Thames Water Mogden Sewage Treatment Works Residents Liaison Meeting 8 September 2010

Upload: others

Post on 02-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mogden Sewage Treatment Works

Residents Liaison Meeting

8 September 2010

Page 2: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Agenda

� Review of previous minutes

� Operations and correspondence

� Communications

� Mosquito survey results

� Sewage Treatment Work Upgrade Project – an update

� AOB

Page 3: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Operations and correspondence

Page 4: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Operations update

� Optimising the performance of the new final settlement tanks has continued to increase the quality of water that we discharge to the River Thames and allow us to process more raw sewage each day.

� This has included adding a V-notch weir to increase the volume in each tank and a bridge mounted scum removal system.

� Battery C aeration lanes will be redomed in October 2010.

Page 5: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Operational Correspondence2010 - 2008

0

10

20

30

40

50

60

70

80

90

100Jan-0

8

Feb-0

8

Ma

r-08

Ap

r-08

May-0

8

Jun-0

8

Jul-

08

Aug-0

8

Sep-0

8

Oct-

08

Nov-0

8

Dec-0

8

Jan-0

9

Feb-0

9

Ma

r-09

Ap

r-09

May-0

9

Jun-0

9

Jul-

09

Aug-0

9

Sep-0

9

Oct-

09

Nov-0

9

Dec-0

9

Jan-1

0

Feb-1

0

Ma

r-10

Ap

r-10

May-1

0

Jun-1

0

Jul-

10

Aug-1

0

Sep-1

0

Other

Mosquitoes

Odour and mosquitoes

Odour

Page 6: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Notifications June – Present

June 2010

� Notification of storm tank maintenance work - a precautionary notice

� Footpath closure for urgent work on a gas main

July 2010

� None

August 2010

� Advance notice of tree works along Whitton Dene

� Notification of extension project commencement

September 2010

� None

Page 7: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Communications

Page 8: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito Awareness Campaign

� We were contacted by the Cole Park Allotments Association about several abandoned water butts after they received the mosquito awareness letter.

� A site visit with one of our professional entomological consultants showed them that in the butts that weren’t regularly agitated, there was mosquito larvae.

� We provided advice on draining the tanks and have supplied a hand pump siphon.

� Water efficiency tips for gardeners have also been emailed at their request.

Page 9: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

S106 Odour Study

� Entec, a UK based environmental and engineering consultancy, has been commissioned to carry out an odour study. This forms part of the Section 106 planning conditions relating to the extension project.

� A letter has been sent to over 10,000 residents giving the background and aims of the odour study.

� A public forum will be held on Wednesday 3 November 2010 at 7pmat the Civic Centre, Hounslow.

� The final report will be available on both Thames Water’s and the London Borough of Hounslow’s websites for download by the end ofthe year.

Page 10: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

� We run a Community Speaker Programme that delivers talks to schools, colleges, and organisations across our region free of charge.

� The talks are given by Thames Water employees and cover many topics related to water and the water industry. For example: saving water, sewage treatment, how we treat and deliver tap water. Talks can also be tailored to meet the requirements of the requester.

� We aim to provide in excess of 50 talks per year.

� Talks can be booked using the Speaker Programme booking form on our website under Community and recreation > Water in Schools> Community Speaker Programme.

Community Speaker Programme

Page 11: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Hounslow Network Challenge

� A network challenge event was held in July at the Kew Bridge Steam Museum.

� This activity was developed by Thames Water engineers to challenge students to design, build and commission a water distribution network. It supports the National Curriculum at Key Stage 3 and 4, and includes problem solving, communication and teamwork.

� Teams compete to plan and construct their network of pipes, manage their budgets and stay within the time allowed - just like a real-life engineering project! The results were:

1st place St Marks School 42 points2nd place Isleworth & Syon School for Boys 39 points3rd place The Green School 34 points4th place Brentford School for Girls 22 points5th place Longford Community School 17 points

Page 12: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito Survey Results

Page 13: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Controlling mosquitoes at Mogden

� A strict year-round mosquito survey and control programme is followed at Mogden with weekly surveys in summer months and fortnightly in the winter. These are regularly audited by the London Boroughs of Hounslow and Richmond Upon Thames Environmental Health Officers.

� The surveys are carried out by professional entomological consultants who record any mosquito egg rafts, larvae (which move in a distinctive way), pupae and adults seen.

� All larval and adult activity is treated by Bioguard, a professional pest control company, with a bacterial insecticide or adulticide less than 2 days after the surveys are carried out.

