5a. Stormwater Quantity Requirements - Overview
![Page 3: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/3.jpg)
The Evolution of MS-19
The regulatory Drivers:
• The Erosion & Sediment Control (ESC) Regulations
• Stormwater Management (SWM) Regulations (Part IIC)
• SWM Law
• SWM Regulations (Part IIB)
![Page 4: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/4.jpg)
9VAC25-840-40.19.
Concentrated stormwater runoff leaving a
development site shall be discharged directly
into an adequate natural or man-made
receiving channel, pipe or storm sewer system.
Adequacy of all channels and pipes shall be
verified in the following manner . . . .
ESC Regulations: Minimum Standard 19
PG 2
![Page 5: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/5.jpg)
9VAC25-870-97. Stream channel erosion.
The VSMP authority shall require compliance
with subdivision 19 of 9VAC25-840-40 of the
ESC Regulations.
VSMP authority may determine that some
watersheds require enhanced criteria :
1-year Extended Detention (ED)
SWM Regulations (Part IIC): Minimum Standard 19 (redux)
PG 3
![Page 6: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/6.jpg)
Channel Protection ‘safe harbor’
§ 62.1‐44.15:28.10 require that VSMPs . . . .
• Where TMDL or exceptional waters require more
stringent control the following shall satisfy any
regulatory requirements for natural channel
capacity:
– (i) 48 hour ED of the WQv (0.5”);
– (ii) 24‐hour ED of the 1-yr storm runoff; and
– (iii) proportional reduction of the 1.5, 2, and 10-yr
storms peak flow rate using forested condition
energy balance.
PG 3-4
![Page 7: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/7.jpg)
9VAC25-870-66. Water quantity.
Channel Protection.
Channel protection and flood protection
minimum standards are established pursuant
to the requirements of subdivision 7 of § 62.1-
44.15:28 of the Code of Virginia.
SWM Regulations (Part IIB): Quantity Control
Meet the new boss . . .
. . . Same as the old boss?
PG 4
![Page 8: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/8.jpg)
9VAC25-870-66. Water quantity.
Channel Protection.
Compliance with the minimum standards set out
in this section shall be deemed to satisfy the
requirements of subdivision 19 of 9VAC25-840-40
(Minimum standards; Virginia Erosion and
Sediment Control Regulations).
SWM Regulations (Part IIB): Quantity Control
PG 4-5
![Page 9: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/9.jpg)
§ 62.1‐44.15:28 A.10
Require that VSMPs:
• Replicate, as nearly as practicable, existing predevelopment runoff characteristics and site hydrology, or
• Improve upon contributing share of predevelopment stream channel erosion or localized flooding
Primary Regulatory Driver: SWM Law
PG 4-5
![Page 10: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/10.jpg)
Circle Back to ESC Law & Regulations
§ 62.1‐44.15:52. ESC Law.
• After July 1, 2014, flow rate capacity requirements
o SWM Water Quantity Requirements
(§ 62.1‐44.15:24 et seq.) and attendant regulations (9VAC25-870-66)
o Unless grandfathering provisions apply
PG 4-5
![Page 11: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/11.jpg)
5b. Channel Protection Criteria & the Energy Balance Method
![Page 12: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/12.jpg)
9VAC25-870-66. Water quantity.
Channel Protection:
Concentrated stormwater flow shall be released in to a stormwater conveyance system:
Photo: City of Charlottesville Photo: Williamsburg Environmental Group
PG 6-12
![Page 13: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/13.jpg)
System Capacity
"Manmade stormwater conveyance system"
means a pipe, ditch, vegetated swale, or other
stormwater conveyance system constructed by
man except for restored stormwater
conveyance systems
PG 6
![Page 14: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/14.jpg)
System Capacity Manmade stormwater conveyance system:
• Non-erosive capacity for 2-yr peak flow & 1% Rule
analysis OR
• Energy Balance (Natural Stormwater Conveyance)
PG 6
![Page 15: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/15.jpg)
System Capacity
"Restored stormwater conveyance system"
means a stormwater conveyance system that
has been designed and constructed using
natural channel design concepts. Includes the
main channel and the flood-prone area
adjacent to the main channel.
Photo: Williamsburg Environmental Group
PG 7
![Page 16: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/16.jpg)
Restored stormwater conveyance system:
• Development (density, scale, etc.) and peak flow rate consistent with the design parameters of the restored system & 1% Rule
analysis OR
• Energy Balance (Natural Stormwater Conveyance)
Photo: City of Charlottesville
PG 7
![Page 17: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/17.jpg)
System Capacity
"Natural stormwater conveyance system" means the
main channel of a natural stream and the flood-prone
area adjacent to the main channel.
