Gruppe Geotechnik Graz ZT GMBH ! Verify design assumptions ! Together with updated geotechnical model allow short term prediction ! Provide input for final design and optimization of excavation and support on site ! Prediction of final displacements ! Control stability ! Data collection for future developments (expert systems) TARGETS MONITORING / SHORTTERM PREDICTION

Upload: others

Post on 23-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Verify design assumptions

! Together with updated geotechnical model allow short term prediction

! Provide input for final design and optimization of excavationand support on site

! Prediction of final displacements

! Control stability

! Data collection for future developments (expert systems)

TARGETS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

EMedley
Text Box
FROM AEG SHORT COURSE " Tunnels Through Fault Rocks and Tectonic Melanges: A Short Course for Engineering Geologists and Geotechnical Engineers", Oakland, California; June 1, 2002; Instructors: Prof. Gunter Riedmueller and Prof. Wulf Schubert, Technical University of Graz, Austria and Gruppe Geotechnik Graz COPYRIGHT OF 3G - Gruppe Geotechnik Graz www.3-g.at REPRODUCED AND PROVIDED WITH THE PERMISSION OF AEG and 3G CONTACT: Dr. Alfred Fasching, CEO and Managing Director: [email protected]
Page 2: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Absolute displacements of tunnel wall with electronic total station

! Relative displacement measurements with precision measuring tape, extensometers, inclinometers

! strains

METHODS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 3: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

Tape convergence meter Multiple extensometers

Levelling points

METHODS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 4: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

ABSOLUTE DISPLACEMENTS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 5: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Displacements influenced by:

� Rock mass properties� Heterogeneity� Tunnel size� Primary stresses� Excavation sequence� Excavation rate� Support

INFLUENCING FACTORS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 6: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

0

10

20

30

40

50

60

0 5 10 15 20 25 30 35 40days

settl

emen

t (m

m)

0

30

60

90

120

150

180

adva

nce

(m)

TIME � DISPLACEMENTcontinuous advance

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 7: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

0

10

20

30

40

50

60

0 5 10 15 20 25 30 35 40days

settl

emen

t (m

m)

0

30

60

90

120

150

180

adva

nce

(m)

TIME � DISPLACEMENTdiscontinous advance

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 8: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

0

10

20

30

40

50

60

0 5 10 15 20 25 30 35 40days

settl

emen

t (m

m)

0

30

60

90

120

150

180

adva

nce

(m)

TIME � DISPLACEMENTcomparison

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 9: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

PREDICTION OF DISPLACEMENTS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 10: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

predicted displacements

PREDICTION OF DISPLACEMENTS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 11: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

with top heading invert

without top heading invert

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

DIFFERENT SUPPORT

Page 12: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

COMPARISON PREDICTION - REALITY

Page 13: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

failure of top heading invert

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

DEVIATIONS FROM PREDICTION

Page 14: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

collapse

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

DEVIATIONS FROM PREDICTION

Page 15: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Gräbern Tunnel, Austria

ROOF SETTLEMENTS, DEFLECTION CURVES

Page 16: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Gräbern Tunnel, Austria

DISPLACEMENT VECTORS

Page 17: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

DISPLACEMENT RATIO

Page 18: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

DISPLACEMENT RATIO

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 19: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

DISPLACEMENT RATIO

Page 20: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

DISPLACEMENT RATIO

Page 21: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

DISPLACEMENT VECTOR ORIENTATION

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 22: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

HETEROGENEITY � VECTOR ORIENTATION

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 23: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

SETTLEMENT & VECTOR ORIENTATION TRENDS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 24: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

DEFLECTION CURVE & VECTOR ORIENTATION TRENDS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Gräbern Tunnel, Austria

Page 25: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

DISPLACEMENT VECTORS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Inntal Tunnel, Austria

Page 26: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

DISPLACEMENT VECTORS

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Inntal Tunnel, Austria

Page 27: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

SPATIAL DISPLACEMENT VECTOR

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Page 28: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

VECTOR ORIENTATION - TREND

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Hinterberg Fault Zone, Galgenberg Tunnel, Austria

