mobile testing profile
TRANSCRIPT
-
8/3/2019 Mobile Testing Profile
1/3
Skill Summary:
Well acquainted with the Software Development Life Cycle (SDLC).
Good knowledge at in all areas of Testing LifeCycle
Involved in Database Testing. Involved in creating Test Plan.
Designed and written test cases based on functional/Business requirementspecficitations,executed test cases and reporting/prioritizing of software bugs.
Attended training on tools like Manual Testing,WinRunner,QTP.Load Runner
Good at preparing Test Estimation.
Education Details:
Experience:
Working as Software Engineer, Bangalore from March2009 to till date
PROJECT DETAILS:
PROJECT#1:Wireless Rip wave system
Wireless Rip wave system basically works on OFDM technology, consist of three majorcomponent EMS (Element management system), Base station, CPE (Consumer Prominence
Equipment). The Rip wave EMS is a Java based element manager that seamlessly plugs into an
intranet or the Internet. This scalable management system for up to 1,000 base stationsprovides comprehensive element, subscriber, bandwidth and service management. Because of
its distributed architecture, Objectivity/DB can meet network and service managementrequirements as networks continue to scale dramatically, delivering future-proof solutions to
service providers using the Rip wave EMS. Objectivity/DB captures and stores network datawhere it is generated. This eliminates the need to continually access network databases and
carry network specific information to central locations, allowing for near limitless scalability
while increasing speed and efficiency.Platform/OS : Linux, Solaris, Windows
Role : Test Engineer
Description
Writing Test Cases and execute them manually Testing the EMS Diagnostics tool and other applications on multi OS environments.
Writing scripts on Perl to execute CLI based Test cases. Training the team in test cases & execution of test cases
Preparing, maintaining & modifying the Test Bed for various regressions, stress, load,black Box & functionality test.
Testing L1, L2, L3 protocols Assist Development engineers in Defect diagnosis.
1
-
8/3/2019 Mobile Testing Profile
2/3
Configuring, maintaining & trouble shooting the EMS. The product installation testing, Stress testing, load testing, Performance Testing.
Testing customer based MRs (Modification Request). Writing Perl/Unix shell script for regression testing
PROJECT#2: LG-400 Series Mobile handset testing
Team Size : 5
Role : Test EngineerProtocols : SIP, GSM (RR&CC), Call Processing
Tools : Ethereal, MAPS.
Description
LG-400 Series supports Latest wireless technology and can operate on GSM 800, GSM 1800,GSM 1900 range of frequencies, and provides new features like WAP and Blue tooth
technology. Some of the features are phone services, Email services, text messaging, wirelessdata exchange, address book, Internet browser Calendar. The GSM gateway implements the
call processing unit and supports the CC protocol. The GSM and GPRS protocol stack involvesthe conformance testing of mobile handset. GCF standard are followed for this mobile handset
testing. The LG-400 series enables inbound and outbound VOIP and Cellular calls - all in one
compact box. Given the systems flexibility, modularity and scalability, the LG-400 can be pre-configured to meet precise customer requirements.
ROLES & RESPONSIBILITIES
Involved in writing test cases for SIP functionality for various features such asCall cancellation
Call transferCall forward
Involved in Inter interoperability Testing Analyzing the scope of testing
Design and Execution of test cases Posting Bugs and updating bug-tracking system as appropriate
Planning daily activities and prioritizing according to the release notes
ACADEMIC PROJECT:
Design and implementation of the interface unit for operation of Electronic Scanning
Pressure Module.
The Electronic Scanning Pressure Module is an instrument used for the measurement of
pressures exerted at various locations of the aircraft surface during its maneuvers and normal
flight simulated during wind tunnel tests.
The project involves the design and development of a portable pressure measurement systemwhich is required to be used at low speed wind tunnel, overhaul department as H.A.L. The
pressure measurement system is divided into two parts like interface unit and data
Acquisition/Display module.
The Interface unit is designed to provide the required voltages to the six address lines of ESP
module in order to select the desired port and measure the pressure at the selected port. The
data Acquisition/display module makes use of Microcontroller which provides the address of
2
-
8/3/2019 Mobile Testing Profile
3/3
the desired port to the interface unit and then converts the analog signal available at the
interface unit to digital counts. This data is displayed in real time by a group of LEDs. The
pressure measured plays a vital role for the design of aircraft.
Competencies:
Excellent verbal and written communication skills.
Analysis and Problem Solving. Quality focus.
Learning ability.
Personal Details:
Nationality : Indian
Sex : FemaleDate of Birth : 28/10/1986
Marital Status : Single
Passport Number :
Declaration:
I hereby declare that the information given above is true to the best of my
knowledge.
Date:
Place: Bangalore (Mamatha T.C)
3