Page 1: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

UPDATED FORM – 1

SUBMISSION

TO

MINISTRY OF ENVIRONMENT, FORESTS

& CLIMATE CHANGE, NEW DELHI

MOHIT PETROCHEMICALS (P) LTD,

(NAGINA ROAD, BIJNOR)

[AMENDMENT IN ENVIRONMENTAL CLEARANCE]

VILLAGE : FIROZPUR HAFIZ

TEHSIL : MOHAMMEDPUR DEOMAL

DISTRICT : BIJNOR

STATE : UTTAR PRADESH

Page 2: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

FORM – 1

Sl.No.

Information/ ChecklistConfirmation

Details thereof (with approximatequantities/rates, wherever possible) with source ofinformation data

1 Name of the Project Mohit Petrochemicals (P) Ltd2 Project Sector Industrial Project (Industry - II)3 Sr. No in the Schedule Schedule 5(g) under category – A of EIA

Notification dated 14th September 2006.4 Proposed

capacity/Area/length/tonnage to behandled/command area/leasearea/number of wells to be drilled.

The present proposal is Amendment in EC of 40.0KLPD Distillery Plant (Molasses Based) :Increase in no. of operational days of Distillery from270 to 330 days

5 New/Expansion/Modernization The present proposal is request for increase in no. ofoperational days of Distillery from 270 to 330 days

6 Existing capacity / Area Etc EC has been accorded by MOEF to the 40.0 KLDDistillery plant vide order no. J–11011/247/2003 – IAII (I) dated March 10, 2004.

7 Category of project i.e. ‘A’ or ‘B’. A8 Does it attract the General condition? If

yes, please specify.NO

9 Does it attract the specific condition? Ifyes, please specify

NO

10 LocationVillageBlockTehsilDistrictState

Firozpur HafizMohammedpur DeomalBijnoreBijnoreUttar Pradesh

11 Nearest railway station/airport alongwith distance in Kms.

Railway Station: Jhalara Hault Railway Station : 4.57km in NorthAirport : Jolly grant Airport Dehradun : 154.0 km.

12 Nearest town, City, DistrictHeadquarters along with distance inKms.

Bijnor : 7.51 km in west.

13 Village Panchayats, Zilla Parishad,Municipal Corporation, Local body(Complete postal addresses withtelephone nos to be given)

Village Panchayat – Firozpur Hafiz

Page 3: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

14 Name of the applicant Mohit Petrochemicals (P) Ltd,Vill.: Firozpur Hafiz, Tahsil - Bijnor, Distt. : Bijnor(UP)

15 Registered address 15A/13 Upper Ground Floor, East Patel Nagar, NewDelhi-110008FAX : 011-25886797Phone No : 011 – 25886798

16Address for correspondence Mohit Petrochemicals (P) Ltd,

Vill.: Firozpur Hafiz, Tahsil - Bijnor, Distt. : Bijnor(UP)

Name Mr Suresh PanwarDesignation General ManagerAddress Mohit Petrochemicals (P) Ltd,

Vill.:Firozpur Hafiz , Tahsil - Bijnor, Distt. : Bijnor(UP)

Pin Code 246701E-mail [email protected] No. +919756601966

17 Details of Alternatives sitesexamined, if any. Location of thesesites should be shown on a topo sheet.

No alternate sites are considered as the presentproposal is only request for amendment to ECaccorded vides reference cited above.

18 Interlinked Project No19 Whether separate application of

interlinked project has been submitted?No

20 If yes, date of submission Not applicable21 If no, reason Present proposal only for amendment to EC.22 Whether the proposal involves

approval/clearance under: If yes,details of the same and their status tobe given.

The forest (Conservation) Act,1980.

The wildlife (Protection) Act,1972

The C.R.Z. Notification, 1992

No any

23 Whether there is any GovernmentOrder/Policy relevant/relation to thesite

No any

Page 4: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

24 Forest land involved (Hectares) No any25 Whether there is any litigation

pending against the project and/orland in which the project is proposeto be set up?Name of the CourtCase NoOrders/directions of the court,if any and its relevance with theproposed project.

No any

26 Project Cost Rs 52.0 Lakhs (This cost for construction of shed inactive bio compost area)

(II) ACTIVITY1. Construction, operation or decommissioning of the Project involving actions, which willcause physical changes in the locality (topography, land use, changes in water bodies, etc.)Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximatequantities /rates, wherever possible) withsource of information data

1.1 Permanent or temporary change inland use, land cover or topographyincluding increase in intensity of landuse (with respect to local land useplan)

No The total land acquired for the Distillery unitis 22.0 Acre.

For the above unit, Environmental Clearancewas accorded by Honorable Ministry videorder no. J-11011/247/2003-IA II (I) datedMarch 10, 2004.

