Module Bonding Working Group. Salvatore Costa Universit à di Catania and INFN – Sezione di Catania. Bonding Facilities. Bonding Machines. Bonding Times per Module. Pre-bonding visual inspection:10min ARC test: 15-30min Bond: 5-35min 5min for K&S - PowerPoint PPT PresentationTRANSCRIPT
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
Module BondingWorking Group
Salvatore CostaUniversità di Catania and INFN – Sezione di Catania
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
Bonding Facilities
22 Nov 2004CMS Tracker MPR 3 Salvatore Costa - Catania
Bonding Machines
Center Bonding Machines available to CMS
Bari Delvotec 6400
Catania Hughes 2470-II (1+1)
Firenze Delvotec 6400
Padova Kulicke&Soffa 8090, Kulicke&Soffa 4123, Hughes 2470-V
Pisa Kulicke&Soffa 8090
Torino Delvotec 6400
Fermilab Kulicke&Soffa 8090 (3)
Santa-Barbara Kulicke&Soffa 8090, Kulicke&Soffa 8060
Aachen Hesse&Knipps 710M
Hamburg Delvotec 6400
Karlsruhe Hesse&Knipps 710M
Strasbourg Delvotec 6400
Vienna Kulicke&Soffa 4123
Zurich Delvotec 6319, Delvotec 6320
22 Nov 2004CMS Tracker MPR 4 Salvatore Costa - Catania
Bonding Times per Module• Pre-bonding visual inspection: 10min• ARC test: 15-30min• Bond: 5-35min
» 5min for K&S» 10min for Delvotec and Hesse&Knipps Double for 2-Sen Modules » 35min for Hughes.
• Post-bonding inspection: 10min• Pull test [if required] (pull, cleanup, rebond): 20min• DB entry: 5min
TOTAL: 45-90min excluding pull testTOTAL: 45-90min excluding pull test
NOTES: 1. ARC test times vary with Vpsp adjustment2. Some op may be performed in parallel by different people
22 Nov 2004CMS Tracker MPR 5 Salvatore Costa - Catania
DB Interface
22 Nov 2004CMS Tracker MPR 6 Salvatore Costa - Catania
Bonding WG Web Site
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
Production Rate
22 Nov 2004CMS Tracker MPR 8 Salvatore Costa - Catania
Production Rate
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
Bonding Failures & Repair Actions
22 Nov 2004CMS Tracker MPR 10 Salvatore Costa - Catania
Maintenance, Failures, Downtime Center Maintenance schedule Failures Downtime
TIB: Bari ~yearly, no contract No N/A
Catania on demand,no contract Once 1 month (*)Firenze yearly by contract 2 times 2 months (*) Padova regularly by bond op. No N/APisa by bond op. as needed No N/ATorino ~yearly, no contract No N/A
TEC:Aachen regularly by bond op. No N/AHamburg on demand,no contract Once 3 days Karslruhe on demand,no contract Once 1.5 daysStrasbourg yearly by contract No N/AVienna yearly by contract No N/AZurich on demand,no contract Once 2 weeks
TOB:FNAL 4/year by contract Damage by None
power failures UCSB 4/year by contract 1/machine ~1-2 week/machine
(*) Attempts (failed) to fix in house, to save money, made because prod was stopped
22 Nov 2004CMS Tracker MPR 11 Salvatore Costa - Catania
Bonding Failures/Rep Actions1. Bonding failure detected during bonding or at post-bonding inspection:
– Wire won’t stick – Bond pops up (lift off) – Foot is misplaced and causes a short somewhere
We repair these right away if we can and/or list as unbonded the strips that are such as a result of the failure or of the “repair” action.
2. (Bonding) failure detected during post-bonding ARCS or LT tests:– Pinhole (caused by bonding/handling accident or pre-existing and either undetected in Sensor
test or on untested Sensor)– Short (caused by bonding/handling accident or by misplaced foot)– Open (bond popped up)
Same action.
3. Electric failure detected with ARCS at any stage (pre-bonding, post-bias-pre-readout-bonding, post-bonding or LT tests which dos not exhibit a clear link to bonding:
– Increased LV current – Anomalous IV
We post the problem for the Debug/Repair Center
4. Electric failure detected during post-bonding ARCS or LT tests, which might be traced back to a bonding failure:
– Example: “pseudo”-pinhole: At post-bonding ARCS test, a “PHL-” is found. We pull the readout bond as prescribed for pinholes but the test keeps saying “PHL-”, so the Hyb ch is damaged. Since it was OK at ARCS test on arrival perhaps we killed it with bonding.
