED REGULATORY AND MISC. REFLECTORIZED SIGN DECALS 3M_ Diamond Grade DG3_ Reflective Sheeting, Series 4092 & 4081

MD ·Vulcan, Size Example(s) Lightle

Solutions * Dornbos Inc. ..

30"x30" R1-1 24.75 N/8 21.25 21.13

36"x36" R1-1 35.64 N/8 30.60 30.42

30"x30" W3-1 29.88 N/8 27.75 31.81

36"x36" W3-1 43.80 N/B 39.79 45.81 ~ - - - - - - - ------

PREFABRICATED REGULATORY AND MISC. REFLECTORIZED SIGN FACES

68.22 N/8

121.28 N/8

H.T. Osburn

1_ Moriarity

8.69 N/B I

8.69 N/B

8.69 N/B

· Osburn H.T.- I

-r- Moriarity _ 1

20.88 N/B

30.06 N/8

20.88 N/8

30.06 N/B

3M Diamond Grade Flores.cent DG3 Reflective Sheeting, Series 4083- Fluorescent Yellow Green on 0.80 flat aluminum

Size Example(s) Lightle · · MD * Dornbos. Vulcan, Osburn · H.T.

·--Solutions Inc. Moriarity

36"X36" S1-1,·S2-1 65.70 N/8 53.36. 57.84 69.21 N/8

pentagon

36"X36" . S3-1, W11-2 66.33 N/B 54.72 62.04 69.21 N/B

24"X12" W16~7p, W16-9p 14.74 N/B 12.16 14.61 15.38 N/B -

Mnnri1P. Cmmtv Rn;,c:l Cnmmissinn

i

Page 4 of 7

Page 71: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

24"X8" S4-3

36"X36" S4-5

2 color

Size Example(s)

12"x6" R~ctangle

12'x18" Rectangle

18"x6" Rectangle

18"x12" Rectangle

18"x24" Rectangle

24"x6" _Rectangle.

24"x10" Rectangle ·

24"x12" Rectangle

24"x18" Rectangle

24"x30" Rectangle

24"x36~' Rectangle

30"x6" Rectangle

60"x30" Rectangle

36"x6" Rectangle

36"x12" Rectangle

36"x18" Rectangle

36"x30" · Rectangle

48"x12" Rectangle

48"x24" Rectangle

48"x30" Rectangle ·.

MnnroP. Cntmtv Rn::lrl Cnmmissinn

_...., ''"' "''"'....,'"' 11'-"•••"-' '-JVJJLJVJ uc:;vrvc;;:, UIU !c::tU

March 5, 2019 ·

9.88 N/8 8.09

66.70 N/8 '63.26

ALUMINUM SIGN BLANKS On 0.80 flat aluminum

Lightle MD * Dornbos

Solutions

1.70 1.90 . 1.49

5.03 4.2~ 4.46

2.60 2.15 2.23

5.03 4.29 4.46

10.05 8.58 8.91

3.35 2.86 2.97

5.60 4.77 4.96.

6.70 5.72 5.94

10.05 8.58 8.91

16.75 14.30 14.85

20.10 17.16 17.82

4.20 4.09 3.71

41.88. 35.75 37.13

5.03 4.29 4.46

. 10.05 8.58 8.91

15.08 12.87 13.37

25.13 21.45 22.28

13.40 11.44 11.88

26.80 8.58 23.76

33.50 28.60 29.70

9.83 10.25 N/8

72.56 70.11 N/8

Vulcan, Osburn H.T.

Inc. Mor~arity

1.60 1.48 N/8

4.58 . 4.43 N/8

2.37 2.21 N/8

4.39 . 4.43 N/8

8.93 8.85 · N/8

3.04 2.95 N/8

5 .. 01 . 4.92 N/8

5.98 5.90 N/8

8.93 8.85 N/8

·14.59 14.75 N/8

17.62 17.70 N/8 -I

I 3.75 N/8 I

3.69

. 36.88 36.88 N/8

4.61 4.43 N/8

8.98 8.85 N/8

13.37 13.28 N/8

22.22 22.13 N/8

11.83 1-1.80 N/8

23.4.1 23.60 NIB

29.27 29.50 N/8

Page 5 of 7

Page 72: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

12"x12" Square

18"x18" Square

24"x24" Square

30"x30" Square

36"x36" Square

48"x48" Square '--- - --- -·· ·······--

Si~e

24"x9"

30"x9"

36"x9"

42"x9"

24"x12" ·

30"x12" .