Photo: Ellanor C. Lawrence Park Fairfax, County
PG 8
![Page 18: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/18.jpg)
Criteria for the Protection of Natural Channels
Protection of natural stream channels
– Restore them using natural channel design
– Protect them using the Energy Balance Method (1-yr event)
– Safe Harbor Provision (from SWM Law § 62.1‐44.15:28.10)
PG 8
![Page 19: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/19.jpg)
Energy Balance
Goal: Establish “balance” exerted by pre- and post-developed stormwater discharge
(Qpeakpre*Vol) with 10% improvement factor
(Qpeak*Vol)pre (Qpeak*Vol)post
PG 9
![Page 20: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/20.jpg)
What is Energy Balance & Why use it?
Simple “balance” offsets increase in volume and
peak flow of developed condition hydrology
PG 9
Post-development runoff volume increases
Allowable discharge decreases
![Page 21: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/21.jpg)
Stormwater Quantity Channel Protection 9VAC25-870-66.A
Energy Balance
Post (Vol1-yr * Peak Q1-yr) ≤ Pre (Vol1-yr * Peak Q1-yr)
IF = Improvement Factor: (0.8 for sites > 1 acre or 0.9 for sites ≤ 1 acre)
PG 9-11
![Page 22: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/22.jpg)
Why Energy Balance?
§ 62.1‐44.15:28 A.11.
Encourage:
• Low-impact development designs
• Nonstructural means for controlling stormwater
• Regional/watershed approaches
PG 9-10
![Page 23: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/23.jpg)
How Does Energy Balance encourage LID?
• Decrease volume by self-crediting site design
– Less impervious cover
– Minimizing impacts to native vegetation
– Minimize impacts to native soils
• Decrease volume by utilizing structural and non-structural Runoff Reduction practices
PG 9-10
![Page 24: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/24.jpg)
How Does Energy Balance encourage LID
PG 10
• Use VRRM Spreadsheet to calculate the volume reduction with a double credit:
– Reduced Volpost1 for Energy Balance Equation; and
– Reduced Curve Number (CN) for computing the Q1post
![Page 25: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/25.jpg)
How Does Energy Balance encourage LID
PG 10
Better site design
reduces post-
development
runoff volume
• As Volpost1 reduced
• Volpre1/Volpost1 ratio increases
• Results in increase in allowable Q1post
*Decreases storage required for peak flow
![Page 26: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/26.jpg)
Improvement Factor (IF)
§ 62.1‐44.15:28
• requires stormwater regulations to
improve upon contributing share of
existing predevelopment runoff
characteristics and site hydrology . . . .
• At minimum, pre-developed discharge
will be reduced using factor of 0.8 or 0.9
PG 10-11
![Page 27: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/27.jpg)
Energy Balance Terminology •
PG 12
![Page 28: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/28.jpg)
Energy Balance: 9VAC25-870-66.A
•
PG 12
![Page 29: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/29.jpg)
5c. Energy Balance Design Example
![Page 30: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/30.jpg)
1, 2, and 10-year volume (RV) measured in watershed inches RV1 = 1.28 inches RV2 = 1.76 inches RV10 = 3.30 inches
Energy Balance Design Example: Option 1 (No RR)
Project Graphic Courtesy of Geosyntec
PG 13
![Page 31: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/31.jpg)
Q1-yr = 1.28”
P1-yr = 2.79”
Where Does the Runoff Depth come From? PG 14
![Page 32: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/32.jpg)
CN = 83
Where Does the Runoff Depth come From?
