model application and decision making in tana...

28
Model Application and Decision Making in Tana Sub-Basin Anteneh Zewdie Tana Sub Basin Organization: Geo-Hydrology [email protected] and Dejene Sahlu River basin Info. Mangt. Dept Abbay Basin Authority Bahir Dar, Ethiopia IWNI NBDC Hydro-Modeling Symposium November 12, 2012, ILIRI Campus, Addis Ababa. Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 1 / 25

Upload: hoangkhanh

Post on 25-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Model Application and Decision Making in TanaSub-Basin

Anteneh ZewdieTana Sub Basin Organization:

Geo-Hydrology

[email protected]

andDejene Sahlu

River basin Info. Mangt. Dept

Abbay Basin Authority

Bahir Dar, Ethiopia

IWNI NBDC Hydro-Modeling Symposium November 12, 2012,ILIRI Campus, Addis Ababa.

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 1 / 25

Page 2: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Outline of talk1 Abbay Basin Authority-Tana Sub-Basin Org. and RBOs2 Modeling in TaSBO3 Modeling Tools Implemented in TaSBO4 Issues in modeling for TaSBO5 GIS-RS Modeling6 Integration Requirement for Erosion Modeling Para Dime Shift in

Finding the BMP:

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 2 / 25

Page 3: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Abbay Basin Authority-Tana Sub-Basin Org. and RBOs

Abbay Basin Authority-Tana Sub-Basin Org. and RBOs

Functions of Abbay Basin AuthorityPolicy guidanceDirecting preparation of the River Basin PlanMaking proposals to Government on the rates of water chargesExamining and deciding on water allocation rules and principlesManaging water use disputes between stakeholdersProviding information to the concerned bodies in charge ofdiscussions with neighbouring

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 3 / 25

Page 4: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling in TaSBO

Modeling in TaSBO

The use of models

For evaluation and improvement of the Reliability of the hydrologicaldata

In data generation and calibration of hydrological dataFill the gaps, in the previous dataPredict the future condition

For Simulation and Scenario analysis of hydrological data

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 4 / 25

Page 5: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling in TaSBO

Modeling in TaSBO

Application areas of Models in TaSBO

Demand Side Study the Sectors assessment

Water Allocation Model-Water Resources Planning and Management

Supply side study Water Resource assessment

Hydrologic system simulation

Strategic Development Planning

Integration of the above modelsStrategic social and environmental assessmentVisualization and Scenario Analysis to Decision Making by decisionmakers

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 5 / 25

Page 6: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling in TaSBO

Modeling in TaSBO

The challenges of modeling in TaSB

Massive intervention in land and water resources useThe future will be quite different from the present, and prediction isquite complex

Change in Water use behaviorLand use patter changeAssociated Erosion pattern changeClimate change

Requirement of system thinking and Integration of models

Technical capability

Limited number of modelersLimitation in the tools

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 6 / 25

Page 7: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

The Tana Beless DSS: A database based model

Flow measurements at micro-catchment level (25 watersheds)Establishment of time serious water quality data bases on Rivers andthe LakeEstablishment of time serious groundwater

Levels fluctuationGroundwater quality variation

SWAT

Generation of stream flow data,

Older sources are relatively in good quality for use in various purposesInterim data is not in a reliable situationCurrent and future measurements installation is on progressNear/far Future== Requires Prediction

SWAT is being used in

Filling gaps of data qualityPredict the future, in association with climate model

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 7 / 25

Page 8: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

The Tana Beless DSS: A database based model

Flow measurements at micro-catchment level (25 watersheds)Establishment of time serious water quality data bases on Rivers andthe LakeEstablishment of time serious groundwater

Levels fluctuationGroundwater quality variation

SWAT

Generation of stream flow data,

Older sources are relatively in good quality for use in various purposesInterim data is not in a reliable situationCurrent and future measurements installation is on progressNear/far Future== Requires Prediction

SWAT is being used in

Filling gaps of data qualityPredict the future, in association with climate model

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 7 / 25

Page 9: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

SWAT in Gilgel Abbay flow simulation:Poorly Simulated

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 8 / 25

Page 10: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

WEAP/Mike Basin?