Page 29: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

lateral creepingof fault material

excavation

"arch" effect

Fault Zone

ARCH EFFECT

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Hinterberg Fault Zone, Galgenberg Tunnel, Austria

Page 30: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

VISUALIZATION OF MONITORED DATA

MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION

Hinterberg Fault Zone, Galgenberg Tunnel, Austria

Page 31: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Mixed face conditions require different excavation methods on the same section

! Strong variation of rock mass quality! Stress redistribution and deformations extremely influenced by

arrangement of blocks and matrix! Prediction of displacements and lining utilization extremely difficult! Danger of brittle failures in blocks! Difficulty to determine proper support

BIMROCK EFFECTSBIMROCK EFFECTS

Page 32: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

-0,45

-0,40

-0,35

-0,30

-0,25

-0,20

40 50 60 70 80 90 100

110

120

130

140

150

160

170

180

∆r

520 40

75

! Displacements depend on the length of the weak zone between two stiff blocks

DISPLACEMENTS IN MATRIX IN RELATION TO BLOCK DISTANCE PROBLEMS

BIMROCK EFFECTSBIMROCK EFFECTS

Page 33: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Final displacements influenced by zone length and stiffness contrast

-1,10

-1,00

-0,90

-0,80

-0,70

-0,60

-0,50

-0,40

-0,30

-0,20

40 50 60 70 80 90 100

110

120

130

140

150

160

170

180

E1/E2 = 1,5

E1/E2 = 2,0

E1/E2 = 4,0

DISPLACEMENTS

BIMROCK EFFECTSBIMROCK EFFECTS

Page 34: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

1,80

1,90

2,00

2,10

2,20

2,30

2,40

2,50

2,60

2,70

40,0

50,0

60,0

70,0

80,0

90,0

100,0

110,0

120,0

130,0

140,0

150,0

160,0

170,0

180,0

F 1,5 / Var 8

F 2,0 / Var 8

F 4,0 / Var 8

σ1/p1

! Stress concentation in blocks depend on stiffness contrast and distance between blocks

STRESS DISTRIBUTION

BIMROCK EFFECTSBIMROCK EFFECTS

Page 35: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

STRESS CONCENTRATIONS

BIMROCK EFFECTSBIMROCK EFFECTS

Page 36: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

chainage [D]

verc

tor o

rient

atio

n [°

]

advance

settl

emen

t [m

]st

ress

/

σ

σZ

V,PR

IM[-]

chainage [D]

chainage [D]

STIFF STIFFSOFT

VEC

TOR

OR

IEN

TATI

ON

TREN

D +

1/2

DFI

NA

L SE

TTLE

MEN

TSFI

NA

L ST

RES

SES

NO

RM

ALIS

ED

σ σZ V,PRIM / [-]

MODEL1.1

2/3 E stiff

1/2 E stiff

1/4 E stiff

�normal�

�normal�Relative stress increasein stiff material

Relative stress decreasein soft material

Trough shaped displacement

Change of displacementvector orientation near transition

STIFF-SOFT-STIFF

BIMROCK EFFECTSBIMROCK EFFECTS

Page 37: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Stress concentrations can cause brittle failure in stiff blocks ! Resulting stress redistribution leads to additional displacements in

the matrix material

� Knowledge of the spatial distribution of blocks and matrix essential to properly estimate stress situation

� Short term prediction and prediction of displacements extremely important

� Support / reinforcement of blocks necessary to avoid brittle failure and long term stress redistribution, frequently mistaken for creeping

BLOCK REINFORCEMENT

BIMROCK EFFECTSBIMROCK EFFECTS

Page 38: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

CASE STUDIES

Location Map

Tunnel Spital, Austria

BIMROCK EFFECTSBIMROCK EFFECTS

Page 39: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! Twin 2,2 km long freeway tunnels in the Semmering region, eastern Austria

