GruppeGeotechnikGraz ZT GMBH
! Verify design assumptions
! Together with updated geotechnical model allow short term prediction
! Provide input for final design and optimization of excavationand support on site
! Prediction of final displacements
! Control stability
! Data collection for future developments (expert systems)
TARGETS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 2: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/2.jpg)
GruppeGeotechnikGraz ZT GMBH
! Absolute displacements of tunnel wall with electronic total station
! Relative displacement measurements with precision measuring tape, extensometers, inclinometers
! strains
METHODS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 3: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/3.jpg)
GruppeGeotechnikGraz ZT GMBH
Tape convergence meter Multiple extensometers
Levelling points
METHODS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 4: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/4.jpg)
GruppeGeotechnikGraz ZT GMBH
ABSOLUTE DISPLACEMENTS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 5: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/5.jpg)
GruppeGeotechnikGraz ZT GMBH
! Displacements influenced by:
� Rock mass properties� Heterogeneity� Tunnel size� Primary stresses� Excavation sequence� Excavation rate� Support
INFLUENCING FACTORS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 6: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/6.jpg)
GruppeGeotechnikGraz ZT GMBH
0
10
20
30
40
50
60
0 5 10 15 20 25 30 35 40days
settl
emen
t (m
m)
0
30
60
90
120
150
180
adva
nce
(m)
TIME � DISPLACEMENTcontinuous advance
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 7: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/7.jpg)
GruppeGeotechnikGraz ZT GMBH
0
10
20
30
40
50
60
0 5 10 15 20 25 30 35 40days
settl
emen
t (m
m)
0
30
60
90
120
150
180
adva
nce
(m)
TIME � DISPLACEMENTdiscontinous advance
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 8: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/8.jpg)
GruppeGeotechnikGraz ZT GMBH
0
10
20
30
40
50
60
0 5 10 15 20 25 30 35 40days
settl
emen
t (m
m)
0
30
60
90
120
150
180
adva
nce
(m)
TIME � DISPLACEMENTcomparison
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 9: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/9.jpg)
GruppeGeotechnikGraz ZT GMBH
PREDICTION OF DISPLACEMENTS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 10: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/10.jpg)
GruppeGeotechnikGraz ZT GMBH
predicted displacements
PREDICTION OF DISPLACEMENTS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 11: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/11.jpg)
GruppeGeotechnikGraz ZT GMBH
with top heading invert
without top heading invert
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
DIFFERENT SUPPORT
![Page 12: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/12.jpg)
GruppeGeotechnikGraz ZT GMBH
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
COMPARISON PREDICTION - REALITY
![Page 13: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/13.jpg)
GruppeGeotechnikGraz ZT GMBH
failure of top heading invert
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
DEVIATIONS FROM PREDICTION
![Page 14: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/14.jpg)
GruppeGeotechnikGraz ZT GMBH
collapse
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
DEVIATIONS FROM PREDICTION
![Page 15: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/15.jpg)
GruppeGeotechnikGraz ZT GMBH
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Gräbern Tunnel, Austria
ROOF SETTLEMENTS, DEFLECTION CURVES
![Page 16: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/16.jpg)
GruppeGeotechnikGraz ZT GMBH
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Gräbern Tunnel, Austria
DISPLACEMENT VECTORS
![Page 17: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/17.jpg)
GruppeGeotechnikGraz ZT GMBH
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
DISPLACEMENT RATIO
![Page 18: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/18.jpg)
GruppeGeotechnikGraz ZT GMBH
DISPLACEMENT RATIO
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 19: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/19.jpg)
GruppeGeotechnikGraz ZT GMBH
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
DISPLACEMENT RATIO
![Page 20: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/20.jpg)
GruppeGeotechnikGraz ZT GMBH
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
DISPLACEMENT RATIO
![Page 21: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/21.jpg)
GruppeGeotechnikGraz ZT GMBH
DISPLACEMENT VECTOR ORIENTATION
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 22: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/22.jpg)
GruppeGeotechnikGraz ZT GMBH
HETEROGENEITY � VECTOR ORIENTATION
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 23: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/23.jpg)
GruppeGeotechnikGraz ZT GMBH
SETTLEMENT & VECTOR ORIENTATION TRENDS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 24: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/24.jpg)
GruppeGeotechnikGraz ZT GMBH
DEFLECTION CURVE & VECTOR ORIENTATION TRENDS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Gräbern Tunnel, Austria
![Page 25: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/25.jpg)