1.28”
PG 15
![Page 33: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/33.jpg)
NEW PERVIOUS PAVEMENT
MANAGED TURF
BIORETENTION CELLS
RESIDENTIAL LOTS
Energy Balance Design Example: Option 2 with RR
1, 2, and 10-year volume (RV) reduction = RV1 = 1.28” 0.96” CN1 83 77 RV2 = 1.76” 1.44”
CN2 83 78 RV10 = 3.30” 2.98”
CN2 83 80
Project Graphic Courtesy of Geosyntec
PG 15
![Page 34: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/34.jpg)
Channel & Flood Protection Tab
1, 2, and 10-year storm rainfall depths
1, 2, and 10-year volume (RV) reduction = RV1 = 1.12” 0.96” CN1 = 83 77 RV2 = 1.54” 1.44” CN2 = 83 78 RV10 = 2.98” 2.98” CN2 = 83 80
Volume Reduction = 23,065 ft3
PG 15
![Page 35: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/35.jpg)
Curve Number Adjustment Challenge:
• Provide quantity “credit” for distributed retention practices
• Avoid Complex routing/modeling of multiple practices, yet simulate single event modeling
• Allow designers to target volume as primary metric (quantity and quality)
• Various methods explored by VA TAC
PG 16
![Page 36: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/36.jpg)
Hydrograph Modification
Simplifying Assumptions:
• Retention uniformly distributed if considering multiple features or sub-areas
• Negligible discharge from under-drains
(if any)
PG 16
![Page 37: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/37.jpg)
Hydrograph Modification
Methods Considered:
1. Hydrograph Truncation
2. Hydrograph Scalar Multiplication
3. Precipitation Adjustment
4. Runoff Adjustment
5. Curve Number Adjustment
PG 16-17
![Page 38: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/38.jpg)
5 Methods Considered; Curve Number Adjustment Selected
0%
20%
40%
60%
80%
100%
0% 20% 40% 60% 80% 100%
Volume Stored, as Percent of Total Runoff
Pe
rce
nt
of
Ru
no
ff P
ea
k R
em
ain
ing
R_trunc
R_as_P
R_as_Q
CN_adj
Scalar
Method of
AnalysisCN Adjustment
Excerpted from work by Paul R. Koch, Ph.D., P.E.
PG 18
![Page 39: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/39.jpg)
Does It Really Work?
Reported Reductions in Runoff Volume:
Losses Due to Exfiltration, Evapotranspiration and Post Storm Delivery
• Sampling of reductions reported
by research:
CT: 99% UK: 58% FL: 98% NC: 30 to 65%
PA: 80% Aus: 73% WA: 96% MD: 46 to 54%
![Page 40: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/40.jpg)
Does It Really Work?
• Extended Filtration of Bioretention systems mimic pre-developed hydrologic response
(an undeveloped watershed)
• Permeable Pavement systems equipped with underdrains demonstrate significant RR
– Extended discharge that can be considered negligible in comparison to surface runoff from other areas of site
Photo: Conservation Design Forum
![Page 41: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/41.jpg)
Curve Number Adjustment: Hydrograph Modification
Runoff Depth Equations (TR-55):
Where:
Q = runoff depth (in)
P = precipitation depth (in)
S = potential maximum retention after runoff begins
Ia = initial abstraction, volume that must be filled before runoff
begins
Eq. 2-1: Eq. 2-2:
Eq. 2-4:
PG 14
![Page 42: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/42.jpg)
Step 3: 1.28” runoff
Step 1: 2.8” rainfall Step 4: Adjust For Retention (-0.96”)
Step 5: Adjusted CN ~ 77
Step 2: Original CN = 83
PG 14-15
![Page 43: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/43.jpg)
Channel & Flood Protection Tab
1, 2, and 10-year storm rainfall depths
1, 2, and 10-year volume (RV) reduction = RV1 = 1.12” 0.96” CN1 = 83 77 RV2 = 1.54” 1.44” CN2 = 83 78 RV10 = 2.98” 2.98” CN2 = 83 80
Volume Reduction = 23,065 ft3
PG 15
![Page 44: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/44.jpg)
NEW PERVIOUS PAVEMENT
MANAGED TURF
BIORETENTION CELLS
RESIDENTIAL LOTS
Energy Balance Design Example: Option 2 with RR
1, 2, and 10-year volume (RV) reduction = RV1 = 1.28” 0.96” CN1 83 77 RV2 = 1.76” 1.44”
CN2 83 78 RV10 = 3.30” 2.98”
CN2 83 80 Project Graphic Courtesy of Geosyntec
PG 15-20
![Page 45: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/45.jpg)
Energy Balance Design Example
One-Year Storm Hydrology Summary: 19.8 acres
Pre-
Developed
Post-
Developed
no RR
Post-
Developed
with RR
Runoff Curve Number 71 83 77
Runoff Volume (RV) 0.62 in 1.28 in 0.96 in
Runoff Volume 1.02 ac-ft. 2.11 ac-ft. 1.58 ac-ft.