! Alignment along a major fault zone

! Excavation area 70 � 90 m2

! Underpassing of a railway line and built up area

! Maximum overburden 80 m

Project data

CASE STUDIES

Tunnel Spital, Austria

BIMROCK EFFECTSBIMROCK EFFECTS

Page 40: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

Geological overview

CASE STUDIES

Tunnel Spital, Austria

BIMROCK EFFECTSBIMROCK EFFECTS

Page 41: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

Nord tube: 1870-2000m

South tube: 1700-1800m

Geological overview

CASE STUDIES

Tunnel Spital, Austria

BIMROCK EFFECTSBIMROCK EFFECTS

Page 42: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

BIMROCK EFFECTSBIMROCK EFFECTS

Heterogeneity - Displacements

CASE STUDIES

Tunnel Spital, Austria

Page 43: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

Block

BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES

Tunnel Spital, Austria

Block effect on displacementsettlement crown / top heading

Page 44: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

1773

1777

1779 1790

1788

1785

BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES

Tunnel Spital, Austria

Cross sections

Page 45: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES

Tunnel Spital, Austria

Bench excavation

Page 46: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! During bench excavation the block fails, leading to additional 60 mm of settlement

BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES

Tunnel Spital, Austria

Failure of block

Page 47: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES

Tunnel Spital, Austria

Final displacements & displacement vector orientation trend

Page 48: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

cracks in the shotcrete on the southern sidewall

DAMAGESCASE STUDIES

Tunnel Spital, Austria

BIMROCK EFFECTSBIMROCK EFFECTS

Page 49: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBHGalgenberg Tunnel, Austria

CASE STUDIES

Project Data

Single tube double track railway tunnel, length 5142 m, maximum overburden 260 m. Design from 1990 to 1992. The construction (three headings) started in June 1993 and was completed in April 1996.

Tasks

Geological � geotechnical site investigation from the feasibility study to the tender design. Consultant services during construction

Geology

Paleozoic graphitic phyllite, greenschist and marble as well as Permo-Triassic quartzite, quartzphyllite and agglomeratewere subjected to intense Alpine thrusting and Tertiary strike-slip faulting

BIMROCK EFFECTSBIMROCK EFFECTS

Page 50: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBHGalgenberg Tunnel, Austria

CASE STUDIES

Collapse

A collapse with fatal accident happened on July 1994 at station 1330 m. Eight meters of heavily supported tunnel section collapsed at the face.A miner, including excavation equipment, was buried under the collapsed rock mass.Redesign and maintenance work lasted for two months. The excavation was resumed in October 1994.

BIMROCK EFFECTSBIMROCK EFFECTS

Page 51: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

Collapse caused by brittle failure of stiff rock outside of excavation

Collapse

Galgenberg Tunnel, Austria

CASE STUDIES

BIMROCK EFFECTSBIMROCK EFFECTS

Page 52: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

HINTERBERG FAULT ZONEPrediction

Galgenberg Tunnel, Austria

CASE STUDIES

BIMROCK EFFECTSBIMROCK EFFECTS

Page 53: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

30

20

10

0

-10

-20

(L/S

)[°]

Plan view

Longitudinal section

HINTERBERG FAULT ZONEActual Situation

Galgenberg Tunnel, Austria

CASE STUDIES

BIMROCK EFFECTSBIMROCK EFFECTS

Page 54: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

HABERL FAULT - IMPROVED PROCEDURE

Modification of excavtion and support � reduction of top heading heigth, yielding elements, regroutable rock bolts

Galgenberg Tunnel, Austria

CASE STUDIES

BIMROCK EFFECTSBIMROCK EFFECTS

Page 55: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

Heterogeneity showing in strong variation of the vector orientation trend

-40

1800 1850 1900 1950 2000 2050

30

20

10

0

-10

-20

-30

-50

∆α

[°]

HABERL FAULT ZONE

Galgenberg Tunnel, Austria

CASE STUDIES

BIMROCK EFFECTSBIMROCK EFFECTS

Page 56: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation

GruppeGeotechnikGraz ZT GMBH

! The complex spatial distribution of rock masses with different stiffness and strength makes prediction of behaviour difficult

! High displacments as well as differences in displacements can lead to severe damage of the (stiff) lining; thus flexible linings are required where bigger displacements are expected, and preferable even in shallow tunnels

! The analysis of the diplacement vector orientations can support the prediction of the location and distribution of blocks

CONCLUSION

BIMROCK EFFECTSBIMROCK EFFECTS