Page 1: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED
Page 2: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)ADD PRESENTER’S NAME HERE / ADD DATE HERE

© Copyright EDF Energy. All rights reserved.

MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

STEFAN LEEDHAM

14 JANUARY 2010

Page 3: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURREDStefan Leedham 14 January 2010

© Copyright EDF Energy plc. All rights reserved. PAGE: 3

PURPOSE OF THE REVIEW

1. When a change of Shipper has occurred the previous Shipper has no way of validating the Mod 640 invoice• Identify what information is required by the previous Shipper to support a Mod 640

invoice

• Identify when this information should be provided

• Identify the format for providing this information

• User Pays issues

2. The outgoing Shipper has no way of influencing the outcome of the annual AQ Review• To identify whether a dispute process is required

• To identify what the Governance of this process should be

• To identify the high level business rules of a disputes process

• User Pays Issues

Page 4: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURREDStefan Leedham 14 January 2010

© Copyright EDF Energy plc. All rights reserved. PAGE: 4

INFORMATION TO BE PROVIDED

• Opening and Closing reads used for setting the AQ and read dates

• Round the clock (TTZ) counts

• Date of AQ change

• Serial Number of the meter

• Current registered Shipper

• Registered AQs since last annual AQ review

Page 5: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURREDStefan Leedham 14 January 2010

© Copyright EDF Energy plc. All rights reserved. PAGE: 5

INFORMATION TIMING

1. At initial notification of AQs by xoserve• Provides early insight for investigation and preparation by previous Shipper

• Resource intensive

• AQ may be amended to SSP

• Does not provide real view of Mod 640 invoice

2. At end of AQ review• Provides more accurate view of Mod 640 invoice

• Less resource intensive

• Takes into account AQ amendment window

• Provides early insight for investigation and preparation by previous Shipper

• Would enable registered Shipper to undertake an AQ Appeal if required

3. As backing data in the Mod 640 invoices• Reflects Mod 640 invoice

• No time for investigation and preparation by previous Shipper

• No time to appeal the AQ by registered Shipper

Page 6: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURREDStefan Leedham 14 January 2010

© Copyright EDF Energy plc. All rights reserved. PAGE: 6

FORMAT OF REPORT

• To be guided by xoserve, however our aspirations are:

• Single report delivered at M+1 after end of AQ Review

• Delivered via IX file• Secure

• Same format as Mod 640 invoice

Page 7: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURREDStefan Leedham 14 January 2010

© Copyright EDF Energy plc. All rights reserved. PAGE: 7

USER PAYS ISSUES

• This is a User Pays Service as this represents a change to an existing service

• Who Pays?• Transporters:

– Common practice that when an invoice is issued there is sufficient supporting information to validate and pay the invoice

– Could reduce invoice queries and disputes reducing xoserve’s workload?

– If the implementation costs were very low the cost of invoicing may be greater than the value of the invoice?

• Shippers:– Supports their settlement and finance roles

– Mod 640 designed to protect RbD Shippers

Page 8: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURREDStefan Leedham 14 January 2010

© Copyright EDF Energy plc. All rights reserved. PAGE: 8

QUESTIONS?

Page 9: MOD 272 – REVIEW OF MOD 640 VALIDATION ARRANGEMENTS FOR WHEN A CHANGE OF SHIPPER HAS OCCURED

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)ADD PRESENTER’S NAME HERE / ADD DATE HERE

© Copyright EDF Energy. All rights reserved.