PROJECT : 53 BENITEZ ROCKWELL PRIMARIES OWNER : ROCKWELL PRIMARIES CONTRACTOR : MCDC DATE : FEBRUARY 26,2016 ITEM NO NO. SCOPE OF WORKS FIFTH FLOOR 1 2 3 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 23 25 DRY WORKS 1 DRY WALL FRAMING 2 1-PHASE 3 2-PHASE 4 FRAMING 5 ENCLOSURE 6 CEILING MR FRAMING 7 ENCLOSURE 8 BULKHEAD FRAMING 9 ENCLOSURE SEALANT APPLICATIONS 10 CONCEALED SEALANT APPL. 11 EXPOSED SEALANT APPLICATION PAINTING WORKS 12 SKIMCOAT PUTTY 13 BORAL PUTTY 14 SANDING 15 PRIMER 16 FIRST COAT 17 FINAL COAT THRESHOLDS 18 MAINDOOR THRESHOLD 19 COMMON T&B THRESHOLD 20 MASTERS T&B THRESHOLD CEILING ORDINARY

Upload: macquille-trampe

Post on 10-Jul-2016

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Monitoring System Updated Feb 26

PROJECT : 53 BENITEZ ROCKWELL PRIMARIES

OWNER : ROCKWELL PRIMARIES

CONTRACTOR : MCDC

DATE : FEBRUARY 26,2016 ITEM NO

NO. SCOPE OF WORKSFIFTH FLOOR

1 2 3 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 23 25

DRY WORKS1

DRY WALL

FRAMING

2 1-PHASE

3 2-PHASE

4 FRAMING

5 ENCLOSURE

6CEILING MR

FRAMING

7 ENCLOSURE

8BULKHEAD

FRAMING

9 ENCLOSURE

SEALANT APPLICATIONS10 CONCEALED SEALANT APPL.

11 EXPOSED SEALANT APPLICATION

PAINTING WORKS12 SKIMCOAT PUTTY

13 BORAL PUTTY

14 SANDING

15 PRIMER

16 FIRST COAT

17 FINAL COAT

THRESHOLDS18 MAINDOOR THRESHOLD

19 COMMON T&B THRESHOLD

20 MASTERS T&B THRESHOLD

CEILING ORDINARY

Page 2: Monitoring System Updated Feb 26

NO. SCOPE OF WORKSFIFTH FLOOR

1 2 3 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 23 25

DOOR INSTALLATIONS & PAINTING21

MAINDOOR

DOOR INSTALLATION

22 DOOR PAINTING

23 LOCKSET INSTALLATION

24 SEALANT APPLICATION

25

BEDROOM-1

DOOR INSTALLATION

26 DOOR PAINTING

27 LOCKSET INSTALLATION

28 SEALANT APPLICATION

29

BEDROON-2

DOOR INSTALLATION

N / A N / A N /A30 DOOR PAINTING

31 LOCKSET INSTALLATION

32 SEALANT APPLICATION

33 DOOR INSTALLATION

34 DOOR PAINTING

35 LOCKSET INSTALLATION

36 SEALANT APPLICATION

37 DOOR INSTALLATION

38 DOOR PAINTING

39 LOCKSET INSTALLATION

40 SEALANT APPLICATION

41 DOOR INSTALLATION

42 DOOR PAINTING

43 LOCKSET INSTALLATION

44 SEALANT APPLICATION

45 DOOR INSTALLATION

46 DOOR PAINTING

47 LOCKSET INSTALLATION

48 SEALANT APPLICATION

49 DOOR INSTALLATION

N / A N / A N /A50 DOOR PAINTING

51 LOCKSET INSTALLATION

MASTERS BEDROOM

COMMON T&B DOOR

MASTERS T&B DOOR

UTILITY ROOM DOOR

MAIDS T&B DOOR

Page 3: Monitoring System Updated Feb 26

52 SEALANT APPLICATION

N / A N / A N /A

NO. SCOPE OF WORKSFIFTH FLOOR

1 2 3 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 23 25

WET WORKS53 COMMON T&B PIPE CHASE

54 MASTERS T&B PIPE CHASE

55 PANEL BOARD PIPE CHASE

TILE WORKS56

COMMON T&BWALL TILES

57 FLOOR TILES

58MASTERS T&B

WALL TILES

59 FLOOR TILES

60 LIVING/DINNING/KITCHEN TILES

61 MAIDS ROOM FLOOR TILES

CONCRETE TOPPING62 BEDROOM 1

63 BEDROOM 2 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

64 MASTERS BEDROOM

65 BALCONY AREA ( W.O.P.)

METROLINK CONSTRUCTION & DEVELOPMENT CORP. ROCKWELL PRIMARIES

PREPARED BY: CHECKED BY: CHECKED BY: NOTED BY:

MAIDS T&B DOOR

Page 4: Monitoring System Updated Feb 26

PROJECT IN CHARGE PROJECT MANAGER INSPECTOR COORDINATOR

Page 5: Monitoring System Updated Feb 26

FIFTH FLOOR

26 27 28 29 30 31 32 33

Page 6: Monitoring System Updated Feb 26

FIFTH FLOOR

26 27 28 29 30 31 32 33

N / A

N / A

Page 7: Monitoring System Updated Feb 26

N / A

FIFTH FLOOR

26 27 28 29 30 31 32 33

N/A N/A N/A N/A N/A N/A N/A N/A

LEGEND :

ON GOING

INCOMPLETE

DONE

Page 8: Monitoring System Updated Feb 26

CLOSED OUT

PRIORITY UNITS

COORDINATOR