� Other control methods include removing any standing water on site by covering skips and unblocking drains and using electronic fly killers.

Page 14: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito data- Number of sites inspected

0

50

100

150

200

250

300

350

400

2 6 10 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52

Week

Nu

mb

er

of

sit

es

Average 03-07 2008 2009 2010

Page 15: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito data- Percentage of sites showing any activity

0

5

10

15

20

25

30

35

40

45

50

2 6 10 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52

Week

% o

f sit

es

wit

h a

ny a

cti

vit

y

.

Average 03-07 2008 2009 2010

Page 16: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito data- Percentage of sites showing any adults

0

5

10

15

20

25

30

35

40

45

50

2 6 10 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52

Week

% o

f sit

es w

ith

ac

tivit

y

.

Average 03-07 2008 2009 2010

Page 17: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito data- Percentage of sites with many adults

0

5

10

15

20

25

30

35

40

45

50

2 6 10 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52

Week

% o

f sit

es w

ith

ac

tivit

y

.

Average 03-07 2008 2009 Average 03-07

Page 18: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito data- Percentage of sites with many adults (2)

0

1

2

3

4

5

6

7

8

9

10

2 6 10 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52

Week

% o

f sit

es w

ith

ac

tivit

y

.

Average 03-07 2008 2009 Average 03-07

Page 19: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Mosquito data- Percentage of sites with larvae activity

0

5

10

15

20

25

30

35

40

45

50

2 6 10 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52

Week

% o

f sit

es w

ith

ac

tivit

y

.

Average 03-07 2008 2009 2010

Page 20: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Sewage Treatment Works Upgrade Project – an update

Page 21: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Construction update

� Pre-commencement planning obligations discharged.

� Earlier this year, we cleared trees and shrubs from the western boundary.

� Clearance of Japanese knotweed.

� Mature oak trees preserved.

� Construction commenced 23rd August.

Page 22: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Control measures

� Working to keep disruption, especially dust and noise, to a minimum.

� Access to the site off the A316 and Rugby Road only.

� Regularly water the area to reduce the potential for dust.

�Automated dust monitors.

Page 23: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

What’s happening next 3 months?

� Working hours Monday to Friday between 7am and 7pm.

� Noisiest construction activities limited between 8am and 6pm.

� Earthworks to reshape the western embankment.

� Erection of temporary construction offices.

� Supporting structures and piles for the new equipment.

� Modification of digesters.

Page 24: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Reinstatement of embankment

� Re-planting most of the new embankment with native trees and hedgerows, and seeding herb-rich grassland in spring 2011.

� Final landscaping will be complete in 2012. Until then, we will need to temporarily store some earth around and on top of the new embankment.

� Remove contractors compound early 2013.

Page 25: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Phasing Plan

� S106 Agreement includes a ‘phasing plan’.

� Aimed at ensuring odour improvements are achieved as soon as possible.

� The plan has four ‘Tranches’ of deliverables.

Page 26: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Phasing Plan

Jul Oct Jan Apr Jul Oct Jan Apr Jul Oct Jan Apr Jul

Earthworks

Inlet works

Odour control unit 11

New primary settlement tanks

Activated sludge plant

Final settlement tanks

Modify existing primary settlement tanks

Sludge handling plant

Odour control unit 12

Digester 5 modifications

Digester 6 modifications

Digester 7 modifications

Digester 8 modifications

Digester 9 modifications

Digester 10 modifications

Digester 11 modifications

Digester 12 modifications

Digester 13 modifications

Digester 14 modifications

Digester 15 modifications

Digester 16 modifications

Digester 17 modifications

Digester 18 modifications

Digester 19 modifications

Digester 20 modifications

Gas compressor station

Commissioning

2010 2011 2012 2013

Tranche 1 Tranche 4Tranche 3Tranche 2

Page 27: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

AOB

Page 28: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Proposed dates of meetings:

� Wednesday 8 December 2010

� Wednesday 9 March 2011

� Wednesday 8 June 2011

Page 29: Mogden Sewage Treatment Works - Thames Water · A site visit with one of our professional ... The final report will be available on both Thames Water’s and the London Borough of

Thames Water

Need to contact us about Mogden?

Call the Mogden 24hr line (via the Thames Water

Operations Contact Centre):

0845 641 0030

To subscribe to email notifications, email us at:

[email protected]

Visit our website:

www.thameswater.co.uk/mogden

Write to us:

Customer FeedbackPO Box 286

SwindonSN38 2RA