GruppeGeotechnikGraz ZT GMBH
DISPLACEMENT VECTORS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Inntal Tunnel, Austria
![Page 26: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/26.jpg)
GruppeGeotechnikGraz ZT GMBH
DISPLACEMENT VECTORS
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Inntal Tunnel, Austria
![Page 27: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/27.jpg)
GruppeGeotechnikGraz ZT GMBH
SPATIAL DISPLACEMENT VECTOR
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
![Page 28: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/28.jpg)
GruppeGeotechnikGraz ZT GMBH
VECTOR ORIENTATION - TREND
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Hinterberg Fault Zone, Galgenberg Tunnel, Austria
![Page 29: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/29.jpg)
GruppeGeotechnikGraz ZT GMBH
lateral creepingof fault material
excavation
"arch" effect
Fault Zone
ARCH EFFECT
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Hinterberg Fault Zone, Galgenberg Tunnel, Austria
![Page 30: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/30.jpg)
GruppeGeotechnikGraz ZT GMBH
VISUALIZATION OF MONITORED DATA
MONITORING / SHORT�TERM PREDICTIONMONITORING / SHORT�TERM PREDICTION
Hinterberg Fault Zone, Galgenberg Tunnel, Austria
![Page 31: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/31.jpg)
GruppeGeotechnikGraz ZT GMBH
! Mixed face conditions require different excavation methods on the same section
! Strong variation of rock mass quality! Stress redistribution and deformations extremely influenced by
arrangement of blocks and matrix! Prediction of displacements and lining utilization extremely difficult! Danger of brittle failures in blocks! Difficulty to determine proper support
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 32: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/32.jpg)
GruppeGeotechnikGraz ZT GMBH
-0,45
-0,40
-0,35
-0,30
-0,25
-0,20
40 50 60 70 80 90 100
110
120
130
140
150
160
170
180
∆r
520 40
75
! Displacements depend on the length of the weak zone between two stiff blocks
DISPLACEMENTS IN MATRIX IN RELATION TO BLOCK DISTANCE PROBLEMS
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 33: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/33.jpg)
GruppeGeotechnikGraz ZT GMBH
! Final displacements influenced by zone length and stiffness contrast
-1,10
-1,00
-0,90
-0,80
-0,70
-0,60
-0,50
-0,40
-0,30
-0,20
40 50 60 70 80 90 100
110
120
130
140
150
160
170
180
E1/E2 = 1,5
E1/E2 = 2,0
E1/E2 = 4,0
DISPLACEMENTS
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 34: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/34.jpg)
GruppeGeotechnikGraz ZT GMBH
1,80
1,90
2,00
2,10
2,20
2,30
2,40
2,50
2,60
2,70
40,0
50,0
60,0
70,0
80,0
90,0
100,0
110,0
120,0
130,0
140,0
150,0
160,0
170,0
180,0
F 1,5 / Var 8
F 2,0 / Var 8
F 4,0 / Var 8
σ1/p1
! Stress concentation in blocks depend on stiffness contrast and distance between blocks
STRESS DISTRIBUTION
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 35: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/35.jpg)
GruppeGeotechnikGraz ZT GMBH
STRESS CONCENTRATIONS
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 36: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/36.jpg)
GruppeGeotechnikGraz ZT GMBH
chainage [D]
verc
tor o
rient
atio
n [°
]
advance
settl
emen
t [m
]st
ress
/
σ
σZ
V,PR
IM[-]
chainage [D]
chainage [D]
STIFF STIFFSOFT
VEC
TOR
OR
IEN
TATI
ON
TREN
D +
1/2
DFI
NA
L SE
TTLE
MEN
TSFI
NA
L ST
RES
SES
NO
RM
ALIS
ED
σ σZ V,PRIM / [-]
MODEL1.1
2/3 E stiff
1/2 E stiff
1/4 E stiff
�normal�
�normal�Relative stress increasein stiff material
Relative stress decreasein soft material
Trough shaped displacement
Change of displacementvector orientation near transition
STIFF-SOFT-STIFF
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 37: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/37.jpg)
GruppeGeotechnikGraz ZT GMBH
! Stress concentrations can cause brittle failure in stiff blocks ! Resulting stress redistribution leads to additional displacements in
the matrix material
� Knowledge of the spatial distribution of blocks and matrix essential to properly estimate stress situation
� Short term prediction and prediction of displacements extremely important
� Support / reinforcement of blocks necessary to avoid brittle failure and long term stress redistribution, frequently mistaken for creeping
BLOCK REINFORCEMENT
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 38: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/38.jpg)
GruppeGeotechnikGraz ZT GMBH
CASE STUDIES
Location Map
Tunnel Spital, Austria
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 39: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/39.jpg)
GruppeGeotechnikGraz ZT GMBH
! Twin 2,2 km long freeway tunnels in the Semmering region, eastern Austria
! Alignment along a major fault zone
! Excavation area 70 � 90 m2
! Underpassing of a railway line and built up area
! Maximum overburden 80 m
Project data
CASE STUDIES
Tunnel Spital, Austria
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 40: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/40.jpg)
GruppeGeotechnikGraz ZT GMBH
Geological overview
CASE STUDIES
Tunnel Spital, Austria
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 41: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/41.jpg)