1.2 Clearance of existing land, vegetationand buildings?

No The proposed increase in no. of operationaldays of existing distillery not involves anyclearance of existing land, vegetation andbuildings. Covered shed has beenconstructed for active bio compost area.

1.3 Creation of new land uses? No N.A.1.4 Pre-construction investigations e.g.

bore houses, soil testing?No As plant has already been constructed and in

operation, no such investigations or tests areenvisaged.

1.5 Construction works? No Covered Shed for active bio compost areahas been constructed.

1.6 Demolition works? No No demolition works are envisaged as thepresent proposal is only request foramendments to increase of no. of operational

Page 5: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

days of existing distillery.1.7 Temporary sites used for construction

works or Housing of constructionworkers?

No NA

1.8 Above ground buildings, structures orearthworks including linear structures,cut and fill or excavations

Yes Covered shed has been constructed for activebio compost area.

1.9 Underground works including miningor tunneling?

No No underground works will be involved inpresent proposal.

1.10 Reclamation works? No No such work will be involved in presentproposal.

1.11 Dredging? No No such work will be involved in presentproposal.

1.12 Offshore structures? No No such work will be involved in presentproposal.

1.13 Production and manufacturingprocesses?

No The process of Fermentation & Distillationalready exists and there is no change inproduction capacity.

1.14 Facilities for storage of goods ormaterials?

No No additional storage of goods or materials isenvisaged.

1.15 Facilities for treatment or disposal ofsolid waste or liquid effluents?

Yes The present treatment is Bio-methanationthen RO plant followed by MEE, MEEconcentrate is being utilized in Bio-composting. MEE Condensate is beingrecycled into the process.Now we have been constructed covered shedfor active bio compost area to avoidcontamination in run off during rainy season.In view of the above, we requestHonorable Ministry to permit us tooperate Distillery for 330 days.

1.16 Facilities for long term housing ofoperational workers?

No NA

1.17 New road, rail or sea traffic duringconstruction or operation?

No Already existing roads to the factory arebeing utilized.

1.18 New road, rail, air waterborne or othertransport infrastructure including newor altered routes and stations, ports,airports etc?

No Already existing roads to the factory arebeing utilized. No new roads envisaged as apart of this proposed amendments.

1.19 Closure or diversion of existing No Already existing roads to the factory are

Page 6: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

transport routes or infrastructureleading to changes in trafficmovements?

being utilized. No closure of roads ordiversion is envisaged as a part of thisproposed amendment.

1.20 New or diverted transmission lines orpipelines?

No Nil.

1.21 Impoundment, damming, culverting,realignment or other changes to thehydrology of watercourses oraquifers?

No No impoundment, damming, culverting,realignment or other changes to thehydrology of watercourses or aquifers isenvisaged.

1.22 Stream crossings? No Not Applicable as no stream crossings existsin the Plant site.

1.23 Abstraction or transfers of water formground or surface waters?

Yes The total water requirement for the Distilleryunit is 400.0 m3/day.Industrial Purposes : 380.0 m3/day ( @9.5 KL/KL of alcohol )Domestic : 20.0 m3/dayThere will not be any increase in waterrequirement. In fact the water requirement isbeing reduced due to recycling of MEEcondensate.

1.24 Changes in water bodies or the landsurface affecting drainage or run-off?

No There will not be any change in water bodiesor the land surface affecting drainage or run-off due to the proposed amendments.

1.25 Transport of personnel or materials forconstruction, operation ordecommissioning?

Yes There will not be increase in traffic duringoperation as no capacity enhancement isproposed.

1.26 Long-term dismantling ordecommissioning or restorationworks?

No No dismantling or decommissioning orrestoration works are envisaged.

1.27 Ongoing activity duringdecommissioning which could have animpact on the environment?

No No decommissioning activities are involvedas a part of this proposed amendments

1.28 Influx of people to an area in eithertemporarily or permanently?

No No Influx of people to an area in eithertemporarily or permanently is anticipated

1.29 Introduction of alien species? No There will not be any introduction of alienspecies

1.30 Loss of native species or geneticdiversity?

No There will not be loss of native species orGenetic diversity.

1.31 Any other actions? No Nil

Page 7: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

2. Use of natural resources for construction or operation of the Project (such as land, water,materials or energy, especially any resources which are non-renewable or in short supply)

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

2.1 Land especially undeveloped oragricultural land (ha)

No No additional land is envisaged for theproposed amendment of increase in no. ofoperational days and change of treatmentsystem.

2.2 Water (expected source & competingusers) unit: KLD

Yes The total water requirement for the existingDistillery unit is 400.0 m3/day.

Industrial Purposes : 380.0 m3/day (@ 9.5KL/KL of alcohol)Domestic : 20 m3/day

The water required which is being met fromground water for the plant.

