Background
UNC mod proposal 0262 “Treatment of Capacity affected by Force Majeure”, brought forward by National Grid NTS proposing:
introduction of a Force Majeure Rebate to Users at a Network Point where FM has been declared:
the FM quantity prorated between those Users registered as holding capacity at the affected point taking into account Unsold Capacity.
application of a WAP of each Users registered capacity holdings multiplied by the prorated quantity
Applicable to Capacity only but includes both NTS Entry & NTS Exit (Flat) Capacity
National Grid NTS to recover the rebate via the appropriate TO/SO Commodity charge
a reduction (when required) in the Users entitlements, by the prorated quantity, at zero price
Proposal taken to July mod Panel with a request that it be issued for consultation. Panel decision was to refer back to Transmission Workstream for further discussion/clarification
![Page 3: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/3.jpg)
3
The mod panel asked for clarification on the following..
What is the planned mod implementation date?
1 October 2009
Can Legal Text be provided
We have requested suggested legal text & it will be provided at the earliest
opportunity.
How would this apply to DNOs
The proposal will only apply to DNOs, as a User of the NTS, from 1 October
2012 (Enduring NTS Exit Regime), this is implicit in the proposal as the mod
only refers to Annual NTS Exit (Flat) Capacity and makes no reference to
NTS Exit Capacity.
![Page 4: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/4.jpg)
4
Clarifications ctd…
What would happen if the User failed to respond to National Grid NTS’
request for Buyback/Forward Offers
Such a failure would put the User in breach of their UNC obligations,
National Grid NTS would expect this in itself to be sufficient to ensure
compliance.
The mod appears to indicate that silence can be deemed as acceptance, is
this acceptable under contract law?
National Grid NTS has sought legal clarification on this point and will either
provide an opinion at the workstream or amend the Proposal beforehand.
![Page 5: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/5.jpg)
5
Clarifications ctd…
How would the FM Rebate be calculated?
The FM rebate will be calculated individually for each User, National Grid NTS would
expect the legal text to contain an equation similar to the following:
where:
n is the number of successful capacity bids
P is the bid price for each successful capacity bid
Q is the amount of capacity allocated pursuant to each capacity bid
n
ii
n
iii
Q
QP
1
1
![Page 6: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/6.jpg)
6
How would the FM Rebate be calculated?
4 Steps Required:
Step 1 - Calculate the Adjusted FM amount
FM amount – Unsold Capacity – any Daily Firm Capacity sold on the day of the FM notification
Step 2 - Calculate the Prorated Amount
Users entitlement @ ASEP / Sold Quantity @ ASEP * Adjusted FM Amount
Step 3 – Calculate WAP
Sum of each successful bid * bid price / Users Registered holding
Step 4 – Apply WAP to prorated Amount
WAP * Prorated Amount
![Page 7: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/7.jpg)
7
Example
ASEP X
FM Notice Issued 1 August
Duration 1 Month (31 Days)
Obligated Level 500GWh/day
FM Amount 100GWh/day
Unsold Capacity 50GWh/day
Number of Users 4
![Page 8: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/8.jpg)
8
Step 1 – Calculate Prorated amount
Shipper Users
Registered
Holding
GWh/day
Sold Quantity
GWh/day
Adjusted FM
Amount
GWh/day
Prorated
Amount
GWh/day
A 100 450 50 11.11
B 150 450 50 16.66
C 90 450 50 10.00
D 110 450 50 12.22
Step 2 – Calculate Prorated amount
FM Amount
GWh/day
Unsold Capacity
GWh/day
Daily Firm Capacity sold
on day of FM notification
Adjusted FM amount
100 50 0 50
![Page 9: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/9.jpg)
9
Step 3 – Calculate WAP
Shipper Users
Registered
Holdings
GWh/day
BIDS
GWh/day
Bid
Prices
Bid Value
A 100 30 0.0079 237000
25 0.0082 205000
45 0.0085 382500
B 150 60 0.0079 474000
50 0.0081 405000
40 0.0085 340000
C 90 40 0.0079 316000
35 0.0085 297500
15 0.0091 136500
D 110 55 0.0079 434500
45 0.0083 373500
10 0.0089 89000
Shipper WAP
A 0.0083
B 0.0081
C 0.0083
D 0.0082
![Page 10: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/10.jpg)
10
Step 4 – Apply WAP to prorated quantity
Shipper Prorated
Amount
GWh/day
WAP FM Rebate
Amount 1
FM Rebate
Amount August
A 11.11 0.0083 £922.22 £28,588.89
B 16.66 0.0081 £1350.00 £41,850.00
C 10.00 0.0083 £830.00 £25,730.00
D 12.22 0.0082 £1002.22 £31,068.89
![Page 11: Mod 0262 - Clarifications Transmission Workstream 6 August 2009](https://reader036.vdocuments.us/reader036/viewer/2022082820/5697bf7d1a28abf838c84bb0/html5/thumbnails/11.jpg)
11
Proposed Timeframes
Proposal discussed Workstream 06/08/09
Mod Panel 06/08/09
Issued for Consultation 07/08/09
Closeout for Representations 26/08/09
Mod Panel Recommendation 03/09/09
FMR submitted to Ofgem 04/09/09
Proposed Implementation date 01/10/09