We post the problem for the Debug/Repair Center.
22 Nov 2004CMS Tracker MPR 12 Salvatore Costa - Catania
Bonding Failure Rates• Global percentage of damaged channels (Hyb ch and/or Sen
strips) because of bonding failures: <~0.01 %<~0.01 %– Based on a compilation of unrepairable bond failures reported by individual
centers on 20Apr2004. At that time 1180 Modules had been bonded (~800,000 bonds).
– Since then reports at Meetings have indicated improvements, therefore although a more recent quantitative estimate is not available, it can only be less.
– Global percentage is the average between 0 from a few centers (such as Pisa) were not a single bond failure leading to loss of channels has been observed and 0.08 % in Catania [see next slide for analysis of failure types] where the oldest bonding machines, also lacking modern amenities such as automatic correction of bond parameters with varying substrate quality, are.
• Not a singleNot a single module lost yet (i.,e. no module with > 2% affected channels) because of bonding failures out of 2,700 Modules bonded so far.
• Only 1 module unbondable for dirty Pitch Adapter.
22 Nov 2004CMS Tracker MPR 13 Salvatore Costa - Catania
Bond Failure Analysis (Catania) 53 Modules
34048
bonds
Unrepairable failures
# modules affected % # channels affected %
Totals 10 19 29 0.08
Machine failures
7 13.2 14 0.04
Bond foot misplacement
2 3.8 9 0.026
to stick 4 7.6 4 0.012
Pinholes (caused by bonding?)
1 1.9 1 0.003
Operator mistakes
3 5.7 15 0.04
Mishandling 2 3.8 7 0.02
Wrong ref
Wrong par
(lifts, pinholes)1 1.9 8 0.02
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
The chief Bonding quality indicator:the Pull Test
22 Nov 2004CMS Tracker MPR 15 Salvatore Costa - Catania
Module Pull Tests Performed
# Modules pull tested # Modules pull tested after 01Dec2003 (at last Mtg)after 01Dec2003 (at last Mtg)
Center PA TA PA-Sen Sen-Sen
Bari 98 (83 ) 101 (86) n/a
Catania 51 (51) 51 (51) n/a
Firenze 9 (9) 5 (5) n/a
Padova 18 (18) 99 (99) n/a
Pisa 18 (10) 46 (37) n/a
Torino 119 (114) 46 (46) n/a
Fermilab 121 (119) 35 (33) 35 (34)
Santa-Barbara 51 (51) 58 (58) 76 (76)
Aachen 37 (0) 41 (0) 41 (0)
Hamburg 69 (62) 50 (45) n/a
Karlsruhe 0 (0) 20 (20) n/a
Strasbourg 20 (20) 65 (65) 65 (65)
Vienna 55 (19) 91 (28) n/a
Zurich 0 (0) 42 (38) n/a
22 Nov 2004CMS Tracker MPR 16 Salvatore Costa - Catania
Pull Test Results (Nov ‘04)
BA CT FI PD PI TO FL FL SB SB AA AA HA KA ST ST VI ZH
. ss ss ss ss
5g
Not angle-corrected yet!
Ave
rag
e f
orc
es (
g)
22 Nov 2004CMS Tracker MPR 17 Salvatore Costa - Catania
Pull Test Results (Jul ‘04)
Readout bonds
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Av
era
ge
fo
rc
es
(g
)
01Dec-06Jun
07Jun-18Jul
BA CT FI PD PI TO FL FL SB SB HA KA ST ST VI ZH
. ss ss ss
5g
Not angle-corrected yet!
22 Nov 2004CMS Tracker MPR 18 Salvatore Costa - Catania
Readout bonds
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Av
era
ge
p
ull fo
rc
e (g
)
01Dec-18Apr
19Apr-06Jun
Pull Test Results (Jun ‘04)
BA CT FI PD PI TO FL FL SB SB HA KA ST ST VI ZH
. ss ss ss
5g
22 Nov 2004CMS Tracker MPR 19 Salvatore Costa - Catania
Loop Documentation
Procedure: Uses a few of the identical symmetrical bonds we place on the PA Tests areas.1. Document the original bond
2. Straighten a bond to (near) triangular shape
3. Measure the angle at the bond foot
4. Determine correction factor for pull strengths
22 Nov 2004CMS Tracker MPR 20 Salvatore Costa - Catania
1. Document the original bond
• Gently push bond over with the pull tester hook until it rests flat on the PA surface, but taking care that its shape is not significantly altered.