Primarily interest for Sectors demand analyses

Reservoir operations (balance between sectors andecology)The potential for substitution among water usesThe potential for substitution among water saving

Ran water managementFlood managementGroundwater use/conjunctive

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 9 / 25

Page 11: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

WEAT, Schematic on progress

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 10 / 25

Page 12: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

Groundwater flow and contaminant transport modeling (MODFLOW)

This Under construction

Conceptual model==flow from the basin to the Beless basin

GIS-RS Modeling

Ex: Vegetation dynamics in Tana Basin

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 11 / 25

Page 13: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Modeling Tools Implemented in TaSBO

Modeling Tools Implemented in TaSBO

Groundwater flow and contaminant transport modeling (MODFLOW)

This Under construction

Conceptual model==flow from the basin to the Beless basin

GIS-RS Modeling

Ex: Vegetation dynamics in Tana Basin

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 11 / 25

Page 14: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Issues in modeling for TaSBO

Issues in modeling for TaSBO

Selection of better modeling tools

Improved the modeling capability of professionals

Consistency with the use of the selected model

Continuous Updating of the models

More on integration of socio-economic conditions for various scenariosanalysis

In-depth Integration of hydrological modeling with other disciplines

Ex:Ex: Geology and Gully erosion/ Slope Failure/ Small Scale LandSlide

Water quality is an issue now and more in the future

Integration of Socioeconomic and Environmental models forAdministrative purpose = System Dynamics Modeling

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 12 / 25

Page 15: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

GIS-RS Modeling

GIS-RS Modeling

Vegetation dynamics (trend)

MODIS satellite NDVI image of growing season monthly vegetationpeak between 2001 and 2010 were analyzed

Explained by linear relation

Y = aX + b (1)

where a is the Gain Coefficient (slope) of NDVI

a >0, increasing trenda =0, no changea <0, decreasing trend

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 13 / 25

Page 16: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

GIS-RS Modeling

Vegetation dynamics in Tana Basin, slope

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 14 / 25

Page 17: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

GIS-RS Modeling

Wetland-Biomass Showing Slightly Decreasing Trend

This is supported with field visit and community say

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 15 / 25

Page 18: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Integration Requirement for Erosion Modeling Para DimeShift in Finding the BMP:

The Debremawi Watershed/ soil

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 16 / 25

Page 19: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 17 / 25

Page 20: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Description of Slope Classes

Upper slope class

Exposed weathered rockIn the near past it has been covered by clay soil (community),Prologue agricultural practice, with no managementSource of rill/sheet erosion in the pastIt has been source of infiltration excess runoff in the pastNo longer used for cultivation, exposure of rockNow it is recharge zone, with saturation excess runoff

Middle slope class

Covered by clay SoilPizometric water is above the ground,The land mass is stableAt gully bottoms there are ephemeral springsIt is the source of infiltration excess runoffLargest area coverage of the watershedIt is crop land

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 18 / 25

Page 21: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Description of Slope Classes

Upper slope class

Exposed weathered rockIn the near past it has been covered by clay soil (community),Prologue agricultural practice, with no managementSource of rill/sheet erosion in the pastIt has been source of infiltration excess runoff in the pastNo longer used for cultivation, exposure of rockNow it is recharge zone, with saturation excess runoff

Middle slope class

Covered by clay SoilPizometric water is above the ground,The land mass is stableAt gully bottoms there are ephemeral springsIt is the source of infiltration excess runoffLargest area coverage of the watershedIt is crop land

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 18 / 25

Page 22: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Description of Slope Classes

Down Slope

Has been wet land in the pastAccumulation of water recharged from the upper slopeThis flow accumulation is larger than ever before, the rechargevolume from the recharge zone is higher nowHuge slide of the land mass

Water Level Map

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 19 / 25

Page 23: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Decline in the water levels after sliding event

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 20 / 25

Page 24: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Pictures at the saturation zone

More important: succession of slope failure in associated to the slides

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 21 / 25

Page 25: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Sequence of Failure Plains

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 22 / 25

Page 26: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Sequence of Failure Plains

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 23 / 25

Page 27: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Conclusion

It is important Prioritizing the location for erosion control

Increasing recharge in the upper slope causes more land slide

What is being done in the watershed is massive soil and waterconservation practice?????

The future direction is to study in Geotechnical Modeling

What will be the impact of Upland Soil And Water Conservation Practice?

Would It Enhance Recharge?

Right or Wrong?

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 24 / 25

Page 28: Model Application and Decision Making in Tana Sub-Basinnilebdc.wikispaces.com/file/view/Anteneh_Dejenie_IWMI_NBDC... · Model Application and Decision Making in Tana ... Abbay Basin

Integration Requirement for Erosion Modeling Para Dime Shift inFinding the BMP:

Thank You,,

Anteneh and Dejene (TaSBO, ABA) IWM November 12, 2012 25 / 25