2.3 Minerals (MT) No No usage of minerals is envisaged2.4 Construction material – stone,

aggregates, sand / soil (expected source– MT)

No NA

2.5 Forests and timber (source – MT) No -2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel(MT), energy (MW) \

Yes Power requirement: 1.0 MW.Power is being met through SEB.Fuel; requirement for 8.0 TPH Boiler isBagasse : 70.0 TPDBiogas : 18200.0 M3

2.7 Any other natural resources (useappropriate standard units)

No Nil

3. Use, storage, transport, handling or production of substances or materials, which could beharmful to human health or the environment or raise concerns about actual or perceivedrisks to human health

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

3.1 Use of substances or materials, Yes Used oil generated is being given to SPCB

Page 8: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

which are hazardous (as per MSIHCrules) to human health or theenvironment (flora, fauna, and watersupplies) .

authorized recyclers.

3.2 Changes in occurrence of disease oraffect disease vectors (e.g. insect orwater borne diseases)

No No effect envisaged

3.3 Affect the welfare of people e.g. bychanging living conditions?

Yes The existing unit enabled local villagers to getemployment and improved the businessopportunities to the locals.

3.4 Vulnerable groups of people who couldbe affected by the project e.g. hospitalpatients, children, the elderly etc.,

No No any

3.5 Any other causes No --

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

4.1 Spoil, overburden or mine wastes. No Not applicable as it is a distillery unit4.2 Municipal waste (domestic and or

commercial wastes)No Municipal waste generated is being disposed

as per rules.4.3 Hazardous wastes (as per Hazardous

Waste Management Rules)Yes Used oil is being disposed to SPCB

authorized recyclers.Other Industrial Wastes

4.4 Surplus product No No any4.5 Sewage sludge or other sludge from

effluent treatment.Yes Sewage sludge is being treated in septic tank

and soak pit.4.6 Construction and demolition wastes No NA4.7 Redundant machinery or equipment No NA4.8 Contaminated soil and other materials No NA4.9 Contaminated soils and other materials No NA4.10 Agriculture Waste No NA4.11 Other solid waste Yes Fermenter Sludge : 2.5 Ton/Day

Total Fly ash generation : 1.26 Ton/Day

Page 9: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximatequantities /rates, wherever possible) withsource of information data

5.1 Emissions from combustion of fossilfuels from stationary or mobilesources

Yes A 8.0 TPH Boiler is being used for steamwhich results in emissions. A 31 meter stackalong with 8.0 TPH boiler, Multi cyclone dustcollector and wet scrubber are being installedas APCS. The stack shall be of RCC withinternal fire-brick lining.The exhaust gases from the Multi cyclonedust collector and Wet scrubber will bedischarged into the atmosphere through astack of adequate height for effectivedispersion of gases into the atmosphere as perCPCB norms for effective dispersion of PM,emissions into the atmosphere.

5.2 Emissions from production processes Yes PM ,NOX,SO2,CO5.3 Emissions from materials handling

including storage or transportYes The control measures include concrete /

asphalt road construction, water sprinkling,tarpaulin cover on trucks carrying materialsand covered storage yard for fuel.

5.4 Emissions from constructionactivities including plant andequipment

No NA

5.5 Dust or odours from handling ofmaterials including constructionmaterials, sewage and waste

Yes During operation impact shall be minimizedby taking the following measures: Water sprinkling

Use of dust arresting panels/ sheets Regular removal of construction waste

material Proper storage of construction material Use of cover on trucks

Speed limit for vehicles5.6 Emissions from incineration of waste No Not Applicable5.7 Emissions from burning of waste in

open air (e.g. slash materials,construction debris)

No Not applicable

5.8 Emissions from any other sources No Not Applicable

Page 10: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

6.1 From operation of equipment e.g.engines, ventilation plant, crushers

No All equipment’s installed in the unit are ofstandard make manufactured as per noiseregulations stipulated by MoEF.

During operation phase, noise has beengenerated by the operation of pumps, aircompressors, boilers, TG set etc. as openstructure is there, no abnormal sound level isexpected. Persons working in the high noisearea have been provided the required earplugs& earmuffs.

6.2 From industrial or similar processes No All equipment’s installed in the unit are ofstandard make manufactured as per noiseregulations stipulated by MoEF. The ambientnoise levels in the plant are well within thestandards stipulated by MoEF.

6.3 From construction or demolition. No There will not be any much noise generationduring operation.

6.4 From blasting or piling No Not Applicable.6.5 From construction or operational

trafficNo NA

6.6 From lighting or cooling systems No Not applicable6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or intosewers, surface waters, groundwater, coastal waters or the sea

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

7.1 From handling, storage, use orspillage of hazardous materials

No Used oil is being disposed to SPCBauthorized recyclers.