36"x12"

42"x12" '------~-~-----

.......... I." ..._,.....,. 1\.1 '\JI L..l'""' v IVVV L-'JU IO.U

March 5, 2019

3.35 2.86 2.97 3.09

7.54 6.44 6.68 6.77

13.40 11.44· 11.88 11.79'

20.94 17.88 18.56 18.41

30.15 . 25'.7 4 26.73 26.55

53.60 45.76 . 47.52 46.76 -

PREFABRICATED REFLECTORIZED STREET SIGNS 3M ·Diamond Grade DG3 Reflective Sheeting, Series 4090

Whi~e Sheeting/One Side Only on 0.80 flat aluminum

Lightle MD * Dornbos . Vulcan, Solutions Inc.

10.32 12.78 9.56 8.65

12.90 15.98 11.98 13.44

15.48 19.17 14.33 16.09

18.06 22.37 16.75 18.80

13.76 17.04 12.74 •14.30

17.20 21.30 15.93 17.88

. 20.64 25.56 19.11 21.45

24.08 . 29.82 22.30 25.03

SU.PPL Y OF GREEN BAKED ENAMEL 3#/ft. U-CHANNEL SIGN POSTS

2.95

6.64

11.80

18.44

26.55

47.20

Osburn

11.54

14.42

17.30

20:1.5

15.38

19.23

23.07 .

26.92 '--

Size Price Per Post I Price Per Bundle Lightle *MD * Dornbos. Vulcan, Osburn Of 50 Solutions ' Inc.

11' 23.87/1083.50 20.90/1045.00 25.90/1295:00 N/B N/B

12' 26.04/1182.00 22.80/1140.00 28.24/1412.00 NIB N/B

14' 30.38/1379.00 26.60/1330.00 32.96/1648.00 N/B ·N/B

15' 32.55/1477.50 28.50/1425.00 35.32/1766.00 N/B N/B

16' 34.72/1576.00 30.40/1520.00 40.84/2042.00 NIB N/B -- - --

MonrnP. Countv Ro:;:Hi Commission

N/B

N/B

. N/B

N/B

N/B ·

N/B

H.T . Moriaritv N/B

N/B

N/B

N/B

N/B

N/B

N/B

N/B

.H.T. Moriaritv

N/B

N/B J

N/B

N/B.

N/B

Page 6 of 7.

Page 73: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

- ~ ~--- ..... • • -...• ••'-' '-'......,• 11.1 "-'1 L...J'-' v IV'-'V LJIU I O.U

. March 5, 2019

MISCELLANEOUS

Material Vulcan, H.T. I

Lightle *MD Solutions * Dornbos Inc.

Osburn Moriaritv 1

Unistrut- 1 %" Square x 3' long- 12 gauge NIB "15.00 11.96 N/B N/B N/B

Unistrut- 1 %" Square x 4' long- 12 gauge N/B 20.00 15.63 NIB N/B N/B

24"x24" Adopt A Road Sign -see attac~ed 31.00 N/B 28.03 32.99 30.76 N/B

Plastic Barricade Board - Blank- Type 3 Panel 32.50. N/B 58:58 N/B N/B 50.00 (left, Bi Directional, Right, Closure

Type Ill Barricade- see attached 180.00 N/B 255.00 N/B N/B 180.00

*MD Solutions- U Channel Posts 10,000 lbs minimum order or freight is additional.. ·

*Dornbos -Signs sold in quantities of 6 or more of the same legend. Minimum order of $1 ,500 for prepaid freight. U Channel Posts sold in bundles of 50. Minimum post order quantity 200/can mix and match. . ·

Page 7 of 7 MnnrnP. r.nuntv Rn~rl r.nmmi~~inn

Page 74: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission
Page 75: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

Monroe County Road CommissionBid Comparison

Contract ID: 459-006-190615Description: 5.51 miles of tree and stump removals on South Stony Creek Road from Palmer Road to Sumpter Road (MCRC Project No. 459-006-190615)

and on Palmer Road from Oakville Waltz Road to South Stony Creek Road (MCRC Project No. 459-010-199065) in Exeter and LondonTownships, Monroe County, Michigan

Location:South Stony Creek Road Palmer Road

Projects(s):459-006-190615

Rank Bidder Total Bid % Over Low % Over Est.

