modular, pay as you grow, data centers trends & case study
TRANSCRIPT
![Page 1: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/1.jpg)
Modular, Pay As You Grow, Data Centers
Trends & Case Study
![Page 2: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/2.jpg)
Current Trends
Re-centralisation of computing facilities
• Virtualisation
• Grid Computing
Willing to spend to save (TCO reduction)
• Modernisation
Pay As You Grow
• Start small
• Low CAPEX
Customers want solution not vendors
Most large DC facilities are running out of power / space
Power and space at a premium in built up areas
Bad News Good News
Credit crunch !
Focus on reducing computing costs
• IT Hardware
• Software
• Physical infrastructure
• Energy
Increased regulation
• Basell II
• SOX
• Cauldicot
• Insurance
• Kyoto
Increased Threats
• Economical
• Environmental
• Physical
![Page 3: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/3.jpg)
Traditional Data Center's
Organicly grown
Mixed technologes
Mixed power densities
• Poor cooling
• Hot spots
Within existing buildings / offices
• Expensive space
• Limited expansion
Poor physical security
• Standard construction
Poor location
Meets little or no industry standards
2000 - For every £1 spent on facilities, £3 was spend on IT
2010 - For every £1 spent on IT, £3 will be spend on facilities
Source – IBM Data
![Page 4: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/4.jpg)
EN1047-2 Fire Resistance of Data rooms
TIA/EIA 942 Telecommunication Infrastructure Standard for Data Centers
EN 60529 Water and dust protection (IP 6 5)
ISO 1182Construction materials behavior to Fire
EN 23093 Fire Resistance classification of construction materials
ISO 14520 Gas tightness of room
EN 1627 Vandalism Security (WK3)
ISO 14644 Dust (Clean room standard)
ISO 17799 IT Security Infrastructure
EN 56709 Raised floor
Sarbanes Oxley (SOX) Ensure data protection and audit guidelines
Basel II – Huge implications for Banking, Finance, Brokering, Trading, Insurance etc..
Data Center Standards
![Page 5: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/5.jpg)
Temperature rises > 300°CRel. Humidity up to 100%
Nothing survives within the Data Center (HW, tapes,...)
Water condensation in plenum => shortcircuits
-Environmental Contamination (human hazard): 1 kg PVC burned (at 300ºC) causes 5.800 m³ of acrid gas.
-80% of Fires affecting Data Centers, come from the outside.
Water flooding Risk: ceiling is not water proof.
Fire & Water in Conventional Data Centers
Source – Swiss RE
Flames > 1100ºC
Water Steam emitted by wet materials walls (gypsum and brick walls RF120)> 150 liters of water / m3 of concrete wall
![Page 6: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/6.jpg)
Temperature rises < 50°C (max 70ºC as per EN1047)Rel. Humidity up to 70% (max. 85% as per EN1047)
HW operates normally.Tapes and disk preserved.
Flames > 1100ºC
NO Water Steam emitted as wall materials are dry (no wet material).
NO Water condensation in plenum: Sealed Room.
- NO Environmental Contamination (NO human hazard): NO burning possible as internal temperature is below 70oC
HIGH SECURE DATA CENTER structure (Fire resistant 120 min.)
NO Water flooding Risk: concrete ceiling is not water proof,but Secure Data Centre is.
Emitted steam remains out of theSmart Shelter.
The Solution
30db Reduction in HF EMC Fields.
![Page 7: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/7.jpg)
EN 1047 Testing
![Page 8: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/8.jpg)
Case Study
• Existing data center in converted church.
• Listed building with limited space for expansion
• Customers wanting traditional co-location & hosting as well as bespoke products.
• Limited power on existing site
• Lots of commercial properties with power and connectivity but poor physical structures / security
Problem
Solution• Purchase low cost commercial property with available power.
• Build 100% capacity in electrical and cooling back bone infrastructure.
• Develop modular build and growth model.
• Build data center using high security modular construction methods.
![Page 9: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/9.jpg)
Case Study – The SiteDisused Shoe Factory
![Page 10: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/10.jpg)
Case Study – The Site
Leaking roof with asbestos but solid level floor
![Page 11: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/11.jpg)
Case Study – The SitePhased Design
Chiller &
Generator Compound• Deploy 50% power and cooling capacity with N+1 redundancy plus 100% backbone capacity.
