NOTICE OF AIR PRESSURE TEST:
AIR PERMEABILITY TEST:
³
DER : 19.56 (PASS) TER : 19.93
MECHANICAL VENTILATION TO BATHROOM:
VENTILATION OF INTERNAL Wc
NB:
ELECTRICAL INSTALLATION:
NB:
c copyright
ALL DIMENSIONS TO BE CHECKED ON SITE
Description
CLIENT:
Rev. Date
PROJECT:
DRAWING No:
DRAWING TITLE:
PROJECT No: DATE:
Drn.
SCALE:
DRAWN:
as shown
kmd
1:50
sections & garage details
Apr. '1616-kh
16-kh-w04
Ms. Kerry Hasson
Proposed New Dwelling & Garage adjacent to 7
Plantation Rd, Ballykelly.
2a coleraine rd, maghera,co. derry, bt46 5bn
architectural & planning servicesd.m.kearney design
4450
6450
7050
Garage
ROLLER SHUTTER DOOR
1No. 150mm RISERS300mm GOING
'KEYSTONE' LINTEL OVER OPENING
ground floor plan
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)NB: EXTERNAL DOORS TO BE FITTED WITH AN EASY OPENING DEVICE
1025 3000 10255050
600
1000
5450
Garage
2700
30°
2100
typical section
2100
RWP + GT
TO SOAKAWAY(SEE BLOCK PLAN)
RWP + GT
TO SOAKAWAY(SEE BLOCK PLAN)
2100
30°
front elevation
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
side elevation
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
side elevation
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
rear elevation
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
30°
GARAGE FLOOR CONSTRUCTION:
GARAGE CAVITY WALL
CONSTRUCTION:
TRUSSED ROOF CONSTRUCTION (30 Deg.):
NB: ALL TRUSS DESIGN TO BE FORWARDED TO BUILDING CONTROL PRIOR TO MANUFACTURER
METHODS OF LIMITINGAIR INFILTRATION
NB:
ACOUSTIC FLOOR DESIGN - SCALE 1:10(OVER KITCHEN/DINING & LOUNGE AREA)
22mm T&G FLOORING (MIN. MASS PER UNITAREA 15Kg/m2) SCREWED TO ATTIC TRUSSDESIGN @ 400mm CTS.
ROCKWOOL FLEXI ACOUSTIC INSULATION(MIN. 100mm WITH MIN. DENSITY 10Kg/m3)
12.5mm PLATERBOARD BONDED & SKIMMED(MIN. MASS PER UNIT AREA 10Kg/m2)
1600
45°
Lounge
Bathroom Hall
PorchHall
2400
2400
2400
3070
2100
DAMP PROOF MEMBRANE IN FLOOR TO BE CONTINIOUS& TO BE LAPPED & BONDED TO DAMP PROOF COURSE
LATTER TO BE 550mm WIDE
typical section
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
3070
TOP OF WALLPLATE
DAMP PROOF MEMBRANE IN FLOOR TO BE CONTINIOUS& TO BE LAPPED & BONDED TO DAMP PROOF COURSE
LATTER TO BE 550mm WIDE
HARDCORE TO BE LAID &CONSOLIDATED IN LAYERS
NOT EXCEEDING 150mm
780x1600mm TOP HUNGFIRE ESCAPE 'VELUX'OVER. ADEQUATE OFPROVIDING 4500mm sq.TRICKLE VENTILATION
1600
809
2400
210024
00
45°
typical section
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
PROVIDE STEPPED DAMP PROOFCOURSE OVER ALL WINDOW HEAD's
HORIZONTAL DAMP PROOFCOURSE TO BE WRAPPED AROUNDINSIDE FACE OF CILL AND LAPPEDWITH VERTICAL DAMP PROOF TOJAMB's
PROVIDE RV 608 STRIP SOFFIT &RV635 RAFTER VENTILATORS ATEAVES LEVEL TO ALLOW FOR25,000mmSQ/M CLEARVENTILATION TO BOTH SIDES OFROOF (AS SUPPLIED BY GLIDEVALEOR OTHER EQUAL & APPROVED)
DPC 150mm MIN ABOVEGROUND LEVEL
Kitchen /
Dining Area
Bed 3
DRY RIDGE VENT TILE TO PROVIDE5000mmSQ/M CLEAR VENTILATION ATRIDGE TO BS5250 1989.