• Take snapshot of bond under measuring machine.
22 Nov 2004CMS Tracker MPR 21 Salvatore Costa - Catania
2. Make bond triangular• Gently pull bond up at mid-span with the pull tester hook until it takes a
(nearly) triangular shape (figure below).
• Gently push bond over with the pull tester hook until it rests flat on the PA surface, but taking care that its now triangular shape is not significantly altered.
22 Nov 2004CMS Tracker MPR 22 Salvatore Costa - Catania
3. Measure angle at bond foot
• Take snapshot of triangularized bond.• Measure angle using measuring machine.
22 Nov 2004CMS Tracker MPR 23 Salvatore Costa - Catania
4. Determine correction factor (1)
22 Nov 2004CMS Tracker MPR 24 Salvatore Costa - Catania
4. Determine correction factor (2)
Correction factor:a = 1 / (2 sin)
(º) corr. factor a
10 2.88
20 1.46
30 1
40 0.79
50 0.65
60 0.58
70 0.53
80 0.51
90 0.5
For symmetrical bond:
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
Module Gradingfrom Bonding
22 Nov 2004CMS Tracker MPR 26 Salvatore Costa - Catania
Module Grading from Bonding (1)
Grading based on # unbonded stripsGrading based on # unbonded strips
• First flag in BONDSTATUS_VALBONDSTATUS_VAL vector:– 0 if n_unbonded <1– 1 if 1% - 2– -1 if >2%
• These are consistent to grades A,B,C of ModTest and the module is faulty with >2% unbonded strips.
22 Nov 2004CMS Tracker MPR 27 Salvatore Costa - Catania
Module Grading from Bonding (2)
Grading based on Grading based on mechanical quality of the bondsmechanical quality of the bonds
• Criteria to generate this second flag:– # Bias Bonds (Spec: 5, 15 for TIB back)
• >2: grade A (flag 0)• 2: grade B (flag 1)• <2: grade C (flag -1)
– # “critical” readout bonds [definition list of “critical” by Alan]: • ≤ 2%: grade A (flag 0)• > 2%: grade B (flag 1)• > 20%: grade C (flag -1)
– Operator judgment on all other bonds [guidelines to issue this judgment by Alan]:
• A, B, C.
• These criteria will be or’ed together to generate flag.
CMS Tracker MPR, CERN, 22 November 2004
22 Nov 2004CMS Tracker MPRSalvatore Costa - Catania
Bonding Specifications & Procedures
22 Nov 2004CMS Tracker MPR 29 Salvatore Costa - Catania
Bonding Specs (1)
• Document on Bonding web site:
cms.ct.infn.it/bonding/bondspec.htm• Contents:
– Bonding Specifications … – Specifications on Bonding Jigs – Specifications on Module Carriers – Specifications on Module Components and Assembly
Relating to Bonding – Specifications on Working Environment – Specifications on Final Module Bonding Quality &
Acceptance
22 Nov 2004CMS Tracker MPR 30 Salvatore Costa - Catania
Bonding Specs (2)
• wire thickness and type• number of bias bonds• loop height and form• tail length• accuracy of placement in X and Y• pull strength• break on pull failure• failure rate• number of bonds with one tool
22 Nov 2004CMS Tracker MPR 31 Salvatore Costa - Catania
Bonding Procedures
• Bonding Proc Document on Bonding web site:
cms.ct.infn.it/bonding/bondproc.htm– “Reference” doc in 43 steps– Has many pictures (mainly for TIB at the moment)
• Procedure to perform the 50th wire Pull Tests
cms.ct.infn.it/bonding/pullproc.htm
22 Nov 2004CMS Tracker MPR 32 Salvatore Costa - Catania
Skip rules
• Leave unbonded– All strips in bad-IDIEL list
(considered pinholes)
– All Isolated bad CAC (believed to have high chance to develop into pinholes with irradiation)
– All but lowest in a bad CAC chain (believed to represent shorts)
CAC Example: 3 34 35 36 37 skip isolated 3,
skip all but lowest in 34-37 chain, or: bond only 34
• Leave unbonded all strips in bad-IDIEL list (although 16 % are good), i.e. do not bother looking at their actual IDIEL value.
• Bond all isolated bad-CAC • For the consecutive bad-CAC,
compute rC and consider them members of a short if rC>1.5. Then bond only the first strip in the short.
• If rc<1.5 bond them, as if they were isolated