7.2 From discharge of sewage or other No It is ZERO discharge units.

Page 11: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

effluents to water or the land(expected mode and place ofdischarge)

No waste water is disposed to outside plantpremise. Sanitary waste water generated isbeing treated in septic tank followed by soakpit. The generated spent wash, presently isbeing treated by Biomethanation then ROtreatment followed bio composting.Secondary effluent like MEE condensate,Boiler blow down , floor washing andcooling tower blow down is being treated inIInd stage reverse osmosis. Permeate from ROis being recycled in the process.

7.3 By deposition of pollutants emitted toair into the land or into water

No Nil

7.4 From any other sources No7.5 Is there a risk of long term build up

of pollutants in the environmentfrom these sources?

No

8. Risk of accidents during construction or operation of the Project, which could affect humanhealth or the environment

Sl.No.

Information/Checklist confirmation Yes/No

Details thereof (with approximatequantities /rates, wherever possible) withsource of information data

8.1 From explosions, spillages, fires etcfrom storage handling, use orproduction of hazardous substances

No No such hazardous substances which lead toexplosions, spillages, fires etc from storage,handling are being utilized or produced in theexisting unit

8.2 From any other causes No Not applicable

8.3 Could the project be affected bynatural disasters causingenvironmental damage (e.g. floods,earthquakes, landslides, cloud burstetc)?

Yes There are very less chances of natural disastercausing environmental changes but as per ourproper Disaster management Plan &Environment Management Plan if it willoccur then we will try to minimize theimpacts of Natural Disaster on project.

Page 12: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

9. Factors which should be considered (such as consequential development) which could lead toenvironmental effects or the potential for cumulative impacts with other existing or plannedactivities in the locality

Sl.No. Information/Checklistconfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

9.1 Lead to development ofsupporting facilities, ancillarydevelopment or developmentstimulated by the project whichcould have impact on theenvironment e.g.:-Supporting infrastructure(roads, power supply, waste orwaste water treatment, etc.)- housing development- extractive industries- supply industries.- other

No The existing unit has enabled the local to getemployment and also increased the businessopportunities to the locals

9.2 Lead to after-use of the site,which could have an impact onthe environment

No All precautionary measures are being taken in theunit to avoid any impact on plant site.

9.3 Set a precedent for laterdevelopments

Yes It will increase Ethanol production of the country,which in turn in the long run could lead to furtherindustrial development and considerable savings ofPetrol.

9.4 Have cumulative effects due toproximity to other existing orplanned projects with similareffects.

No The existing unit is an isolated industry and not incluster. A better planned and executed project hasto yield a better result individually.

(III) ENVIRONMENTAL SENSITIVITYSl. No. Areas Name/

IdentityAerial distance (within 15 km.) ofproposed project location boundary

1 Areas protected underinternational conventionsnational or local legislation for

No No any

Page 13: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

their ecological, landscapecultural or other related value

2 Areas which are important orsensitive for ecological reasons(Wetlands, watercourses orother water bodies, coastalzone, biospheres, mountains,forests)

No River Chhoeya – 200 meter in southdirection.

3 Areas used by protected,important or sensitive species offlora or fauna for breeding,nesting, foraging, resting, overwintering, migration

No No any

4 Inland, coastal, marine orunderground waters

No

5 State, National boundaries No

6 Routes or facilities used by thepublic for access to recreationor other tourist, pilgrim areas

No

7 Defense installations No8 Densely populated or built-up

areaNo The proposed project site lies in the vicinity

of town : Bijnor – 7.51 KM9 Areas occupied by sensitive

man-made land uses (hospitals,schools, places of worship,community facilities)

No Some such areas exist in town : Bijnor – 7.51km

10 Areas containing important,high quality or scarce resources(ground water resources,surface resources, forestry,agriculture, fisheries, tourism,minerals.)

No No such area exists.

11 Areas already subjected topollution or environmentaldamage (those where existinglegal environmental standardsare exceeded)

No No such area exists.

12 Areas susceptible to naturalhazard which could cause the

No The proposed project area lies in Zone IVSeismic area. All necessary design be

Page 14: MOHIT PETROCHEMICALS (P) LTD, (NAGINA …environmentclearance.nic.in/writereaddata/modification/...UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,

Proiect to presentenvironmental problems(earthquakes, subsidence,landslides, erosion, flooding orextreme or adverse climaticconditions)

considerations ro@structures shall be incorporated in the designofthe project.

I hereby give an undertaking that the data and information given in the application and enclosures aretrue to the best of my knowledge and belief and I am u*u." Ihu, if any parrof the data and informationsubmitted is found to be false or misleadin g at any stage, rhe project wilt be rejected and clearancegiven, if any to the project will be revoked at our risk and cost.

Date:10-03-2017Place : Bijnor

Signature of the applicantAuthorized Signatory

(Name: Suresh panwar )

Mohit Petro chemicals (p) LtdBijnore, Uttar pradesh