max. 1
.1m
4302.97
3070
TOP OF WALLPLATE
2100
Snug
3770
DAMP PROOF MEMBRANE IN FLOOR TO BE CONTINIOUS& TO BE LAPPED & BONDED TO DAMP PROOF COURSE
LATTER TO BE 550mm WIDE
typical section
*
-- INDICATES SAFTEY GLAZING (TO BE DESIGNED AND INSTALLED TO BS 6180)
3070
TOP OF WALLPLATE
*
*
* *
*
*
2100 18
00
45°
PROVIDE STEPPED DAMP PROOFCOURSE OVER ALL WINDOW HEAD's
HORIZONTAL DAMP PROOFCOURSE TO BE WRAPPED AROUNDINSIDE FACE OF CILL AND LAPPEDWITH VERTICAL DAMP PROOF TOJAMB's
PROVIDE RV 608 STRIP SOFFIT &RV635 RAFTER VENTILATORS ATEAVES LEVEL TO ALLOW FOR25,000mmSQ/M CLEARVENTILATION TO BOTH SIDES OFROOF (AS SUPPLIED BY GLIDEVALEOR OTHER EQUAL & APPROVED)
DPC 150mm MIN ABOVEGROUND LEVEL
DRY RIDGE VENT TILE TO PROVIDE5000mmSQ/M CLEAR VENTILATION ATRIDGE TO BS5250 1989.
ALL WORKS TO COMPLY WITH BUILDINGREGULATION APPROVAL AND BRITISH STANDARD
CODES OF PRACTICE.ALL MEASUREMENTS TO BE VERIFIED ON SITE &FIGURED DIMENSIONS TO TAKE PREFERENCE TO
SCALED DIMENSIONS
NB:
ROOFSPACE INSULATION ARRANGEMENT
(U-value 0.11W/m²K):
200mm GLASSFIBRE INSULATION ROLL TO BE LAID BETWEEN JOISTS WITH200mm GLASSFIBRE INSULATION OVER ENTIRE ROOFSPACE AS SHOWN
SCALE 1:20
COVE ROOF INSULATION ARRANGEMENT
(U-value 0.15W/m²K):
VAPOUR BARRIER
12.5mm PLASTERBOARD
50mm KOOLTHERM K7 PITCHED ROOFBOARD INSULATION BOARD TO U/SIDE OFRAFTERS AS SHOWN
100mm KOOLTHERM K7 PITCHED ROOFBOARD INSULATION BETWEEN RAFTERS
AutoCAD SHX TextA FLUE SHOULD BE CHECKED AT COMPLETION TO ENSURE THAT IT IS FREE FROM OBSTRUCTIONS, SATISFACTORILY GAS-TIGHT AND CONSTRUCTED WITH MATERIALS AND COMPONENTS OF SIZES THAT SUIT THE INTENDED APPLICATION. WHERE THE BUILDING WORK INCLUDES THE INSTALLATION OF A COMBUSTION APPLIANCE, ALL OF THE TESTS SHOULD INCLUDE THE FLUE PIPE AND THE GAS-TIGHTNESS OF THE JOINT BETWEEN THE FLUE PIPE AND THE COMBUSTION APPLIANCE OUTLET. A SPILLAGE TEST SHOULD BE CARRIED OUT WITH THE APPLIANCE UNDER FIRE
AutoCAD SHX TextTHE DISTRICT COUNCIL SHALL BE NOTIFIED IN WRITING NOT MORE THAN 5 DAYS AFTER COMPLETION OF THE TESTING AND COMMISSIONING - (A) OF THE RESULTS OF AIR FLOW TESTS; AND (B) THAT ANY FIXED MECHANICAL VENTILATION SYSTEM AND ASSOCIATED CONTROLS HAVE BEEN COMMISIONED. THE OWNER/OCCUPIER SHOULD BE GIVEN SUFFICIENT INFORMATION ABOUT THE VENTILATION SYSTEM AND ITS MAINTENANCE REQUIREMENTS SO THE BUILDING CAN BE OPERATED, MAINTAINED AND VENTILATED IN AN EFFICIENT MANNER. (REGULATION 67 & 68 BUILDING REGULATIONS (NI) 2012)
AutoCAD SHX TextTHE HEATING AND HOT WATER SYSTEMS SHALL BE DESIGNED, INSTALLED AND COMMISSIONED SUCH THAT, FOR THE PURPOSES OF THE CONSERVATION OF FUEL AND POWER, THE SYSTEM AND ITS CONTROLS ARE HANDED OVER IN EFFICIENT WORKING ORDER.
AutoCAD SHX TextWHERE THE OPERATING TEMPERATURE OF DOMESTIC HOT WATER IN THE STORAGE VESSEL IN A DWELLING IS CAPABLE OF EXCEEDING 80ºC UNDER NORMAL OPERATING CONDITIONS THE OUTLET FROM THE STORAGE VESSEL SHOULD BE FITTED WITH A DEVICE, SUCH AS AN IN-LINE HOT WATER SUPPLY TEMPERING VALVE IN ACCORDANCE WITH BS EN 15092. THE IN-LINE HOT WATER TEMPERING VALVE SHOULD BE SET/ADJUSTED TO ENSURE THAT THE TEMPERATURE SUPPLIED TO THE DOMESTIC HOT WATER DISTRIBUTION SYSTEM DOES NOT EXCEED 60ºC & 48ºC FOR A BATH.