9 cfs 39 cfs 27 cfs
Post Developed EB
Allowed Peak
Discharge (cfs)
Storage Volume Reqd.,
(ac-ft)
PG 20
![Page 46: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/46.jpg)
Energy Balance Design Example • Compute the Energy Balance (EB) Allowed
Peak Discharge (with and without RR):
without RR with RR
PG 21
![Page 47: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/47.jpg)
One-Year Storm Hydrology Summary: 19.8 acres
Pre-
Developed
Post-
Developed
no RR
Post-
Developed
with RR
Runoff Curve Number 71 83 77
Runoff Volume (RV) 0.62 in 1.28 in 0.96 in
Runoff Volume 1.02 ac-ft. 2.11 ac-ft. 1.58 ac-ft.
9 cfs 39 cfs 27 cfs
Post Developed EB
Allowed Peak Discharge
(cfs) 3.5 cfs* 4.7 cfs*
Storage Volume Reqd.,
(ac-ft)
Energy Balance Design Example
1. Increase in allowable discharge!
2. Energy Balance discharge not required to be less than ratio
reduction for Forested condition
PG 22
![Page 48: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/48.jpg)
With RR:
Without RR:
With RR: 0.48
0.55
0.10 0.17
PG 23
![Page 49: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/49.jpg)
Energy Balance Design Example
•
PG 23
![Page 50: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/50.jpg)
Energy Balance Design Example
One-Year Storm Hydrology Summary: 19.8 acres
Pre-
Developed
Post-
Developed
no RR
Post-
Developed
with RR
Runoff Curve Number 71 83 77
Runoff Volume (RV) 0.62 in 1.28 in 0.96 in
Runoff Volume 1.02 ac-ft. 2.11 ac-ft. 1.58 ac-ft.
9 cfs 39 cfs 27 cfs
Post Developed EB
Allowed Peak
Discharge (cfs) 3.5 cfs 4.7 cfs
Storage Volume Reqd. (ac-ft)
1.16 ac-ft.* 0.76 ac-ft.*
37% Reduction in required 1-yr Channel Protection
Storage Volume
PG 24
![Page 51: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/51.jpg)
VRRM Compliance Spreadsheet Limitations
• Spreadsheet uses different Land Cover terminology than NRCS Methods
• Not single-event routing model
• Reflects annual volume & annual pollutant load reduction
• VRRM spreadsheet does not reflect over-sized practices
• CN Adjustment based on annual credit
– Predicated on required practice sizing
PG 24-25
![Page 52: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/52.jpg)
• Multiple treatment trains difficult to compute?
‒ Aggregated practices (e.g., several lots of simple impervious
disconnection)
• Do not all flow to same type of downstream practice
• Must be aggregated on separate DA tabs based on common downstream practice
VRRM Compliance Spreadsheet Limitations
PG 25
![Page 53: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/53.jpg)
VRRM Compliance Spreadsheet Limitations
• Multiple treatment trains difficult to compute?
‒ Spreadsheet cannot track aggregated volume from multiple treatment trains displayed on separate DA tabs into single downstream practice
‒ Designer must track volume independently of spreadsheet
PG 25
![Page 54: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/54.jpg)
5d. Flood Protection
![Page 55: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/55.jpg)
Water Quantity Criteria Flood Protection PG 26
Demonstrate:
*No 10-yr flooding now
* No 10-yr flooding after development
* and 1% Rule analysis
Local flooding?
Must eliminate flooding by:
* on-site detention
* system improvements
* combination
* and 1% Rule analysis
OR:
* Detention of 10-year peak flow to less than existing
* No further (1% Rule) analysis required
9VAC25-870-66. localized flooding:
![Page 56: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/56.jpg)
5e. Limits of Analysis
![Page 57: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/57.jpg)
Water Quantity Control Compliance
1% Rule Analysis:
• Downstream capacity analysis carried to a point where:
– Site’s contributing DA is < 1% of total watershed area or
– Site’s 10-yr contributing peak flow rate is < 1% of total watershed area
(before implementation of any quantity detention)
PG 27-28
![Page 58: Module 5 - Virginia DEQ 5 Stormwater Quantity ... Regulations (Part IIC) •SWM Law •SWM Regulations ... to the requirements of subdivision 7 of § 62.1-44.15:28 of the Code of](https://reader031.vdocuments.us/reader031/viewer/2022022512/5ae90b577f8b9a3d3b90d12d/html5/thumbnails/58.jpg)
Sheet Flow
9VAC25-870-66. Water quantity.
D. Increased volumes of sheet flow resulting
from pervious or disconnected impervious
areas, or from physical spreading of
concentrated flow through level spreaders,
must be identified and evaluated for
potential impacts on down-gradient
properties or resources.