• Install comms
• Build traditional data center for co-location hosting clients.
• Build demonstration custom facility.
• Build NOC, offices & meeting facilities.
• Migrate from existing facility.
• Occupancy threshold or new custom client triggers new build.
UPS & Power
Phase 1
70Racks
Phase 2
70Racks
![Page 12: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/12.jpg)
SmartShelter Built in Warehouse
200m2 Data Center Delivered on a truck
![Page 13: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/13.jpg)
SmartShelter Built in Warehouse
Unloading and Ready to Build
![Page 14: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/14.jpg)
SmartShelter Built in Warehouse
Laying Room Track & Build Start
![Page 15: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/15.jpg)
SmartShelter Built in Warehouse
15m2 Communications Room build in 2 days !
![Page 16: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/16.jpg)
SmartShelter Built in Warehouse
Building frame for main data center space
![Page 17: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/17.jpg)
SmartShelter Built in Warehouse
Door frames and panels being installed
![Page 18: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/18.jpg)
SmartShelter Built in Warehouse
Walls and all cable entry points in place
![Page 19: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/19.jpg)
SmartShelter Built in Warehouse
Ceiling Installed & Raised Floor
![Page 20: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/20.jpg)
SmartShelter Built in Warehouse
Lighting, Fresh Air System, Over Pressure System & Cable Glands
![Page 21: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/21.jpg)
SmartShelter Built in Warehouse
Communications Room and Data Center Complete – Offices to be built round this room at a later date.
![Page 22: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/22.jpg)
SmartShelter Built in Warehouse
Room complete and ready for internal fit out
![Page 23: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/23.jpg)
SmartShelter Built in Warehouse
WK4 Secure Vault Doors with Retina Scanners
![Page 24: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/24.jpg)
Secure cable and pipe access
![Page 25: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/25.jpg)
Chiller and Generator Plant Area
![Page 26: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/26.jpg)
SmartShelter Built in Warehouse
Fully operational
![Page 27: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/27.jpg)
SmartShelter Built in Warehouse
Plan for warehouse next door – 2 story data center to maximise available floor space.
![Page 28: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/28.jpg)
Mobility & Outdoors locations
• The future is MOBILE:
– A traditional DC does not meet everyone's needs• Short term projects• Disaster recovery• Remote locations• Hostile environments• Space limitations• Expensive real-estate will push DC out of
traditional urban environments
![Page 29: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/29.jpg)
Containerised Solutions
• High security, high density, truly mobile data centre.
• Plug & Play• Containerised DC• Includes:• Precision cooling• Fire Detection & Suppression• Racks• N+1 redundancy
![Page 30: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/30.jpg)
Containerised Data Centers
![Page 31: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/31.jpg)
Fan coils
Fire detection and extinguishing
Racks
Smart Shelter water tight and fire proof internal enclosure
UPS
PDUWater chiller
Containerised Data Centers
![Page 32: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/32.jpg)
Containerised Data Centers
![Page 33: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/33.jpg)
Services & Solutions Available From Zycko
• Data Centre Consultancy & Design• Data Centre Audits• EMI Consultancy & Testing• EMI Shielding Solutions• High Security (modular) Data Centre Construction
• Modular wall systems• Turn key solutions (working with resellers)• Proven track record with 300+ projects
![Page 34: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/34.jpg)
Methodology by PMI
17 Engineers / Project Managers in EMEA, specialised in:
- IT infrastructure (5)
- Electrical and Semicon (5)
- Telecommunications (2)
- General construction and electro-mechanical installations (4)
- Risk Engineer (1)
Official Memberships
![Page 35: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/35.jpg)
REFERENCE CUSTOMERS
Bank of Tokyo Mitsubishi
EDS
![Page 36: Modular, Pay As You Grow, Data Centers Trends & Case Study](https://reader030.vdocuments.us/reader030/viewer/2022032723/56649d025503460f949d5d98/html5/thumbnails/36.jpg)
Contact
Simon BradyDirector
AST UK Ltd5 Cooperage Way Business Village
Carsebridge RoadAlloa
ScotlandFK10 3LP
Tel +44 1259 222322Mob +44 7771 873361www.ast-global.co.uk