GruppeGeotechnikGraz ZT GMBH
Nord tube: 1870-2000m
South tube: 1700-1800m
Geological overview
CASE STUDIES
Tunnel Spital, Austria
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 42: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/42.jpg)
GruppeGeotechnikGraz ZT GMBH
BIMROCK EFFECTSBIMROCK EFFECTS
Heterogeneity - Displacements
CASE STUDIES
Tunnel Spital, Austria
![Page 43: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/43.jpg)
GruppeGeotechnikGraz ZT GMBH
Block
BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES
Tunnel Spital, Austria
Block effect on displacementsettlement crown / top heading
![Page 44: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/44.jpg)
GruppeGeotechnikGraz ZT GMBH
1773
1777
1779 1790
1788
1785
BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES
Tunnel Spital, Austria
Cross sections
![Page 45: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/45.jpg)
GruppeGeotechnikGraz ZT GMBH
BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES
Tunnel Spital, Austria
Bench excavation
![Page 46: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/46.jpg)
GruppeGeotechnikGraz ZT GMBH
! During bench excavation the block fails, leading to additional 60 mm of settlement
BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES
Tunnel Spital, Austria
Failure of block
![Page 47: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/47.jpg)
GruppeGeotechnikGraz ZT GMBH
BIMROCK EFFECTSBIMROCK EFFECTSCASE STUDIES
Tunnel Spital, Austria
Final displacements & displacement vector orientation trend
![Page 48: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/48.jpg)
GruppeGeotechnikGraz ZT GMBH
cracks in the shotcrete on the southern sidewall
DAMAGESCASE STUDIES
Tunnel Spital, Austria
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 49: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/49.jpg)
GruppeGeotechnikGraz ZT GMBHGalgenberg Tunnel, Austria
CASE STUDIES
Project Data
Single tube double track railway tunnel, length 5142 m, maximum overburden 260 m. Design from 1990 to 1992. The construction (three headings) started in June 1993 and was completed in April 1996.
Tasks
Geological � geotechnical site investigation from the feasibility study to the tender design. Consultant services during construction
Geology
Paleozoic graphitic phyllite, greenschist and marble as well as Permo-Triassic quartzite, quartzphyllite and agglomeratewere subjected to intense Alpine thrusting and Tertiary strike-slip faulting
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 50: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/50.jpg)
GruppeGeotechnikGraz ZT GMBHGalgenberg Tunnel, Austria
CASE STUDIES
Collapse
A collapse with fatal accident happened on July 1994 at station 1330 m. Eight meters of heavily supported tunnel section collapsed at the face.A miner, including excavation equipment, was buried under the collapsed rock mass.Redesign and maintenance work lasted for two months. The excavation was resumed in October 1994.
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 51: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/51.jpg)
GruppeGeotechnikGraz ZT GMBH
Collapse caused by brittle failure of stiff rock outside of excavation
Collapse
Galgenberg Tunnel, Austria
CASE STUDIES
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 52: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/52.jpg)
GruppeGeotechnikGraz ZT GMBH
HINTERBERG FAULT ZONEPrediction
Galgenberg Tunnel, Austria
CASE STUDIES
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 53: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/53.jpg)
GruppeGeotechnikGraz ZT GMBH
30
20
10
0
-10
-20
(L/S
)[°]
Plan view
Longitudinal section
HINTERBERG FAULT ZONEActual Situation
Galgenberg Tunnel, Austria
CASE STUDIES
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 54: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/54.jpg)
GruppeGeotechnikGraz ZT GMBH
HABERL FAULT - IMPROVED PROCEDURE
Modification of excavtion and support � reduction of top heading heigth, yielding elements, regroutable rock bolts
Galgenberg Tunnel, Austria
CASE STUDIES
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 55: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/55.jpg)
GruppeGeotechnikGraz ZT GMBH
Heterogeneity showing in strong variation of the vector orientation trend
-40
1800 1850 1900 1950 2000 2050
30
20
10
0
-10
-20
-30
-50
∆α
[°]
HABERL FAULT ZONE
Galgenberg Tunnel, Austria
CASE STUDIES
BIMROCK EFFECTSBIMROCK EFFECTS
![Page 56: MONITORING / SHORTŒTERM PREDICTIONMONITORING / …bimrocks.com/bimsite/wp-content/uploads/2010/07/AEGTSC2002part7.pdf · Provide input for final design and optimization of excavation](https://reader033.vdocuments.us/reader033/viewer/2022041815/5e5a5bd877e70156bb692807/html5/thumbnails/56.jpg)
GruppeGeotechnikGraz ZT GMBH
! The complex spatial distribution of rock masses with different stiffness and strength makes prediction of behaviour difficult
! High displacments as well as differences in displacements can lead to severe damage of the (stiff) lining; thus flexible linings are required where bigger displacements are expected, and preferable even in shallow tunnels
! The analysis of the diplacement vector orientations can support the prediction of the location and distribution of blocks
CONCLUSION
BIMROCK EFFECTSBIMROCK EFFECTS