AutoCAD SHX TextWHERE AN AIR PRESSURE TEST IS UNDERTAKEN FOR THE PURPOSES OF DEMONSTRATING COMPLIANCE WITH REGULATION 40(2), THE PERSON CARRYING OUT THE WORK SHALL GIVE, NOT MORE THAN 5 DAYS AFTER COMPLETION OF THE TESTING, A NOTICE IN WRITING TO THE DISTRICT COUNCIL STATING THE RESULT OF THE AIR PRESSURE TEST.
AutoCAD SHX TextAN AIR PERMEABILITY OF *m³ / (hm² ) @ 50Pa HAS BEEN USED IN THE DESIGN *m³ / (hm² ) @ 50Pa HAS BEEN USED IN THE DESIGN m³ / (hm² ) @ 50Pa HAS BEEN USED IN THE DESIGN / (hm² ) @ 50Pa HAS BEEN USED IN THE DESIGN CALCULATIONS, THIS RATE OF LESS MUST BE ACHIEVED BY TEST ON COMPLETATION OF DWELLING
AutoCAD SHX TextTO BE FITTED WITH A DEVICE WHICH AUTOMATICALLY CONTINUES ITS OPERATION FOR A PERIOD OF NOT LESS THAN 15 MINUTES AFTER IT IS SWITCHED OFF.
AutoCAD SHX TextINTERNAL Wc WITHOUT VENTILATION OPENINGS SHALL HAVE MECHANICAL EXTRACT VENTILATION OPERATING @ A RATE OF 15Lts/Sec & SHALL HAVE AN OVERRUN TIME OF NOT LESS THAN 15MIN's & SHALL BE ACTIVATED EITHER AUTOMATICALLY OR MANUALLY (eg. by the operation of a light switch) IN ADDITION TO THE ABOVE THE Wc SHALL HAVE A PERMANENTLY OPEN AIR INLET HAVING A MIN. FREE OPENING OF 9000mm sq.
AutoCAD SHX TextWHERE IT IS NOT POSSIBLE TO DETERMINE IF THE AIR PERMEABILITY OF A DWELLING IS LIKELY TO BE MORE THAN 5.0m3/(h.m2) THEN IT SHOULD BE ASSUMED THAT THE DWELLING HAS AN AIR PERMEABILITY OF 5.0m3/(h.m2) OR LESS. THIS REQUIRES AN AIR SUPPLY OF 550mm2 PER kW OF APPLIANCE RATED OUTPUT (EVEN IF LESS THAN 5kW).
AutoCAD SHX TextTHIS PROJECT IS TO BE EXECUTED AND COMPLETED IN ACCORDANCE WITH THE CURRENT BUILDING REGULATIONS, CODES OF PRACTICE, BRITISH STANDARDS, PROPER METHODS OF WORKMANSHIP, PROTECTION AND CONSTRUCTION SO AS TO GIVE A COMPLETE SOUND AND SECURE JOB. CONTRACTOR SHALL COMPLETE ALL NOTICES REQUIRED UNDER BUILDING REGULATIONS FOR INSPECTION OF WORK AS CONTRACT PROCEEDS AND SHALL VERIFY ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION AND REPORT ANY DISCREPENCIES IMMEDIATELY. DO NOT SCALE THIS DRAWING.
