MODERN PROJECT MANAGEMENT
SYSTEM MATURITY MODELS : THE ESSENCE AND
COMPARISONS
Strelchuk Yulia
![Page 2: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/2.jpg)
Maturity model of project management system is a set of parameters that correspond to a certain stage of the development of
the project management system.
![Page 3: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/3.jpg)
MODERN MATURITY MODEL OF PROJECT MANAGEMENT SYSTEM
Kerzner's technological maturity model; Berkeley PM Maturity Model (5-Level (PM)2 Model) Organizational Project Management Maturity Model
(OPM3); Capability Maturity Model for Software (SW CMM)
![Page 4: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/4.jpg)
Kerzner's technological maturity model
![Page 5: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/5.jpg)
Berkeley PM Maturity Model
![Page 6: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/6.jpg)
Organizational Project Management Maturity Model or OPM3
![Page 7: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/7.jpg)
Capability Maturity Model for Software
![Page 8: MODERN PROJECT MANAGEMENT SYSTEM MATURITY MODELS: THE ESSENCE AND COMPARISON](https://reader033.vdocuments.us/reader033/viewer/2022061613/55a828551a28ab3f368b45b3/html5/thumbnails/8.jpg)
Existing PMM models differ in their scope, structure, and areas of analyzed organizational project management. These differences include the following: "maturity" definition in the logical structure of the model, project management knowledge areas are used and the scope of maturity model. However, various maturity models typically describe the specific project management dimensions, related to maturity levels. The basic principle of construction for all models is the transition from a lower level of maturity (a general awareness of project management) to a higher level, which provides continuous process of the improvement of the project management
system.