0 ENGINEER'S ESTIMATE $51,650.00 24.62% 0.00%

1 (_00010) T & J Excavating and Tree Clearing, LLC $41,445.00 0.00% -19.75%

2 (06505) CHOP $48,750.00 17.62% -5.61%

3 (_00014) Pro Line Tree Clearance, Inc. $50,495.00 21.83% -2.23%

4 (05685) Treeworks, Inc. $69,100.00 66.72% 33.78%

5 (04456) Owen Tree Service, Inc. $86,465.00 108.62% 67.40%

Contract # 459-006-190615 (South Stony Creek Road Palmer Road)MERL: 2018.11.1

03/06/2019 11:46:01 AM

Page 1 of 3

459-010-191002

Page 76: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

(0) ENGINEER'S ESTIMATE(1) T & J Excavating and TreeClearing, LLC (2) CHOPLine Pay Item Code Quantity Units

Description Bid Price Total Bid Price Total Bid Price Total0001 2010001 1.25 Acre $8,000.00 $10,000.00 $4,650.00 $5,812.50 $5,500.00 $6,875.00Clearing

0002 2020002 23 Ea $700.00 $16,100.00 $400.00 $9,200.00 $800.00 $18,400.00Tree, Rem, 19 inch to 36 inch

0003 2020003 7 Ea $1,300.00 $9,100.00 $2,000.00 $14,000.00 $1,650.00 $11,550.00Tree, Rem, 37 inch or Larger

0004 2020004 26 Ea $200.00 $5,200.00 $150.00 $3,900.00 $185.00 $4,810.00Tree, Rem, 6 inch to 18 inch

0005 2020006 11 Ea $200.00 $2,200.00 $90.00 $990.00 $185.00 $2,035.00Stump, Rem, 19 inch to 36 inch

0006 2020007 5 Ea $350.00 $1,750.00 $92.50 $462.50 $225.00 $1,125.00Stump, Rem, 37 inch or Larger

0007 2020008 4 Ea $100.00 $400.00 $45.00 $180.00 $100.00 $400.00Stump, Rem, 6 inch to 18 inch

0008 2027050 3 Ea $300.00 $900.00 $300.00 $900.00 $185.00 $555.00_ Tree Trimming

0009 8127051 1 LSUM $6,000.00 $6,000.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00_ Maintaining Traffic

Bid Totals: $51,650.00 $41,445.00 $48,750.00

Contract # 459-006-190615 (South Stony Creek Road Palmer Road)MERL: 2018.11.1

03/06/2019 11:46:01 AM

Page 2 of 3

Page 77: MONROE COUNTY ROAD COMMISSION · 2020-01-02 · Scofield Sumpter to East end of pavement Single chip seal . ... Commissioner Stewart indicated he was pleased that the Road Commission

(3) Pro Line Tree Clearance,Inc. (4) Treeworks, Inc. (5) Owen Tree Service, Inc.Line Pay Item Code Quantity Units

Description Bid Price Total Bid Price Total Bid Price Total0001 2010001 1.25 Acre $6,600.00 $8,250.00 $15,000.00 $18,750.00 $11,500.00 $14,375.00Clearing

0002 2020002 23 Ea $990.00 $22,770.00 $700.00 $16,100.00 $925.00 $21,275.00Tree, Rem, 19 inch to 36 inch

0003 2020003 7 Ea $1,320.00 $9,240.00 $1,300.00 $9,100.00 $1,425.00 $9,975.00Tree, Rem, 37 inch or Larger

0004 2020004 26 Ea $130.00 $3,380.00 $275.00 $7,150.00 $315.00 $8,190.00Tree, Rem, 6 inch to 18 inch

0005 2020006 11 Ea $145.00 $1,595.00 $250.00 $2,750.00 $515.00 $5,665.00Stump, Rem, 19 inch to 36 inch

0006 2020007 5 Ea $300.00 $1,500.00 $400.00 $2,000.00 $750.00 $3,750.00Stump, Rem, 37 inch or Larger

0007 2020008 4 Ea $100.00 $400.00 $125.00 $500.00 $240.00 $960.00Stump, Rem, 6 inch to 18 inch

0008 2027050 3 Ea $120.00 $360.00 $250.00 $750.00 $425.00 $1,275.00_ Tree Trimming

0009 8127051 1 LSUM $3,000.00 $3,000.00 $12,000.00 $12,000.00 $21,000.00 $21,000.00_ Maintaining Traffic

Bid Totals: $50,495.00 $69,100.00 $86,465.00