AutoCAD SHX TextELECTRICAL INSTALLATION TO COMPLY WITH 16th EDITION OF I.E.E REGULATIONS TO BE INSTALLED BY A REGISTERED CONTRACTOR
AutoCAD SHX TextA FLUE SHOULD BE CHECKED AT COMPLETION TO ENSURE THAT IT IS FREE FROM OBSTRUCTIONS, SATISFACTORILY GAS-TIGHT AND CONSTRUCTED WITH MATERIALS AND COMPONENTS OF SIZES THAT SUIT THE INTENDED APPLICATION. WHERE THE BUILDING WORK INCLUDES THE INSTALLATION OF A COMBUSTION APPLIANCE, ALL OF THE TESTS SHOULD INCLUDE THE FLUE PIPE AND THE GAS-TIGHTNESS OF THE JOINT BETWEEN THE FLUE PIPE AND THE COMBUSTION APPLIANCE OUTLET. A SPILLAGE TEST SHOULD BE CARRIED OUT WITH THE APPLIANCE UNDER FIRE
AutoCAD SHX Texttel: email:
AutoCAD SHX Text0287954 9488 0783403 4941 [email protected]
AutoCAD SHX Text100mm CONCRETE SCREED RUBBED SMOOTH 1200 GAUGE POLYTHENE DPM ON SAND BLINDING, 150mm (MIN.) CLEAN BROKEN HARDCORE CONSOLIDATED IN 300mm (MAX.) LAYERS
AutoCAD SHX TextROUGHCAST RENDER FINISH ON 100mm DENSE CONCRETE BLOCKWORK OUTER LEAF, 100mm O/A CAVITY AND 100mm DENSE CONCRETE BLOCKWORK INNER LEAF, PLASTERED & SKIMMED. CLOSE CAVITIES AT TOP OF ALL WALLS AND OPENINGS IN 12.5mm 'SUPALUX' BOARDING. PROVIDE CAVITY WALL TIES TO SUIT WIDTH OF CAVITY IN 'VISTAFIX' OR OTHER EQUAL AND APPROVED VERTICAL TWIST S/STEEL TIES AT 750mm CTS. HORIZONTALLY AND 450mm CTS. VERTICALLY AND STAGGERED. PROVIDE ADDITIONAL TIES TO ALL OPENINGS. PROVIDE 35MM HD. INSULATION TO ALL HEADS, CILLS AND JAMBS TO COMPLY. PROVIDE 'RUBEROID' HILOAD VERTICAL AND HORIZONTAL DPC's TO BS:743 TO ALL HEADS, JAMBS AND CILLS. PROVIDE WEAK MIX CONCRETE FILL TO ALL EXTERNAL WALL UP TO 150mm BELOW GL.
AutoCAD SHX TextANGLE RIDGE TILES (VENTILATED) FLAT BLACK CONCRETE ROOF TILES 50x25mm BATTENS LAYER ROOFING FELT TRUSSES AS PER SECTIONS @ 400mm CTS. WITH DIAGONAL, LONGITUDIANAL & CHEVRON BRACING, ALL TO BS:5268 PT3. 1985 100x50mm WALLPLATES 19mm FASCIA & BARGE BOARDS 10mm MASTERBOARD CAVITY CLOSERS 10mm MASTERBOARD SOFFITS, WITH VENTILATION EQUAL TO 25mm CONTINIOUS GAP ALONG SOFFITS
AutoCAD SHX Textseal at
AutoCAD SHX Textperimeter
AutoCAD SHX Textseals
AutoCAD SHX Textcontinuos
AutoCAD SHX Textdraught seal
AutoCAD SHX Textseals
AutoCAD SHX Textdraught seal
AutoCAD SHX Textmortar
AutoCAD SHX Textseal gaps with
AutoCAD SHX Textplasterboard
AutoCAD SHX Texthole in
AutoCAD SHX Texttight fitting
AutoCAD SHX Textexternal wall
AutoCAD SHX Text(b) Sealing at windows and door's
AutoCAD SHX Text(d) Sealing around services pipes
AutoCAD SHX Text450
AutoCAD SHX Text1200
AutoCAD SHX TextDRAUGHT SEALS TO BE PROVIDED AT ALL EXTERNAL DOORS, WINDOWS & ACCESS HATCH (SEE DETAILS)
AutoCAD SHX Textdry linings fixed to masonry walls
AutoCAD SHX Text(a) Continuos sealing strips around
AutoCAD SHX Textand roof voids
AutoCAD SHX Text(c) Sealing at hatches to unheated floor
AutoCAD SHX Textcompress draught seal
AutoCAD SHX Textbolt or catch to
AutoCAD SHX TextSWITCHES, SOCKETS etc. WALL MOUNTED SOCKET OUTLETS AND SWITCHES (OTHER THAT ISULATORS) IN THE ENTRANCE STOREY, SHALL BE LOCATED NOT MORE THAN 1200mm OR NOT LESS THAN 450mm ABOVE THE FLOOR LEVEL. THE CORD OF A PULL CORD SWITCH SHALL TERMINATE NOT MORE THAN 1200mm ABOVE THE FLOOR LEVEL SEE DIAGRAM BELOW
AutoCAD SHX Textjoists are built into external walls
AutoCAD SHX Text(e) Sealing around joists where
AutoCAD SHX TextA DURABLE NOTICE SHALL BE FIXED @ AN APPROPRIATE LOCATION IN THE BUILDING FOR EACH HEARTH, FIREPLACE & FLUE STATING - LOCATION - TYPE OF APPLIANCE THAT CAN BE ACCOMMODATED - TYPE, SIZE & MANUFACTURER OF FLUE OR LINER - INSTALLERS NAME AND DATE OF INSTALLATION